ABSTRACT
Water Resources Department -B.R.R Vamsadhara Project Phase II of Stage II- Package
88 - Investigation, design, estimation and excavation of flood flow canal from Km
14.205/13.447 to Km 34.100/33.704 including construction of CM&CD works and
formation of balancing reservoir at Parapuram in Kothuru (M) of Srikakulam (D) -
Carrying out controlled blasting from Km. 18.387 to Km. 18.500 and from Km. 18.750 to
Km19.000 for an amount of Rs.1,29,97,250/- Sanctioned- Orders – Issued.
WATER RESOURCES (Proj.I) DEPARTMENT
In the reference read above, the Chief Engineer, North Coast while explaining
the circumstances requested the Government to issue necessary permission to the
present agency i.e., M/s Sri Sai Lakshmi Constructions & Co, Vijayawada for
carrying out controlled blasting in the paid but left over reaches from Km. 18.387 to
Km.18.500 and from Km.18.750 to Km.19.00 in the FFC along with financial
implication of Rs. 1,29,97,250/- at the earliest so as to complete the balance work.
3. The Chief Engineer, North Coast shall take necessary action to recover the
amount Rs.3.19 Cr. from the earlier agency i.e., M/s SCL Infratech Ltd either from the
other projects or through other legal measures.
//FORWARDED::BYORDER//
SECTION OFFICER