Type Number Title Date Approved

SATIP SATIP-A-004-03 Hydrostatic Testing of Pipelines 3/24/2016


SATIP SATIP-A-004-05 LEAK TESTING (per SAES-A-004) 3/24/2016
SATIP SATIP-A-114-01 Earthwork - Site Preparation, Excavation and Backfill During Construction. 3/24/2016
SATIP SATIP-D-001-01 PRESSURE VESSEL INSTALLATION 3/24/2016
SATIP SATIP-G-005-01 CENTRIFUGAL PUMP 3/24/2016
SATIP SATIP-G-115-01 Lubrication, Shaft Sealing & Oil Systems (Rotating Equipment) 3/24/2016
SATIP SATIP-H-002-02 External FBE Coating & Repairs of Field Welded Joints 3/24/2016
SATIP SATIP-H-002-08 Internal FBE Coating of Field Girth Welds & Repairs 3/24/2016
SATIP SATIP-H-003-01 Coating Application on Concrete Surfaces 3/24/2016
SATIP SATIP-J-003-01 Instrumentation Piping and Tubing 3/24/2016
SATIP SATIP-J-100-01 Flow Instrumentation 3/24/2016
SATIP SATIP-J-200-01 Pressure Instrumentation 3/24/2016
SATIP SATIP-J-300-01 Level Instrumentation 3/24/2016
SATIP SATIP-J-400-01 Temperature Instrumentation 3/24/2016
SATIP SATIP-J-505-01 Combustible Gas and Hydrogen Sulfides Air Detection System 3/24/2016
SATIP SATIP-J-600-01 Safety Relief Valve Installation 3/24/2016
SATIP SATIP-J-700-01 Motor Operated Valves (MOV) and Control Valves (CV) 3/24/2016
SATIP SATIP-J-900-01 Instrumentation Control Loop Checking 3/24/2016
SATIP SATIP-J-901-01 Instrument Air Supply System 3/24/2016
SATIP SATIP-J-901-02 Instrument Air Distribution Piping Installation 3/24/2016
SATIP SATIP-J-902-01 Metallic Instrumentation and Control Cable 3/24/2016
SATIP SATIP-J-902-04 Fiber Optic Cable 3/24/2016
SATIP SATIP-J-902-05 Electronic Control Systems - DCS / ESD / PLC 3/24/2016
SATIP SATIP-J-903-01 Intrinsically Safe (IS) Systems 3/24/2016
SATIP SATIP-L-052-01 Hot Tap & Stopple Connection Installations (Latest* SAEP-311, 13 SEPT 2009) 3/24/2016
SATIP SATIP-L-108-01 Valve Inspection, Testing & Installation 3/24/2016
SATIP SATIP-L-350-01 On-Plot Metallic Piping Installation (Excluding Brazed Piping) 3/24/2016
SATIP SATIP-L-350-02 Piping Tie-In Installation For Plant Piping 3/24/2016
SATIP SATIP-L-350-05 Fire Water Distribution Piping Installation 3/24/2016
SATIP SATIP-L-350-08 Shop Fabrication - Piping & Miscellaneous Steel Structures 3/24/2016
SATIP SATIP-L-350-09 Utility Piping Installation - Plant Air & Nitrogen Gas 3/24/2016
SATIP SATIP-L-420-01 SCRAPER TRAP STATION 3/24/2016
SATIP SATIP-L-450-03 Cross Country Above Ground Pipeline 3/24/2016
SATIP SATIP-L-450-04 Cross Country Buried Pipeline (Mainline) 3/24/2016
Type Number Title Date Approved
SATIP SATIP-NDE-LPT-01 Liquid Penetrant Testing (LPT) on IK Projects 3/24/2016
SATIP SATIP-NDE-MPT-0 Magnetic Particle Testing (MPT) on IK Projects 3/24/2016
SATIP SATIP-NDE-RT-01 Radiographic Testing (RT) on IK Projects 3/24/2016
SATIP SATIP-NDE-UT-01 Ultrasonic Testing (UT) on IK Projects 3/24/2016
SATIP SATIP-P-104-01 Low Voltage (up to 1 kV) Power Cable and Building Wire 3/24/2016
SATIP SATIP-P-104-02 Medium Voltage Cable and Conductors (1.001 kV to 35 kV) 3/24/2016
SATIP SATIP-P-104-03 Cable Tray, Fittings, and Accessories 3/24/2016
SATIP SATIP-P-104-04 Boxes (Junction, Terminal, and Pull) Wire Troughs, and Wireways 3/24/2016
SATIP SATIP-P-104-05 Above-Grade Conduit, Fittings, and Accessories 3/24/2016
SATIP SATIP-P-104-07 Below Grade Conduit and Duct Bank 3/24/2016
SATIP SATIP-P-111-01 Grounding and Bonding 3/24/2016
SATIP SATIP-P-113-01 Low Voltage Squirrel Cage Induction Motors (SCIM) 3/24/2016
SATIP SATIP-P-113-02 Medium Voltage Induction and Synchronous Motors (Up to Nameplate Voltage 13.2 kV) 3/24/2016
SATIP SATIP-P-114-01 Electrical System Protection and Metering 3/24/2016
SATIP SATIP-P-116-07 Low Voltage Panelboard 3/24/2016
SATIP SATIP-P-123-01 Light Fixtures and Lighting Systems 3/24/2016
SATIP SATIP-Q-001-01 Ready Mix Concrete Batch Plants and 3rd Party Laboratory Management 3/24/2016
SATIP SATIP-Q-001-02 Cast-In-Place Portland Cement Concrete 3/24/2016
SATIP SATIP-Q-010-01 Cement Based Non-Shrink Grouting 3/24/2016
SATIP SATIP-Q-011-01 Epoxy Grout For Machinery Support 3/24/2016
SATIP SATIP-S-070-01 Earthwork – Excavation and Backfill For Under Ground Utilities 3/24/2016
SATIP SATIP-W-012-01 Welding of Pipelines 3/24/2016
SATIP SATIP-X-400-01 Galvanic Cathodic Protection 3/24/2016
Discipline
Mechanical
Mechanical
Civil
Mechanical
Mechanical - Rotating
Mechanical - Rotating
Mechanical
Mechanical
Mechanical
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Discipline
Mechanical - NDE
Mechanical - NDE
Mechanical - NDE
Mechanical - NDE
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Civil
Civil
Civil
Civil
Plumbing
Mechanical
Cathodic Protection
Type Number Title Date Approved
SAIC SAIC-A-1001 Soil Sampling, Testing and Review of Test Reports 3/24/2016
SAIC SAIC-A-1002 Fill, Select-Fill and Marl Cap Materials Receiving Inspection 3/24/2016
SAIC SAIC-A-1003 Soil Protection and Control, Drainage and De-Watering Inspection 3/24/2016
SAIC SAIC-A-1004 Fill Placement and Compaction Inspection 3/24/2016
SAIC SAIC-A-1005 Compaction Testing 3/24/2016
SAIC SAIC-A-1006 Final Fill Inspection 3/24/2016
SAIC SAIC-A-1007 Geotechnical Investigation Requirements 3/24/2016
SAIC SAIC-A-1008 Geotechnical Field Works Inspection 3/24/2016
SAIC SAIC-A-1009 Laboratory Testing Inspection 3/24/2016
SAIC SAIC-A-1010 Geotechnical Investigation Reports 3/24/2016
Soil Improvement Vibro Replacement (Stone Columns) Materials Approval, Specialized Personnel Approval, Testing &
SAIC SAIC-A-1011 3/24/2016
Review of Test Reports Inspection
SAIC SAIC-A-1012 Soil Improvement Vibro Replacement (Stone Columns) Materials Receiving Inspection 3/24/2016
SAIC SAIC-A-1013 Soil Improvement Vibro Replacement (Stone Columns) Pre-Installation (Survey) and Installation Inspection 3/24/2016
SAIC SAIC-A-1014 Preweld Qualification of HDPE Welder 3/24/2016
SAIC SAIC-A-1015 HDPE Liner Material Receiving & Storage Inspection 3/24/2016
SAIC SAIC-A-1016 HDPE Liner Placement and Seaming Inspection 3/24/2016
SAIC SAIC-A-1017 HDPE Liner Final Inspection 3/24/2016
SAIC SAIC-A-2001 Review Procedure - Pressure Testing (All Applications) 3/24/2016
SAIC SAIC-A-2003 Review of Test Package Preparation (Content, Format & Database) 3/24/2016
SAIC SAIC-A-2004 Verify Pneumatic Test Medium (Air, Nitrogen & Inert Gas) & Bubble Solution (for Leak Testing) 3/24/2016
SAIC SAIC-A-2005 Review of Leak Test Procedure (Bubble Test) 3/24/2016
SAIC SAIC-A-2006 Review Procedure - Post Test Reinstatement & Checklist 3/24/2016
SAIC SAIC-A-2007 Review Procedure - Lay-up of Piping Systems or Vessels 3/24/2016
SAIC SAIC-A-2008 Verify Test Medium for Hydrostatic Testing & Lay-up 3/24/2016
SAIC SAIC-A-2009 Verify Test Equipment (Safety Assessment) 3/24/2016
SAIC SAIC-A-2010 Pre-Test Punch Listing of On-Plot Piping 3/24/2016
SAIC SAIC-A-2011 Inspection of Pressure Test Preparation 3/24/2016
SAIC SAIC-A-2013 Inspection of Filling & Pressurization (Hydro test) 3/24/2016
SAIC SAIC-A-2015 Visual Inspection at Test Pressure 3/24/2016
SAIC SAIC-A-2016 Visual Insp of Air Test on Repads & Weld-Plus-Ends Cplgs 3/24/2016
SAIC SAIC-A-2017 Depressurization & Disposal of Hydrotest Water 3/24/2016
SAIC SAIC-A-2018 Lay-up of Piping Systems & Vessels 3/24/2016
SAIC SAIC-A-2020 Pressurization of Pneumatic Test (Strength & Service) 3/24/2016
Type Number Title Date Approved
SAIC SAIC-A-2021 Inspection of Pneumatic Test (Strength & Service) 3/24/2016
SAIC SAIC-A-2022 Depressurization of Pneumatic Test (Perform Leak Test) 3/24/2016
SAIC SAIC-A-2023 Pressurization for Bubble Leak Test (Using Air, Inert Gas) 3/24/2016
SAIC SAIC-A-2024 Inspection of Leaks for Tightness Testing 3/24/2016
SAIC SAIC-A-2025 Pre-Test Inspection of Pressure Vessels (All Applications, Including In-situ Testing of New Fin Fan Coolers) 3/24/2016
SAIC SAIC-A-2026 Pre-Test Inspection of API Tanks 3/24/2016
SAIC SAIC-B-1001 Fire Proofing Pre-placement/ Site Preparation Inspection 3/24/2016
SAIC SAIC-B-1002 Fireproofing Concrete Application Inspection 3/24/2016
SAIC SAIC-B-1003 Fireproofing Concrete Curing Inspection 3/24/2016
SAIC SAIC-B-1004 Concrete Fireproofing Final Inspection 3/24/2016
SAIC SAIC-B-2001 Review Proprietary Fireproofing System & Procedure (Intumescent Epoxy Mastics & Lightweight Concretes) 3/24/2016
SAIC SAIC-B-2002 Review Qualifications for Proprietary (Intumescent) Fireproofing Applicator 3/24/2016
SAIC SAIC-B-2004 Inspect Storage, Handling & Preservation of Intumescent Fireproofing Mat'ls 3/24/2016
SAIC SAIC-B-2005 Performance Verification of Equipment & Applicators of Intumescent Fireproofing (FP) Materials 3/24/2016
SAIC SAIC-B-2006 Pre-Application Insp of Intumescent Fireproofing Mat'ls 3/24/2016
SAIC SAIC-B-2007 In-Process Inspection of Intumescent Fireproofing Mat'ls 3/24/2016
SAIC SAIC-B-2008 Post-Application* Insp of Intumescent Fireproofing Mat'l 3/24/2016
SAIC SAIC-B-2009 Top Coating Application (Intumescent Fireproofing Matls) 3/24/2016
SAIC SAIC-B-2010 Final Inspection of Intumescent Fireproofing Application 3/24/2016
SAIC SAIC-B-2011 Material Receiving Insp - Portable Fire Protection Equip 3/24/2016
SAIC SAIC-B-2012 Storage, Handling & Preservation of Portable Fire Protection Equipment 3/24/2016
SAIC SAIC-B-2013 Portable Fire Extinguishers - Installation Inspection 3/24/2016
SAIC SAIC-B-2014 Foam Generating Equipment - Installation Insp & Testing 3/24/2016
SAIC SAIC-B-2015 Special Fixed Extinguishing Equipment - Installation Inspection & Testing 3/24/2016
SAIC SAIC-B-2016 Access & Platforms for Portable Fire Protection System 3/24/2016
SAIC SAIC-B-2017 Reinstatement of Portable Fire Protection Systems 3/24/2016
SAIC SAIC-B-4001 Emergency Eyewash/Shower Receiving, Handling, Storage and Preservation 3/24/2016
SAIC SAIC-B-4002 Emergency Eyewash/Shower System Installation 3/24/2016
SAIC SAIC-B-6101 Fire Alarm System - Cable and Accessories - Material Receiving and Installation 3/24/2016
SAIC SAIC-B-6102 Fire Alarm System - Control Panel - Material Receiving and Installation 3/24/2016
SAIC SAIC-B-6103 Fire Alarm System - Audible / Visual Annunciator - Material Receiving & Installation 3/24/2016
SAIC SAIC-B-6104 Fire Alarm System - Smoke & Heat Detector - Material Receiving 3/24/2016
SAIC SAIC-B-6105 Fire Alarm System - Smoke / Heat / Radiant Detector - Installation 3/24/2016
SAIC SAIC-B-6106 Fire Alarm System - Water Flow Switch and Water Valve Position Switches - MR & Installation 3/24/2016
Type Number Title Date Approved
SAIC SAIC-B-6107 Fire Alarm System - Manual Pull Station - Material Receiving & Installation 3/24/2016
SAIC SAIC-B-6108 Fire Alarm System - Pre-Commissioning Inspection 3/24/2016
SAIC SAIC-D-2001 Review of Vessel Safety Instruction Sheet & Procedure for Vessel Internal Component Installation 3/24/2016
SAIC SAIC-D-2002 Receiving Inspection of Pressure Vessels- External 3/24/2016
SAIC SAIC-D-2003 Receiving Inspection of Pressure Vessels- Internal 3/24/2016
SAIC SAIC-D-2004 Receiving Inspection of Fabricated Structural Attachments to Equipment (Access and Supports) 3/24/2016
SAIC SAIC-D-2005 Storage, Handling and Preservation (Vessels & Tanks) 3/24/2016
SAIC SAIC-D-2006 Equipment Pre-Installation Inspection 3/24/2016
SAIC SAIC-D-2007 Equipment Alignment & Elevation Check 3/24/2016
SAIC SAIC-D-2008 Inspection of Vessel Trim Installation 3/24/2016
SAIC SAIC-D-2009 Installation & Inspection of Trays & Packing in Vessels (Special Construction Process Procedure) 3/24/2016
SAIC SAIC-D-2012 Final Inspection of Pressure Vessels (Re-Instatement) 3/24/2016
SAIC SAIC-D-2014 Review of Tank Data Sheet & Safety Instruction Sheet 3/24/2016
SAIC SAIC-D-2015 Receiving Inspection of Small Metallic Tanks per SAES-D-109- (External Insp) 3/24/2016
SAIC SAIC-D-2016 Receiving Inspection of Small Metallic Tanks per SAES-D-109- (Internal Insp) 3/24/2016
SAIC SAIC-D-2017 Inspection of FRP Tank installation 3/24/2016
SAIC SAIC-D-2018 Insp of Under-Tank Leak Detection, Sub-Grade Protection For Steel Tank Supported Directly on Soil Foundation 3/24/2016
SAIC SAIC-D-2019 Inspection of Above Ground Small MetallicTank Installation 3/24/2016
SAIC SAIC-D-2020 Inspection of Tank Trim Installation 12/31/2014
SAIC SAIC-D-2021 Final Insp of Tank Installation (Tanks) 3/24/2016
SAIC SAIC-D-2022 Verification of Non-Material Requirements for Vessels and Trays 3/24/2016
SAIC SAIC-D-2023 Receiving Insp of API Tank Plate Mat'l & Appurtenances 3/24/2016
SAIC SAIC-D-2024 Insp Foundation & Undertank before Floor Plate Layout 3/24/2016
SAIC SAIC-D-2025 Inspect Installation of API Tank Plates & Appurtenances 3/24/2016
SAIC SAIC-E-2001 Review of SIS for Shell & Tube Heat Exchanger 3/24/2016
SAIC SAIC-E-2002 Receiving Inspection of Shell & Tube Heat Exchanger 3/24/2016
SAIC SAIC-E-2003 Storage Handling & Presevation of Heat Exchangers. 3/24/2016
SAIC SAIC-E-2004 Review of SIS for Air Cooled Heat Exchanger 3/24/2016
SAIC SAIC-E-2005 Receiving Inspection of Air-Cooled Heat Exchanger 3/24/2016
SAIC SAIC-E-2006 Inspect Assembly of Air-Cooled Heat Exchanger Components 3/24/2016
SAIC SAIC-E-2008 Re-instatement of Air Cooled Heat Exchanger 3/24/2016
SAIC SAIC-E-2009 Internal Cleanliness Inspection of Heat Exchangers 3/24/2016
SAIC SAIC-E-2010 In-Situ Strength Test of Fin Fan Coolers (Preparation) 3/24/2016
SAIC SAIC-E-2011 Nitrogen and Pearlite Application on BAHE Frame 3/24/2016
Type Number Title Date Approved
SAIC SAIC-F-2001 Review Procedure - Fired Heater Installation 3/24/2016
SAIC SAIC-F-2002 Review UT Thickness Record (Fired Heater Components) 3/24/2016
SAIC SAIC-F-2003 Review of Data Sheet & SIS for Fired Heaters. 3/24/2016
SAIC SAIC-F-2004 Receiving Inspection of Fired Heaters & Components 3/24/2016
SAIC SAIC-F-2005 Handling, Storage and Preservation of Fired Heaters 3/24/2016
SAIC SAIC-F-2006 Installation of Fired Heaters and Components 3/24/2016
SAIC SAIC-F-2007 Heater Box Closure Inspection 3/24/2016
SAIC SAIC-F-2008 Final Insp of Fired Heater & Components (Re-Instatement) 3/24/2016
SAIC SAIC-F-2020 Review Industrial Boiler Forms & Data Sheets (SIS, etc) 3/24/2016
SAIC SAIC-F-2021 Receiving Insp of Industrial Boilers & Mech. Components 3/24/2016
SAIC SAIC-F-2022 Receiving Inspection of Power Piping & Auxillaries 3/24/2016
SAIC SAIC-F-2023 Storage, Handling & Preservation of Industrial Boilers & Mech. Components 3/24/2016
SAIC SAIC-F-2024 Lay-Up of Boiler Tubes & Drums 3/24/2016
SAIC SAIC-F-2025 Lay-Up & Preservation of Boiler's Furnace 3/24/2016
SAIC SAIC-F-2026 Cleaning of Boiler Tubes, Associated Piping & Vessels 3/24/2016
SAIC SAIC-F-2027 Installation of Economizer 3/24/2016
SAIC SAIC-F-2028 Installation of Boiler Trim, Connections & Instruments 3/24/2016
SAIC SAIC-F-2029 Installation of Boiler Stack 3/24/2016
SAIC SAIC-F-2030 Final Punchlisting of Boilers & Accessories 3/24/2016
SAIC SAIC-F-2031 Receiving Inspection of Flare Package Components 3/24/2016
SAIC SAIC-F-2032 Handling, Storage & Preservation (Flare System Pkg.) 3/24/2016
SAIC SAIC-F-2033 Final Insp of Flare System Package (Re-Instatement) 3/24/2016
SAIC SAIC-G-2001 Review of Procedure for Storage, Handling & Preservation of Equipment 3/24/2016
SAIC SAIC-G-2002 Receiving Inspection of Centrifugal Pumps 3/24/2016
SAIC SAIC-G-2003 Handling, Storage & Preserv. Insp of Centrifugal Pumps 3/24/2016
SAIC SAIC-G-2004 Inspection of Auxiliary Piping Installation 3/24/2016
SAIC SAIC-G-2005 Inspect Pump Suction and Discharge Piping Connection 3/24/2016
SAIC SAIC-G-2007 Final Inspection / Walkthrough of Pump installation 3/24/2016
SAIC SAIC-G-2009 Receiving Inspection of Positive Displacement Pumps 3/24/2016
SAIC SAIC-G-2010 Handling, Storage and Preservation Inspection of Positive Displacement Pumps (Per API 675 & API 686) 3/24/2016
SAIC SAIC-G-2011 Chemical Cleaning and Flushing Procedures 3/24/2016
SAIC SAIC-G-2012 Receiving, Handling, Storage & Preservation Inspection of Lubrication, Shaft Sealing & Oil Syst. (Rotating Equip) 3/24/2016
SAIC SAIC-G-2013 Lubrication System (Lubrication Skid) Handling, Storage and Preservation 3/24/2016
Type Number Title Date Approved
SAIC SAIC-G-2014 Installation of Mechanical Components of Lubrication, Shaft Sealing and Oil Systems for Rotating Equipment 3/24/2016
SAIC SAIC-G-2015 Final Inspection / Walkthrough of Lubrication, Shaft Sealing and Control Oil Systems 3/24/2016
SAIC SAIC-G-2016 Pre-Cleaning Insp of the Lube and/or Seal Oil System 3/24/2016
SAIC SAIC-G-2017 Mech & Chemical Cleaning of Lube & or Seal Oil System 3/24/2016
SAIC SAIC-G-2018 Final Cleanliness Inspection After Cleaning and Flushing of Lube and/or Seal Oil System. 3/24/2016
SAIC SAIC-G-2019 Final Reinstatement after Mechanical & Chem Cleaning 3/24/2016
SAIC SAIC-G-2021 Mounting Plate Installation and Leveling for Pumps 3/24/2016
SAIC SAIC-G-2022 Preliminary / Final Alignment of Pump & Driver 3/24/2016
SAIC SAIC-G-2023 Pump & Component Installation for Lift Stations 3/24/2016
SAIC SAIC-GI-2102 Pressure Testing Safely 3/24/2016
SAIC SAIC-H-1002 Concrete Coatings and Repair Materials Receiving, Storage & Preservation Inspection 3/24/2016
SAIC SAIC-H-1003 Concrete Coatings Pre-Installation Inspection 3/24/2016
SAIC SAIC-H-1004 Coating and Final Inspection 3/24/2016
SAIC SAIC-H-2001 Review Procedure: Cement-Shop applied internal Cement Mortar protective lining for steel pipe 3/24/2016
SAIC SAIC-H-2002 Receiving Inspection of Raw Materials for Cement Lining 3/24/2016
SAIC SAIC-H-2004 Verification of Cement Lining Equipment 3/24/2016
SAIC SAIC-H-2005 Pre-Application Inspection of Cement Lining 3/24/2016
SAIC SAIC-H-2006 In-Process Inspection of Cement Lining 3/24/2016
SAIC SAIC-H-2007 Final Inspection & Acceptance of Cement Lining [Includes repairs] 3/24/2016
SAIC SAIC-H-2009 Review Procedure - Field Applied External FBE Coating and Repair Procedure 3/17/2016
SAIC SAIC-H-2010 Review of Contractor Qualifications - Coating Personnel Certification (In-Kingdom Field Application Only) 3/24/2016
SAIC SAIC-H-2011 Receiving Inspection of FBE Powder & Abrasive Materials and its Storage 3/24/2016
SAIC SAIC-H-2013 Insp & Verification of FBE Powder Application Equipment 3/24/2016
SAIC SAIC-H-2014 Surface Preparation for Application of External Epoxy Coating on Pipeline 3/17/2016
SAIC SAIC-H-2015 In-Process Inspection of FBE coating Application on External Field Girth Welds [Includes Repair / Patch-up coating] 3/24/2016
SAIC SAIC-H-2016 Holiday Testing of External Coatings on Pipelines 3/24/2016
SAIC SAIC-H-2018 Final Inspection of External FBE Coated Field Girth Welds before Backfill 3/24/2016
Review Procedure for Liquid Coatings on Industrial Services & Pipelines-Buried Services (APCS-113A,113 B, 113E &
SAIC SAIC-H-2023 3/24/2016
113F)
SAIC SAIC-H-2024 Receiving Inspection of Paint & Abrasive Materials 3/24/2016
SAIC SAIC-H-2025 Storage, Handling and Preservation of Paint and Abrasive Materials. 3/24/2016
SAIC SAIC-H-2026 Coating Equipment Inspection 3/24/2016
SAIC SAIC-H-2027 Surface Preparation for Liquid Coating Systems 3/24/2016
Type Number Title Date Approved
SAIC SAIC-H-2028 In-Process Insp. of Primer or First Coat (Liquid Coating System) 3/24/2016
SAIC SAIC-H-2029 Inspection of Primer Coat (Prior to Top Coating) 3/24/2016
SAIC SAIC-H-2030 In-Process Insp - Intermediate or Top Coat Application 3/24/2016
SAIC SAIC-H-2031 Inspection of Top Coat(s) of Liquid Coating System 3/24/2016
SAIC SAIC-H-2032 Repair and/or Touch-up of Coatings 3/17/2016
SAIC SAIC-H-2033 Application of Safety Color Coding & Stenciling of Equipment/Piping Identification. 3/24/2016
SAIC SAIC-H-2034 Final Inspection of Coating for Mechanical Completion 3/24/2016
SAIC SAIC-H-2048 Surface Preparation for Application of APCS-113 liquid Coating Systems on Pipeline. 3/24/2016
SAIC SAIC-H-2049 In-Process Inspection of APCS-113 Coating Systems Application 3/24/2016
SAIC SAIC-H-2050 Visual Inspection of APCS-113 Coating systems Application 3/24/2016
SAIC SAIC-H-2051 Final Inspection before Backfill - APCS 113 Coated Pipe 3/24/2016
SAIC SAIC-H-2057 Review Procedure - Field Applied Internal Coatings & Repairs 3/24/2016
SAIC SAIC-H-2058 Receiving Inspection of Internal Coating Materials for Over-the-Ditch Field Girth Welds 3/24/2016
SAIC SAIC-H-2059 Surface Preparation of Pipe Joints for Field Internal Coating 3/24/2016
SAIC SAIC-H-2060 In-Process & Final Inspection of Internal coating Application on Field Girth Welds
SAIC SAIC-H-2080 Review Procedure - External Protective Coating System For Repair & Renovation of Buried Pipelines (APCS 113C) 3/24/2016
SAIC SAIC-H-2081 Verification & Storage of APCS - 113C Materials 3/24/2016
SAIC SAIC-H-2082 Surface Preparation, Application and Acceptance of APCS-113C Coating System (Including Repairs) 3/24/2016
SAIC SAIC-J-2005 Review of Relief Valve Authorization Form 3099A 3/24/2016
SAIC SAIC-J-2006 Receiving Inspection Of Relief Valves 3/24/2016
SAIC SAIC-J-2007 Storage, Handling & Preservation of Relief Valves 3/24/2016
SAIC SAIC-J-2008 Relief Valve testing & Calibration 3/24/2016
SAIC SAIC-J-2009 Relief Valve Installation 3/24/2016
SAIC SAIC-J-2010 Completion of Form 3099A 3/24/2016
SAIC SAIC-J-2011 Receiving Inspection of Instrument Air Compressor & Mechanical Components 3/24/2016
SAIC SAIC-J-2012 Storage, Handling & Preservation of Instrument Air Compressor and its Mechanical Components 3/24/2016
SAIC SAIC-J-2013 Installation of Air Compressor and its Components 3/24/2016
SAIC SAIC-J-2014 Punch Listing of Instrument Air Supply System 3/24/2016
SAIC SAIC-J-2015 Piping Installation for Instrument Air Distribution System 3/24/2016
SAIC SAIC-J-2016 Re-instatement / Final Inspection of Instrument Air Distribution Piping System 3/24/2016
SAIC SAIC-J-2018 Receiving Inspection of Meter Prover Skid 3/24/2016
SAIC SAIC-J-6001 General Tubing and Accessories - Handling, Storage and Preservation (SHP) 3/24/2016
Type Number Title Date Approved

General Piping and Tubing System - Materials Receiving for Instrument Air supply, Impulse line purge, pneumatic
SAIC SAIC-J-6002 signal transmission installations and for connecting instruments to process piping and equipment. (Including Electric / 3/24/2016
Steam Traced Bundle)
SAIC SAIC-J-6003 Brass / Stainless steel, Globe / Needle Valves - Material Receiving 3/24/2016
SAIC SAIC-J-6004 Stainless Steel and Copper Tubing - Material Receiving 3/24/2016
SAIC SAIC-J-6005 Compression Fittings and Accessories - Material Receiving 3/24/2016
SAIC SAIC-J-6006 Copper Tubing & Fittings Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-J-6007 Stainless Steel Tubing and Accessories Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-J-6016 Recorder / Indicator - Material Receiving 3/24/2016
SAIC SAIC-J-6017 General - Instrumentation Accessories - Material Receiving 3/24/2016
SAIC SAIC-J-6019 General - Mechanical Equipment Skid - Zone or DIV. 2 Locations - Material Receiving 3/24/2016
SAIC SAIC-J-6020 Skid for Non- Hazardous Locations - Material Receiving 3/24/2016
SAIC SAIC-J-6021 General - Mechanical Equipment Skid - Corrosive Locations - Material Receiving 3/24/2016
General - Instrumentation Workspace Clearances Civil / Structural Installation - Visual Inspection (before skid
SAIC SAIC-J-6022 3/24/2016
installation)
SAIC SAIC-J-6025 General - Manufactured Instrument Enclosures, Panels and Racks - Material Receiving 3/24/2016
SAIC SAIC-J-6028 General - Instrument Racks and Panel Fabrication - Material Receiving 3/24/2016
SAIC SAIC-J-6030 General - Instrumentation Enclosures, Panels and Racks - Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-J-6031 Supplemental Support Fabrication and Installation Visual Inspection (Before Installation) 3/24/2016
SAIC SAIC-J-6101 Flow-Orifice Plate - Material Receiving 3/24/2016
SAIC SAIC-J-6102 Flow-Orifice Meter - Material Receiving 3/24/2016
SAIC SAIC-J-6103 Flow-Nozzle - Material Receiving 3/24/2016
SAIC SAIC-J-6104 Flow - Venturi - Material Receiving 3/24/2016
SAIC SAIC-J-6105 Flow - Averaging Pitot Element - Material Receiving 3/24/2016
SAIC SAIC-J-6106 Flow - Integral Orifice - Material Receiving 3/24/2016
SAIC SAIC-J-6107 Flow - Turbine Meter - Material Receiving 3/24/2016
SAIC SAIC-J-6108 Flow - Positive Displacement Meter - Material Receiving 3/24/2016
SAIC SAIC-J-6109 Flow - Magnetic Flow Meter - Material Receiving 3/24/2016
SAIC SAIC-J-6110 Flow - Mass Meter (Coriolis and Thermal) - Material Receiving 3/24/2016
SAIC SAIC-J-6111 Flow - Ultrasonic Meters (Transit time & Doppler) - Material Receiving 3/24/2016
SAIC SAIC-J-6112 Flow - Vortex Shedding Meter - Material Receiving 3/24/2016
SAIC SAIC-J-6113 Flow - Variable Area Meter (Rotameter) - Material Receiving 3/24/2016
SAIC SAIC-J-6201 Pressure Gauges - Material Receiving 3/24/2016
SAIC SAIC-J-6202 Pressure Switches - Material Receiving 3/24/2016
Type Number Title Date Approved
SAIC SAIC-J-6203 Pressure Transmitter - Material Receiving 3/24/2016
SAIC SAIC-J-6204 Differential Pressure Transmitter - Material Receiving 3/24/2016
SAIC SAIC-J-6205 General - Instrumentation Accessories - Installation 3/24/2016
SAIC SAIC-J-6301 Level - Sight Glass Gauges / Switches - Material Receiving 3/24/2016
SAIC SAIC-J-6302 Level - Magnetic Gauges / Switches - Material Receiving 3/24/2016
SAIC SAIC-J-6303 Level - Displacement Instruments - Material Receiving 3/24/2016
SAIC SAIC-J-6304 Level - Automatic Tank Gauging (ATG) - Material Receiving 3/24/2016
SAIC SAIC-J-6305 Level - Ball Float Instrument - Material Receiving 3/24/2016
SAIC SAIC-J-6306 Level - Differential Pressure Instruments - Material Receiving 3/24/2016
SAIC SAIC-J-6307 Level - Capacitance - Type Instruments - Material Receiving 3/24/2016
SAIC SAIC-J-6401 Temperature - Thermowells - Material Receiving 3/24/2016
SAIC SAIC-J-6402 Temperature - Thermocouples (Including Extension Wire) - Material Receiving 3/24/2016
SAIC SAIC-J-6403 Temperature - Resistance Temperature Detectors -Material Receiving 3/24/2016
SAIC SAIC-J-6404 Temperature - Filled System Instruments – Material Receiving 3/24/2016
SAIC SAIC-J-6405 Temperature - Bimetallic Instruments – Material Receiving 3/24/2016
SAIC SAIC-J-6406 Temperature - Infra-Red Instruments – Material Receiving 3/24/2016
SAIC SAIC-J-6501 Instrumentation and Control Loop checking - Documentation Review (Procedures and Packages) 3/24/2016
SAIC SAIC-J-6601 I & C Copper Cable - Unshielded, Single Twisted Pair/Triad and Multipair/Triad, Group 1 & 3 - MR 3/24/2016
SAIC SAIC-J-6602 I & C Copper Cable - Shielded, Single Twisted Pair/Triad and Multipair/Triad, Group 2 & 4 - MR 3/24/2016
SAIC SAIC-J-6603 Instrument Cable - Thermocouple Extension Cable – Material Receiving 3/24/2016
SAIC SAIC-J-6604 Instrument Cable - Coaxial and Twinaxial Data Cable - Material Receiving 3/24/2016
SAIC SAIC-J-6605 Instrument Cable Accessories - Material Receiving 3/24/2016
SAIC SAIC-J-6606 Instrument Cable - Installation, Termination, Identification and Pre-Commissioning 3/24/2016
SAIC SAIC-J-6622 Fiber Optic Cable - Multi-Mode Fiber Cable – Material Receiving 3/24/2016
SAIC SAIC-J-6623 Fiber Optic Cable - Multi-Mode Fiber Cable splicing / Testing Tools and Accessories - Material Receiving 3/24/2016
SAIC SAIC-J-6624 Fiber Optic Cable - Installation, Termination, Identification and Pre-Commissioning 3/24/2016
SAIC SAIC-J-6701 Valves - MOV / CV Storage, Handling and Preservation 3/24/2016
SAIC SAIC-J-6702 Valves - Motor Operated Valve E & I - Material Receiving 3/24/2016
SAIC SAIC-J-6703 Control Valve E & I - Material Receiving (Class 600 and Lower) 3/24/2016
SAIC SAIC-J-6802 Electronic Control Systems - DCS/ESD - I/O and CPU Cabinets and Operators Consoles - Material Receiving 3/24/2016
SAIC SAIC-J-6803 Electronic Control Systems - PLC - Material Receiving 3/24/2016
SAIC SAIC-J-6804 Electronic Control Systems - DCS / ESD Manufacturer's Data Highway Cable - Material Receiving 3/24/2016
Electronic Control Systems - DCS / ESD - I/O and CPU Cabinets and Operators Consoles - Installation and Pre-
SAIC SAIC-J-6805 3/24/2016
Commissioning
Type Number Title Date Approved

SAIC SAIC-J-6806 Electronic Control Systems - PLC (Stand-Alone as well as Integrated with DCS) – Installation and Pre-Commissioning 3/24/2016

SAIC SAIC-J-6807 Electronic Control Systems - DCS/ESD Manufacturer's Data Highway Cable - Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-J-6902 Intrinsically Safe Circuit - Design / Procurement Package - Documentation Review 3/24/2016
SAIC SAIC-J-6903 Intrinsically Safe Circuit - Instruments, Barriers &TB's -Material Receiving 3/24/2016
SAIC SAIC-J-6904 Intrinsically Safe Circuit - Instrumentation, Box and Barrier Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-J-6905 Intrinsically Safe Circuit - Cable Installation, Termination, Identification and Pre-Commissioning 3/24/2016
SAIC SAIC-J-6906 Intrinsically Safe Circuit - Circuit Final Inspection 3/24/2016
SAIC SAIC-J-6911 Foundation Fiedlbus System -Design / Procurement Package 3/24/2016
SAIC SAIC-J-6912 FOUNDATION Fieldbus - Cable-Type "A" or Multipair, Individually Shielded Cable - Material Receiving 3/24/2016
SAIC SAIC-K-2001 Review of Procedure for Storage, Handling & Preservation of Gas Compressors 3/24/2016
SAIC SAIC-K-2002 Receiving Inspection of Centrifugal Compressor 3/24/2016
SAIC SAIC-K-2003 Storage, Handling , and Preservation of Centrifugal and Reciprocating Gas Compressors 3/24/2016
SAIC SAIC-K-2004 Mounting Plate Installation and Leveling for Compressors 3/24/2016
SAIC SAIC-K-2005 Inspection of Auxiliary Piping Installation for Compressor 3/24/2016
SAIC SAIC-K-2007 Process Piping Connections to Centrifugal Compressor 3/24/2016
SAIC SAIC-K-2008 Final Compressor / Driver Alignment 3/24/2016
SAIC SAIC-K-2009 Final Insp/Walkthrough of Centrifugal Compressor Install. 3/24/2016
SAIC SAIC-K-2011 Recv Insp of Reciprocating Compressor (Process Air or Gas) 3/24/2016
SAIC SAIC-K-2017 Verification & Visual Insp of Diesel Engine & Accessories 3/24/2016
SAIC SAIC-K-2018 Diesel Engine Storage and Preservation 3/24/2016
SAIC SAIC-K-2019 Installation of Diesel Engine & Mechanical Components 3/24/2016
SAIC SAIC-K-2020 Final Insp / Walkthrough of Diesel Engine Installation 3/24/2016
SAIC SAIC-K-2026 Reciprocating Compressor Suction & Discharge Process Piping Installation 3/24/2016
SAIC SAIC-K-2029 Final Inspection / Walkthrough of Reciprocating Compressor for Process Air or Gas Services installation 3/24/2016
SAIC SAIC-K-4001 Exhaust Fan Receiving, Handling and Preservation 3/24/2016
SAIC SAIC-K-4002 Exhaust Fan Installation Inspection 3/24/2016
SAIC SAIC-K-4003 Installation of Air moving and Cooling Duct / Pipe Connections 3/24/2016
SAIC SAIC-K-4004 Air Handling Unit (AHU) Receiving, Handling, Storage and preservation 3/24/2016
SAIC SAIC-K-4005 Air Handling Unit (AHU) Installation 3/24/2016
SAIC SAIC-K-4006 Essential Operating Facilities (EOF) HVAC Requirements 3/24/2016
SAIC SAIC-K-4007 Condensate Drain Installation 3/24/2016
SAIC SAIC-K-4008 Metal Duct, Hangers and Supports and Insulation Receiving 3/24/2016
Type Number Title Date Approved
SAIC SAIC-K-4009 Air Terminal Devices, Volume Damper and Duct Heaters Receiving 3/24/2016
SAIC SAIC-K-4010 Fire Damper Receiving Inspection 3/24/2016
SAIC SAIC-K-4011 Duct System Handling, Storage and Preservation 3/24/2016
SAIC SAIC-K-4012 Metal Duct Hangers and Support Installation 3/24/2016
SAIC SAIC-K-4013 Metal Duct Installation 3/24/2016
SAIC SAIC-K-4014 Grease Duct Installation 3/24/2016
SAIC SAIC-K-4015 Metal Duct Insulation Installation 3/24/2016
SAIC SAIC-K-4016 Volume Damper and Duct Heater Installation 3/24/2016
SAIC SAIC-K-4017 Air Terminal Devices (Diffusers, Grills and Registers) & Flexible Duct Installation including Hanger & Support 3/24/2016
SAIC SAIC-K-4018 Fire / Smoke / Fire-Smoke Damper Installation 3/24/2016
SAIC SAIC-K-4020 Chilled Water Piping Lay-out 3/24/2016
SAIC SAIC-K-4021 Two Way and Three Way Control Valve Arrangement (Chilled Water Lines) 3/24/2016
SAIC SAIC-K-4022 Chilled Water System Components Receiving, Handling, Storage and Preservation Inspection 3/24/2016
SAIC SAIC-K-4023 Chilled Water System Components Installation 3/24/2016
SAIC SAIC-K-4025 Refrigerant Gas - Receiving, Handling, Storage and Preservation 3/24/2016
SAIC SAIC-K-4026 Refrigerant Piping lay-out 3/24/2016
SAIC SAIC-K-4027 Air Moving / Cooling Valve and Apparatus Arrangement Installation (DX Units) 3/24/2016
SAIC SAIC-K-4028 Receiving, Storage, Handling and Preservation of Filters 3/24/2016
SAIC SAIC-K-4029 Air Filtration Devices Installation 3/24/2016
SAIC SAIC-K-4030 Grease Filter Installation 3/24/2016
Through-The-Wall and Window-Mounted Air Conditioners (Room Air Conditioners) Receiving, Handling, storage and
SAIC SAIC-K-4031 3/24/2016
Preservation
SAIC SAIC-K-4032 Through-The-Wall and Window-Mounted Air Conditioners (Room Air Conditioners) Installation 3/24/2016
SAIC SAIC-K-4033 Exhaust Hood Receiving, Handling and Preservation 3/24/2016
SAIC SAIC-K-4034 Hybrid and Passively Cooled Shelter Receiving 3/24/2016
SAIC SAIC-K-4035 Passively Cooled Shelter Installation Inspection 3/24/2016
SAIC SAIC-K-4036 Hood Installation 3/24/2016
SAIC SAIC-K-4037 Air Cooled Condenser Receiving and Storage 3/24/2016
SAIC SAIC-K-4038 Fan Coil Unit (FCU) Receiving, Handling, Storage and Preservation 3/24/2016
SAIC SAIC-K-4039 Air Cooled Condenser Installation 3/24/2016
SAIC SAIC-K-4040 Fan Coil Installation 3/24/2016
SAIC SAIC-K-4041 Review of HVAC System Testing Organization Qualifications 3/24/2016
SAIC SAIC-K-4042 HVAC System Testing, Adjusting and Balancing Procedures 3/24/2016
SAIC SAIC-K-4043 Final inspection of HVAC System 3/24/2016
Type Number Title Date Approved
SAIC SAIC-K-4044 Pressurized Building HVAC Requirements 3/24/2016
SAIC SAIC-K-4045 Communication Facilities and Data Centers HVAC Requirements 3/24/2016
SAIC SAIC-K-4046 Battery Room HVAC Requirements 3/24/2016
SAIC SAIC-L-1001 Pipeline Right of Way (ROW) Inspection 3/24/2016
SAIC SAIC-L-1003 Pipe Lowering Inspection 3/24/2016
SAIC SAIC-L-1004 Backfilling and Berm Construction Inspection 3/24/2016
SAIC SAIC-L-2001 Review Procedure - Internal Cleaning for Plant Systems, Plant Equipment and Pipelines 3/24/2016
SAIC SAIC-L-2002 REVIEW OF FLANGE JOINT-GASKET VERIFICATION AND BOLT TIGHTENING PROCEDURE 3/24/2016
SAIC SAIC-L-2003 Review Procedure - Piping Material Traceability 3/24/2016
SAIC SAIC-L-2004 Review of Positive Material Identification Program and Testing Procedure 3/24/2016
SAIC SAIC-L-2005 Recv Inspection of Pipe and Pipe Nipples (Plant Piping) 3/24/2016
SAIC SAIC-L-2006 Receiving Inspection of Pipe Fittings and Flanges 3/24/2016
SAIC SAIC-L-2007 Receiving Inspection of Gaskets 3/24/2016
SAIC SAIC-L-2008 Receiving Inspection of Flange Bolts (Studs, Machine Bolts and Washers) 3/24/2016
SAIC SAIC-L-2009 Receiving Insp of Venturi, Restriction & Flow Orifices 3/24/2016
SAIC SAIC-L-2010 Positive Material Identification (PMI) of Alloy Piping & Alloy Components (All Applications) 3/24/2016
SAIC SAIC-L-2011 Piping Pre-Installation Inspection (Prior to On-Plot Work) Including Spec Check 3/24/2016
SAIC SAIC-L-2012 Pipe Laying, Spool Erection & Assy on Piperacks and Sleeperways 3/24/2016
SAIC SAIC-L-2013 Inspection of Piping Branch Connections 3/24/2016
SAIC SAIC-L-2014 INSPECTION OF BOLTED FLANGE JOINT ASSEMBLY 3/24/2016
SAIC SAIC-L-2015 Inspect Threaded Joint Engagement (Gap Control) 3/24/2016
SAIC SAIC-L-2016 Inspection of Venturi, Restriction Orifice and Flow Orifice 3/24/2016
SAIC SAIC-L-2017 Piping / Equipment Internal Cleaning Inspection 3/24/2016
SAIC SAIC-L-2018 Inspection of Pipe Support and Pipe Anchor Installation 3/24/2016
SAIC SAIC-L-2019 Installation of Buried Piping (UG On-Plot Metallic Piping) 3/24/2016
SAIC SAIC-L-2020 Inspection of Thermowell (TW) Installation 3/24/2016
SAIC SAIC-L-2021 Inspection of Chemical Injection Quill/Nozzle, Corrosion Monitoring Station & Sample Connections (Incl Receipt) 3/24/2016
SAIC SAIC-L-2022 Final Piping Punchlisting (Piping Re-Instatement) 3/24/2016
SAIC SAIC-L-2025 Review of Tie-In Pkg & Tie-In Procedure (Plant Piping) 3/24/2016
SAIC SAIC-L-2026 Preparatory Tie-In Requirements (Plant Piping) 3/24/2016
SAIC SAIC-L-2027 Inspect Post-Cutting & Pre-Welding on Tie-Ins for Existing Hydrocarbon Pipelines/Piping (Fitness for Service) 3/24/2016
SAIC SAIC-L-2028 Final Punchlisting for Tie-In Works (Re-Instatement) 3/24/2016
SAIC SAIC-L-2029 Inspection of Tie-In Materials 3/24/2016
Type Number Title Date Approved
SAIC SAIC-L-2030 Receiving Inspection of Internally Coated Pipe and Fabricated Pipe Spools 3/24/2016
SAIC SAIC-L-2031 Review & Approve Piping Fabrication Shop (Guide - Assure Successful Project Start-up) 3/24/2016
SAIC SAIC-L-2033 Review Procedure for Pipe Bending (Includes Hot Bends, Cold Bends, & Common Pressure Piping Ovality Repairs) 3/24/2016
SAIC SAIC-L-2034 Inspection of Material Storage & Handling at Fab. Shop 3/24/2016
SAIC SAIC-L-2035 Cutting & Assembly Fit-Up 3/24/2016
SAIC SAIC-L-2037 Inspection of Hot Bending Process 3/24/2016
SAIC SAIC-L-2038 Final Inspection for Release of Fabricated Piping 3/24/2016
SAIC SAIC-L-2039 Final Insp. for Release of Fabricated Piping Components 3/24/2016
SAIC SAIC-L-2040 Receiving Inspection of Manual Valves 3/24/2016
SAIC SAIC-L-2041 Storage and Preservation of Valves 3/24/2016
SAIC SAIC-L-2042 Field Hydrostatic Testing of Isolation Valves 3/24/2016
SAIC SAIC-L-2043 Valve Installation Inspection & Valve Stroking 3/24/2016
SAIC SAIC-L-2053 Material Receiving Inspection of Fire Water Components (Non-Piping Components) 3/24/2016
SAIC SAIC-L-2054 Storage, Handling & Presevation of Fire Water Components 3/24/2016
SAIC SAIC-L-2055 Inspection of Fire Water Distribution Piping Lay-Out 3/24/2016
SAIC SAIC-L-2056 Installation of Fire Water Isolation Valves 3/24/2016
SAIC SAIC-L-2057 Installation of FW Hydrants, Monitors and Hose Reels 3/24/2016
SAIC SAIC-L-2058 Install Fire Water Deluge Piping To Equipment 3/24/2016
SAIC SAIC-L-2059 Installation of Fixed Spray Piping 3/24/2016
SAIC SAIC-L-2060 Final Inspection of Fire Water Distribution System 3/24/2016
SAIC SAIC-L-2061 Review of Steam Blow Procedure 3/24/2016
SAIC SAIC-L-2062 Receiving Insp of Steam System In-Line Components 3/24/2016
SAIC SAIC-L-2063 Storage, Handling & Pres. of Steam System In-Line Components 3/24/2016
SAIC SAIC-L-2064 Inspection of Drip legs (Steam Trap Component) 3/24/2016
SAIC SAIC-L-2065 Inspection of Venturi, Restriction Orifice and Flow Orifice 3/24/2016
SAIC SAIC-L-2066 Steam Trap/Strainer Installation 3/24/2016
SAIC SAIC-L-2067 Inspection of Injection / Sampling Quill 3/24/2016
SAIC SAIC-L-2068 Installation of Plant Utility Steam Hose Connection 3/24/2016
SAIC SAIC-L-2069 Installation of Utility Steam Connection to Process Equip 3/24/2016
SAIC SAIC-L-2070 Steam Tracing 3/24/2016
SAIC SAIC-L-2071 Steam System Punch Listing 3/17/2016
SAIC SAIC-L-2072 Steam Blowing for Final Internal Cleaning 3/24/2016
SAIC SAIC-L-2073 Recv Insp of Cement Lined Pipe, Fittings, & Joint Filler 3/24/2016
Type Number Title Date Approved
SAIC SAIC-L-2074 Storage, Handling and Preservation of Cement Lined Pipe/Fittings and Joint Filler Materials 3/24/2016
SAIC SAIC-L-2075 Inspect Joint Preparation of Cement Lined Piping Fabrication or Installation 3/24/2016
SAIC SAIC-L-2076 Inspection of Repair to Cement Lining 3/24/2016
SAIC SAIC-L-2077 Final Inspection of Cement Lined Pipe Installation 3/24/2016
SAIC SAIC-L-2078 Recv Insp, Storage & Handling of Piping Matls for Utility Service-(Plant Air, Inst. Air, Nitrogen, Water & Steam) 3/24/2016
SAIC SAIC-L-2079 Receiving Insp of Plant Utility Connectors 3/24/2016
SAIC SAIC-L-2080 Installation of Utility Take-off From Header Piping 3/24/2016
SAIC SAIC-L-2081 Installation of Utility Air or Nitrogen Gas Connections to Process Equipment 3/24/2016
SAIC SAIC-L-2083 Material Verification & Visual Inspection of Utility Piping, Valves & Gaskets (Mat'l Receiving) 3/24/2016
SAIC SAIC-L-2084 Storage & Preservation of Materials of Well Head Piping 3/24/2016
SAIC SAIC-L-2085 Installation of Piping Appurtenances 3/24/2016
SAIC SAIC-L-2086 Insulating Spool/Flange Installation 3/24/2016
SAIC SAIC-L-2087 Installation of Pipe Anchors and Supports 3/24/2016
SAIC SAIC-L-2088 Installation of Wellhead Guard Rails. 3/24/2016
SAIC SAIC-L-2089 Punch Listing of Well Head Piping Installation 3/24/2016
SAIC SAIC-L-2090 Review Procedure - Hot Tap & Stopple Connection Installation (Per SAEP-311, 13 September 2009) 3/24/2016
SAIC SAIC-L-2091 Review of Hot Tap/Stopple & Reinforcement Calc Sheet 3/24/2016
SAIC SAIC-L-2092 Recv Insp of Mat'ls for Hot Tap & Stopple Connections 3/24/2016
SAIC SAIC-L-2093 Storage , Handling & Preservation of Materials For Hot Tap & Stopple Connections 3/24/2016
SAIC SAIC-L-2094 Pre-Welding Inspection of Hot Tap Connection 3/24/2016
SAIC SAIC-L-2095 Pressure Testing of Hot Tap & Stopple Connection Install. 3/24/2016
SAIC SAIC-L-2096 Inspection of Cut Coupon of Hot Tap 3/24/2016
SAIC SAIC-L-2097 Punch Listing / Final Inspection of Hot Tap Connection 3/24/2016
SAIC SAIC-L-2106 Review of Pipe-to-Pipe Tie-in Procedures for Pipelines 3/24/2016
SAIC SAIC-L-2109 Review of Thrust Boring Procedure 3/24/2016
SAIC SAIC-L-2110 Review Procedure - Piping Matl Traceability (Pipelines) 3/24/2016
SAIC SAIC-L-2112 Receiving Insp - Pipeline Mat'ls (Pipe, Spools, Preformed Bends) 3/24/2016
SAIC SAIC-L-2113 Installation of Pipe/Pipe String (Pipelaying) for Above Ground Pipeline 3/24/2016
SAIC SAIC-L-2114 Inspection of Field Bending for Pipelines 3/24/2016
SAIC SAIC-L-2115 Pipeline Inspection Prior to Welding of Temperature Tie-In Weld Joint 3/24/2016
SAIC SAIC-L-2116 Inspection of Above Ground Anchors and PipeSupports 3/24/2016
SAIC SAIC-L-2117 Receiving Inspection of Scraper Trap 3/24/2016
SAIC SAIC-L-2118 Inspection of Culvert Crossing 3/24/2016
SAIC SAIC-L-2120 Inspection of Thrust Boring at Road Crossings 3/24/2016
Type Number Title Date Approved
SAIC SAIC-L-2121 Inspection of Pipeline & Powerline Crossing 3/24/2016
SAIC SAIC-L-2122 Installation of Pipeline Appurtenances 3/24/2016
SAIC SAIC-L-2125 Installation of Pipeline Kilometer Markers 3/24/2016
SAIC SAIC-L-2127 Installation of Pipeline Leak Detection System 3/24/2016
SAIC SAIC-L-2128 Performance of Pipeline Internal Gauging 3/24/2016
SAIC SAIC-L-2129 Re-Instatement/Punchlisting of Above Ground Pipeline 3/24/2016
SAIC SAIC-L-2130 Installation of Buried Anchor for Underground Pipelines 3/24/2016
SAIC SAIC-L-2131 Inspection of Pipeline Crossing or Parallel with Existing Pipelines and Other Buried facilities. 3/24/2016
SAIC SAIC-L-2132 Underground Pipeline Stringing & Pipelaying 3/24/2016
SAIC SAIC-L-2133 Re-Instatement/Punchlisting of Under Ground Pipeline 3/24/2016
SAIC SAIC-L-2134 Storage & Preservation of Scraper Trap & Appurtenances 3/24/2016
SAIC SAIC-L-2135 Installation of Scraper Trap and Appurtenances 3/24/2016
SAIC SAIC-L-2136 Scraper Trap and Piping Re-Instatement 3/24/2016
SAIC SAIC-L-2138 Gravity (Oily Water) Piping Installation Inspection 3/24/2016
SAIC SAIC-L-2139 Pre-Test Punch Listing of Cross Country Pipeline 3/24/2016
SAIC SAIC-L-2140 OWS Manhole and Clean-Out Installation Inspection 3/24/2016
SAIC SAIC-L-2141 Final Inspection / Walkthrough of Oily Water System Installation 3/24/2016
SAIC SAIC-L-2142 Material Verification of Pressure Containing Repair Sleeves 3/24/2016
SAIC SAIC-L-2143 Exploration, Inspection of Pipe Surface and Location of Repair Sleeve Areas for Pipeline Rehabilitation 3/24/2016
SAIC SAIC-L-2144 Fit-Up Inspection of Repair Sleeve With Longitudinal Butt Welded Seams 3/24/2016
SAIC SAIC-L-2145 Non-Destructive Testing of Welds for Pipeline Repair Sleeve Installation 3/24/2016
SAIC SAIC-LPT-2001 Review Procedure - Liquid Penetrant Testing (LPT) 3/24/2016
SAIC SAIC-LPT-2002 Review of Qualifications - LPT Personnel 3/24/2016
SAIC SAIC-LPT-2003 Insp & Verification - LPT Materials & Test Equipment 3/24/2016
SAIC SAIC-LPT-2004 In-Process Verification of LPT Technique for Water Washable Flourescent Penetrant Examination Method 3/24/2016
SAIC SAIC-LPT-2005 In-Process Verification of Penetrant Test Techniques for Solvent-Removable Flourescent Penetrant Examination 3/24/2016
SAIC SAIC-LPT-2006 In-Process Verification of Water Washable Color Contrast (Visible Dye) Penetrant Examination 3/24/2016
SAIC SAIC-LPT-2007 In-Process Verification of Solvent-Removable Color Contrast (Visible Dye) Penetrant Examination 3/24/2016
SAIC SAIC-LPT-2010 LPT Process Control Procedure on IK Projects 3/24/2016
SAIC SAIC-M-1001 Fence and Gate Components Receiving Inspection- Types I - V Fences 3/24/2016
SAIC SAIC-M-1002 Fencing Types I - V Installation Inspection 3/24/2016
SAIC SAIC-M-1003 Location, Depth of Trench/Boreholes & Elevation for Types I - V Fences Inspection 3/24/2016
SAIC SAIC-M-1004 Pre-pour Inspection for Type I - V Fences 3/24/2016
SAIC SAIC-M-1005 Final Inspection for Types I - V Fences 3/24/2016
Type Number Title Date Approved
SAIC SAIC-M-1006 Concrete Masonry Unit (CMU) Compressive Strength and Aggregate Test Reports 3/24/2016
SAIC SAIC-M-1007 Masonry Materials Receiving and Storage Inspection 3/24/2016
SAIC SAIC-M-1008 Concrete and CMU Surface Preparation and Protection Inspection 3/24/2016
SAIC SAIC-M-1009 Masonry Units and Plaster Installation Inspection 3/24/2016
SAIC SAIC-M-1012 Waterproofing Receiving and Storage Inspection 3/24/2016
SAIC SAIC-M-1014 Waterproofing Surface Preparation, Waterproofing Layer Installation Inspection 3/24/2016
SAIC SAIC-M-1018 Waterproofing Final Inspection 3/24/2016
SAIC SAIC-M-1031 Pre-Engineered Building Components/ Material Receiving, Handling & Storage Inspection 3/24/2016
SAIC SAIC-M-1032 Pre-Engineered Building - Foundations and Pre-Installation Inspection 3/24/2016
SAIC SAIC-M-1033 Pre-Engineered Building - Components and Accessories Installation Inspection 3/24/2016
SAIC SAIC-M-1034 Pre-Engineered Buildings - Interior and Exterior Final Inspection 3/24/2016
SAIC SAIC-M-1035 Gypsum Board System Receiving & Storage Inspection 3/24/2016
SAIC SAIC-M-1037 Gypsum Board Framing, Insulation, and Pre-Installation Inspection 3/24/2016
SAIC SAIC-M-1038 Gypsum Board Installation Inspection 3/24/2016
SAIC SAIC-M-1039 Gypsum Board System Plastering, Finishing and Final Inspection 3/24/2016
SAIC SAIC-M-1041 Ceramic Wall and Floor Tiles and Accessories Receiving and Storage Inspection 3/24/2016
SAIC SAIC-M-1043 Ceramic Wall and Floor Tile Pre-Installation and Surface Preparation Inspection 3/24/2016
SAIC SAIC-M-1044 Ceramic Wall and Floor Tiles Installation and Final Inspection 3/24/2016
SAIC SAIC-M-1046 Metal Doors & Windows Receiving Inspection 3/24/2016
SAIC SAIC-M-1047 Metal Doors and Windows Pre-Installation Inspection 3/24/2016
SAIC SAIC-M-1049 Metal Doors and Windows Installation Inspection 3/24/2016
SAIC SAIC-M-1051 Metal Doors and Windows Final Inspection 3/24/2016
SAIC SAIC-M-1052 Acoustical False Ceilings Receiving & Storage Inspection 3/24/2016
SAIC SAIC-M-1053 Ceilings Suspension System Installation Inspection 3/24/2016
SAIC SAIC-M-1054 Acoustical False Ceilings Installation & Final Inspection 3/24/2016
SAIC SAIC-M-1055 Raised Equipment Floor Installation and Final Inspection 3/24/2016
SAIC SAIC-M-1057 Glass & Glazing Receiving and Storage Inspection 3/24/2016
SAIC SAIC-M-1059 Glass & Glazing Pre-Installation Inspection 3/24/2016
SAIC SAIC-M-1060 Glass & Glazing Installation & Final Inspection 3/24/2016
SAIC SAIC-M-1062 Resilient Vinyl Floor Tile & Base Receiving & Storage Inspection 3/24/2016
SAIC SAIC-M-1063 Resilient Vinyl Floor Tile Pre - Installation inspection 3/24/2016
SAIC SAIC-M-1064 Resilient Vinyl Floor Tile Installation and Final Inspection 3/24/2016
SAIC SAIC-M-1065 Review of Procedure for Tightening of High Strength ASTM A325 and A490 Bolts 3/24/2016
SAIC SAIC-M-1066 Review of Procedure for Localized Heating to Correct Warping 3/24/2016
Type Number Title Date Approved
SAIC SAIC-M-1067 Receiving Inspection of Structural Steel Shapes & Plates 3/24/2016
SAIC SAIC-M-1068 Storage, Handling and Preservation of Structural Steel Materials and Components 3/24/2016
SAIC SAIC-M-1069 Inspection of Support Foundation Prior to Structural Installation 3/24/2016
SAIC SAIC-M-1070 Inspection Of Structural Alignment During Erection 3/24/2016
SAIC SAIC-M-1071 Repair/Correction of Errors of Structural Alignment 3/24/2016
SAIC SAIC-M-1072 High Strength Bolts Tightening Inspection and Testing (ASTM A325 or A490 Bolts) 3/24/2016
SAIC SAIC-M-1073 Inspection of Structure Installation 3/24/2016
SAIC SAIC-M-1074 Structural Re-instatement Punchlisting 3/24/2016
SAIC SAIC-M-1075 Raised Equipment Floor Material Receiving Inspection 3/24/2016
SAIC SAIC-M-2001 Review Procedure - Tightening High Strength Bolts (ASTM A325) 3/24/2016
SAIC SAIC-M-2002 Procedure - Localized Heating for Warpage Repair 3/24/2016
SAIC SAIC-M-2003 Receiving Inspection of Structural Steel Shapes & Plates 3/24/2016
SAIC SAIC-M-2004 Receiving Insp of Fabricated Steel & Aluminum Structures 3/24/2016
SAIC SAIC-M-2005 Storage, Handling and Preservation of Structural Steel Materials and Components 3/24/2016
SAIC SAIC-M-2006 Inspection of Support Foundation Prior to Structural or Equipment Installation 3/24/2016
SAIC SAIC-M-2007 Inspection Of Structural Alignment During Erection 3/24/2016
SAIC SAIC-M-2009 High Strength Bolts Tightening Inspection and Testing (ASTM A325 or A490 Bolts) 3/24/2016
SAIC SAIC-M-2010 Inspection of Access Structure Installations 3/24/2016
SAIC SAIC-M-2011 Final Inspection (Re-Instatement) of Structural Steel Installations 3/24/2016
SAIC SAIC-M-2012 Inspection of Structural Welding (Per AWS D1.1) 3/24/2016
SAIC SAIC-M-2021 Receiving Inspection - Bolts, Nuts & Washers for Structural Connections 3/24/2016
SAIC SAIC-M-2022 Pile Driving Procedure (Trials, Splicing, NDT) 3/24/2016
SAIC SAIC-MPT-2001 Review Procedure - Magnetic Particle Testing (MPT) 3/24/2016
SAIC SAIC-MPT-2002 Review Qualifications - MPT Personnel 3/24/2016
SAIC SAIC-MPT-2003 Inspection & Verification of MPT Equipment & Materials 3/24/2016
SAIC SAIC-MPT-2004 In-Process Inspection of Electromagnetic Yoke Technique 3/24/2016
SAIC SAIC-MPT-2005 In-Process Inspection of Prod Technique 3/24/2016
SAIC SAIC-MPT-2006 In-Process Inspection 0f Direct Contact Method (Circular magnetization technique) 3/24/2016
SAIC SAIC-MPT-2007 Demagnetization & Post Cleaning After Mag Particle Testing 3/24/2016
SAIC SAIC-MPT-2010 MPT Process Control Procedure on IK Projects 3/24/2016
SAIC SAIC-N-2001 Review Procedure - Cold Insulation Installation 3/24/2016
SAIC SAIC-N-2002 Review Qualifications - Insulation Installer & Inspector 3/24/2016
SAIC SAIC-N-2003 Review Project Specific Insulation Data Sheet & Specs (Cold Insulation) 3/24/2016
SAIC SAIC-N-2004 Receiving Insp - Hot & Cold Insulation Materials 3/24/2016
Type Number Title Date Approved
SAIC SAIC-N-2005 Storage, Handling & Preservation (Hot & Cold Insulation Matl) 3/24/2016
SAIC SAIC-N-2006 Pre-Application Inspection of Cold Insulation 3/24/2016
SAIC SAIC-N-2007 In-Process Application Inspection of Cold Insulation 3/24/2016
SAIC SAIC-N-2008 Inspection of Vapor Barrier Installation of Cold Insulation Prior to Cladding 3/24/2016
SAIC SAIC-N-2009 Inspection of Acoustical Control (AC) or Noise Control Insulation Installations (Cold & Hot Insulation) 3/24/2016
SAIC SAIC-N-2010 Inspection of Weather Protection/Cladding Application 3/24/2016
SAIC SAIC-N-2011 Punch Listing of Cold Insulation Installation 3/24/2016
SAIC SAIC-N-2012 Review Procedure - Hot Insulation Installation 3/24/2016
SAIC SAIC-N-2013 Review Project Specific Insulation Data Sheet & Specs (Hot Insulation) 3/24/2016
SAIC SAIC-N-2014 Inspection of Hot Insulation (Pre-Application Inspection & In-Process Inspection) 3/24/2016
SAIC SAIC-N-2015 Inspection of Hot Insulation Installation Prior to Cladding (Weatherproofing) 3/24/2016
SAIC SAIC-N-2016 Inspection of Weatherproofing (Cladding, Mastics and Removable Type Insulation) for Hot Insulation 3/24/2016
SAIC SAIC-N-2017 Punch Listing of Hot Insulation Installation 3/24/2016
SAIC SAIC-N-2018 Review Procedure - Castable & Extreme Erosion Resistant Refractory Installation 3/24/2016
SAIC SAIC-N-2019 Review Qualifications & Performance - Authorize Applicator & Inspector for (ALL) Refractory Installations 3/24/2016
SAIC SAIC-N-2020 Receiving Inspection of Castable Refractory Raw Materials & Anchors, Supports & Hexsteels 3/24/2016
SAIC SAIC-N-2021 Storage, Handling & Preservation - Castable Refractory Raw Materials, Anchors, Supports & Hexsteels 3/24/2016
SAIC SAIC-N-2022 Welding of Anchors & Supports (SAES-N-110/120/130) 3/24/2016
SAIC SAIC-N-2023 Pre-Qualification Test of Refractory Application Procedure 3/24/2016
SAIC SAIC-N-2024 Pre-Application Inspection of Castable & Brick Refractory 3/24/2016
SAIC SAIC-N-2025 In-Process Inspection of Pneumatically Applied (Gunned) Refractory 3/24/2016
SAIC SAIC-N-2026 In-Process Inspection of Refractory Applied by Casting 3/24/2016
SAIC SAIC-N-2027 In-Process Inspection of Refractory Applied by Vibration Casting 3/24/2016
SAIC SAIC-N-2028 Post-Application Inspection of Castable Refractories 3/24/2016
SAIC SAIC-N-2029 Inspection of Repairs of Castable Refractories 3/24/2016
SAIC SAIC-N-2030 Perform Inspection of Dryout (Furnace, etc) 3/24/2016
SAIC SAIC-N-2031 Final Inspection & Punchlisting of Castable Refractories 3/24/2016
SAIC SAIC-N-2032 In-Process Inspection of Extreme Erosion Resistant Refractory 3/24/2016
SAIC SAIC-N-2033 Post-Application Inspection of Extreme Erosion Resistant Refractory 3/24/2016
SAIC SAIC-N-2034 Inspection of Repairs to Extreme Erosion Resistant Refractory 3/24/2016
SAIC SAIC-N-2035 Review Installation Procedure for Fireclay Bricks 3/24/2016
SAIC SAIC-N-2036 Review of Curing & Dryout Procedure for Fireclay Brick Installations 3/24/2016
SAIC SAIC-N-2037 Receiving Inspection of Fireclay Bricks & Mortar 3/24/2016
SAIC SAIC-N-2038 Storage & Preservation of Fireclay Bricks & Mortar 3/24/2016
Type Number Title Date Approved
SAIC SAIC-N-2039 Pre-Application Inspection of Fireclay Brick Refractory 3/24/2016
SAIC SAIC-N-2040 In-Process Inspection of Fireclay Brick Installation 3/24/2016
SAIC SAIC-N-2041 Post-Application Inspection of Fireclay Brick Installation 3/24/2016
SAIC SAIC-N-2042 Inspection of Curing & Dryout of Fireclay Bricks 3/24/2016
SAIC SAIC-N-2043 Final Inspection & Punchlisting of Fireclay Brick Installations 3/24/2016
SAIC SAIC-N-2044 Review of Refractory Ceramic Fiber (RCF) Installation Procedure 3/24/2016
SAIC SAIC-N-2045 Receiving Inspection of RCF Materials & Anchors 3/24/2016
SAIC SAIC-N-2046 Receiving Inspection of High Temperature Coating Materials (including Vapor Barriers) 3/24/2016
SAIC SAIC-N-2047 Storage & Preservation of RCF Materials 3/24/2016
SAIC SAIC-N-2048 Pre-Welding Insp & Trial Welding of Anchors Incl. Bend Testing 3/24/2016
SAIC SAIC-N-2049 Insp of Production Welding (anchors, support) Incl. Bend Testing 3/24/2016
SAIC SAIC-N-2050 Inspection of High Temperature Coating (Vapor Barrier) Application for RCF 3/24/2016
SAIC SAIC-N-2051 Surface Preparation Inspection Prior to RCF Installation 3/24/2016
SAIC SAIC-N-2052 In-Process Inspection of Installation of RCF Materials 3/24/2016
SAIC SAIC-N-2053 Inspection of Repairs of RCF Installations 3/24/2016
SAIC SAIC-N-2054 Punch Listing of RCF Installations 3/24/2016
SAIC SAIC-O-1001 Fence and Gate Components Receiving Inspection- SSD/1 Fence 3/24/2016
SAIC SAIC-O-1002 Pre-Cast Posts Receiving Inspection for SSD/1 Fence 3/24/2016
SAIC SAIC-O-1003 SSD/1 Location, Depth of Trench/Boreholes & Elevation Inspection 3/24/2016
SAIC SAIC-O-1004 Pre-pour Inspection for SSD/1 Fence 3/24/2016
SAIC SAIC-O-1005 Final Inspection for SSD/1 Fence 3/24/2016
SAIC SAIC-P-3002 General - Electrical Equipment, Storage, Handling & Preservation 3/24/2016
SAIC SAIC-P-3003 General - Switchgear Room / Substation, Equipment Pre-Installation Inspection 3/24/2016
SAIC SAIC-P-3004 General - Hazardous Location Conduit and Cable Sealing Special Work Procedure, Document Review 3/24/2016
SAIC SAIC-P-3005 General - Channel, Strut, and Support Materials - Material Receiving 3/24/2016
SAIC SAIC-P-3007 General Boxes, Enclosures, and Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3008 General Boxes and Enclosures - Metallic Wireways and Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3009 General Boxes and Enclosures - Non-Metallic Wireways and Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3010 General Boxes Enclosures - Pushbutton and Pilot Light Control Stations & Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3014 General Boxes and Enclosures - Non-Hazardous Indoor Enclosures, Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3015 General Boxes and Enclosures - Non-Hazardous Outdoor Enclosure, Installation and Pre-commissioning 3/24/2016
SAIC SAIC-P-3016 General Boxes & Enclosures - Class I, Div 1 or Zone 1, Haz. Location Encl. Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3017 General Boxes & Enclosures - Class I, Division 2 or Zone 2, Haz. Loc. Installation and Pre-commissioning 3/24/2016
SAIC SAIC-P-3018 General - Exothermic (Thermite) Welding Materials, Molds, & Tools - Material Receiving 3/24/2016
Type Number Title Date Approved
SAIC SAIC-P-3019 General Mechanical Equipment Skid for Zone (0 or 1) or Div. 1 - Material Receiving 3/24/2016
SAIC SAIC-P-3020 General Mechanical Equipment Skid for Zone 2 or Div. 2 - Material Receiving 3/24/2016
SAIC SAIC-P-3021 General Mechanical Equipment Skid for Non-Hazardous Locations - Material Receiving 3/24/2016
SAIC SAIC-P-3022 General Mechanical Equipment Skid for Corrosive Locations - Material Receiving 3/24/2016
SAIC SAIC-P-3023 General Electrical Workspace Clearances 3/24/2016
SAIC SAIC-P-3101 UPS/DC Vented Ni-Cad Wet Cell, Storage Handling & Preservation 3/24/2016
SAIC SAIC-P-3102 UPS/DC Vented Lead-Acid Wet Cell, Storage Handling & Preservation 3/24/2016
SAIC SAIC-P-3103 UPS/DC Valve Regulated Lead-Acid (VRLA) Gelatin Cell, Storage Handling & Preservation 3/24/2016
SAIC SAIC-P-3104 UPS/DC Aqueous Sulfuric Acid Electrolyte, Storage Handling and Preservation 3/24/2016
SAIC SAIC-P-3105 UPS/DC Dry Potassium or Sodium Hydroxide Electrolyte, Storage Handling & Preservation 3/24/2016
SAIC SAIC-P-3106 UPS DC/AC Inverter, Material Receiving 3/24/2016
SAIC SAIC-P-3107 UPS Static Switch, Material Receiving 3/24/2016
SAIC SAIC-P-3108 UPS Transfer Switch, Material Receiving 3/24/2016
SAIC SAIC-P-3109 UPS Bypass Line Transformer Material Receiving 3/24/2016
SAIC SAIC-P-3110 UPS Maintenance Bypass Switch Material Receiving 3/24/2016
SAIC SAIC-P-3111 UPS Panelboards / CB's Material Receiving 3/24/2016
SAIC SAIC-P-3112 UPS/DC Battery Rectifier / Charger Material Receiving 3/24/2016
SAIC SAIC-P-3113 UPS/DC Vented Ni-Cad Wet Cell Material Receiving 3/24/2016
SAIC SAIC-P-3114 UPS/DC Vented Lead-Acid Wet Cell Material Receiving 3/24/2016
SAIC SAIC-P-3115 UPS/DC VRLA Gelatin Cell Material Receiving 3/24/2016
SAIC SAIC-P-3116 UPS/DC Aqueous Sulfuric Acid Electrolyte Material Receiving 3/24/2016
SAIC SAIC-P-3117 UPS/DC Dry Potassium or Sodium Hydroxide Material Receiving 3/24/2016
SAIC SAIC-P-3118 UPS/DC System and Battery Accessories, Material Receiving 3/24/2016
SAIC SAIC-P-3119 UPS/DC Battery Room, Equipment Pre-Installation Inspection 3/24/2016
SAIC SAIC-P-3120 UPS/DC Equipment and Battery Rack, Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3121 UPS/DC System Electrochemical Battery Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3122 DC Switchboard / CB's, Material Receiving 3/24/2016
SAIC SAIC-P-3123 DC Panelboard / CB's, Material Receiving 3/24/2016
SAIC SAIC-P-3124 GES - DCS/ESD/PLC/SCADA Grounding Installation 3/24/2016
SAIC SAIC-P-3125 GEC/EGC - AC UPS System Grounding - Installation 3/24/2016
SAIC SAIC-P-3126 GEC/EGC - DC System Grounding Installation 3/24/2016
SAIC SAIC-P-3201 Cable Storage, Handling, and Preservation 3/24/2016
SAIC SAIC-P-3202 Low Voltage UL/NEC Power and Control Cable and Wire Material Receiving 3/24/2016
SAIC SAIC-P-3203 Low Voltage NEC / SASO / IEC Unjacketed Wire, Material Receiving 3/24/2016
Type Number Title Date Approved
SAIC SAIC-P-3204 Low Voltage IEC Armored Cable, Material Receiving 3/24/2016
SAIC SAIC-P-3205 Low Voltage IEC Unarmored Cable, Material Receiving 3/24/2016
SAIC SAIC-P-3206 Low Voltage Power Cable Accessories, Material Receiving 3/24/2016
SAIC SAIC-P-3207 Low Voltage Power and Control Cable, Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3208 Low Voltage Building Wire, Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3209 Hazardous Location Conduit / Cable Seal Fitting Installation and Sealing 3/24/2016
SAIC SAIC-P-3210 Medium Voltage Cable - Termination and Splicing Special Work Procedure - Document Review 3/24/2016
SAIC SAIC-P-3211 Medium Voltage UL / NEC Cable, Material Receiving 3/24/2016
SAIC SAIC-P-3212 Medium Voltage IEC Cable, Material Receiving 3/24/2016
SAIC SAIC-P-3214 Medium Voltage Cable, Installation and Pre-Commissioning (Rated 5KV through 35KV) 3/24/2016
SAIC SAIC-P-3215 High Voltage Cable - Termination and Splicing Special Work Procedure - Document Review 3/24/2016
SAIC SAIC-P-3216 High Voltage Cable - Material Receiving 3/24/2016
SAIC SAIC-P-3217 High Voltage Cable Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3218 High Voltage Cable - Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3219 Very High Voltage Cable - Termination and Splicing Special Work Procedure - Document Review 3/24/2016
SAIC SAIC-P-3220 Very High Voltage Cable - Material Receiving 3/24/2016
SAIC SAIC-P-3221 Very High Voltage Cable Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3222 Very High Voltage Cable - Installation and Pre-Commissioning. (above 69 kV) 3/24/2016
SAIC SAIC-P-3223 Overhead T&D Cable Termination and Splicing Special Work Procedure, Document Review 3/24/2016
SAIC SAIC-P-3224 Overhead T&D Power Pole - Wood, Storage and Material Receiving 3/24/2016
SAIC SAIC-P-3226 Overhead T&D Power Pole - Galvanized Steel, Storage and Material Receiving 3/24/2016
SAIC SAIC-P-3228 Overhead T&D Power Structure - Galv. Lattice Steel, Storage and Material Receiving 3/24/2016
SAIC SAIC-P-3229 Overhead T&D - ACSR/AW Cable, Material Receiving 3/24/2016
SAIC SAIC-P-3230 Overhead T&D Surge Arresters, Material Receiving 3/24/2016
SAIC SAIC-P-3231 Overhead T&D Capacitor Banks, Material Receiving 3/24/2016
SAIC SAIC-P-3233 Overhead T&D Metering Cabinet, Material Receiving 3/24/2016
SAIC SAIC-P-3234 Overhead T&D Circuit Accessories, Material Receiving 3/24/2016
SAIC SAIC-P-3235 Overhead T&D Power Pole, Installation 3/24/2016
SAIC SAIC-P-3236 Overhead T&D Power Structure, Installation 3/24/2016
SAIC SAIC-P-3237 Overhead T&D Equipment, Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3238 Overhead T&D Cable, Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3247 MV Cablebus Framework Material Receiving 3/24/2016
SAIC SAIC-P-3248 MV Cablebus Conductor Material Receiving 3/24/2016
SAIC SAIC-P-3249 MV Cablebus Accessories Material Receiving 3/24/2016
Type Number Title Date Approved
SAIC SAIC-P-3250 MV Cablebus Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3251 MV Cablebus Bulkhead Fire Barrier Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3256 LV Cablebus Framework Material Receiving 3/24/2016
SAIC SAIC-P-3257 LV Cablebus Conductor Material Receiving 3/24/2016
SAIC SAIC-P-3258 LV Cablebus Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3259 LV Cablebus Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3260 LV Cablebus Bulkhead Fire Barrier Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3301 Cable Tray and Accessories - Storage, Handling and Preservation 3/24/2016
SAIC SAIC-P-3302 Cable Tray, Metallic Tray Systems - Material Receiving 3/24/2016
SAIC SAIC-P-3306 Cable Tray Firewall Barriers - Material Receiving 3/24/2016
SAIC SAIC-P-3307 Cable Tray, Metallic Tray Systems – Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3309 Cable Tray Firewall Barriers, Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3310 Conduit - Storage, Handling and Preservation 3/24/2016
SAIC SAIC-P-3311 Conduit- Galvanized Rigid Steel (GRS) Conduit & Fitting, Material Receiving (PVC Coated & HD Galvanized) 3/24/2016
SAIC SAIC-P-3313 Conduit - Flexible Metal Conduit (FMC) Material Receiving 3/24/2016
SAIC SAIC-P-3314 Conduit - Liquid-Tight Flexible Metal Conduit (LT Flex) Material Receiving 3/24/2016
SAIC SAIC-P-3315 Conduit - Explosion-Proof Flexible Metal Couplings (EXP Flex), Material Receiving 3/24/2016
SAIC SAIC-P-3316 Conduit - Electrical Metallic Tubing (EMT), Material Receiving 3/24/2016
SAIC SAIC-P-3317 Conduit - EXP Fittings and Accessories, Material Receiving 3/24/2016
SAIC SAIC-P-3318 Conduit - EMT & FMC Fittings and Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3319 Conduit - GRS Fittings and Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3320 Conduit - LT Flex Fittings and Accessories Material Receiving 3/24/2016
Conduit - Hazardous Location GRS & LT Flex Conduit System (Class 1, Zone or Div 2), Installation and Pre-
SAIC SAIC-P-3321 3/24/2016
Commissioning
Conduit - Hazardous Location GRS & EXP Flex Conduit Systems (Class 1, Zone or Div 1), Installation and Pre-
SAIC SAIC-P-3322 3/24/2016
Commissioning
SAIC SAIC-P-3323 Conduit - PVC-Coated GRS & LT Flex Conduit Systems (HL and NHL), Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3324 Conduit - GRS & LT Flex Conduit Systems (NHL), Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3325 Conduit - EMT and FMC Raceway Systems (NHL), Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3327 Pre-cast Ductbank / Manhole / Hand-hole, Jobsite Storage, Handling & Preservation 3/24/2016
SAIC SAIC-P-3328 Ductbank PVC Conduit, Material Receiving 3/24/2016
SAIC SAIC-P-3331 Direct Buried Conduit Installation 3/24/2016
SAIC SAIC-P-3333 Ductbank / Conduit Excavation, Trenching and Backfilling 3/24/2016
SAIC SAIC-P-3334 Ductbank Fabrication (Pre-Cast and Cast in Place) 3/24/2016
Type Number Title Date Approved
SAIC SAIC-P-3335 Manhole / Handhole Fabrication (Pre-Cast and Cast in Place) 3/24/2016
SAIC SAIC-P-3336 Conduit - Identification and Termination Visual Inspection 3/24/2016
SAIC SAIC-P-3337 Ductbank / Manhole / Hand-hole Grounding and Bonding, installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3401 HVAC - Control Panel - Material Receiving, Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3406 HVAC - E & I Installation for Pressurized Building Inspection 3/24/2016
SAIC SAIC-P-3407 LV SCIM - Motor Storage, Handling, and Preservation 3/24/2016
SAIC SAIC-P-3408 LV SCIM - Explosion-Proof Motor Material Receiving 3/24/2016
SAIC SAIC-P-3409 LV SCIM - Severe Duty TE Motor Material Receiving 3/24/2016
SAIC SAIC-P-3410 LV SCIM - API Air-Cooled H/E Fan Motor Material Receiving 3/24/2016
SAIC SAIC-P-3411 LV SCIM - Non-Industrial Facilities Motor Material Receiving 3/24/2016
SAIC SAIC-P-3413 LV SCIM - Squirrel-Cage Induction Motor Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3414 MV Motor - Storage, Handling, and Preservation 3/24/2016
SAIC SAIC-P-3415 MV Motor - Form Wound Squirrel Cage Induction Motor (SCIM) Material Receiving 3/24/2016
SAIC SAIC-P-3416 MV Motor - Form Wound Synchronous Motor Material Receiving 3/24/2016
SAIC SAIC-P-3417 MV Motor - Non-industrial Facilities Motor Receiving 3/24/2016
SAIC SAIC-P-3418 MV Motor - Motor Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3419 MV Motor - Motor Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3420 DG Set - Storage, Handling and Preservation 3/24/2016
SAIC SAIC-P-3421 DG Set - Engine and Synchronous Generator Material Receiving 3/24/2016
SAIC SAIC-P-3422 DG Set - GCB, Voltage Regulator, Enclosure, Load Test Set and DG Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3423 DG Set - Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3424 Cranes, Hoists, Elevators - Speciality Equipment and Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3425 Cranes, Hoists, Elevators - Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3426 VSD - Air Cooled LV Adjustable Frequency Drive (AFD) Material Receiving 3/24/2016
SAIC SAIC-P-3428 VSD - Air Cooled MV Adjustable Frequency Drive (AFD) Material Receiving 3/24/2016
SAIC SAIC-P-3440 VSD - Air Cooled LV Adjustable Frequency Drive (AFD) Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3442 VSD - Air Cooled MV AFD Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3454 LV SCIM for Fire Water Pump Service Material Receiving 3/24/2016
SAIC SAIC-P-3455 LV SCIM - Severe Duty TE Motor Material Receiving 3/24/2016
SAIC SAIC-P-3456 LV SCIM for Non-Industrial Facilities (Jockey Pump Service) Material Receiving 3/24/2016
SAIC SAIC-P-3457 LV Motor Controller for Fire Service Material Receiving 3/24/2016
SAIC SAIC-P-3458 Fire / Jockey Pump Motors & Controller Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3601 Receptacles & Cords - Pin-and-Sleeve Receptacle / Plug - Material Receiving 3/24/2016
SAIC SAIC-P-3602 Receptacles & Cords - NEMA Receptacle / Plug - Material Receiving 3/24/2016
Type Number Title Date Approved
SAIC SAIC-P-3603 Receptacles & Cords - Flexible Cord - Material Receiving 3/24/2016
SAIC SAIC-P-3604 Receptacles & Cords - Cable Reels - Material Receiving 3/24/2016
SAIC SAIC-P-3605 Receptacles & Cords - Festoon Systems - Material Receiving 3/24/2016
SAIC SAIC-P-3610 Fluorescent Light Fixtures - Material Receiving 3/24/2016
SAIC SAIC-P-3611 HID Light Fixtures - Material Receiving 3/24/2016
SAIC SAIC-P-3612 Emergency Light Fixtures - Material Receiving 3/24/2016
SAIC SAIC-P-3613 Incandescent Light Fixtures - Material Receiving 3/24/2016
SAIC SAIC-P-3614 12V High Intensity Incandescent Fixtures - Material Receiving 3/24/2016
SAIC SAIC-P-3615 Aviation / Obstruction Light Fixtures - Material Receiving 3/24/2016
SAIC SAIC-P-3616 Lighting Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3617 Light Pole Assembly and Installation 3/24/2016
SAIC SAIC-P-3618 Hung Ceiling, Surface / Flush Mounted Light Fixtures - Assembly, Installation, and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3621 HID - Low / High-bay Light Fixtures - Assembly, Installation, and Pre- Commissioning 3/24/2016
SAIC SAIC-P-3623 Lighting Control System - Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3624 Pole-Mounted Light Fixtures - Assembly, Installation, and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3625 Security Light Fixtures (Fence, Area, and Checkpoint Ltg.) - Assembly, Installation, and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3626 Aviation / Obstruction Light Fixtures - Assembly, Installation, and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3627 Offshore Light Fixtures - Assembly, Installation, and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3701 Grounding - GES- Copper Rod, Copper Jacketed Rod & Galvanized Steel Rod - Material Receiving 3/24/2016
SAIC SAIC-P-3704 Grounding - GES- Zinc and Magnesium Anode Electrodes - Material Receiving 3/24/2016
SAIC SAIC-P-3705 Grounding - GES - Ground Grid & Electrode Conductors - Material Receiving 3/24/2016
SAIC SAIC-P-3708 Grounding - GES - Hydraulic Compression Connectors and Tools - Material Receiving 3/24/2016
SAIC SAIC-P-3709 Grounding and Bonding Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3710 Grounding - Neutral Ground Resistor - Material Receiving 3/24/2016
SAIC SAIC-P-3711 Grounding - GES - Copper, Copper-Clad (Jacketed) Steel, Galvanized Steel Rod - Installation 3/24/2016
SAIC SAIC-P-3712 Grounding - GES - Zinc and Magnesium Anode Electrode Installation 3/24/2016
SAIC SAIC-P-3713 Grounding - GES/GEC - Exothermic (Thermite) Welding Materials - Molds, & Tools Installation 3/24/2016
SAIC SAIC-P-3714 Grounding - GES/GEC/EGC - Hydraulic Compression Connectors Installation 3/24/2016
SAIC SAIC-P-3715 Grounding - GES - Concrete Embedded Copper Electrode Installation 3/24/2016
SAIC SAIC-P-3716 Grounding - GES - Piping Electrode Installation 3/24/2016
SAIC SAIC-P-3717 Grounding - GES - Structural Steel Electrode Installation 3/24/2016
SAIC SAIC-P-3718 Grounding - GES - Copper Conductor Ground Ring Installation 3/24/2016
SAIC SAIC-P-3719 Grounding - GES - Power Ground Electrode System (GES) - Installation 3/24/2016
SAIC SAIC-P-3720 Grounding - GES - Substation Grounding Installation 3/24/2016
Type Number Title Date Approved
SAIC SAIC-P-3721 Grounding - GES - Cathodic Protection Grounding Installation 3/24/2016
SAIC SAIC-P-3722 GES - Offshore Grounding Installation 3/24/2016
SAIC SAIC-P-3723 GES - Telecommunications Grounding System Installation 3/24/2016
SAIC SAIC-P-3724 GEC - High Resistance Grounding Installation 3/24/2016
SAIC SAIC-P-3725 GEC - LV Dry Transformer Grounding Installation 3/24/2016
SAIC SAIC-P-3726 GEC/EGC - Panelboard Grounding Installation 3/24/2016
SAIC SAIC-P-3727 GEC/EGC - Switchgear / Controlgear Grounding Installation 3/24/2016
SAIC SAIC-P-3728 GEC/EGC - DG Set System Grounding Installation 3/24/2016
SAIC SAIC-P-3729 GEC/EGC - ATS / MTS System Grounding Installation 3/24/2016
SAIC SAIC-P-3730 GEC/EGC - Pad-Mounted Transformer Grounding Installation 3/24/2016
SAIC SAIC-P-3731 GEC/EGC - Power Transformer Grounding Installation 3/24/2016
SAIC SAIC-P-3732 GEC/EGC - Variable Speed Drive Grounding Installation 3/24/2016
SAIC SAIC-P-3733 EGC - Cable Tray Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3734 EGC - Conduit Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3735 EGC - Buried Cable Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3736 EGC - Electrical Manhole Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3737 EGC - Electrical Eqpt. Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3738 EGC - Instrumentation Grounding / Bonding / Shielding Installation 3/24/2016
SAIC SAIC-P-3739 EGC - Surge Arrestor Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3740 EGC - Process Eqpt. Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3741 EGC - Structural Steel Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3742 EGC - LV Cable Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3743 EGC - MV Cable Grounding / Bonding / Shielding Installation 3/24/2016
SAIC SAIC-P-3744 EGC - Raised Floor Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3745 EGC - Offshore Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3746 EGC - Fence Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3747 EGC - Tank Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3748 EGC - Static Electricity Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3749 EGC - Isolated Grounding / Bonding Installation 3/24/2016
SAIC SAIC-P-3750 Lightning Protection Air Terminals Material Receiving 3/24/2016
SAIC SAIC-P-3751 Lightning Protection Ground Terminals Material Receiving 3/24/2016
SAIC SAIC-P-3752 Lightning Protection Cable Material Receiving 3/24/2016
SAIC SAIC-P-3753 Lightning Protection Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3754 Lightning Protection Air Terminals Installation 3/24/2016
Type Number Title Date Approved
SAIC SAIC-P-3755 Lightning Protection Ground Terminals Installation 3/24/2016
SAIC SAIC-P-3756 Lightning Protection Loop / Down / Bonding Conductor Installation 3/24/2016
SAIC SAIC-P-3801 Protection & Metering - Annunciator Panel Material Receiving 3/24/2016
SAIC SAIC-P-3802 Protection & Metering - Metering Cabinet Material Receiving 3/24/2016
SAIC SAIC-P-3803 Protection & Metering - Relay Cabinet Material Receiving 3/24/2016
SAIC SAIC-P-3804 Protection & Metering - Current Transformer Material Receiving 3/24/2016
SAIC SAIC-P-3805 Protection & Metering - Potential Transformer Material Receiving 3/24/2016
SAIC SAIC-P-3806 Protection & Metering - Protection Relay Material Receiving 3/24/2016
SAIC SAIC-P-3807 Protection & Metering - Electric Meter / Recorder Material Receiving 3/24/2016
SAIC SAIC-P-3808 Protection & Metering - Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3809 Protection & Metering - Equipment Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3810 Protection & Metering - CT and PT Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3811 Protection & Metering - Relay Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3812 Protection & Metering - Meter / Recorder Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3813 MV Switchgear - Metal-Clad Switchgear (Indoor/Outdoor) Material Receiving 3/24/2016
SAIC SAIC-P-3814 MV Switchgear - SF6 Switchgear (Outdoor) Material Receiving 3/24/2016
SAIC SAIC-P-3815 MV Switchgear - Manual SF6 Circuit Breaker Material Receiving 3/24/2016
SAIC SAIC-P-3816 MV Switchgear - Vacuum Circuit Breaker 1 to 38 kV (Motor Load) Material Receiving 3/24/2016
SAIC SAIC-P-3817 MV Switchgear - Vacuum Circuit Breaker 1 to 38 kV (Feeder Load) Material Receiving 3/24/2016
SAIC SAIC-P-3818 MV Switchgear and SF6 breaker - Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3819 MV Switchgear - Metal-Clad Switchgear Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3820 MV / HV Switchgear - Outdoor SF6 Switchgear Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3821 MV Switchgear - MV Manual SF6 Circuit Breaker Pre-Commissioning 3/24/2016
SAIC SAIC-P-3822 MV Switchgear - MV Vacuum Circuit Breaker - Motor Load Pre-Commissioning 3/24/2016
SAIC SAIC-P-3823 MV Switchgear - MV Vacuum Circuit Breaker - Feeder Pre-Commissioning 3/24/2016
SAIC SAIC-P-3824 MV Controlgear - Metal-Enclosed Equipment (Indoor/Outdoor) Material Receiving 3/24/2016
SAIC SAIC-P-3825 MV Controlgear - Power Circuit Breaker Material Receiving 3/24/2016
SAIC SAIC-P-3829 MV Controlgear - Metal-Enclosed Equipment Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3830 MV Controlgear - Power Circuit Breaker Pre-Commissioning 3/24/2016
SAIC SAIC-P-3833 LV Switchgear - Equipment Material Receiving 3/24/2016
SAIC SAIC-P-3834 LV Switchboard - Material Receiving 3/24/2016
SAIC SAIC-P-3835 LV Switchgear - Power Circuit Breaker Material Receiving 3/24/2016
SAIC SAIC-P-3837 LV Switchgear / Switchboard - Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3840 LV Switchgear - Metal-Enclosed Equipment Installation and Pre-Commissioning 3/24/2016
Type Number Title Date Approved
SAIC SAIC-P-3841 LV Switchboard - Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3842 LV Controlgear - Metal-Enclosed Equipment, Material Receiving 3/24/2016
SAIC SAIC-P-3843 LV Controlgear - Power Circuit Breaker Material Receiving 3/24/2016
SAIC SAIC-P-3844 LV Controlgear - Full Voltage Motor Controller Material Receiving 3/24/2016
SAIC SAIC-P-3845 LV Controlgear - Reduced Voltage Motor Controller Material Receiving 3/24/2016
SAIC SAIC-P-3846 LV Controlgear - Feeder Contactor Material Receiving 3/24/2016
SAIC SAIC-P-3847 ATS / MTS Material Receiving 3/24/2016
SAIC SAIC-P-3848 LV Controlgear - Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3849 LV Controlgear - Metal-Enclosed Equipment Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3850 LV Controlgear - Power Circuit Breaker Pre-Commissioning 3/24/2016
SAIC SAIC-P-3851 LV Controlgear - Full Voltage Motor Controller Pre-Commissioning 3/24/2016
SAIC SAIC-P-3852 LV Controlgear - Reduced Voltage Motor Controller Pre-Commissioning 3/24/2016
SAIC SAIC-P-3853 LV Controlgear - Feeder Contactor Pre-Commissioning 3/24/2016
SAIC SAIC-P-3854 LV Controlgear - ATS / MTS Pre-Commissioning 3/24/2016
SAIC SAIC-P-3855 Switchrack - Material Receiving 3/24/2016
SAIC SAIC-P-3857 Switchrack Pre-Commissioning 3/24/2016
SAIC SAIC-P-3859 LV Panelboard - Industrial Panelboard (≤400A) Material Receiving 3/24/2016
SAIC SAIC-P-3860 LV Panelboard - Non-Industrial Panelboard Material Receiving 3/24/2016
SAIC SAIC-P-3862 LV Panelboard - Industrial Explosion-Proof Panelboard (≤400A) Material Receiving 3/24/2016
SAIC SAIC-P-3867 LV Panelboard - Non-Hazardous AC/DC Panelboard Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3869 LV Panelboard - Explosion-Proof AC/DC Panelboard Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3901 Switchyard - ACSR Cable and Accessories Storage, Handling, and Preservation 3/24/2016
SAIC SAIC-P-3902 Switchyard - HV Equipment Storage, Handling, and Preservation 3/24/2016
SAIC SAIC-P-3903 Switchyard - Seamless Aluminum Bus Pipe and Accessories Material Receiving and Storage 3/24/2016
SAIC SAIC-P-3904 Switchyard - Aluminum Conductor Steel Reinforced (ACSR) Cable and Accessories Material Receiving 3/24/2016
SAIC SAIC-P-3905 Switchyard - HV SF6 CBs and Switchgear Material Receiving 3/24/2016
SAIC SAIC-P-3906 Switchyard - HV Post Insulators Material Receiving 3/24/2016
SAIC SAIC-P-3907 Switchyard - HV Surge Arresters and Capacitors Material Receiving 3/24/2016
SAIC SAIC-P-3908 Switchyard - HV Disconnect Switches (Motor-operated and manual) Material Receiving 3/24/2016
SAIC SAIC-P-3909 Switchyard - HV Metering and Protection CT & PT Material Receiving 3/24/2016
SAIC SAIC-P-3910 Switchyard - HV SF6 CB and Switchgear Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3911 Switchyard - HV Post Insulators Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3912 Switchyard - HV Surge Arresters and Capacitors Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3913 Switchyard - HV Disconnect Switches (Motor-operated and manual) Installation and Pre-Commissioning 3/24/2016
Type Number Title Date Approved
SAIC SAIC-P-3914 Switchyard - HV Metering and Protection CT & PT Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3915 Switchyard - Seamless Aluminum Bus Pipe and Accessories Installation and Pre-Commissioning 3/24/2016
Switchyard - Aluminum Conductor Steel Reinforced (ACSR) Cable and Accessories Installation and Pre-
SAIC SAIC-P-3916 3/24/2016
Commissioning
SAIC SAIC-P-3918 Dry Transformer - LV Open Vented and Non-Vented Xfmr (≤500 kVA, LV Pri) Material Receiving and Storage 3/24/2016
SAIC SAIC-P-3919 Dry Type Transformer - MV Xfmr (MV or ≥501 kVA) Material Receiving and Storage 3/24/2016
SAIC SAIC-P-3920 Dry Transformer - LV Xfmr (≤500 kVA, LV Pri) Assembly, Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-P-3921 Dry Transformer- Medium Voltage- MV Xfmr (MV or ≥501 kVA) Assembly, Installation & Pre-Commissioning 3/24/2016
SAIC SAIC-P-3922 Power Transformer - Storage, Handling, and Preservation 3/24/2016
SAIC SAIC-P-3923 Power Transformer - Material Receiving 3/24/2016
SAIC SAIC-P-3924 Power Transformer Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3925 Power Transformer - Installation, Assembly, and Filling 3/24/2016
SAIC SAIC-P-3926 Power Transformer - Pre-Commissioning and Energization 3/24/2016
SAIC SAIC-P-3929 Overhead Transformer - Installation, Assembly, and Filling 3/24/2016
SAIC SAIC-P-3930 Overhead Transformer - Pre-Commissioning and Energization 3/24/2016
SAIC SAIC-P-3931 Self-Cooled Pad-Mounted MV Transformer - Material Receiving 3/24/2016
SAIC SAIC-P-3932 Self-Cooled Pad-Mounted MV Transformer Accessories - Material Receiving 3/24/2016
SAIC SAIC-P-3933 Self-Cooled Pad-Mounted MV Transformer - Installation, Assembly, and Filling 3/24/2016
SAIC SAIC-P-3934 Self-Cooled Pad-Mounted MV Transformer - Pre-Commissioning and Energization 3/24/2016
SAIC SAIC-Q-1001 Raw Materials Sampling, Testing and Reviewing Test Reports/ Plant Calibration Certificates 3/24/2016
SAIC SAIC-Q-1002 Concrete Batch Plant/Equipment & Laboratory Inspection 3/24/2016
SAIC SAIC-Q-1003 Concrete Ingredients Inspection 3/24/2016
SAIC SAIC-Q-1004 Fresh Concrete Sampling & Testing Inspection @ The Batch Plants 3/24/2016
SAIC SAIC-Q-1005 Plant QC Lab Inspection 3/24/2016
SAIC SAIC-Q-1006 Raw Materials Sampling, Testing & Concrete Mix Design Approval 3/24/2016
SAIC SAIC-Q-1007 FBE Rebar & Embedments Receiving Inspection 3/24/2016
SAIC SAIC-Q-1008 Handling, Storage & Preservation of FBE Steel Bars 3/24/2016
SAIC SAIC-Q-1009 Cast-in-Place Ready Mix Concrete Receiving Inspection 3/24/2016
SAIC SAIC-Q-1010 Cast-In-Place Concrete Pumps/Transit Mixer Inspection 3/24/2016
SAIC SAIC-Q-1011 Cast-In-Place Concrete Grade & Site Preparation 3/24/2016
SAIC SAIC-Q-1012 Cast-In-Place Concrete Formwork Inspection 3/24/2016
SAIC SAIC-Q-1013 FBE Reinforcing Steel, Embedded Items, and Form Closure Inspection 3/24/2016
SAIC SAIC-Q-1015 Cast-In-Place Concrete Finishing and Curing Inspection 3/24/2016
SAIC SAIC-Q-1016 Cast-In-Place Concrete Formwork Stripping Inspection 3/24/2016
Type Number Title Date Approved
SAIC SAIC-Q-1017 Concrete Compressive Strength Testing and Final Acceptance Inspection 3/24/2016
SAIC SAIC-Q-1018 Pre-Cast Concrete Fence Posts at Fabrication Yards Reinforcing Bar and Formwork Inspection 3/24/2016
SAIC SAIC-Q-1019 Pre-Cast Concrete Fence Posts at Fabrication Yards Concrete Placement, Sampling & Testing Inspection 3/24/2016
SAIC SAIC-Q-1020 Pre-Cast Concrete Fence Posts at Fabrication Yards Demolding and Curing Inspection 3/24/2016
SAIC SAIC-Q-1021 Pre-Cast Concrete Fence Posts Final Inspection 3/24/2016
SAIC SAIC-Q-1022 Pre-Cast & Pre-Stressed Concrete -- Pre-Concreting Inspection 3/24/2016
SAIC SAIC-Q-1023 Pre-cast & Pre-Stressed Concrete -- Casting Beds Set-Up Inspection 3/24/2016
SAIC SAIC-Q-1024 Tensioning and Releasing Inspection for Pre-Stressed-- Pre-Tensioned Concrete 3/24/2016
SAIC SAIC-Q-1025 Precast & Pre-Stressed Concrete -- Concrete Placement, Sampling and Testing Inspection 3/24/2016
SAIC SAIC-Q-1026 Tensioning and Grouting Inspection for Pre-Stressed/ Post-Tensioned Concrete 3/24/2016
SAIC SAIC-Q-1028 Pre-Cast Post-Concreting & Final Inspection 3/24/2016
SAIC SAIC-Q-1030 Raw Materials Sampling, Testing and Review of Test Reports/ Plant Calibration Certificate 3/24/2016
SAIC SAIC-Q-1031 Batch Plant Equipment and Set-up Inspection 3/24/2016
SAIC SAIC-Q-1032 Asphaltic Concrete Ingredients Inspection At Batch Plants 3/24/2016
SAIC SAIC-Q-1033 Hot Mix Asphalt Inspection 3/24/2016
SAIC SAIC-Q-1034 Plant QC Lab Inspection (Asphalt) 3/24/2016
SAIC SAIC-Q-1035 Aggregate Subbase and Base Course Materials Sampling, Testing & Review of Test Reports 3/24/2016
SAIC SAIC-Q-1036 Raw Materials Sampling, Testing & Asphalt Mix Design Review 3/24/2016
SAIC SAIC-Q-1037 Sub-base and Aggregate Base Course Material Receiving Inspection 3/24/2016
SAIC SAIC-Q-1039 Sub-grades, Elevation and Surface Preparation Inspection 3/24/2016
SAIC SAIC-Q-1040 Placement and Compaction of Sub-base and Aggregate Base Course Materials Inspection 3/24/2016
SAIC SAIC-Q-1041 Asphalt Pavement Prime Coat & Tack Coating Inspection 3/24/2016
SAIC SAIC-Q-1043 Asphalt Core Density Testing Inspection 3/24/2016
SAIC SAIC-Q-1044 Asphalt Paving Final Inspection 3/24/2016
SAIC SAIC-Q-1045 Non-Shrink Grout Materials, Sampling, Testing, and Review of Compressive Strength Test Report 3/24/2016
SAIC SAIC-Q-1046 Review of Quality Control Program & Procedures for the Installation of Cement Based Non-Shrink Grout 3/24/2016
SAIC SAIC-Q-1047 Cement Based Non-Shrink Grout Material Components and Ingredients Receiving Inspection 3/24/2016
SAIC SAIC-Q-1048 Cement Based Non-Shrink Grout Surface Preparation & Final Formwork Inspection Prior to Grouting 3/24/2016
SAIC SAIC-Q-1049 Cement Based Non-Shrink Grout Mixing, Placement, Sampling, Testing, Curing and Final Inspection 3/24/2016
SAIC SAIC-Q-1051 Sampling, Testing Epoxy Grout and Review of Compressive Strength Test Report 3/24/2016
SAIC SAIC-Q-1052 Epoxy Grout Materials Receiving and Storage Inspection 3/24/2016
SAIC SAIC-Q-1053 Epoxy Grout Pre-Installation Inspection 3/24/2016
SAIC SAIC-Q-1054 Epoxy Grout Mixing, Placement, Sampling & Testing Inspection 3/24/2016
SAIC SAIC-Q-1055 Foundation and Epoxy Grout Curing/Protection and Final Inspection 3/24/2016
Type Number Title Date Approved

SAIC SAIC-Q-1057 Material Sampling, Testing & Review of Engineering Properties of Foamed Stabilizing Agents & Sub-base Materials 3/24/2016
SAIC SAIC-Q-1058 Stabilization Equipment Set-up Inspection 3/24/2016
SAIC SAIC-Q-1059 Placement, Compaction and Quality Control of Foamed Stabilized Materials 3/24/2016
SAIC SAIC-Q-1060 Concrete Sampling, Testing & Placement Inspection 3/24/2016
SAIC SAIC-Q-1061 Conventional Asphalt & Sulfur Extended Asphalt Concrete Receiving, Placement and Testing Inspection 3/24/2016
SAIC SAIC-Q-1062 Repair of Major Defects on Structural Concrete Inspection 3/24/2016
SAIC SAIC-Q-1064 Receiving & Storage Inspection for Structural and Architectural Pre- Cast Concrete Members & Connectors 3/24/2016
SAIC SAIC-Q-1065 Structural and Architectural Pre-cast Concrete Pre-Installation Inspection 3/24/2016
SAIC SAIC-Q-1066 Pre-cast Concrete Erection & Alignment Inspection 3/24/2016
SAIC SAIC-Q-1067 Pre-cast Concrete Installation Final Inspection 3/24/2016
SAIC SAIC-RT-2001 Review Procedure - Radiographic Testing (RT) 3/24/2016
SAIC SAIC-RT-2002 Review Qualifications - RT Personnel 3/24/2016
SAIC SAIC-RT-2003 Radiation Safety Procedure Review 3/24/2016
SAIC SAIC-RT-2004 Inspection/Verification of RT Devices & Safety Equipment 3/24/2016
SAIC SAIC-RT-2005 Insp of Radiographic Film & Developing Equipment 3/24/2016
SAIC SAIC-RT-2007 In-Process Verification - RT Techniques & Procedure Implementation 3/24/2016
SAIC SAIC-RT-2008 Radiographic Film Processing 3/24/2016
SAIC SAIC-RT-2009 Radiographic Film Evaluation and Reporting 3/24/2016
SAIC SAIC-RT-2010 RT Process Control Procedure on IK Projects 3/24/2016
SAIC SAIC-S-1001 Clean Sand and Aggregate Base Course Sampling, Testing & Review of Test Reports 3/24/2016
SAIC SAIC-S-1002 Clean Sand and Aggregate Base Coarse Receiving Inspection 3/24/2016
SAIC SAIC-S-1003 Excavation Bracing and De-Watering Inspection 3/24/2016
SAIC SAIC-S-1004 Excavation, Placement and Compaction in Subkha Areas 3/24/2016
SAIC SAIC-S-1005 Excavation, Placement and Compaction in Non-Subkha Areas 3/24/2016
SAIC SAIC-S-1006 Excavation, Placement and Compaction in Trenches With High Pressure Piping 3/24/2016
SAIC SAIC-S-1007 Final Inspection for Excavation, Placement and Compaction 3/24/2016
SAIC SAIC-S-2001 Vent Piping Installation Inspection 3/24/2016
SAIC SAIC-S-2002 Inspection of Catch Basin & Installation 3/24/2016
SAIC SAIC-S-4001 Manhole Receiving, Handling, Storage and Preservation 3/24/2016
SAIC SAIC-S-4002 Sanitary Sewer Pipe Lay-Out 3/24/2016
SAIC SAIC-S-4003 Sanitary Sewer Manhole Installation Inspection 3/24/2016
SAIC SAIC-S-4005 Wet-Well, Wet-Well/Dry-Well Receiving, Handling, Storage and Preservation 3/24/2016
SAIC SAIC-S-4006 Lift Station Electrical and Control Receiving, Handling, Storage and preservation 3/24/2016
Type Number Title Date Approved
SAIC SAIC-S-4008 Force Main /Piping Lay-Out 3/24/2016
SAIC SAIC-S-4009 Thrust Block Installation 3/24/2016
SAIC SAIC-S-4010 Wet Well and Wet Well / Dry Well Lift Stations Installation 3/24/2016
SAIC SAIC-S-4012 Lift Station Control Installation System 3/24/2016
SAIC SAIC-S-4013 Lift Station Enclosure Installation 3/24/2016
SAIC SAIC-S-4016 Water Distribution Lay-Out (Upstream of Isolation Valve) 3/24/2016
SAIC SAIC-S-4017 Hangers and Supports Receiving, Handling and Storage 3/24/2016
SAIC SAIC-S-4018 Water Distribution Lay-Out (Downstream of Isolation Valve and within building) 3/24/2016
SAIC SAIC-S-4019 Hanger and Supports Installation 3/24/2016
SAIC SAIC-S-4020 Disinfection of Newly Constructed Water Mains 3/24/2016
SAIC SAIC-S-4021 Final Inspection of Water Distribution Systems 3/24/2016
SAIC SAIC-S-4022 Receiving, Handling, Storage and Preservation of Sprinkler and Standpipe system 3/24/2016
SAIC SAIC-S-4023 Piping and Fitting Installation (Sprinkler and Standpipe) 3/24/2016
SAIC SAIC-S-4024 Location and Spacing of Sprinkler 3/24/2016
SAIC SAIC-S-4025 Valve Installation 3/24/2016
SAIC SAIC-S-4026 Final Inspection of Building Sprinkler and Standpipe System 3/24/2016
SAIC SAIC-S-4027 Electric Water Heater Receiving, Handling, Storage and Preservation 3/24/2016
SAIC SAIC-S-4028 Electric Water Heater Installation & Piping Connection 3/24/2016
SAIC SAIC-S-4030 Receiving and Storage of Electric Water Coolers 3/24/2016
SAIC SAIC-S-4031 Installation of Electric Drinking Water Coolers 3/24/2016
SAIC SAIC-S-4032 Control Wire Installation 3/24/2016
SAIC SAIC-S-4033 Skid Mounted R.O. system Receiving, Handling and Storage 3/24/2016
SAIC SAIC-S-4034 Installation of Reverse Osmosis System 3/24/2016
SAIC SAIC-S-4035 Final Inspection of Reverse Osmosis System 3/24/2016
SAIC SAIC-S-4036 Plumbing Fixtures Receiving and Storage 3/24/2016
SAIC SAIC-S-4037 Plumbing Fixtures Installation 3/24/2016
SAIC SAIC-S-4038 Roof Drain Installation Inspection 3/24/2016
SAIC SAIC-S-4039 Roof Drain Receiving and Storage 3/24/2016
SAIC SAIC-S-4040 Drainage System Lay-Out 3/24/2016
SAIC SAIC-S-4041 Vent Piping Connection 3/24/2016
SAIC SAIC-S-4042 Trap and Interceptors / Separators Installation 3/24/2016
SAIC SAIC-S-4043 Indirect Waste Piping Installation 3/24/2016
SAIC SAIC-S-4044 Neutralization tanks and its accessories, Receiving, handling, storage and Preservation 3/24/2016
SAIC SAIC-S-4045 Neutralization Tank and Its Piping Connection 3/24/2016
Type Number Title Date Approved
SAIC SAIC-S-4046 Neutralization tanks and Accessories Final Inspection 3/24/2016
SAIC SAIC-S-4047 Review of Brazer Qualifications 3/24/2016
SAIC SAIC-S-4048 Brazing Procedures 3/24/2016
SAIC SAIC-S-4049 Copper Pipe and Brazing Wire Receiving 3/24/2016
SAIC SAIC-S-4050 Copper Pipe Installation 3/24/2016
SAIC SAIC-S-4052 Irrigation Piping lay-out 3/24/2016
SAIC SAIC-S-4053 Irrigation system Accessories 3/24/2016
SAIC SAIC-S-4054 RTR & Thermoplastic Pipe Installer Qualifications 3/24/2016
SAIC SAIC-S-4055 RTR and Thermoplastic Piping Receiving (Pressure and Sewer Pipe) 3/24/2016
SAIC SAIC-S-4056 RTR and Thermoplastic Piping Handling, Storage and Preservation 3/24/2016
SAIC SAIC-S-4057 Assembly of Thermoplastic (PVC, UPVC, CPVC and HDPE) Piping 3/24/2016
SAIC SAIC-S-4058 Assembly and Laying of RTR piping 3/24/2016
SAIC SAIC-S-4060 Storm Water Drainage Systems Installation 3/24/2016
SAIC SAIC-S-4061 Fire Sprinkler System (Hanging, Bracing and Restraint of System Piping) 3/24/2016
SAIC SAIC-S-4062 Sprinkler Installation 3/24/2016
SAIC SAIC-S-4063 Waterflow Alarms and Fire Department Connection 3/24/2016
SAIC SAIC-S-4064 Surface Drainage, Drain and Toe Walls 3/24/2016
SAIC SAIC-S-4065 Installation of Lift Station (Structure) 3/24/2016
SAIC SAIC-S-4066 Process Control Installation Requirements (Oily Water Sewer) 3/24/2016
SAIC SAIC-T-5001 General - Indoor Electronic Equipment - Storage, Handling, and Preservation 3/24/2016
SAIC SAIC-T-5113 DC System - Master Ground Bus Bar (MGB) - Material Receiving 3/24/2016
SAIC SAIC-T-5118 D.C. Power System - Installation Inspection 3/24/2016
SAIC SAIC-T-5119 DC System-DC MGB-Installation & Pre-commissioning 3/24/2016
SAIC SAIC-T-5201 Page Party P.A. System - Manufacturers page/party power cable - Materials receiving 3/24/2016
SAIC SAIC-T-5202 Page Party P.A. System - Manufacturers page/party Speaker cable - Materials receiving 3/24/2016
SAIC SAIC-T-5203 Page Party P.A. System - Speaker - Materials Receiving 3/24/2016
SAIC SAIC-T-5204 Page Party P.A. System - Page Party Station - Indoor - Materials Receiving 3/24/2016
SAIC SAIC-T-5205 In-Plant Voice Paging System - Page Party Station - Outdoor - Materials Receiving 3/24/2016
SAIC SAIC-T-5206 Page Party P.A. System - Page Party Station - Speaker/Amplifier - Materials Receiving 3/24/2016
SAIC SAIC-T-5207 Page Party P.A. System - Page Party Station - Speaker - Line Balance Assembly - Materials Receiving 3/24/2016
SAIC SAIC-T-5208 Page Party P.A. System - Page Party Accessories - Materials Receiving 3/24/2016
SAIC SAIC-T-5209 Page Party P.A. System - Installation and Identification 3/24/2016
SAIC SAIC-T-5301 Communication System -Equipment Rack -Material Receiving 3/24/2016
SAIC SAIC-T-5302 Communication System - RF equipment Material Receiving 3/24/2016
Type Number Title Date Approved
SAIC SAIC-T-5303 Communication System - Antenna - Material Receiving 3/24/2016
SAIC SAIC-T-5304 Communication System - PBX Distribution Equipment -Material Receiving 3/24/2016
SAIC SAIC-T-5305 Communication System -Transmission Equipment -Material Receiving 3/24/2016
SAIC SAIC-T-5306 Communications Systems - VHF/UHF Land-Mobile and Fixed Radio Communication - Material Receiving 3/24/2016
SAIC SAIC-T-5307 Communications Systems - RF Waveguide/Coaxial Cable- Material Receiving 3/24/2016
SAIC SAIC-T-5308 Communications Systems Accessories- Material Receiving 3/24/2016
SAIC SAIC-T-5309 Communication System-Equipment Rack-Installation 3/24/2016
SAIC SAIC-T-5310 Communications System-RF Equipment-Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-T-5311 Communication Systems-PBX/Distribution Equipment Installation, Testing and Pre-Commissioning 3/24/2016
SAIC SAIC-T-5312 Communication Systems- Transmission Equipment Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-T-5314 Communication System -Antenna -Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-T-5315 Communications Systems-Waveguide Bulkhead-Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-T-5316 Communications Systems-RF Waveguide / Coaxial cable Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-T-5401 Fiber Optics Circuits-OSP- Single mode FOC cable-Material receiving 3/24/2016
SAIC SAIC-T-5402 Fiber Optics Circuits-OSP- Multimode Fiber Optic Cable-Material Receiving 3/24/2016
SAIC SAIC-T-5403 Fiber Optics Circuits-Bldg. Single Mode FOC cable-Material Receiving 3/24/2016
SAIC SAIC-T-5405 Fiber Optics Circuits-Optical Splicing Accessories-Material Receiving 3/24/2016
SAIC SAIC-T-5406 Fiber Optics Circuits-Optical Fiber Testing Accessories-Material Receiving 3/24/2016
SAIC SAIC-T-5407 Fiber Optics Circuits-Cable Accessories- Material Receiving 3/24/2016
SAIC SAIC-T-5408 Fiber Optic Circuits-OSP FOC Cable Installation, Splicing, Termination and Identification 3/24/2016
SAIC SAIC-T-5409 Fiber Optic Circuits-Inter and Intra building OSP FOC Cable Installation, Termination and Identification 3/24/2016
SAIC SAIC-T-5501 Copper Circuits - Cable Storage, Handling and Preservation 3/24/2016
SAIC SAIC-T-5502 Copper Circuits - OSP Cable- Material Receiving 3/24/2016
SAIC SAIC-T-5504 Copper Circuits - ISP Building Cable- Material Receiving 3/24/2016
SAIC SAIC-T-5505 Copper Circuits - Cable Accessories - Materials Receiving 3/24/2016
SAIC SAIC-T-5506 Copper Circuits - Excavation, Trenching and Backfilling 3/24/2016
SAIC SAIC-T-5507 Copper Circuits - OSP Cable - Underground Installation and Precommissioning 3/24/2016
SAIC SAIC-T-5508 Copper Circuits-ISP Building Cable- Installation and Precommissioning 3/24/2016
SAIC SAIC-T-5509 Copper Circuits- OSP Cable- Direct Buried Installation and Precommissioning 3/24/2016
SAIC SAIC-T-5601 Comms facilities - Self Supporting Communication Tower - Material Receiving 3/24/2016
SAIC SAIC-T-5602 Comms facilities - Guyed Steel Communication Tower - Material receiving 3/24/2016
SAIC SAIC-T-5603 Comms facilities - Cable Rack - Material Receiving 3/24/2016
SAIC SAIC-T-5604 Comms facilities - Communication Tower - Installation and Precommissioning 3/24/2016
SAIC SAIC-T-5605 Comms facilities - HVAC Systems - Installation and Precommissioning 3/24/2016
Type Number Title Date Approved
SAIC SAIC-T-5608 Comms facilities - Security IDAS/CACS - Installation and Precommissioning 3/24/2016
SAIC SAIC-T-5609 Comms Facilities - Vault Cable Racks Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-T-5701 OSP Ductbank-Plastic Conduit/Sleeves/Innerduct, Storage Handling and Preservation. 3/24/2016
SAIC SAIC-T-5702 OSP Ductbank-Manhole & Handhole Hardware & Accessories- Storage, Handling, and Preservation 3/24/2016
SAIC SAIC-T-5703 OSP Ductbank-Conduit Plugs/Seal Fittings/Innerducts Accessories, Storage, Handling and Preservation 3/24/2016
SAIC SAIC-T-5704 OSP Ductbank-PVC Plastic Conduit /sleeves -Material Receiving 3/24/2016
SAIC SAIC-T-5705 OSP Ductbank-Maintenance & Service Hole Hardware -Material Receiving 3/24/2016
SAIC SAIC-T-5707 OSP Ductbank-Plastic innerducts and accessories- Material Receiving 3/24/2016
SAIC SAIC-T-5708 OSP Ductbank-Conduit Fitting and Accessories- Material Receiving 3/24/2016
SAIC SAIC-T-5709 OSP Ductbank-Duct bank Fabrication, Installation and Mandrel Test 3/24/2016
SAIC SAIC-T-5710 OSP Ductbank-Maintenance & Service Holes Fabrication and Installation 3/24/2016
SAIC SAIC-T-5711 OSP Ductbank- Innerduct Installation and Identification 3/24/2016
SAIC SAIC-T-5712 OSP Ductbank-Conduit ID Termination 3/24/2016
SAIC SAIC-T-5801 OSP Circuits-Pedestal and Accessories Material Receiving 3/24/2016
SAIC SAIC-T-5802 OSP Circuits-Pedestal Installation And Pre-Commissioning 3/24/2016
SAIC SAIC-T-5901 Building Premises Distribution System- Cable Tray System Material Receiving 3/24/2016
SAIC SAIC-T-5902 Building Premises Distribution System- Square "D" Ducting System Material Receiving 3/24/2016
SAIC SAIC-T-5903 Building Premises Distribution System- Cellular & Underfloor Ducting System Material Receiving 3/24/2016
SAIC SAIC-T-5904 Building Premises Distribution System- Distribution Conduit System Material Receiving 3/24/2016
SAIC SAIC-T-5905 Building Premises Distribution System- UTP/STP Copper Cable - Material Receiving 3/24/2016
SAIC SAIC-T-5906 Building Premises Distribution System- Indoor Fiber Optic Cable - Material Receiving 3/24/2016
SAIC SAIC-T-5907 Building Premises Distribution System- Equipment Racks & Accessories Material Receiving 3/24/2016
SAIC SAIC-T-5908 Building Premises Distribution System- Cable Management Trays- Material Receiving 3/24/2016
SAIC SAIC-T-5909 Building Premises Distribution System- Horizontal Connecting Hardware Material Receiving 3/24/2016
SAIC SAIC-T-5910 Building Premises Distribution System- Backbone Connecting Hardware Material Receiving 3/24/2016
SAIC SAIC-T-5911 Building Premises Distribution System- TC/TER Size And Location 3/24/2016
SAIC SAIC-T-5912 Building Premises Distribution System- TC Miscellaneous Requirements 3/24/2016
SAIC SAIC-T-5913 Building Premises Distribution System- TER Miscellaneous Requirements 3/24/2016
SAIC SAIC-T-5914 Building Premises Distribution System- TC Power Requirements 3/24/2016
SAIC SAIC-T-5915 Building Premises Distribution System- TER Power Requirements 3/24/2016
SAIC SAIC-T-5916 Building Premises Distribution System- Installation Of Backbone Cable Tray System 3/24/2016
SAIC SAIC-T-5917 Building Premises Distribution System- Installation Of Backbone Conduits System 3/24/2016
SAIC SAIC-T-5918 Building Premises Distribution System- Installation Of Sleeve And Slots System 3/24/2016
SAIC SAIC-T-5919 Building Premises Distribution System- Installation Of Horizontal Cable Tray System 3/24/2016
Type Number Title Date Approved
SAIC SAIC-T-5920 Building Premises Distribution System- Installation Of Square "D" Ducting System 3/24/2016
SAIC SAIC-T-5921 Building Premises Distribution System- Installation Of Cellular And Underfloor Duct System 3/24/2016
SAIC SAIC-T-5922 Building Premises Distribution System- Installation Of Horizontal Distribution Conduit System 3/24/2016
SAIC SAIC-T-5923 Building Premises Distribution System- Installation Of Conduits For Home Run Ceiling System 3/24/2016
SAIC SAIC-T-5924 Building Premises Distribution System- Sizing And Installation Of Indoor Pull Boxes 3/24/2016
SAIC SAIC-T-5925 Building Premises Distribution System - Installation Of Work Area Outlet Boxes 3/24/2016
SAIC SAIC-T-5926 Building Premises Distribution System- Sizing And Installation Of Outdoor Pull Boxes 3/24/2016
SAIC SAIC-T-5927 Building Premises Distribution System- Installation Of Horizontal UTP/STP Copper Cable 3/24/2016
SAIC SAIC-T-5928 Building Premises Distribution System- Installation Of Horizontal Fiber Optic Cable 3/24/2016
SAIC SAIC-T-5929 Building Premises Distribution System- Installation Of Horizontal Connecting Hardware 3/24/2016
SAIC SAIC-T-5930 Building Premises Distribution System- Installation Of Backbone UTP/STP Copper Cable 3/24/2016
SAIC SAIC-T-5931 Building Premises Distribution System- Installation Of Backbone Fiber Optic Cable 3/24/2016
SAIC SAIC-T-5932 Building Premises Distribution System- Installation Of Backbone Connecting Hardware 3/24/2016
SAIC SAIC-T-5933 Building Premises Distribution System- Installation Of Equipment Racks And Accessories 3/24/2016
SAIC SAIC-T-5934 Building Premises Distribution System-Installation of Cable Management Trays 3/24/2016
SAIC SAIC-UT-2001 Review of Procedure for Ultrasonic Testing 3/24/2016
SAIC SAIC-UT-2002 Review of UT Personnel Qualifications. 3/24/2016
SAIC SAIC-UT-2003 Review of TKY Technique Procedure & Mock-up Design for Ultrasonic Testing. 3/24/2016
SAIC SAIC-UT-2004 Verification of Ultrasonic Test Equipment 3/24/2016
SAIC SAIC-UT-2005 Verification and/or set up of Mock-up of TKY Joints. 3/24/2016
SAIC SAIC-UT-2007 Inspection Requirements prior to UT Applications 3/24/2016
SAIC SAIC-UT-2008 In-Process Verification of Techniques & Procedure Implementation of UT 3/24/2016
SAIC SAIC-UT-2009 Evaluation of Ultrasonic Test and Test Report 3/24/2016
SAIC SAIC-UT-2010 Manual UT Thickness Testing 3/24/2016
SAIC SAIC-W-2001 Review WPS & Process Control Procedure (Plant Piping) 3/24/2016
SAIC SAIC-W-2002 Review of Procedure for Weld Repair (Plant Piping) 3/24/2016
SAIC SAIC-W-2003 Review Post Weld Heat Treatment (PWHT) Specification, Procedure, & Table for On-Plot Piping 3/24/2016
SAIC SAIC-W-2004 Post Weld Heat Treatment (PWHT) for On-Plot Piping 3/24/2016
SAIC SAIC-W-2005 Pre-Welding Inspection (Shop & Field) of Plant Piping 3/24/2016
SAIC SAIC-W-2006 In-Process Welding Inspection 3/24/2016
SAIC SAIC-W-2007 Post-Welding Visual Inspection (Plant Piping) 3/24/2016
SAIC SAIC-W-2008 Review Procedure - Weld ID & Traceability, Process Control Tracking (SAEP-1160 Database) 3/24/2016
SAIC SAIC-W-2009 Review Procedure - Control of Welding Consumables (Storage, Handling, Issuance, Conditioning) - Plant Piping 3/24/2016
SAIC SAIC-W-2010 Receiving Inspection of Welding Consumables 3/24/2016
Type Number Title Date Approved
SAIC SAIC-W-2011 Validation of Welding Equipment (Plant Piping) 3/24/2016
SAIC SAIC-W-2012 Review Hardness Testing Procedure - All Applications (Plant Piping, Pipelines, Vessels & Tanks) 3/24/2016
SAIC SAIC-W-2013 Inspection of Repair on Weld Joints or Base Metal by Welding (Prior to Weld Acceptance) 3/24/2016
SAIC SAIC-W-2014 Verify Hardness Testing - All Applications (Plant Piping, Pipelines, Vessels & Tanks) 3/24/2016
SAIC SAIC-W-2015 Selection of Welds for NDE (On-Plot Piping ) 3/24/2016
SAIC SAIC-W-2016 Production Weld & Welder Repair Rate Assessment for On-Plot Piping 3/24/2016
SAIC SAIC-W-2017 Review of Welding documents - WPS, PQR and WPQ related to Overlay Welding & Cladding Restoration/Repair 3/24/2016
SAIC SAIC-W-2018 Review Supplemental Procedure - Method Statements related to Overlay Welding, Cladding Restoration, Repair 3/24/2016
SAIC SAIC-W-2019 Review of Procedure for Weld Deposit Chemical Composition Analysis of Final Weld Overlay 3/24/2016
SAIC SAIC-W-2020 Hydrogen Disbonding Test (Qualification Testing Reqmt) 3/24/2016
SAIC SAIC-W-2021 Pre-Welding Insp - Weld Overlay & Cladding Restoration 3/24/2016
SAIC SAIC-W-2022 In-Process Welding Insp - Weld Overlay & Cladding Rest. 3/24/2016
SAIC SAIC-W-2023 Final Welding Insp - Weld Overlay & Cladding Rest. 3/24/2016
SAIC SAIC-W-2024 Inspect Repairs of Weld Overlay & Restored Cladding 3/24/2016
SAIC SAIC-W-2025 Weld Overlay Chemical Composition Testing & Results 3/24/2016
SAIC SAIC-W-2026 Ferroxyl Test Per ASTM A380 (Overlay Weld Cracking) 3/24/2016
SAIC SAIC-W-2027 Welding Overlay Workmanship Assessment 3/24/2016
SAIC SAIC-W-2028 Final Inspection & Acceptance for Weld Overlays 3/24/2016
SAIC SAIC-W-2029 Review Procedure - Ferrite Content Testing 3/24/2016
SAIC SAIC-W-2030 Ferrite Content Testing (As-welded) for Production Welds & Procedure Qualifications (All Applications) 3/24/2016
SAIC SAIC-W-2031 In-Process Welding Insp of Hot Tap and Stopple Fittings 3/24/2016
SAIC SAIC-W-2032 Control of Welding Consumables - Plant Piping (Site Storage, Handling, Conditioning & Issuance) 3/24/2016
SAIC SAIC-W-2033 Buttering and / or Weld Build-up - Plant piping 3/24/2016
SAIC SAIC-W-2034 Receiving Inspection & Verification of Welding Consumables for Overlay 3/24/2016
Welder & Welding Operator Certification, Issuance of JCC (Job Clearance Card) & Review of Performance (Plant
SAIC SAIC-W-2035 3/24/2016
Piping)

SAIC SAIC-W-2036 Inspect/Verify Piping & Weld Modifications* After Initial Welding Acceptance (Modifications, Repair and Rework) 3/24/2016
SAIC SAIC-W-2037 Inspection & Procedure review of Socket Welded Joints & Seal Welding of Threaded Joints. 3/24/2016
SAIC SAIC-W-2038 Review of WPS & Process Control Procedure (Pipelines) 3/24/2016
SAIC SAIC-W-2039 Welder & Operator Certification Review / Issuance of JCC (Job Clearance Card) & Review Performance - Pipelines 3/24/2016
SAIC SAIC-W-2040 Review of Weld Repair Procedure for Pipelines 3/24/2016
Type Number Title Date Approved
SAIC SAIC-W-2042 Review Procedure Post Weld Heat Treatment (Pipelines) 3/24/2016
SAIC SAIC-W-2044 Receiving Insp of Welding Consumables (Pipelines) 3/24/2016
SAIC SAIC-W-2045 Validation of Welding Equipment (Pipelines) 3/24/2016
SAIC SAIC-W-2046 Control of Welding Consumables (Storage, Handling, Issuance & Conditioning) - Pipelines 3/24/2016
SAIC SAIC-W-2047 Buttering and/or Weld Build-Up - Pipelines 3/24/2016
SAIC SAIC-W-2048 Pre-Welding, In-Process & Final Inspection (Pipelines) 3/24/2016
SAIC SAIC-W-2051 Inspection of Repair on Weld Joints or Base Metal by Welding (Prior to Weld Acceptance) for Pipelines 3/24/2016
SAIC SAIC-W-2052 Post Weld Heat Treatment Inspection (Pipelines) 3/24/2016
SAIC SAIC-W-2054 Selection of Welds for NDE (Pipelines) 3/24/2016
SAIC SAIC-W-2055 Review Procedure - Control of Welding Consumables (Recv, Storage, Handling, Issue, Conditioning) - Pipelines 3/24/2016
SAIC SAIC-W-2056 Production Weld & Welder Repair Rate Assessment (Pipelines) 3/24/2016
SAIC SAIC-W-2057 Temperature Tie-In Welding 3/24/2016
SAIC SAIC-W-2058 Review of Welding Procedure Specification (Vessels) 3/24/2016
SAIC SAIC-W-2059 Review of Weld Repair Method Statement for Pressure vessels 3/24/2016
SAIC SAIC-W-2061 Procedure Review: PWHT for Pressure Vessels 3/24/2016
SAIC SAIC-W-2063 Procedure Review: Control of Welding Consumables for Pressure Vessels 3/24/2016
SAIC SAIC-W-2064 Receiving Inspection of Welding Consumables 3/24/2016
SAIC SAIC-W-2065 Validation of Welding Equipment (Pressure Vessels) 3/24/2016
SAIC SAIC-W-2066 Control of Welding Consumables - Pressure vessels (Site Storage, Handling, Conditioning & Issuance) 3/24/2016
SAIC SAIC-W-2067 Buttering or Weld Build-Up of Pressure vessel Joints 3/24/2016
SAIC SAIC-W-2068 Pre-Welding Inspection on Vessel Fabrication 3/24/2016
SAIC SAIC-W-2069 In-Process Weld Inspection 3/24/2016
SAIC SAIC-W-2070 Post-Welding Visual Inspection 3/24/2016
SAIC SAIC-W-2071 Selection of Welds Joints for Radiography (Vessels) 3/24/2016
Weekly Reporting (Vessels) a) Production Weld Status; b) Weld Repair Rate; c) Welder's Repair Assessment & Tracer
SAIC SAIC-W-2072 3/24/2016
Welds
SAIC SAIC-W-2073 Pressure Vessel Weld Repair Verification & Inspection 3/24/2016
SAIC SAIC-W-2075 Procedure Review: WPS for API Tank Construction 3/24/2016
SAIC SAIC-W-2076 Pre-Welding Inspection (API Tanks) 3/24/2016
SAIC SAIC-W-2078 Procedure Review: "PWHT Tank Construction" 3/24/2016
SAIC SAIC-W-2080 Review Procedure: Control of Welding Consumables (Storage, Handling, Issuance, & Conditioning) - API Tanks 3/24/2016
SAIC SAIC-W-2081 Receiving Inspection of Welding Consumables - API Tanks 3/24/2016
SAIC SAIC-W-2082 Validation of Welding Equipment (API TANKS) 3/24/2016
SAIC SAIC-W-2083 Control of Welding Consumables for Tank Works (Site Storage, Handling, Conditioning & Issuance) 3/24/2016
Type Number Title Date Approved
SAIC SAIC-W-2084 Buttering or Weld build-up of Joints (API Tanks) 3/24/2016
SAIC SAIC-W-2085 Pre-Welding Inspection (API Tanks) 3/24/2016
SAIC SAIC-W-2086 In-Process Welding Inspection (API Tanks) 3/24/2016
SAIC SAIC-W-2087 Post-Welding Visual Inspection on Tank Construction 3/24/2016
SAIC SAIC-W-2088 Selection of Weld Joints for NDE (API Tanks) 3/24/2016
SAIC SAIC-W-2089 PWHT Inspection for API Tanks 3/24/2016
SAIC SAIC-W-2090 Weekly Reporting of Project Weld Status for API Tanks 3/24/2016
SAIC SAIC-W-2091 Weld Repair Verification and Inspection (API Tanks) 3/24/2016
SAIC SAIC-X-3001 Exothermic Welding Tools & Materials - Material Receiving 3/24/2016
SAIC SAIC-X-3002 CP Accessories - Material Receiving 3/24/2016
SAIC SAIC-X-3003 Exothermic Welding 3/24/2016
SAIC SAIC-X-3101 Galvanic Anodes for CP (Aluminum, Magnesium, and Zinc Anodes) - Material Receiving 3/24/2016
SAIC SAIC-X-3102 Galvanic CP Test Stations / Junction Boxes - Material Receiving 3/24/2016
SAIC SAIC-X-3103 Galvanic CP Anode Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-X-3104 Galvanic CP Test Station Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-X-3105 Galvanic CP Cable Installation, Termination, and Identification 3/24/2016
SAIC SAIC-X-3201 CP Rectifier - Material Receiving 3/24/2016
SAIC SAIC-X-3202 Impressed Current Anode - Material Receiving 3/24/2016
SAIC SAIC-X-3203 Impressed Current CP Cable - Material Receiving 3/24/2016
SAIC SAIC-X-3204 DC Rectifier Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-X-3205 Impressed Current CP Anode Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-X-3206 Impressed Current CP Deep Anode Bed Installation and Pre-Commissioning 3/24/2016
SAIC SAIC-X-3207 Impressed Current CP Cable Installation, Termination, and Pre-Commissioning 3/24/2016
SAIC SAIC-Y-2001 Ferroxyl Test Per ASTM A380 (Overlay Weld Cracking) 3/24/2016
SAIC SAIC-Y-2002 Storage, Handling and Preservation of Metering Skid and Meter Provers for Hydrocarbon Gas 3/24/2016
SAIC SAIC-Y-2003 Metering Skid Installation and/or Assembly of Dismantled Equipment 3/24/2016
SAIC SAIC-Y-2004 Final Punchlisting (Re-Instatement) of Custody Metering Skid for Hydrocarbon Gas 3/24/2016
Discipline
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Mechanical
Mechanical
Mechanical
Mechanical
Piping
Mechanical
Mechanical
Mechanical
Piping
Mechanical
Mechanical
Piping
Mechanical
Mechanical
Mechanical
Mechanical
Discipline
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Civil
Civil
Civil
Civil
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Plumbing
Plumbing
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Discipline
Instrumentation
Instrumentation
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Discipline
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Discipline
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Plumbing
Mechanical
Civil
Civil
Civil
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Discipline
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating
Coating

Coating
Coating
Coating
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Piping
Piping
Mechanical
Instrumentation
Discipline

Instrumentation

Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Discipline
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Discipline

Instrumentation

Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Instrumentation
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
Discipline
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
Discipline
HVAC
HVAC
HVAC
Civil
Civil
Civil
Piping
Mechanical
Piping
Piping
Piping
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Piping
Piping
Piping
Piping
Mechanical
Mechanical
Piping
Mechanical
Mechanical
Mechanical
Piping
Piping
Piping
Piping
Piping
Mechanical
Discipline
Piping

Piping
Mechanical
Piping
Piping
Piping
Piping
Mechanical
Mechanical
Mechanical
Piping
Piping
Mechanical
Piping
Mechanical
Piping
Piping
Piping
Piping
Mechanical
Mechanical
Mechanical
Mechanical
PIPING
Mechanical
Piping
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Piping
Discipline
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
PIPING
PIPING
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Piping
Piping
Piping
Piping
Mechanical
Mechanical
Mechanical
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Mechanical
Mechanical
Mechanical
Discipline
Mechanical
Mechanical
Piping
Piping
Piping
Piping
Mechanical
Piping
Piping
Piping
Mechanical - Testing
Mechanical
Piping
Plumbing
Piping
Plumbing
Plumbing
Piping
Piping
Piping
Piping
NDE
NDE
NDE
Mechanical - NDE
Mechanical - NDE
Mechanical
Mechanical
NDE
Civil
Civil
Civil
Civil
Civil
Discipline
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Discipline
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
NDE
NDE
NDE
NDE
NDE
NDE
NDE
NDE
Insulation
Insulation
Insulation
Insulation
Discipline
Insulation
Insulation
Insulation
Insulation
Insulation
Insulation
Insulation
Insulation
Insulation
Insulation
Insulation
Insulation
Insulation
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Discipline
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Civil
Civil
Civil
Civil
Civil
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Discipline
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Discipline
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Discipline
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical

Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Discipline
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Discipline
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Discipline
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Discipline
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Discipline
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Discipline
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Discipline
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Discipline

Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
NDE
NDE
NDE
NDE
NDE
NDE
NDE
NDE
NDE
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Discipline
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Discipline
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Plumbing
Telecom
Telecom
TELECOM
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Discipline
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
TELECOM
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Discipline
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
TELECOM
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Discipline
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
Telecom
NDE
NDE
Mechanical
NDE
NDE
Mechanical
NDE
NDE
NDE
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Discipline
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Mechanical
Mechanical
Mechanical
Welding
Welding
Welding
Welding
Welding
Mechanical
Mechanical
Welding
Welding
Welding
Mechanical
Welding
Welding
Welding
Welding

Welding
Welding
Welding
Welding
Welding
Discipline
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Discipline
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Welding
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Cathodic Protection
Mechanical
Mechanical
Mechanical
Mechanical
Type Number Title Date Approved Discipline
SATR SATR-A-2001 Pressure Test Report 3/24/2016
SATR SATR-A-2001-V Pressure Test Report (Valve Inspection & Field Testing) 3/24/2016
SATR SATR-A-2002 Calibration Test Report - Pressure Gauge 3/24/2016 Mechanical
SATR SATR-A-2003 Calibration Test Report - Temperature Gauge 3/24/2016 Mechanical
SATR SATR-A-2004 Calibration Test Report - Pressure Recorder 3/24/2016 Mechanical
SATR SATR-A-2005 Calibration Test Report - Temperature Recorder 3/24/2016 Mechanical
SATR SATR-A-2006 Calibration Test Report - Pressure Test Relief Valve 3/24/2016 Mechanical
SATR SATR-A-2007 Pre-Pressure Test Checklist (Form) 3/24/2016 Mechanical
SATR SATR-A-2008 Internal Cleanliness Report (Piping Systems & Equip) 3/24/2016 Mechanical
SATR SATR-A-2009 System Lay-up Report (Certificate) 3/24/2016 Mechanical
SATR SATR-A-2010 Leak Test Report 3/24/2016 Mechanical
SATR SATR-A-2011 Re-instatement Checklist (Form) 3/24/2016 Mechanical
SATR SATR-A-2012 Positive Material Identification (PMI) Report 3/24/2016 Mechanical
SATR SATR-A-2013 Positive Material Identification (PMI) Log Sheet 3/24/2016 Mechanical
SATR SATR-A-2014 Water Chemistry Report 3/24/2016 Mechanical
SATR SATR-A-6133 Final Inspection/Re-Instatement Punch List (Punch List by Contractor) 3/24/2016 Civil/Plum/Elect/Mec
SATR SATR-B-2001 Release Structure for Fireproofing 3/24/2016 Mechanical
SATR SATR-B-2002 In-Process Inspection Report Form for Intumescent Epoxy Material for Fire Proofing 3/24/2016 Mechanical
SATR SATR-B-4001 Emergency Eyewash/Shower Functional Test Report 3/24/2016 Plumbing
SATR SATR-B-6101 Fire Alarm System - Control Panel - Pre-Commissioning Test 3/24/2016 Instrumentation
SATR SATR-B-6102 Fire Alarm System - Annunciator - Pre-Commissioning Test 3/24/2016 Instrumentation
SATR SATR-B-6103 Fire Alarm System - Smoke / Heat Detector – Pre-Commissioning Test 3/24/2016 Instrumentation
SATR SATR-B-6104 Fire Alarm System - Water Flow Switch and Water Valve Position Switch - Pre-Commissioning Test 3/24/2016 Instrumentation
SATR SATR-B-6105 Fire Alarm System - Manual Pull Station – Pre-Commissioning Test 3/24/2016 Instrumentation
SATR SATR-D-2001 Alignment Inspection Record- Horizontal Vessel 3/24/2016 Mechanical
SATR SATR-D-2002 Alignment Inspection Record- Vertical Vessel 3/24/2016 Mechanical
SATR SATR-D-2003 Vessel Closure Inspection Certificate 3/24/2016 Mechanical
SATR SATR-D-2004 TRAY TEST REPORT 3/24/2016 Mechanical
SATR SATR-D-2005 API Tank Closure Inspection Certificate 3/24/2016 Mechanical
SATR SATR-G-2004 Pump Alignment Record Sheet 3/24/2016 Mechanical
SATR SATR-G-2005 Mounting Plate Level Data Sheet (Pumps) 3/24/2016 Mechanical
SATR SATR-H-1003 Concrete Moisture Field Test (For Coating Purposes) 3/24/2016 Civil
SATR SATR-H-2004 Coating Equipment Check Sheet 3/24/2016 Mechanical
SATR SATR-H-2005 In-Process Inspection of FBE Powder Coating Application on Field Girth Welds 3/24/2016 Mechanical
SATR SATR-H-2006 In-Process Inspection of Field Coating 3/24/2016 Coating
SATR SATR-H-2008 HOLIDAY TEST REPORT 3/24/2016 Mechanical
Type Number Title Date Approved Discipline
SATR SATR-H-2009 CURING TEST OF FBE COATING 3/24/2016 Coating
SATR SATR-H-2010 ADHESION TEST OF FBE COATING 3/24/2016 Coating
SATR SATR-H-2011 Surface Preparation of Internal Pipe End/Joints for FBE Coating 3/24/2016 Mechanical
SATR SATR-H-2012 In-Process Inspection of Internal FBE Coating Application on Field Girth Welds 3/24/2016 Mechanical
SATR SATR-J-2001 Relief Valve Test and Calibration Test Report 3/24/2016 Mechanical
SATR SATR-J-6001 Pressure / Leak Test for Instrument Air Sub-Headers and Pneumatic Hook-Up 3/24/2016 Instrumentation
SATR SATR-J-6002 Recorder / Indicator - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6101 Flow - Orifice Plate - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6102 Flow - Orifice Meter - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6103 Flow - Flow Nozzle - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6104 Flow - Flow Venturi - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
Flow - Averaging Pitot Element - Document Review, Bench Testing, Installation and Pre-
SATR SATR-J-6105 3/24/2016 Instrumentation
Commissioning
SATR SATR-J-6106 Flow - Integral Orifice - Document Review, Bench Testing, Installation and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6107 Flow - Turbine Meter - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
Flow - Positive Displacement Meter - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6108 3/24/2016 Instrumentation
Commissioning
SATR SATR-J-6109 Flow - Magnetic Flow Meter - Document Review, Bench Testing, Installation and Pre-Commissioning 3/24/2016 Instrumentation
Flow - Mass Meter (Coriolis and Thermal) - Document Review, Bench Testing, Installation and Pre-
SATR SATR-J-6110 3/24/2016 Instrumentation
Commissioning
Flow - Ultrasonic (Transit Time & Doppler) - Document Review, Bench Testing, Installation and Pre-
SATR SATR-J-6111 3/24/2016 Instrumentation
Commissioning
SATR SATR-J-6112 Flow - Vortex Shedding Meter - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
Variable Area Meter (Rotameter) - Documentation Review, Bench Testing, Installation and Pre-
SATR SATR-J-6113 3/24/2016 Instrumentation
Commissioning
SATR SATR-J-6201 Pressure Gauges - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6202 Pressure Switches - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6203 Pressure Transmitters - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
Differential Pressure Transmitters - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6204 3/24/2016 Instrumentation
Commissioning
Level - Sight Glass Gauges/Switches - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6301 3/24/2016 Instrumentation
Commissioning
Level - Magnetic Gauges/Switches - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6302 3/24/2016 Instrumentation
Commissioning
Type Number Title Date Approved Discipline
Level - Displacement Instruments - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6303 3/24/2016 Instrumentation
Commissioning
Automatic Tank Gauging (ATG) - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6304 3/24/2016 Instrumentation
Commissioning
SATR SATR-J-6305 Level - Ball Float Instrument - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
Level - Diff. Pressure Instruments - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6306 3/24/2016 Instrumentation
Commissioning
Level - Capacitance Instruments - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6307 3/24/2016 Instrumentation
Commissioning
SATR SATR-J-6401 Temperature - Thermocouples - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
Temperature - Resistance Temperature Detectors - Document Review, Installation, Bench Testing and
SATR SATR-J-6402 3/24/2016 Instrumentation
Pre-Commissioning
Temperature - Filled System instruments - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6403 3/24/2016 Instrumentation
Commissioning
Temperature - Infrared Temperature Monitoring Instruments - (Pyrometers) - Document Review,
SATR SATR-J-6405 3/24/2016 Instrumentation
Installation, Bench Testing and Pre-Commissioning
Temperature - RTD Transmitter Type - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6406 3/24/2016 Instrumentation
Commissioning
Temperature - Transmitter T/C Type - Document Review, Installation, Bench Testing and Pre-
SATR SATR-J-6407 3/24/2016 Instrumentation
Commissioning
SATR SATR-J-6408 Temperature - Switch - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6409 Temperature - Thermowell - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6501 Instrument Loop - Inputs - Transmitter Circuit Test 3/24/2016 Instrumentation
SATR SATR-J-6502 Instrument Loop - Inputs - Switch / Pulse Circuit Test 3/24/2016 Instrumentation
SATR SATR-J-6503 Instrument Loop - Inputs - Analyzer or Transducer Circuit Test 3/24/2016 Instrumentation
SATR SATR-J-6504 Instrument Loop - Inputs - Thermocouple Circuit Test 3/24/2016 Instrumentation
SATR SATR-J-6505 Instrument Loop - Inputs - RTD Circuit Test 3/24/2016 Instrumentation
SATR SATR-J-6506 Instrument Loop - Inputs - CT / PT Circuit Test 3/24/2016 Instrumentation
SATR SATR-J-6507 Instrument Loop - Outputs - Recording Indicator Test 3/24/2016 Instrumentation
SATR SATR-J-6508 Instrument Loop - Outputs - Analog / Digital Display Meter Test 3/24/2016 Instrumentation
SATR SATR-J-6509 Instrument Loop Outputs - Visual / Audible Annunciator / Alarm Test 3/24/2016 Instrumentation
SATR SATR-J-6510 Instrument Loop Outputs - Relay / Contactor / Transducer Operation and Trip Test 3/24/2016 Instrumentation
SATR SATR-J-6511 Instrument Loop Outputs - Motor Operated Valve Test 3/24/2016 Instrumentation
SATR SATR-J-6512 Instrument Loop - Outputs - Hydraulic / Pneumatic Control Valve Test 3/24/2016 Instrumentation
Type Number Title Date Approved Discipline
SATR SATR-J-6513 Instrument Loop Outputs - Variable and Fixed Speed Motor 3/24/2016 Instrumentation
Instrument Loop Checking - Integrated (Input and Output) Loop Inspection, Functional Test and
SATR SATR-J-6514 3/24/2016 Instrumentation
Acceptance
Instrument Cable - Continuity, Insulation Resistance Testing (On Reel) and Insulation testing (Installed
SATR SATR-J-6601 3/24/2016 Instrumentation
Cable)
SATR SATR-J-6602 Instrument Cable - Continuity, Insulation Resistance (Installed) and Termination Torque Testing 3/24/2016 Instrumentation
SATR SATR-J-6621 Fiber Optic Cable - Continuity Testing 3/24/2016 Instrumentation
SATR SATR-J-6701 Motor Operated Valve - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6702 Control Valve - Document Review, Installation, Bench Testing and Pre-Commissioning 3/24/2016 Instrumentation
SATR SATR-J-6801 Electronic Control Systems - DCS / ESD Systems - Functional Testing 3/24/2016 Instrumentation
SATR SATR-J-6802 Electronic Control Systems - PLC - Functional Testing (Stand-Alone as well as Integrated with DCS) 3/24/2016 Instrumentation
SATR SATR-J-6911 FOUNDATION Fieldbus Cable Continuity and Insulation Resistance Testing (Installed Cable) 3/24/2016 Instrumentation
SATR SATR-J-6912 FOUNDATION Fieldbus Segment Signal / Noise and Impedance Testing (Installed Segment) 3/24/2016 Instrumentation
SATR SATR-J-6913 FOUNDATION Fieldbus Instruments and Accessories Field Calibration and Testing 3/24/2016 Instrumentation
Combustible Gas and Hydrogen Sulfides Systems, Document Review, Installation, Bench Testing and
SATR SATR-J-6921 3/24/2016 Instrumentation
Pre-Commissioning
SATR SATR-K-001 Fire Damper Functional Field Test (Static Testing) 3/24/2016 HVAC
SATR SATR-K-2001 Mounting Plate Level Data Sheet (Rotating Equipment) 3/24/2016 Mechanical
SATR SATR-K-2002 Compressor Alignment Record Sheet 3/24/2016 Mechanical
SATR SATR-K-4003 Refrigerant Pipe Pressure Field Test 3/24/2016 HVAC
SATR SATR-K-4004 Refrigerant Pipe Vacuum Test 3/24/2016 HVAC
SATR SATR-K-4005 Laboratory Hood Test 3/24/2016 HVAC
SATR SATR-K-4006 Testing, Adjusting and Balancing of HVAC System 3/24/2016 HVAC
SATR SATR-L-2001 Flange Joint Tightening Inspection Report 3/24/2016 Mechanical
SATR SATR-L-2009 Pipeline Internal Cleaning Report 3/24/2016 Piping
SATR SATR-L-2010 VISUAL INSPECTION and ULTRA SONIC (UT) THICKNESS REPORT 3/24/2016 Piping
SATR SATR-M-1014 Roof Flood Testing 3/24/2016 Civil
SATR SATR-M-1060 A Glass Window or Glass Curtain Wall Installation Leak Test Procedure and Form 3/24/2016 Civil
SATR SATR-M-1060 B Glass Window or Glass Curtain Wall Installation Tests and Warranties 3/24/2016 Civil
SATR SATR-M-1063 Concrete Floor Moisture and pH Tests (For Resilent Vinyl Purposes) 3/24/2016 Civil
SATR SATR-M-2001 Structural Steel Alignment Report 3/24/2016 Mechanical
Pre-Installation Procedure Verification Testing Using the Turn-of-Nut Method (ASTM A325 or ASTM
SATR SATR-M-2002 3/24/2016 Mechanical
A490 Bolts)
Pre-Installation Procedure Verification Testing of Direct Tensioning Indicator (ASTM A325 or ASTM
SATR SATR-M-2003 3/24/2016 Mechanical
A490 Bolts)
Type Number Title Date Approved Discipline
Pre-Installation Procedure Verification Testing of Calibration Wrench (ASTM A325 or ASTM A490
SATR SATR-M-2004 3/24/2016 Mechanical
Bolts)
SATR SATR-N-2001 Castable Refractory Sample Test Report 3/24/2016 Mechanical
SATR SATR-N-2002 EER Refractory Sample Mixing/Batching Test Report 3/24/2016 Mechanical
SATR SATR-NDE-2001 Vaccum box Leak test report 3/24/2016 Mechanical - NDE
SATR SATR-NDE-2002 Liquid Penetrant Test Report 3/24/2016 Mechanical - NDE
SATR SATR-NDE-2003 Magnetic Particle Examination Request & Report Sheet 3/24/2016 NDE
SATR SATR-NDE-2004 Radiography Test Report 3/24/2016 Mechanical - NDE
SATR SATR-NDE-2005 Ultrasonic Test Report - TKY Joints 3/24/2016 NDE
SATR SATR-NDE-2006 Ultrasonic Test Report (Weld Overlay UT Examination) 3/24/2016 NDE
SATR SATR-NDE-2007 Ultrasonic Testing (SAEP-311 Hot Tap/Tie In) Report 3/24/2016 NDE
SATR SATR-NDE-2008 NDT ASSESSMENT / INTERPRETATION REPORT 3/24/2016 Mechanical - NDE
SATR SATR-NDE-2009 Assessment of Ultrasonic Results 3/24/2016 Mechanical - NDE
SATR SATR-NDE-2010 Ultraviolet (UV) Light Intensity Log 3/24/2016 NDE
SATR SATR-NDE-2011 NON-DESTRUCTIVE TESTING (NDT) REQUEST FORM 3/24/2016 Mechanical - NDE
SATR SATR-P-3101 UPS/DC Electrochemical Battery, Storage and Preservation Testing 3/24/2016 Electrical
SATR SATR-P-3102 UPS/DC Vented Ni-Cad Wet Cell, Jobsite Acceptance Test 3/24/2016 Electrical
SATR SATR-P-3103 UPS/DC Vented Lead-Acid Wet Cell, Jobsite Acceptance Test 3/24/2016 Electrical
SATR SATR-P-3104 UPS/DC Valve-Regulated Lead-Acid (VRLA) Gelatin Cell, Jobsite Acceptance Test 3/24/2016 Electrical
SATR SATR-P-3105 UPS DC/AC Inverter, Pre-Commissioning & Functional Testing 3/24/2016 Electrical
SATR SATR-P-3106 UPS Static Switch, Pre-Commissioning & Functional Testing 3/24/2016 Electrical
SATR SATR-P-3107 UPS Transfer Switch, Pre-Commissioning & Functional Testing 3/24/2016 Electrical
SATR SATR-P-3108 UPS Bypass line Transformer, Pre-Commissioning & Functional Testing 3/24/2016 Electrical
SATR SATR-P-3109 UPS Maintenance Bypass Switch, Pre-Commissioning & Functional Testing 3/24/2016 Electrical
SATR SATR-P-3110 UPS Panelboards / CB's, Pre-Commissioning & Functional Testing 3/24/2016 Electrical
SATR SATR-P-3111 UPS/DC Battery Rectifier / Charger, Pre-Commissioning & Functional Testing 3/24/2016 Electrical
SATR SATR-P-3112 UPS Distribution System, Energized Bolted - Fault Test 3/24/2016 Electrical
SATR SATR-P-3113 UPS/DC Vented Ni-Cad Wet Cell, Battery Pre-commissioning Test 3/24/2016 Electrical
SATR SATR-P-3114 UPS/DC Vented Lead-Acid Wet Cell, Battery Pre-commissioning Test 3/24/2016 Electrical
SATR SATR-P-3115 UPS/DC Valve-Regulated Lead-Acid (VRLA) Gelatin Cell, Battery Pre-commissioning Test 3/24/2016 Electrical
SATR SATR-P-3116 DC Switchboard / CB's, Pre-Commissioning & Functional Testing 3/24/2016 Electrical
SATR SATR-P-3117 DC Panelboards / CB's, Pre-Commissioning & Functional Testing 3/24/2016 Electrical
SATR SATR-P-3201 Low Voltage Power and Control Cable (On Reel), Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3202 Low Voltage Building Wire (On Reel), Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3203 Low Voltage Power and Control Cable, Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3204 Low Voltage Building Wire, Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
Type Number Title Date Approved Discipline
SATR SATR-P-3205 Low Voltage Power and Control Cable, Termination Torque Testing 3/24/2016 Electrical
SATR SATR-P-3206 Low Voltage Building Wire, Termination Torque Testing 3/24/2016 Electrical
SATR SATR-P-3207 Medium Voltage Power Cable (On Reel) Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3208 Medium Voltage Power Cable (Installed), Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3209 Medium Voltage Power Cable, Termination Torque Testing 3/24/2016 Electrical
SATR SATR-P-3210 Medium Voltage Power Cable, High-Potential Withstand Testing 3/24/2016 Electrical
SATR SATR-P-3211 High Voltage Power Cable (On Reel), Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3212 High Voltage Power Cable (Installed), Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3213 High Voltage Power Cable, Termination Torque Testing 3/24/2016 Electrical
SATR SATR-P-3214 High Voltage Power Cable, High-Potential Withstand Testing 3/24/2016 Electrical
SATR SATR-P-3215 Very High Voltage Power Cable (On Reel), Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3216 Very High Voltage Power Cable (Installed), Continuity and Megger Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3217 Very High Voltage Power Cable, Termination Torque Testing 3/24/2016 Electrical
SATR SATR-P-3218 Very High Voltage Power Cable, Very High-Potential Withstand Testing 3/24/2016 Electrical
SATR SATR-P-3219 Overhead T&D - Circuit Polarity, Continuity and Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3220 Overhead T&D - High-Potential Withstand Testing 3/24/2016 Electrical
SATR SATR-P-3221 Overhead T&D - Cable Termination Torque Testing 3/24/2016 Electrical
SATR SATR-P-3222 Overhead T&D - Surge Arresters, Functional Testing 3/24/2016 Electrical
SATR SATR-P-3223 Overhead T&D - Capacitor Banks, Functional Testing 3/24/2016 Electrical
SATR SATR-P-3225 Overhead T&D - Metering Cabinet, Functional Testing 3/24/2016 Electrical
SATR SATR-P-3233 MV Cablebus Continuity and Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3234 MV Cablebus Torque Testing 3/24/2016 Electrical
SATR SATR-P-3235 MV Cablebus High-Potential Withstand Testing 3/24/2016 Electrical
SATR SATR-P-3238 LV Cablebus Continuity and Insulation Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3239 LV Cablebus Torque Testing 3/24/2016 Electrical
SATR SATR-P-3301 Cable Tray, NEMA VE 1 Static Load Testing 3/24/2016 Electrical
SATR SATR-P-3402 HVAC System - Energized Functional Testing & Motor Four Hour Run Test 3/24/2016 Electrical
SATR SATR-P-3406 LV SCIM - Motor Storage - Space Heater Insulation Resistance and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3407 LV SCIM - Motor Insulation Resistance and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3408 MV Motor - Jobsite Acceptance and Space Heater Functional Testing 3/24/2016 Electrical
SATR SATR-P-3409 MV Motor - Form Wound SCIM Insulation Resistance, Hi-Pot Withstand, and Functional Testing 3/24/2016 Electrical
MV Motor - Form Wound Synchronous Motor Insulation Resistance, Hi-Pot Withstand , and Functional
SATR SATR-P-3410 3/24/2016 Electrical
Testing
MV Motor - Non-industrial Facilities Motor Insulation Resistance, Hi-Pot Withstand, and Functional
SATR SATR-P-3411 3/24/2016 Electrical
Testing
SATR SATR-P-3412 DG Set - Jobsite Acceptance and Space Heater Functional Testing 3/24/2016 Electrical
SATR SATR-P-3413 DG Set - Motor Insulation Resistance and Functional Testing 3/24/2016 Electrical
Type Number Title Date Approved Discipline
SATR SATR-P-3414 Crane Insulation Resistance and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3415 Hoist Insulation Resistance and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3416 Elevator Specific Testing - Pre-Energization Testing 3/24/2016 Electrical
SATR SATR-P-3417 Fire / Jockey Pump Motors & Controller Calibration, Setting, and Functional Testing 3/24/2016 Electrical
Receptacles and Cords - Pin-and-Sleeve Receptacle / plug - Installation, Functional and Polarity
SATR SATR-P-3603 3/24/2016 Electrical
Testing
SATR SATR-P-3604 Receptacles and Cords - NEMA Receptacle / Plug - Installation, Functional and Polarity Test 3/24/2016 Electrical
SATR SATR-P-3605 Receptacles and Cords - Cable Reels - Installation, Functional and Polarity Testing 3/24/2016 Electrical
SATR SATR-P-3606 Receptacles and Cords - Festoon Systems - Installation, Functional and Polarity Testing 3/24/2016 Electrical
SATR SATR-P-3610 Area & Street Lighting (point to point) - Illumination Level Testing 3/24/2016 Electrical
SATR SATR-P-3611 Interior Lighting (zone cavity) - Illumination Level Testing 3/24/2016 Electrical
SATR SATR-P-3613 Security Lighting (Fence, Area, and Checkpoint Ltg.) - Illumination level Testing 3/24/2016 Electrical
SATR SATR-P-3614 Aviation / Obstruction Light Fixtures - Illumination Level Testing 3/24/2016 Electrical
SATR SATR-P-3615 Offshore Lighting - Illumination Level Testing 3/24/2016 Electrical
SATR SATR-P-3701 Grounding - Soil Resistivity Test Report (Jobsite Final Soil) 3/24/2016 Electrical
SATR SATR-P-3702 Grounding - GES - Electrode Resistance Test (IEEE 81) 3/24/2016 Electrical
SATR SATR-P-3703 Grounding - GES - Electrode Resistance Test (Geonics) 3/24/2016 Electrical
SATR SATR-P-3704 Grounding - EGC - Continuity to GES Testing 3/24/2016 Electrical
SATR SATR-P-3705 Grounding - GEC - Neutral Ground Resistor Testing 3/24/2016 Electrical
SATR SATR-P-3706 Grounding - EGC - Ground Termination Torque Testing 3/24/2016 Electrical
SATR SATR-P-3801 Protection & Metering - Relay Calibration, Setting, and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3802 Protection & Metering - Meter / Recorder Calibration, Setting, and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3803 Protection & Metering - Annunciator Pre-energization and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3804 Protection & Metering - CT Pre-energization and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3805 Protection & Metering - PT Pre-energization and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3806 MV Switchgear / Controlgear - Jobsite Acceptance and Space Heater Functional Testing 3/24/2016 Electrical
SATR SATR-P-3807 MV Switchgear - Metal-Enclosed Switchgear Pre-Energized and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3808 MV Switchgear - SF6 Switchgear, Pre-Energized and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3809 MV Switchgear - MV Manual SF6 Circuit Breaker Calibration, Setting, and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3812 MV Controlgear - Metal-Enclosed Equipment Pre-Energized and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3816 LV Switchgear - Metal-Enclosed Equipment Pre-Energized and Functional Testing 3/24/2016 Electrical
Power Circuit Breakers - Protection Relay and Trip Unit Testing and Setting (Electromechanical &
SATR SATR-P-3817 3/24/2016 Electrical
Solid-State Relays)
Protection Relay and Circuit Breaker Trip Unit
SATR SATR-P-3818 3/24/2016 Electrical
Testing and Setting (for Energization Certificate) for Molded Case Circuit Breakers
SATR SATR-P-3819 LV Controlgear - Metal-Enclosed Equipment Pre-Energized and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3820 LV Controlgear - Power Circuit Breaker - Calibration, Setting, and Functional Testing 3/24/2016 Electrical
Type Number Title Date Approved Discipline
SATR SATR-P-3821 LV Controlgear - Full Voltage Motor Controller Calibration, Setting, and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3822 LV Controlgear - Reduced Voltage Motor Controller Calibration, Setting, and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3823 LV Controlgear - Feeder Contactor Calibration, Setting, and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3824 LV Controlgear - ATS / MTS Calibration, Setting, and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3825 LV Panelboard - Pre-Energized and Functional Testing 3/24/2016 Electrical
SATR SATR-P-3901 Switchyard - HV Mechanical Termination Torque Testing 3/24/2016 Electrical
SATR SATR-P-3902 Switchyard - HV Conductor (Pipe and ACSR) Continuity and Conductivity Testing 3/24/2016 Electrical
SATR SATR-P-3903 Switchyard - HV Ground Electrode System Continuity and Resistance Testing 3/24/2016 Electrical
SATR SATR-P-3904 Switchyard - HV Conductor (Pipe and ACSR) High-Potential Withstand Testing 3/24/2016 Electrical
SATR SATR-S-4001 Sewers Gravity Test 3/24/2016 Plumbing
SATR SATR-S-4002 Water and Sewage Retaining Structures (manhole, catch basin, holding tanks, etc) Leak Test 3/24/2016 Plumbing
SATR SATR-S-4003 Building Drainage and Vent Piping Hydrotest 3/24/2016 Plumbing
SATR SATR-S-4006 On-site Built-up Shower Receptor Watertightness Test 3/24/2016 Plumbing
SATR SATR-W-2003 Welder Performance Qualification Test Record 3/24/2016 Welding
SATR SATR-W-2004 Post-Weld Heat Treatment Request 3/25/2016 Welding
SATR SATR-W-2005 PWHT Report Form 3/24/2016 Welding
SATR SATR-W-2006 DAILY WELD FIT-UP INSPECTION REPORT- PLANT PIPING 3/24/2016 Welding
SATR SATR-W-2007 DAILY WELD PRODUCTION REPORT 3/24/2016 Welding
SATR SATR-W-2008 WELD SUMMARY, WELDER PERFORMANCE and NON-DESTRUCTIVE (NDT) TRACKING SYSTEM 3/24/2016 Welding
SATR SATR-W-2009 Welding Rod Oven Calibration/Verification Report 3/24/2016 Welding
SATR SATR-W-2010 WELDING CONSUMABLES ISSUANCE REPORT 3/24/2016 Welding
SATR SATR-W-2011 Welding Machines Verification Report 3/24/2016 Welding
SATR SATR-W-2012 Hardness Test Report (With SAEP-1160 Weld Tracking Criteria) 3/24/2016 Welding
SATR SATR-W-2013 WEEKLY WELDER REPAIR RATE REPORT 3/24/2016 Welding
SATR SATR-W-2014 Temperature Tie-In Welding Report 3/24/2016 Welding
SATR SATR-W-2015 Weld Overlay Chem Comp Testing Report (Attachment) 3/24/2016 Mechanical
SATR SATR-W-2016 FERRITE TESTING REPORT (PER SAIC-W-2030-R7) 3/24/2016 Mechanical
SATR SATR-W-2017 Weld Overlay Inspection & Summary Report / Record 3/24/2016 Welding
SATR SATR-W-2018 WELDER REPAIR ASSESSMENT and TRACER WELD REPORT-WEEKLY 3/24/2016 Welding
SATR SATR-W-2019 WEEKLY and CUMMULATIVE WELD STATUS REPORT 3/24/2016 Welding
SATR SATR-W-2020 Welding Consumable Receiving Insp Report 3/24/2016 Welding
SATR SATR-X-3101 Galvanic CP Testing 3/24/2016 Cathodic Protection
SATR SATR-X-3201 DC Cable Holiday Testing 3/24/2016 Cathodic Protection
SATR SATR-X-3202 DC Rectifier Testing 3/24/2016 Cathodic Protection
SATR SATR-X-3203 Plant Potential Survey Testing 3/24/2016 Cathodic Protection
SATR SATR-X-3204 External Tank Bottom Testing 3/24/2016 Cathodic Protection
Type Number Title Date Approved Discipline
SATR SATR-X-3205 Internal Tank Bottom Testing 3/24/2016 Cathodic Protection
SATR SAIC-GI-2102 Pressure Testing Safely Mechanical
SATR SATR-W-2003 Welder Performance Qualification Test Record Welding
SATR SATR-W-2005 PWHT Report Form Welding
SATR SATR-W-2006 DAILY WELD FIT-UP INSPECTION REPORT- PLANT PIPING Welding
SATR SATR-W-2007 DAILY WELD PRODUCTION REPORT Welding
SATR SATR-W-2008 WELD SUMMARY, WELDER PERFORMANCE and NON-DESTRUCTIVE (NDT) TRACKING SYSTEM Welding
SATR SATR-W-2009 Welding Rod Oven Calibration/Verification Report Welding
SATR SATR-W-2010 WELDING CONSUMABLES ISSUANCE REPORT Welding
SATR SATR-W-2013 WEEKLY WELDER REPAIR RATE REPORT Welding
SATR SATR-W-2015 Weld Overlay Chem Comp Testing Report (Attachment) Welding
SATR SATR-W-2016 FERRITE TESTING REPORT (PER SAIC-W-2030-R7) Welding
SATR SATR-W-2017 Weld Overlay Inspection & Summary Report / Record Welding
SATR SATR-W-2018 WELDER REPAIR ASSESSMENT and TRACER WELD REPORT-WEEKLY Welding
SATR SATR-W-2019 WEEKLY and CUMMULATIVE WELD STATUS REPORT Welding