Technical Memorandum
Recent water records from Flint, GCDC-WWS, and GLCUA have been reviewed to evaluate
historical water use. Working with representatives of these communities, projections of future
water demands were developed. Table 1 shows the initial and projected water demands that
have been assumed for this study, in regard to a new Lake Huron Water Supply. Water records
from Sanilac County were unavailable; the Sanilac County demands shown in Table 1 have
been assumed.
Table 1 - Design Demands for Planning New Lake Huron Water Supply
Customer Min. Day Avg. Day Max. Day Min. Day Avg. Day Max. Day Min. Day Avg. Day Max. Day
Demand Demand Demand Demand Demand Demand Demand Demand Demand
(MGD) (MGD) (MGD) (MGD) (MGD) (MGD) (MGD) (MGD) (MGD)
Genesee
County 10.66 14.21 25.00 12.19 16.25 32.50 16.88 22.50 45.00
City of
12.39 16.52 25.00 14.44 19.25 28.88 18.00 24.00 36.00
Flint
Lapeer
County
1.47 2.54 3.82 5.23 9.01 14.85 6.77 11.66 19.66
3% WTP
Process
0.74 1.00 1.61 0.96 1.34 2.29 1.25 1.74 3.02
Subtotal: 25.25 34.26 55.43 32.81 45.85 78.52 42.89 59.90 103.68
Sanilac
County 0.03 0.05 0.10 0.04 0.07 0.14 0.05 0.10 0.20
Total: 25.28 34.31 55.53 32.85 45.92 78.66 42.94 60.00 103.88
Page 1 of 1
Lake Huron Water Supply Study
Appendix 1A
Projected Water Demands
September 3, 2009
540 S. Saginaw Street Suite 200 P.O. Box 3748 Flint, MI 48502
Lake Huron Water Supply Study Appendix 1A – Projected Water Demands
Based on the demands presented in Table 1of Appendix 1, Genesee County applied for a permit for
withdrawal of 85 MGD of water from Lake Huron. The MDEQ issued the permit on August 28, 2009.