Start Up and Operation: Presented by Fs Engineer Sundyne
Start Up and Operation: Presented by Fs Engineer Sundyne
Presented by Fs Engineer
Sundyne
INTRODUCTION
• Test results
•Shut down
GENERAL DISCUSSION
Pressure
(Pout-Pin)/Pin 7,00% 7,59% 7,36% 7,06% 6,73% 6,01% 5,05% 3,82% 2,37% 0,57%
Ratio
TEST RUN
PREPARATION FOR START-UP
START,
CASING LOW
POINT DRAIN
VALVE SHOULD
BE CHECKED FOR
LIQUID PRIOR
START UP
Start-up Compressor
OK
H Caution !
Danger !!
Q (Volume Flow)