APPENDIX 1

Lake Huron Water Supply Study

Technical Memorandum

Population Projections and Projected Water Demands

Karegnondi Water Authority


City of Flint
Genesee County
Lapeer County
Sanilac County

February 20, 2009

555 South Saginaw Street


Suite 201
Flint, Michigan 48502
Karegnondi Water Authority Lake Huron Water Supply Study

Appendix 1 - Projected Water Demands


1.1 - General

Recent water records from Flint, GCDC-WWS, and GLCUA have been reviewed to evaluate
historical water use. Working with representatives of these communities, projections of future
water demands were developed. Table 1 shows the initial and projected water demands that
have been assumed for this study, in regard to a new Lake Huron Water Supply. Water records
from Sanilac County were unavailable; the Sanilac County demands shown in Table 1 have
been assumed.

Table 1 - Design Demands for Planning New Lake Huron Water Supply

Initial (2014) 25-Year (2039) 50-Year (2064)

Customer Min. Day Avg. Day Max. Day Min. Day Avg. Day Max. Day Min. Day Avg. Day Max. Day
Demand Demand Demand Demand Demand Demand Demand Demand Demand
(MGD) (MGD) (MGD) (MGD) (MGD) (MGD) (MGD) (MGD) (MGD)

Genesee
County 10.66 14.21 25.00 12.19 16.25 32.50 16.88 22.50 45.00

City of
12.39 16.52 25.00 14.44 19.25 28.88 18.00 24.00 36.00
Flint

Lapeer
County
1.47 2.54 3.82 5.23 9.01 14.85 6.77 11.66 19.66

3% WTP
Process
0.74 1.00 1.61 0.96 1.34 2.29 1.25 1.74 3.02

Subtotal: 25.25 34.26 55.43 32.81 45.85 78.52 42.89 59.90 103.68

Sanilac
County 0.03 0.05 0.10 0.04 0.07 0.14 0.05 0.10 0.20

Total: 25.28 34.31 55.53 32.85 45.92 78.66 42.94 60.00 103.88

Page 1 of 1
Lake Huron Water Supply Study

Karegnondi Water Authority


o City of Flint
o Genesee County
o Lapeer County
o Sanilac County

Appendix 1A
Projected Water Demands

September 3, 2009

540 S. Saginaw Street Suite 200 P.O. Box 3748 Flint, MI 48502
Lake Huron Water Supply Study Appendix 1A – Projected Water Demands

1.1 Withdrawal Permit

Based on the demands presented in Table 1of Appendix 1, Genesee County applied for a permit for
withdrawal of 85 MGD of water from Lake Huron. The MDEQ issued the permit on August 28, 2009.