INSPECTION RELEASE NOTE( GENERAL)

DATE : 29-Aug-2021 IRN NO. : 20-2101-HAM-IRN-1538

CLIENT : Seaway 7 JOB NO. : CN/20/2101

PROJECT : Seagreen Offshore Wind Farm PAGE : 1 OF 1

RFI REFERENCE : CN-20-2101-EXT009668-Rev.No.00 LOCATION : Hamriyah

ITEM INSPECTED : J-4 LOWER JACKET LEG-A (BAY-1) ALONG WITH ANODES (EXCLUDING NODES)

DESCRIPTION : FINAL VISUAL INSPECTION PRIOR TO RELEASE FOR PAINTING.

DESCRIPTION WELD MAP DRAWING FABRICATION DRAWING

LEG TUBULAR TO CONE JOINT NO.3 20-2101-EN-S-WD-CL1-6003 SH 01 OF 03 20-2101-EN-S-SD-CL1-1110 SH 01 OF


(C1L-6-LG-5/6, C1L-5-LG-5,C1L-5-LG-1 ) REV 2 01 REV4

ANODE ASSEMBLY JOINT NO.1,2,3,4,5,6 20-2101-EN-S-WD-CL2-6004 SH 01 OF 03 20-2101-EN-S-SD-CLC-5501 SH 01 OF


REV 1 02 REV1

Verification of Completion Yes No N/A Comments

n All materials traceability verified and Material Tracebility Record completed. ✘

n All fit ups completed and accepted. ✘

n All applicable NDT completed and accepted. ✘

n Post Weld Heat Treatment (PWHT) completed and accepted. ✘

n Additional NDT such as Hardness, PMI, Ferrite testing completed and accepted. ✘

n Dimensional Control verification completed and accepted. ✘

n Pressure testing / Hydrostatic testing / Leak testing completed and accepted. ✘

n Final coating completed and accepted. ✘

n Final Preservation Completed (Lay up, Nitrogen Purging, Covering Protection etc.) ✘

n All NCR's and CAR'S close out verification completed. ✘

n All Inspection Test Record (ITR) Certifcates signed off. ✘ Anode ITR's

n Punch list if any generated. ✘

n Final visual inspection completed and accepted. ✘

Released for :


Painting Testing Released for Erection Transfer to Other facility

Post Weld Heat Treatment Others Specify

REMARKS : Coating shall be performed on Weld Joint Flush Ground area inside

Punch Comments:-N/A

CONTRACTOR EMPLOYER
LEL PRODUCTION LEL QC
(Seaway 7) (Seagreen)
NAME : JESWIN JOHN

DESIGNATION : QC Inspector

SIGNATURE :

DATE : 29-Aug-2021 29-Aug-2021

Form : 20/2101/HAM/QC/F/015 Page 1 of 2


Rev. : 0
Date : Oct.2020
PUNCH LIST
CLIENT: SEAWAY 7 / SEAGREEN JOB: CN/20/2101 DATE: 30/06/21
PROJECT: SEAGREEN OFFSHORE WIND FARM DISCIPLINE: STRUCTURAL

Ref : RFI COMPLETED CHECKED BY


SL. NO. DESCRIPTION RESPONSIBILITY CATEGORY COMMENTS
No DATE
LEL QC DATE CLIENT DATE TPI DATE

Form : 20/2101/LGQCF021
Rev. : 0
Date : June. 2020