NOTE:
- PIPE OUTLET MUST NOT 'DAYLIGHT'. STOP PIPE AT MINIMUM COVER OF 600-700MM. OUTFALL MAY BE INSET AS SHOWN IN TOP
DRAWING
- CUT OFF WALLS. BOTTOM MINIMUM 500MM INTO IN SITU. SIDE MINIMUM 1M INTO IN SITU
CODE

- FOR LARGER OUTFALL PIPES CONSTRUCT CONCRETE END WALLS (PARTICULARLY OUTFALLS LARGER THAN 1200MM DIA).
C

- EITHER GRADED ROCK WORK OR PLACED ROCK WORK DEPENDING ON THE GRADE AND WHETHER BELOW OR ABOVE NWL
- ENERGY DISSIPATION CAN BE ENHANCED WITH SHALLOW PLANTED INLET POOLS/SUMPS
- 1.5 M/SEC MAX. OUTLET VELOCITY ; TREATED PINE SAFETY BARRIER FENCE REFER TO 7251/08/206
- OUTLET PIPE TO BE SET BACK INTO THE FINISHED BATTER SLOPE, POINTING A MAX. OF 45 DEGREES DOWNSTREAM; 600-700mm COVER OVER PIPE
- ROCKS ABUTTING THE PIPE TO HAVE A MORTAR PAD BETWEEN THE ROCK AND THE OUTSIDE EDGE OF THE PIPE (NO POINT CAPPING PLATE ROCKS SET ON A MORTAR PAD TO DISTRIBUTE LOAD (NO POINT LOADS)
LOADINGS);
- ROCKWORK PROTECTION REQUIRED FOR THE BED AND BANKS, FROM THE END OF PIPE TO THE LOW FLOW WATER LEVEL.  ROCK MORTAR INTERFACE BETWEEN OUTSIDE OF PIPE AND ROCK
PROTECTION REQUIRED FOR THE FULL EROSION PROJECTION OF THE OPPOSITE BANK AND BED AS REQUIRED FOR THE WATER
FLOW PROFILE WHEN THE OUTLET IS FLOWING FULL ; GRADED ANGULAR ROCK PLACED
- ROCKS WITHIN THE BASE TO BE PLACED ON A FCR BEDDING TO ENSURE THE STORMWATER DISCHARGE IS FLOWING OVER AND TIGHTLY, WHERE GRADES ARE STEEP
AROUND THE ROCKS DOWN INTO THE CREEK, AND NOT  UNDERNEATH. THE REMAINING EXPOSED DIMENSION OF THE ROCKWORK SINGLE SIZE LARGER ROCK MAY BE
IS TO BE A MINIMUM OF 150mm; REQUIRED FOR STABILITY, RUBBLE/FINES
- DISTURBED AREAS OF EXISTING BANK RESULTING FROM THESE WORKS ARE TO BE STABILISED WITH REVEGETATION. (0-100mm) TO BE POURED INTO VOIDS
MOTAR PAD UNDER PIPE
- THE OUTLET MUST BE INTEGRATED INTO THE BANK AND SURROUNDING LANDSCAPE TO MAXIMISE AESTHETICS AND MINIMISE
LARGER FLAT ROCKS UNDER PIPE NWL
IMPACTS
- TOE AND EDGE ROCKS AE TO ADEQUATELY KEYED INTO THE BED OF THE CREEK. (700mm DIA MIN) ADDITIONAL ROCK SCOUR
- ALL  VOIDS SHALL BE FILLED WITH A 0-100mm FCR MIX. GEOTEXTILE FABRIC 434 BIDIM OR EQUIVALENT PROTECTION AS REQUIRED
- APPROPRIATE SILT/DEBRIS CONTROL MEASURES MUST BE INSTALLED.
BEDDING MATERIAL 150mm LAYER
PROCEDURE 100mm MINUS GRADED QUARRY ROCK
- EXCAVATE/BOX OUT TO ENABLE TOE AND MATERIAL. TOE ROCK TYPICAL PIPE OUTFALL SECTION A-A
- INFILL THE CHUTE WITH A 0-100mm FCR MIX. THE CONTRACTOR SHALL USE METHODS FOR HANDLING AND  PLACEMENT OF ROCK (1.0m DIA MIN, 2/3 BELOW SURFACE)
THAT WILL AVOID SEGREGATION OF ROCK SIZE FRACTIONS.
- ROCK SHALL BE CAREFULLY PLACED INTO POSITION. ROCK SHALL  NOT BE DUMPED DIRECTLY.
- IT IS IMPERATIVE THAT ROCK USED  TO  FORM THE ROCK CHUTE IS WELL GRADED  WITH  MINIMAL  VOIDS  TO PRODUCE A BLANKET
OF INTERLOCKING  ROCK.

PLATE ROCK
A

TREATED PINE SAFETY BARRIER FENCE REFER TO 7251/08/206


PIPE ANGLED 45O DOWNSTREAM
TREATED PINE SAFETY TO CONNECT TO WATERWAY. TOP OF BANK
BARRIER FENCE REFER TO
7251/08/206 LARGE (1.0m) CUBIC ROCKS PLACED EITHER SIDE OF PIPE CAPPING PLATE ROCKS
CAPPING PLATE ROCKS BED ON MORTAR PAD SET ON MORTAR PAD
EDGE ROCK (1.0m MIN) TOP OF BANK
TRENCH PROFILE
FILL PIPE/ROCK
EDGE ROCK (1.0m MIN)
WATERWAY INTERFACE WITH 500
LINING ROCK MORTAR 150
BATTER (MIN)
(300mm MIN GRADED)
STAGGERED KEY ROCKS SL81 MESH MORTAR VOIDS
STEEPEN TO FORM CENTRAL 150 WHERE SLOPE IS
TOE ROCK (1.0m MIN) 2/3 EMBEDDED INCLINE TO TOP OF BANK LARGE CUBIC STEEP
FLOW ADDITIONAL SCOUR PROTECTION ROCKS
LINING ROCK FLOW (1M DIA)
MAY BE NECESSARY DEPENDING
(300mm MINUS GRADED) ON PIPE DIAMETER PROXIMITY TO BED OF WATERWAY
500
STREAM AND HEIGHT ABOVE NWL PIPE BEDDING
VELOCITY < 1.5 m/s
CONCRETE CUT OFF
1.0m MIN INTO INSITU GROUND CONCRETE CUT OFF/SUPPORT
BEDDING MATERIAL 0-100 FCR
(150mm DEEP)
A

PIPE END DETAILS


TYPICAL PIPE OUTFALL

COPYRIGHT Melbourne TITLE

Copyright - This document


is the property of Melbourne
Water PIPE OUTFALL DRAWING
Water. Use or copying of
the document in whole or in DRAFTER DESIGNER DESIGN MANAGER PROJECT MANAGER
B WATERWAY DESIGN MANUAL ALLUVIUM JB 21/08/19
part without the written APPROVAL APPROVAL
permission of Melbourne
PROJECT DATUM
Original
MELBOURNE WATER CORPORATION
A NOTATION AMENDMENTS MW MK 17/12/18 Size

PROJECT OR ENG. PR. MAN.


Water constitutes
infringement of copyright.
an DRAFTING CHECK ENGINEERING REVIEW
SCALE
A1 C 7251/08/103 B
REV DESCRIPTION COMPANY DRAWN DATE NOT TO SCALE
WO NUMBER CHECK APP'D CODE MWC DRAWING NUMBER REV

You might also like