1.

Oracle Cloud Infrastructure’s security approach is based on seven core


pillars. Each pillar has multiple solutions designed to maximize the security
and compliance of the platform. Which of the following is NOT Considered
one of the pillars?
(0/1) Points
Visibility
Disaster Recovery
Data Encryption
High Availability
Customer Isolation
Incorrect. Please review Cloud Security

2. Your Customer needs Data Masking in their Fusion SaaS Test


environments. Which of the following statements about Data Masking
Service is correct?
(0/1) Points
Data masking is ONLY required for European Union Customers.
Data masking is a chargeable service, and only standard PII fields are
masked during P2T (Production to Test) refreshes.
Data Masking is a free service and Customer can choose any number of
fields, and their own rules, etc. by raising an SR.
Data masking is ONLY required for regulated Customers or Customers with
Highly sensitive “Cost” data. If Manufacturing /procurement is not there,
Data masking doesn’t apply.
Incorrect. Please review Cloud Security

3. Which TWO statements about Fault Domains are true?


(Choose all correct answers)
(1/1) Points
A failed instance in a fault domain is automatically relaunched
A fault domain is selected automatically based on usage data
A fault domain is a grouping of hardware and infrastructure within an
availability domain
Each availability domain contains three fault domains
Correct!

4. Your Customer Information Security team would like to conduct an audit


on the Cloud services. What advice is the most appropriate?
(1/1) Points
Provide a Security checklist from MOS for the Customer to conduct the audit.

Schedule audit tasks in your project timeframe for the team to conduct audit

Standard audit certifications and attestations are available upon request


from Oracle; additional audits are not necessary
Liaise with Oracle to schedule the audit tasks (raise an SR)
Correct!

5. Oracle Identity Cloud Service has been designed to meet the needs of
organizations in a number of typical use-case scenarios. Which of the
following use cases is applicable?
(0/1) Points
All of the above
Allowing both On-Premise and Cloud resources to be secured from a single
set of controls
Customer-facing extranet requirements
Employee-facing intranet requirements
Mobile access (providing sign-on for native or browser-based apps)
Incorrect. Please review Cloud Security

1. Which of the following statements is NOT considered as a key


differentiator for Enterprise Architecture in the Context of Cloud
(0/1) Points
Better visibility, traceability, flexibility
Auditability and Accountability
Usability, Sustainability, Sociability
Resource elasticity, application scalability, expandability
Agility, availability, adaptability, and autonomy
Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.
2. To take a systematic and methodical approach for a Project, it is
important to conduct a thorough analysis of which of the following the
Enterprise Architecture Layers:
(0/1) Points
Business, Databases, Applications, Technology
Business, Data, Software, Technology
Information, Data, Business processes, Technology
Business, Data, Applications, Technology
Strategy, Data, Applications, Infrastructure
Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.

3. In a joint Enterprise Architecture analysis with your Project Architect, you


identify that the Customer has globally integrated Business Processes with
centralised management and IT Decision Making. The Customer is keen to
take up global design approach by Standardising Business Processes. What
is this Operating Model classified as?
(0/1) Points
Standardization
Diversification
Unification
Coordination
Replication
Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.

4. In a joint Enterprise Architecture review with your Project Architect, you


identify that the Customer Departments seldom share Customers or
Suppliers. Departmental transactions are unique to individual Business Units
with independent Business Processes and little Data Standards. What is this
Operating Model classified as?
(0/1) Points
Standardization
Coordination
Unification
Diversification
Replication
Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.

5. What is the Welcome E-mail that Oracle sends to its Cloud Customers?
(1/1) Points
It’s a declaration sent to Customer administrator informing that Oracle is
about to start the provisioning.
It has important list of action the Cloud admin should do.
It’s a declaration sent to Customer administrator informing that Oracle has
initiated the provisioning of instances
It’s a declaration sent to Customer administrator informing that Oracle has
completed provisioning and the instance is ready to be used.
It’s a declaration sent to Customer administrator informing that Oracle has
received the Order from the Sales Manager.
Correct!

6. The role profile that includes responsibility of managing the Oracle Cloud
Service applications, creating additional MyService users, setting up security
profiles, adding other users or distribution lists to receive notifications is
called as -
(0/1) Points
Identity Domain Administrator
Application Administrator
MOS Administrator
Service Cloud Administrator
Account Administrator
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

7. A Customer is planning for a SaaS Cloud Project and is assessing the


situation if they require any Additional Test Environments (ATE). What are
the key considerations that influence the number of additional test
environments?
(1/1) Points
All of the above
Project lifecycle stage: initial implementation vs. subsequent rollouts
Organization size and complexity of Project scope (geographies, technology,
timezones etc.)
Projects requiring orchestrated integration testing with Legacy systems with
equivalent DEV, TEST and PROD environments
Additional environments for Payroll Parallel Runs
Correct!

8. As a Project Manager, you should include the following SaaS Environment


activities in your schedule to plan ahead and mitigate risks:
(0/1) Points
Quarterly updates on Test / Production, Sizing, P2T, Back-Ups
Quarterly updates on Test / Production, Sizing, P2T, T2P
Quarterly updates on Test / Production, P2T, Concurrent Patching
Quarterly updates on Test / Production, Sizing, P2T and optionally,
concurrent patching
Quarterly updates on Test / Production, Sizing, Concurrent Patching
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

9. When a Customer subscribes to Fusion SaaS ERP and HCM, Oracle will
provision the following as standard:
(0/1) Points
1 unified Production Environment, 1 unified Stage Environment and 1 for
Payroll; Total 3
1 Production Environment for Fin, 1 HCM Production and 1 Fin and 1 HCM as
Stage Environments; Total of 4
1 unified Production Environment and 1 unified Stage Environment; Total 2

One Global Single Instance (GSI)


1 Environment for Test and Production
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

10. Following Production Configuration of Fusion Cloud Applications, it is a


Best Practice to take a Back-Up copy of the application to a hard-disk or
local Storage.
(0/1) Points
True
False
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

1. What is the exact order of the DevOps Cycle?


(0/1) Points
Design - Code - Build - Test - Release - Operate - Monitor
Design - Build - Test - Deploy
Plan - Build - Test - Package - Release- Operate - Monitor
Plan - Code - Build - Test - Release -Deploy - Operate
Plan - Build - code - Test - Package - Release- Operate - Monitor
Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.

2. Which of the following is NOT Considered as an Agile Principle?


(0/1) Points
Working Software
Reflect and Adjust
Embrace Change
Deliver Value
Structured Teams
Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.

3. Your Customer Project has the following in Scope – ERP Cloud, lift and
shift of legacy On-Premise Seibel CRM to OCI, Custom Build Mobile
Applications and integration between ERP Cloud and Seibel CRM using OIC
(Oracle Integration Cloud). What implementation approaches apply for this
scope?
(1/1) Points
ERP Cloud – Solution, Driven OIC and OCI - Requirement Driven, Mobile
apps - Agile
Waterfall Requirement driven will fit to the entire scope
ERP Cloud and Mobile apps - Solution Driven OIC and OCI - Requirement
Driven
ERP Cloud, OIC and OCI -Requirement Driven, Mobile apps - Agile
ERP Cloud and OIC - Solution Driven, OCI - Requirement Driven, Mobile
apps - Agile
Correct!

4. Your Project requires an approach to capture Functional and Technical


specifications prior to designing and developing Reports and Integrations.
Which approach suits your Project?
(0/1) Points
Solution Driven
Architecture Driven
Requirement Driven
Design Driven
Innovation Driven
Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.

5. Your Customer Project scope includes Fusion Engagement Cloud, Service


Cloud (RightNow), Field Service (TOA), Commerce (ATG), CPQ, Marketing
Eloqua and Responsys, integrated through OIC (Oracle Integration Cloud)
recipes. What implementation approaches apply for this scope?
(0/1) Points
There is no one-size fit all. It is mostly Solution Driven; Except for OIC,
some parts of Service Cloud extensions and Marketing where configuration is
shaped by changing Business Strategy.
OIC - Requirement Driven; Marketing - Strategy Driven; Other CX Products -
Solution Driven
Requirement Driven Approach is appropriate for this scope
Solution Driven approach fits the entire scope as there are OIC recipes which
are plug and play
Agile - Iterative and incremental approach
Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.
6. Accelerating the process to deliver applications and software services at a
high speed and high velocity for infrastructure changes is referred to as:
(0/1) Points
Continuous Delivery
DevOps
Agile Development
Continuous Integration
Disciplined Agile
Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.

7. You are assigned to a Project where the scope of work is EPM - Enterprise
Performance Management and Oracle Analytics Cloud. What would be the
implementation approach?
(0/1) Points
Solution Driven – As there are standard processes that may be adopted for
EPM and Analytics
EPM - Requirement Driven Approach and Analytics Cloud Solution Driven
EPM - Solution Driven Approach and Analytics Cloud -Requirement Driven
Agile approach – As it includes Custom development
Requirement Driven – As EPM and analytics are Business and Data
requirements driven
Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.

8. Your Project scope includes configuring Security service entitlements


(VPN, IP whitelisting, SSO). At what point during the Project timeline this
may be configured and tested as a Best Practice recommendation?
(0/1) Points
After Go-Live or Just Before Go-Live, in the Production Environment
Well before UAT starts. During Solution Design workshops (CRP) to allow
maximum testing time and liaison time with Oracle should there be any
issues.
In the Test Environment during UAT
Both in TEST and PRODUCTION Environments just before releasing to UAT
Testing
A few days before UAT on TEST Environment ONLY
Incorrect. Please review Continuous Testing Strategy and Plan to find the correct answer.

9. Test Cycle planning in Multi-Cloud Implementations will require alignment


of which of the following aspects?
(1/1) Points
Project Plan, Environments Plan, Test Cycles plan and Patching Calendar
Only black-out periods to be considered
Project Plan and Test Cycles plan
Project Plan, Test Cycles plan and Environments Plan
No alignment is necessary
Correct!

10. The Customer security profiles may be configured in Production ONLY


but not during CRP or UAT.
(1/1) Points
False
True
Correct!

11. To avoid any delays during the UAT, it’s advised that the partner team
runs the testing scenario in a lab in-front of the Customer. Customer may
practice using the application during Training or after Go live. Is this a Best
Practice?
(0/1) Points
True
False
Incorrect. Please review Continuous Testing Strategy and Plan to find the correct answer.

12. Oracle Identity Cloud Service has been designed to meet the needs of
organizations in a number of typical use-case scenarios. Which of the
following use cases is applicable?
(1/1) Points
All of the above
Employee-facing intranet requirements
Customer-facing extranet requirements
Mobile access (providing sign-on for native or browser-based apps)
Allowing both On-Premise and Cloud resources to be secured from a single
set of controls
Correct!

13. Customer wants to isolate different departments from each other, so


that the visibility and access to resources can be compartmentalized. What
would be the security solution for this use case?
(0/1) Points
Compute: Bare Metal Instances or VM Instances
Identity and Access Management: Compartments and IAM policies
Network: VCN and Subnets
Data: Data-at-rest encryption using Customer-controlled keys
Back-end Infrastructure: Secure isolation between Customer instances and
back-end hosts (Off box Network Virtualization)
Incorrect. Please review Cloud Security

14. During your implementation, to manage the password policy what you
should do? Select the TWO appropriate answers:
(Choose all correct answers)
(0/1) Points
Fusion password policy is flexible enough to adopt to Customer security
needs.
You can raise an SR to change the password policy to match Customer
security
You need to raise an SR, to activate the password policy
You should work with Customer to follow their password policy and ignore
the Fusion application password policy.
You cannot change Passwords
Incorrect. Please review Cloud Security

15. Oracle Cloud Infrastructure’s security approach is based on seven core


pillars. Each pillar has multiple solutions designed to maximize the security
and compliance of the platform. Which of the following is NOT Considered
one of the pillars?
(0/1) Points
Disaster Recovery
High Availability
Customer Isolation
Data Encryption
Visibility
Incorrect. Please review Cloud Security

16. A partner has moved an e-commerce application to Oracle Cloud


Infrastructure. The Project requires strict access control that restricts access
to data from certain geographical regions. What additional Cloud Security
Services will be required to achieve this level of access control?
(1/1) Points
Identity Cloud Service
OCI IAM
Web Application Firewall
Cloud Access Security Broker
Correct!

17. You propose implementing Virtual Private Network to restrict Customer


employee access outside their corporate network. What should you consider
in the Project Delivery Costs?
(1/1) Points
Oracle VPN is a free service bundled with Oracle Cloud Service subscriptions.
So, there is no additional costs to budget for.
Oracle VPN is a subscription based paid service and needs to be budgeted
for the Project
Oracle VPN comes part of OCI under the Universal Credits subscription – so
no additional budget required.
Oracle VPN is part of the application Services that is configured using the
Application Administrator login access rights. Hence, no additional effort/
Costs to budget for.
Correct!

18. A highly regulated Industry Customer requires to self-manage symmetric


storage encryption keys at scale. Considering the sensitivity of the data,
what Service is best positioned for this Project?
(0/1) Points
Cloud Access Security Broker
Vaults/Secrets Management
Vaults/Key Management
None. All Customer Data with any of Oracle Cloud Infrastructure Data
Services is encrypted by default and Customers cannot manage their own
keys
Incorrect. Please review Cloud Security

19. Which of the following Integration tools provides seamless batch and real
time data movement among Cloud and on-premise data sources,
maintaining data consistency along with fault tolerance and resiliency?
(0/1) Points
Oracle Integration Cloud
SOA Cloud Service
API Platform Cloud Service
Managed File Transfer Cloud Service
Data Integration Cloud Service
Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.

20. Your Project scope includes creating APIs by leveraging Oracle’s Apiary
Platform. What are the key planning considerations in this context?
(1/1) Points
Create a Strategy - Include both Business and technology stakeholders to
align Business goals with the best approach
Leverage existing investments like SOA, Integrations, App Dev and Micro-
services efforts may help to jump start API initiatives
Build the Project team and the resources, select technologies, select
vendors, and start Project
All of the Above
Identify target audience, usage, design Mock API and reflect/amend contract
agreements
Correct!

21. Your Customer in the media industry requires streaming integration with
zero down-time, high availability, real time replication and data
synchronisation. What Integration tool is best used for this scenario?
(0/1) Points
Oracle Integration Cloud
Oracle Data Integration Platform Cloud Governance
Oracle Data Integration Platform Cloud Enterprise
Oracle Data Integration Platform Cloud Standard
Oracle Golden Gate Cloud Services
Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.

22. You can optimise Implementation timelines for ERP, SCM and WMS
Cloud Integrations by leveraging -
(0/1) Points
Prebuilt Adapters
Integration Extensions
ERP Connectivity Packages
Integration Recipes
REST and SOAP APIs to build adapters
Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.

23. Which of the following is NOT considered as an Anti-pattern Use Case


while monitoring and maintaining integrations?
(0/1) Points
Reading a file with large number or records and process individual records in
a loop (processing record by record) consuming large memory
View the performance metrics for all active integrations and the status of the
Business identifiers
Proliferation of integrations without looking at existing flows
Processing records within a set of files with a tight SLA due to scheduled
integrations looping all over the files sequentially
Monitor Duplicate integrations created by different developers using different
credentials
Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.

24. As part of baselining an Enterprise Architecture you are reviewing the


following: Business Initiatives and Corresponding Capabilities, Cloud
Strategy, Target Operating Model, Future Business Processes. Which of the
following Enterprise Architecture layers are you analysing?
(0/1) Points
Business Strategy and Processes Architecture
Data and Information Architecture
Technology Architecture
Applications Architecture
Cloud Architecture
Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.

25. Which of the following statements is NOT considered as a key


differentiator for Enterprise Architecture in the Context of Cloud
(0/1) Points
Better visibility, traceability, flexibility
Usability, Sustainability, Sociability
Resource elasticity, application scalability, expandability
Auditability and Accountability
Agility, availability, adaptability, and autonomy
Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.

26. In a joint Enterprise Architecture review with your Project Architect, you
identify that the Customer Departments seldom share Customers or
Suppliers. Departmental transactions are unique to individual Business Units
with independent Business Processes and little Data Standards. What is this
Operating Model classified as?
(0/1) Points
Unification
Coordination
Replication
Standardization
Diversification
Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.
27. Enterprise Business Analysis and Architecture processes continuously
refine an organization’s:
(1/1) Points
Business Strategies and Requirements
Internal and external Compliance and Regulatory requirements
Cloud Strategy and Roadmap
Future-State Architecture
All of the Above
Correct!

28. A Customer’s Project scope includes Cloud ERP, HCM, and Payroll along
with Oracle Integration Cloud (OIC) and modernisation of Custom developed
applications to native Cloud apps in 8 Countries. What is the MINIMUM
number of Cloud Instances recommended as a Best Practice guidance for
this scope? (Note that - ERP, HCM and Payroll are SaaS applications
available on a Single Instance.)
(0/1) Points
SaaS – 2 Environments (TEST, PROD), OIC and Custom Development are
hosted on same instance – 2 (TEST, PROD)
SaaS – 2 Environments (TEST, PROD), OIC – 2 (TEST, PROD) and Custom
Development – 2 (TEST, PROD)
SaaS – 2 Environments (TEST, PROD), OIC – 3 (DEV, TEST, PROD) and
Custom Development – 3 (DEV, TEST, PROD)
SaaS – 3 Environments (DEV, TEST, PROD) to allow Payroll Parallel Run
tests, OIC – 2 (DEV, TEST, PROD) and Custom Development – 2 (DEV,
TEST, PROD)
SaaS – 2 Environments (TEST, PROD), OIC – 4 (Dev1, Dev2, TEST, PROD)
and Custom Development – 4 (Dev1, Dev2, TEST, PROD) to test ERP and
HCM Modules independently.
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

29. What is the unique name for Cloud Environment called? (Note that User
authentication and authorisation for access to Services is defined and
controlled at this level)
(0/1) Points
Cloud Portal
Data Centre Regions
Identity Domain
Service Instance
Cloud Console
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

30. A Customer is on the Quarterly Update cadence (non-concurrent) of


February - May - August - November and has planned Go-Live on the 13th
of May (during week 2). Three weeks in advance of Go-Live, the Customer
plans to request a P2T on the 15th of May (just after 2nd Friday). What do
you envisage could be a problem that would affect fulfilment of this service
entitlement request?
(0/1) Points
Blackout period - Test and Prod are not on the same patch-set level; hence
the request will not be fulfilled.
Test and Production should be on different patching levels, so the request
will be fulfilled.
Unavailability of Oracle Cloud resources over the weekend would affect the
fulfilment.
Test and Production are at the same patch set level, hence request will be
fulfilled
SaaS instances have a scheduled downtime for maintenance hence the
request will not be fulfilled
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

31. A Customer would like to know how to set Project cost control plans
through the Budgeting Feature available in OCI. How can you set up
budgets?
(1/1) Points
Budget can be set at a Compartment level along with alert rule for a % value
ONLY
Budget can be set at a Subnet level along with Budget alert rule for a $
value ONLY
Budget can be set at a Network level along with Budget alert rule for a % or
$ value.
Budget can be set at a Tenancy level along with Budget alert rule for a % or
$ value.
Budget can be set at a Compartment level along with Budget alert rule for a
% or $ value.
Correct!

32. The Fusion Cloud Project you are managing is going Live in 5 weeks’
time. You realised that the P2T refresh immediately following Go-Live is
missing in your plan. What is the latest point of time to request the refresh
so that your activities align with Best Practice recommendation?
(1/1) Points
Latest three weeks in advance avoiding Black-Out periods
2 weeks before Go-Live
No need to schedule any P2T. You may do it after Go-Live.
No need to schedule in advance, just escalate to Oracle whenever a refresh
is required
Maximum four weeks in advance and it can be rescheduled any time prior to
the refresh date.
Correct!

33. Your Cloud Projects scope includes Fusion ERP, HCM, Sales Cloud, Taleo
Recruit, Service Cloud (RightNow) and Field Service. How many
environments are provisioned as Standard?
(0/1) Points
9 (4 Prod/4/Test/1 Dev)
8 (4 Prod/ 4 Test)
6 (3 prod/ 3 test)
10 (4 Prod/3 Test/3 Dev)
11 (4 Prod/4/Test/3 Dev)
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

34. A Cloud Customer buys Universal Credits to implement Oracle Analytics


Cloud. Which of the following influence the Universal Credits’ usage levels
and therefore should be considered as part of Project costs?
(1/1) Points
The type of the OAC subscription: Standard or Enterprise Edition
All of the above
The number of instances and the Number of CPUs used.
No. of Dashboards and reports that will be created
Number of Business Analytics instances that will be created and used
Correct!

35. The best approach to monitor OCI workloads costs for a Project is to
leverage:
(0/1) Points
Avoid using compartments
Build Subnets
Tagging feature
None of the above
Group each workload under one Policy
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.

36. A Customer is planning for a SaaS Cloud Project and is assessing the
situation if they require any Additional Test Environments (ATE). What are
the key considerations that influence the number of additional test
environments?
(1/1) Points
Additional environments for Payroll Parallel Runs
All of the above
Project lifecycle stage: initial implementation vs. subsequent rollouts
Projects requiring orchestrated integration testing with Legacy systems with
equivalent DEV, TEST and PROD environments
Organization size and complexity of Project scope (geographies, technology,
timezones etc.)
Correct!

37. “This is how we do things here”- Is a typical statement from an On-


Premise E-Business Finance Super User highly focused on his requirements.
What positioning/ action would be most appropriate in SaaS Cloud Projects
context?
(0/1) Points
By strictly following the traditional waterfall methodology and Good PM
Practices; obtain requirements sign off as a key milestone. This will set the
Cloud Project to success.
To avoid this situation, undertake a detailed requirement gathering session
is an important Project activity.
Review the requirements in detail, take Executive sponsorship to baseline
requirements as per existing practices.
Initial resistance is natural. It is important to do the benefit selling in any
Cloud Project. Showing the bigger picture and end results will help.
It is crucial for the success of the Project, that every user’s wants are
fulfilled. Develop customisations to meet Business requirements and
replicate existing processes.
Incorrect. Please review Organizational Change Management in Cloud Projects to find the
correct answer.

38. Your Delivery scope for Cloud Transformation Project includes


SaaS/PaaS/OCI components. Change Management is led by the Customer.
Which of the following Change Management activities are ESSENTIAL in the
Customer’s Change planning from the CLOUD Project perspective?
(1/1) Points
Depict the reasons for resisting Change and prepare mitigation activities
Prepare a Change Management and Communication plan
Identify key stakeholders and their roles and responsibilities in the Project

Align corporate vision, mission, objectives and KPIs of the organization with
employee goals
Identify Customer Change agents and Cloud champion(s) from Business and
IT to drive the technology and process Change
Correct!

39. Which of the following activities should be part of a Change Management


Plan for Oracle SaaS CX Project with OIC integration to E-Business Suite?
(1/1) Points
For the SaaS applications, leverage the Oracle Modern Best Practices to
facilitate adoption and process change. For integrations, leverage integration
recipes
Train the Customer IT team on Cloud Environments Management, Cloud
console and portal usage
All of be above
Set up of Cloud communication notifications to target audience to embed the
new Cloud culture in the Customer organization
Conduct organizational impact assessment for shifting from On-Premise to
Cloud for the Business and IT operations departments
Correct!

40. Your Project Scope includes Database Migration. What preparation


activity (activities) must you factor in during the ‘Analyse and Prepare’ phase
of Cloud Delivery Framework?
(1/1) Points
All of the above
Identify the data sources - what is achievable, supportable, reasonable
Analyse the nature of data being transferred among different applications;
source and target databases
Identify the volume and frequency of the data exchange
Identify mode of transfer (file or data) with/without transformation from
source to target.
Correct!

41. Oracle provides built in Data Sheets for each module within Fusion to
simplify the data loading activity
(1/1) Points
False
True
Correct!

42. Your Customer would like their Data Migration Go-Live completed in the
shortest possible time; over the weekend following a quick Data Verification
round and Sign-Off. They have allowed time for One Data Migration Dry Run
before Go-Live Cut-Over. The Data Migration Approach adopted here is -
(0/1) Points
Big Bang Data Migration Strategy
Transformative Data Migration Strategy
Trickle Data Migration Strategy
Autonomous Data Migration Strategy
Phased Data Migration Strategy
Incorrect. Please review Data Management and Migration Plan to find the correct answer.
43. In a Cloud application Implementation, what Data Volumes testing is
recommended across the Project Phases?
(0/1) Points
Sample data for CRP1, up to 60% in CPR2, Full Data volume (100%) in UAT
Data volume (100%), Full in Production
10% Test data for CRP1, up to 60% in CPR2, Full Data volume (100%) in
UAT, Full Data volume (100%) in Production
Sample data for CRP1, up to 60% in CPR2, Partial Data in UAT, Full Data
volume (100%) in Production
Sample data for CRP1, up to 40% in CPR2, 80% in UAT, Full Data volume
(100%) in Production
Master data for CRP1, up to 60% in CPR2, Full Data volume (100%) in UAT,
Full Data volume (100%) in Production
Incorrect. Please review Data Management and Migration Plan to find the correct answer.

44. The tool(s) that may be used to migrate data into Oracle SaaS Cloud
is/are -
(0/1) Points
All of the above
ADF Desktop Integrator
ODI Cloud Services
File based (e.g. FBDI)
WebServices (REST and Public APIs)
Incorrect. Please review Data Management and Migration Plan to find the correct answer.

45. You are assigned as the PM of a new win Oracle Cloud Project. As part of
the Bid to Delivery transition, which of the following needs prioritising over
other activities to ensure alignment between Sales & Delivery?
(1/1) Points
Start compiling the Project Management Plan and agree Project approach
with the Customer
Don’t hesitate to re-engage the sales or management team to reset
expectations.
Validate Cloud services subscribed, establish the Project infrastructure and
collaborative environment
Understand Client’s objectives and Business strategies
Review the contract and scope of work internally first and then with the
Client so that there is a common understanding of the scope, timelines, cost
and terms and conditions
Correct!
46. As part of their overall Vision, an organization has decided to modernize
their platforms by moving to the Cloud and provide world Class HR
experience to their employees through improved efficiency, reduced
employee efforts and reduction of cost. What measurable objective may be
listed as the Project Objectives and KPI for this Project?
(0/1) Points
Improved Employee Experience and Reduction of Cost
Increase Employee Satisfaction survey and self- service rate.
Implement Oracle Recruitment Cloud to Streamline the Offer generation
processing time to less than 5 days
Move from 3 HR fragmented platforms to 1 to streamline operations
Streamline offering process and Provide self- service access to employee
data
Incorrect. Please review Transitioning Aligning Business Goals and Cloud Project Objectives to
find the correct answer.

47. A Telco Operator has been Live with Oracle CX Services for over six
months. When a new product launch was requested, the delivery turn-
around from IT department was more than three months, which is way too
much for the Marketing department. What could have gone wrong during the
implementation that may have resulted in this situation?
(1/1) Points
Misalignment between IT and Business KPIs. Business KPIs were set without
taking into consideration the Time to Market T2M KPI of telco services to be
developed by IT
Oracle products are not addressing all the Customer requirements and need
more commitment from Oracle to address some of the ER-s
IT team is complaining that due to Cloud security they are not able to take
back-up to build analytical reports
Marketing team has promotion bundles to be configured in addition to other
enhancements and the IT team is not able to deliver them on Time
Customer Service team is complaining on the lack of a 360degree integrated
view of Customer which should be accessible to the Customer Service
Advisors
Correct!
48. Which of the following Post Go-Live handover activities form part of your
‘Train the Trainer’ and ‘Transition’ activities for Customer IT team in a Cloud
Project?
(1/1) Points
Technical overview on the application customizations, integrations and
analytical reporting tools along with respective documentation
Cloud Operations and Security review; hands on set up documentation for
the OCI/PaaS/SaaS applications
Functional flows overview and configuration walkthroughs
Orientation to data Conversion tools and processes
All of the above
Correct!

49. Your Customer asks for off-the-shelf trainings available as the Partner
team is set to disengage Post Go-Live. What option best fits a Cloud
deployment and on-going learning requirement, when a Partner is not
around?
(1/1) Points
Incorporate End user training in your scope of work and create custom
videos and user guides
A role based customized training based on job impact assessment handed
over by the Partner during Go-Live Transition
A training plan without integrating Change Management activities
Developing a training plan, enrolling for Oracle Learning Subscription
provided by Oracle University to complement Partner trainings
Build a ‘Train the Trainer’ team to handle the change resistance and improve
adoption
Correct!

50. Almost all of the Project Management Plan depicted processes and
components have a higher INTENSITY of engagement in the Cloud Delivery
Framework except for:
(1/1) Points
Scope Management
Issue Management
Procurement Management
Change Management
Environments Management
Correct!

51. You are preparing the Project governance structure for a multi-pillar
complex Project. Who should you include in the governance structure? Select
the THREE appropriate answers
(Choose all correct answers)
(0/1) Points
Business Sponsors as they are funding the Project
Oracle Stakeholders since there is a dependency for the services provided

Project Team Members


Health and Safety Contingent Workers
IT Management to support the Project
Incorrect. Please review Project Management Plan and Delivery Approach to find the correct
answer.

52. You are scoping for a SaaS Cloud Project. The Customer has subscribed
for Oracle Enterprise Resource Planning Cloud for 30 users. What would be
the FIRST most critical SCOPING ACTIVITY to look into:
(0/1) Points
The processes in scope for implementation.
The quantified features and functionalities to put boundaries in scope
Chart of Account Structure and the Set of Books for Financials
The exact list of modules in scope as part of the Oracle Enterprise Resource
Planning Cloud bundle
All of the above
Incorrect. Please review Project Management Plan and Delivery Approach to find the correct
answer.

53. Planning for a Fusion Cloud transformation Project doesn't require


looking at some aspects of the IT platforms such as:
(0/1) Points
Data Migration and Retention policy
Customizations Strategy and Workarounds Policy
Back Up and Restore of the Applications
Integration Requirements and Strategy
Solution Architecture
Incorrect. Please review Project Management Plan and Delivery Approach to find the correct
answer.

54. A Customer is implementing Oracle SaaS Applications of ERP/HCM/CX


with multiple environments. What Cloud Specific mandatory scoping
consideration would you factor in the Project activity schedule and timeline?
(0/1) Points
Modules and the Number of processes in scope
Localizations and language packs
No of countries in the implementation scope
Number of Cloud environments and the time needed for environment
refreshes
The Updates and Regression testing time required between test and
production environments
Incorrect. Please review Project Management Plan and Delivery Approach to find the correct
answer.

55. The User Role that can create, share analyses and dashboards in OAC is
known as
(1/1) Points
BI Service Administrator
BI Data Model Author
BI Content Author
DV Content Author
BI Consumer
Correct!

56. The Mobile App tool that anticipates questions and delivers appropriate
information to users through self-learning is -
(0/1) Points
Oracle Mobile Hub
Oracle Tap
Oracle Data Visualizer
Oracle Day by Day
Oracle Synopsis
Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.

57. Your Customer would like to conduct a ‘What-if’ analysis for their Trade
Promotions, using the Volumes, Channels, Marketing Pools, Customer Spend
as drivers - for different dimensions including Product, Promotion type etc. in
order to generate a Trade Spend Model. What reporting tool may be used to
meet this requirement?
(0/1) Points
Essbase Business Modelling
Business Intelligence Reporting
Operational Reporting
Enterprise Performance Reporting
None of the above
Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.

58. Which of the following Data sources can Analytics Cloud work on?
(0/1) Points
Autonomous Data Warehouse Cloud
Oracle Database Cloud
On-Premises Databases
All of the above
Exadata Cloud
Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.

59. Your Customer has some advanced requirements for analytics - voice
and chatbots, Data enrichment and Natural Language. What analytics type is
this referred to as?
(0/1) Points
Centralized Analytics
Strategy Analytics
Governed Analytics
Self - Service Analytics
Augmented Analytics
Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.

60. For a 3 years' Cloud subscription service, which of the following prove a
successful Cloud Implementation from the Customer's perspective?
(0/1) Points
Project finished on Time - on Budget
Customer success story with a reference
Customer celebrated the Go-Live event and is planning to renew in a few
years’ time.
The Customer has realized the benefits & value of their Cloud investment
All of the above
Incorrect. Please review Introduction to Cloud Project Management and Delivery Framework to
find the correct answer.

61. You are assigned as a Project Manager for your first Cloud Project. An
experienced counterpart within your organization is available to provide
advice. What would be the best approach to leverage the experience?
(0/1) Points
Check for sample Project plans templates, accelerators and tools
Review the Updated Projects repository, assets, and closure reports of the
Closed Project. Establish the relevance to your Project. Accordingly, set up a
meeting with the PM to leverage appropriate experience.
Have a meeting with him to discuss the lessons learned from his experience
of Cloud
Ensure all the competent consultants who delivered these Projects are
assigned to the Project
Review the Oracle Cloud Services in scope and familiarize with the products

Incorrect. Please review Introduction to Cloud Project Management and Delivery Framework to
find the correct answer.

62. The Partner Cloud Project Manager should be typically responsible for:
(0/1) Points
The entire Delivery of the Project transitioning from Sales to Delivery up to
Go-Live
Oversee Cloud architecture and solution design
Manage Change
Manage resources
Manage Cloud Environments
Incorrect. Please review Introduction to Cloud Project Management and Delivery Framework to
find the correct answer.

63. The best approach to get the expected attention for a Service Request is
to open all the SRs at Highest Severity Severity 1 and 24/7
(0/1) Points
False
True
Incorrect. Please review Cloud Risk Management to find the correct answer.

64. As a Project Manager you are planning for a SaaS Cloud Project and
would like to understand risks related to the services that have a
dependency on Oracle; specifically relating to cloning and enabling certain
services like VPN and SSO. Which of the following gives you more
information in this regard?
(0/1) Points
Cloud Patching Cycles
Cloud Provisioning Processes
Cloud Service Contracts
Cloud Service Entitlements
Cloud Support Services
Incorrect. Please review Cloud Risk Management to find the correct answer.

65. As you approach Go-Live, you encounter an unexpected issue with the
application. You’ve raised an SR with Support as Sev 2, however you are not
getting the expected response – what is the next step as per the Support
Process?
(1/1) Points
Update the SR every 4 hours
Postpone the Go-Live and inform the Customer to speak to Oracle Sales
account Manager.
Call Oracle Sales Account Manager and ask him to escalate the issue.
Call the regional support Hub, request an escalation and a Manager call
back.
Correct!

66. Your Customer has raised a concern and Risk regarding Constraints on
Security testing for SaaS Products. Which of the following would provide
further information on standard security testing coverage as part of the
Service, that you may point to the Customer to address their concerns?
(0/1) Points
Cloud Services Hosting and Delivery Policies
Oracle Advanced Customer Services Contracts
Oracle Moat Services
Cloud Services and Service Descriptions
Cloud Support Service agreements
Incorrect. Please review Cloud Risk Management to find the correct answer.

67. For a Cloud Project to be successful in the longer run, the Sustainment
Plan and Adoption Strategy should include the following:
(1/1) Points
A detailed Customer Support plan with detailed SLAs to address issues
through tracking tools and ensure Customer satisfaction
Focus on Business value realization and value assessment with periodical
Business review workshops
Ensure that KPIs set at the beginning of the Project are met at the end of
the Project and the Customer realized the benefit for their investments
Oracle provides the needful Customer support for the Cloud services
subscribed through MOS - My Oracle Support and Cloud Portal; A reference
to this should be enough.
Proactive and reactive Customer engagement to address issues, help
Customer realize value and progressively update solution to adopt new
features and Best Practices
Correct!

68. Customer complains of failed integrations from Taleo Recruitment &


Learn Applications to their E-Business HRMS. You delivered this Project
including post Go-Live Support to the highest standards two years ago and
therefore called in to rescue. What could have gone wrong?
(1/1) Points
All of the above
Taleo is no longer supported and hence integrations fail.
Taleo Recruit and Learn are no longer positioned on the roadmap of HCM
solutions and hence integrations will not work
Post Go-Live support handover had incomplete tasks
The Customer has taken a reactive issue resolution approach to maintain the
solution instead of proactively looking at the new updates and releases to
maintain the integrations
Correct!

69. You have successfully delivered a Cloud Project, finishing the final hand-
over activities following a period of post Go-Live support. Your final Business
as Usual handover checklist should include all of the following items EXCEPT:
(0/1) Points
Ensure the Customer Cloud admin understands the Cloud Portal activities to
schedule Refresh and sizing of the environments
Ensure the Customer can use the Cloud console to monitor the integration
dashboard and set up notifications
Monitor the OCI Universal Credits Overage, Usage, set limits and Tags
Ensure the Customer understands the Updates cycles and the agile testing
required during the 2 weeks period between TEST and PROD
The configuration workbooks and other Project phase deliverables sign-off
certificates stored in Customer Project Repository
Incorrect. Please review Sustainment Plan and Adoption Strategy to find the correct answer.

70. You are engaged in a CX project with Sales Cloud, Service Cloud, CPQ,
Field Service (TOA) in Scope and want to use the Modern Business Processes
(MBP) as a basis of your information gathering workshops and map activity
level Business Processes. What challenges might you encounter in leveraging
the assets?
(0/1) Points
The MBP diagrams are only at Level 2 and some features are spread across
different applications
Information gathering can happen regardless of the available MBPs provided
the requirements are not in conflict with the company’s overall mission and
objectives
Some of the CX Cloud Services don’t have Level 3 Process diagrams
published yet – so not all areas have assets that may be re-used.
MBPs are only applicable for Fusion products. They include the base
functionality complemented by analytics ONLY.
None of the above
Incorrect. Please review Implementation Approach for SaaS Applications to find the correct
answer.
71. A University SaaS Cloud Transformation Project has Oracle ERP,
Procurement, HCM (including Payroll) and Student Cloud in scope. The
Customer IT Team have detailed Business Process diagrams from existing
On-Premise systems but are open any improvements and count on you for
Project Approach advise. What SaaS Application Implementation approach
would you suggest?
(1/1) Points
As the Customer is open to improvements and new methods, follow a Show
& Tell approach for the entire Project based on the modern best practices
and the Level 3 diagrams as applicable.
Show and Tell approach won`t work for any of the processes in scope
Leverage their existing Process Maps, follow an “ASK & DO” approach to
identify Gaps and use PaaS to extend applications.
Leverage their existing Process Maps, map them to the SaaS Standard
Application flows for solution design and identify gaps. Engage C-Level
stakeholders for Change Management
Correct!

72. One of your PM colleagues informs you that the Oracle Modern Best
Practices are just a marketing tool to use in presales. He suggests
conducting an activity level Business Process diagramming exercise (from
scratch) to capture Customer requirements. Which of the following is
recommended approach as guided by Oracle?
(1/1) Points
MBPs are L2/L3 diagrams which can be used to deliver ANY process in the
Project why invent the wheel
No, MBP is not just marketing tool, you can leverage existing Level 3 (Visio)
diagrams in MOS through iterative and incremental approach during
implementation
Ensure conducting a fit/gap analysis of Business Processes and carry out 3
iterations of detailed diagramming to fully capture the Business Process
activities
Proceed with the detailed mapping approach, as MBPs may only be used in
the Sales cycle.
Correct!

73. Your Customer is interested to implement Blockchain to extend their


ledger information and would like to use bitcoins. Is this possible?
(0/1) Points
Yes - Oracle provides Permissionless Blockchain platform
No- Oracle provides Permissioned Blockchain platform
Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.

74. Which TWO of the following do NOT apply for Microservices deployment
architecture?
(Choose all correct answers)
(0/1) Points
The deployment doesn’t affect the microservices deployed in other
containers.
Microservices must be containerized
The deployment affects the microservices deployed in other containers.
They are managed through a docker
They must be deployed on Virtual Machines
Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.

75. The service that tracks systems management activities (including


discovery, monitoring, managing change, Configuration, Compliance,
Automated remediation, Orchestration, IT Operations Analytics and Capacity
Planning) is called:
(0/1) Points
Oracle Management Cloud
Oracle Cloud Portal
Oracle Cloud Console
Oracle Cloud Subscription Management
Oracle Developer Cloud Service
Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.

76. Which of the following is NOT a feature of the Oracle Cloud Developer
Service?
(1/1) Points
Agile and Sprint Planning
Code Versioning and Repositories
Continuous Integration Engine
Task tracking System
Project Cost Control and Management
Correct!

77. Your Customers asks if Oracle Developer Cloud Services has agile Project
management tools. Which of the following is correct?
(1/1) Points
No - Agile Project management is handled externally on Project plans
Yes - you can set up sprints, teams boards within ODCS
Correct!

78. Which of the following is an advantage of low code development over


traditional coding?
(0/1) Points
Higher level frameworks reduce control
Faster to iterate enhancements
May not be suited to every screen in every app
Applications are tied to a specific framework
Every low code tool caters to a specific need
Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.

79. Which of the following is not a Security trusted component for Oracle
Cloud Environment?
(1/1) Points
Data encryption
Client and end-point protection
Customer isolation
High Availability
Correct!

80. Oracle Cloud provides an Open platform for building, integrating,


extending, securing and managing a multi-Cloud infrastructure by leveraging
Open Source choice of Technology Stacks such as Java, Ruby, Python etc.
(1/1) Points
False
True
Correct!

81. The Continuous integration server that can be used to monitor changes
in the source control system and runs a variety of builds is known as:
(0/1) Points
Git
Hudson
Maven
Eclipse
Selenium
Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.

82. The tool that manages, issues, releases source code, wikis, and snippets
is called:
(1/1) Points
Selenium
Maven
Eclipse
Git
Hudson
Correct!
83. In a Move and Improve Project we consider the subject workload mostly
as a “black box”. Which of the follow statements describes this accurately?
(1/1) Points
We use the black colour to tag these workloads in the respective architecture
diagrams
We do not consider any changes of the functionality encapsulated in the
target workload, so that the end-users will experience no changes in their
nature of their work. Any improvements may just be to the wrapping so as
to improve the Quality of Service
All the above
The target workloads are boxed into VMs or Containers, so they run on
improved environment
Correct!

84. A Customer is moving their On-Premise PeopleSoft to PeopleSoft on OCI.


This is a Move and Improve Project
(1/1) Points
FALSE
TRUE
Correct!

85. You are about to start the BUILD phase of a Move and Improve to OCI
Project and want to ensure all the key considerations are taken care of.
Which TWO of the following should be considered?
(Choose all correct answers)
(0/1) Points
Revise Cloud Service consumption plan
Design the target architecture
Identify and Size the deployment environments with the correct Cloud
services
Configure application logic/data approach to transfer to Cloud
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.
86. Select the TWO knowledge components that are relevant to an IMPROVE
extension of a MOVE Project
(Choose all correct answers)
(0/1) Points
Oracle Autonomous fundamentals
Oracle Management Cloud
All of the above
Location and Connectivity
Multi-Cloud and OCI
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.

87. What is the difference between “Lift and Shift” and “Move and Improve”
Journey to Cloud?
(1/1) Points
Lift and Shift is for IT personas whereas Move and Improve is for Business
personas
Lift and shift is only for non-Production Environments while Move and
Improve is for Production Environments
They are both different Marketing terms for the same kind of Projects
Lift and Shift is pure (OS-based) move of an existing workload whereas
Move and Improve Project looks into optimizing the workload operation
across its lifecycle, and therefore has a wider scope.
Correct!

88. You are managing a Move and Improve Project of a bespoke application
developed on WebLogic Server and Oracle Database. The heavily
transactional On-Premise System runs on Windows Servers and has variable
workloads across the week. As it is a core system, there is a lot of demand
for database administration to keep the lights-on. Which of the following
options serve as a Best Practice improvement solution to meet the
Customer’s needs in an efficient way?
(0/1) Points
Integrate with Oracle Management Cloud Service to monitor the application

Modernize the application with the use of Containers and microservices


Migrate the database to Autonomous
Deploy the WebLogic workloads on Java Cloud Service
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.
89. A Customer is moving their On-Premise Hyperion Planning installation to
Oracle Planning and Budgeting Cloud Service. This is a Move and Improve
Project
(0/1) Points
FALSE
True
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.

90. What are the TWO initial things to consider when you decide to migrate
a legacy application to Cloud
(Choose all correct answers)
(0/1) Points
Assess the Business need
Provision the Cloud resources and install the application package
Discard the old legacy application and adopt a new and modern Cloud based
application offering the same functionalities
Perform analysis to verify the Cloud compatibility and estimate migration
effort
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.