Advantages:
• High capacity.
• Small Footprint.
• Flexible.
• Mobile.
• Excellent Cost/Quality ratio.
• Multi-functional.
Operational area
• All European Union Countries and USA.
(Other countries on request).
Transport
• The 600k can be disassembled in easy transportable sections
with a weight less than 10t.
1/6
BALANCE POINT CONTROL BV
Equipment Specification Sheet
Rig-Up Time
1. The Rig-Up time varies based on the configuration and the
type of operation between 12 and 36 hours.
Pipe Handling
• The 600k Unit is equipped with a flexible and reliable Pipe
Handling System based on the Gin Pole-Lay Down Winch
principle. Large flexibility allows variable Pipe Deck locations,
easy handling of all types of tubular and changing Rig-Up
configurations without modifications.
• The Gin Pole contains two Counter Balance Winches both
rated at 1,5 mTon.
2/6
BALANCE POINT CONTROL BV
Equipment Specification Sheet
Auxiliary Equipment
• Dependent from the scope of work the following equipment may be needed:
»» Data Acquisition System (DAS-System).
»» Hydraulic Power Pack.
»» Well Control Equipment
(Blow-out preventers, Flow-lines, Choke, etc.).
»» Mud Pump.
»» BOP Remote Control Unit.
»» Office Container.
»» Tool Container.
»» Guy Wire Container.
»» Substructures as per client specifications.
600k Snubbing in UK (Live Well) 600k HWO in Germany (Dead Well)
600k Snubbing in Germany (Live Well) 600k on a gas-cavern redevelopment project
4/6
BALANCE POINT CONTROL BV
Equipment Specification Sheet
5/6
BALANCE POINT CONTROL BV
Equipment Specification Sheet
Figure 4: 600k in combination with Coil tubing in UK
6/6