Oracle Cloud Project Management Assessment-4
Oracle Cloud Project Management Assessment-4
2. Which of the following Cloud service is included free of charge with any
Application Development Cloud service?
(0/1) Points
Oracle API Management Cloud Service
Oracle Developer Cloud Service
Oracle APEX
Oracle Visual Builder Cloud service
Incorrect. Please review Implementation Approach: Cloud Applications and Extensions
Development in DevOps to find the correct answer.
10. Which one of the following activities can a Project Manager DO with
ODCS (Oracle Developer Cloud Service)?
(1/1) Points
All of the above
User management and adding Team members
Storage of applications dependencies and libraries
Continuous Integration and Continuous Deployment (CI/CD)
Set up and create Wiki Components for documentation and collaboration
Correct!
11. “This is how we do things here”- Is a typical statement from an On-
Premise E-Business Finance Super User highly focused on his requirements.
What positioning/ action would be most appropriate in SaaS Cloud Projects
context?
(0/1) Points
It is crucial for the success of the Project, that every user’s wants are
fulfilled. Develop customisations to meet Business requirements and
replicate existing processes.
To avoid this situation, undertake a detailed requirement gathering session
is an important Project activity.
By strictly following the traditional waterfall methodology and Good PM
Practices; obtain requirements sign off as a key milestone. This will set the
Cloud Project to success.
Review the requirements in detail, take Executive sponsorship to baseline
requirements as per existing practices.
Initial resistance is natural. It is important to do the benefit selling in any
Cloud Project. Showing the bigger picture and end results will help.
Incorrect. Please review Organizational Change Management in Cloud Projects to find the
correct answer.
15. Your Customer Project scope includes Fusion Engagement Cloud, Service
Cloud (RightNow), Field Service (TOA), Commerce (ATG), CPQ, Marketing
Eloqua and Responsys, integrated through OIC (Oracle Integration Cloud)
recipes. What implementation approaches apply for this scope?
(1/1) Points
Agile - Iterative and incremental approach
There is no one-size fit all. It is mostly Solution Driven; Except for OIC,
some parts of Service Cloud extensions and Marketing where configuration is
shaped by changing Business Strategy.
OIC - Requirement Driven; Marketing - Strategy Driven; Other CX Products -
Solution Driven
Requirement Driven Approach is appropriate for this scope
Solution Driven approach fits the entire scope as there are OIC recipes which
are plug and play
Correct!
16. What is the exact order of the DevOps Cycle?
(0/1) Points
Plan - Code - Build - Test - Release -Deploy - Operate
Design - Code - Build - Test - Release - Operate - Monitor
Plan - Build - Test - Package - Release- Operate - Monitor
Plan - Build - code - Test - Package - Release- Operate - Monitor
Design - Build - Test - Deploy
Incorrect. Please review Implementation Approach for Solution in Scope to find the correct
answer.
18. Build, Measure and Learn Faster is an agile approach that works for:
(1/1) Points
Consumable Product
MVP - Minimum Viable Product
MVF - minimum Viable feature
Working Software
MMP - Minimum Marketable Product
Correct!
19. According to the Agile Manifesto, agile does not value which ONE of the
following principles?
(1/1) Points
Following a plan over responding to change
Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Correct!
22. You are preparing the Project governance structure for a multi-pillar
complex Project. Who should you include in the governance structure? Select
the THREE appropriate answers
(Choose all correct answers)
(0/1) Points
Oracle Stakeholders since there is a dependency for the services provided
23. You are Project Manager for a Greenfield (i.e. no legacy processes or
systems) SaaS Fusion ERP, HCM Project in a single country along with PaaS,
OCI Universal Credits available for third party integration and analytics.
What would be the key consideration to plan for this Project?
(0/1) Points
The Customer’s current IT infrastructure status (requiring modernization to
Cloud native tools, move and improve etc…
All of the above
Customer priorities, Business drivers and Project objectives
Dependency of modules and different non-Oracle Cloud technologies
Different geographies and time zones mandating specific approach of
planning and control.
Incorrect. Please review Project Management Plan and Delivery Approach to find the correct
answer.
24. You are scoping for a SaaS Cloud Project. The Customer has subscribed
for Oracle Enterprise Resource Planning Cloud for 30 users. What would be
the FIRST most critical SCOPING ACTIVITY to look into:
(1/1) Points
The exact list of modules in scope as part of the Oracle Enterprise Resource
Planning Cloud bundle
The quantified features and functionalities to put boundaries in scope
Chart of Account Structure and the Set of Books for Financials
All of the above
The processes in scope for implementation.
Correct!
25. You have prepared a Project Management Plan (PMP) for Oracle Cloud
Project that is transitioning an On-Premise System to Cloud with SaaS, PaaS
and OCI components. What is (are) the important topic (s) you would
highlight to the Customer while reviewing the PMP?
(1/1) Points
Emphasis on depicting Project objectives and KPIs to align with Business
goals and measure success
As there is a high dependency on Oracle, it is important to involve Oracle in
the Project Governance Structure
Organizational Change Management is a key differentiator in Cloud Project
hence it's important to plan for it accordingly
Cloud Environments Management is a new topic that needs be included in
Infrastructure Management
All of the above
Correct!
26. A highly regulated Industry Customer requires to self-manage symmetric
storage encryption keys at scale. Considering the sensitivity of the data,
what Service is best positioned for this Project?
(1/1) Points
Vaults/Secrets Management
Cloud Access Security Broker
Vaults/Key Management
None. All Customer Data with any of Oracle Cloud Infrastructure Data
Services is encrypted by default and Customers cannot manage their own
keys
Correct!
28. You are engaged in a Project where the Customer has SSO (Single Sign
On) requirement between their Fusion Application and other third-party
vendors. How would you address this requirement?
(1/1) Points
Customer need to buy the SSO module, in order to integrate with Fusion
SSO.
Customer SSO can’t be integrated with Fusion applications SSO.
You should raise an SR after Go-Live
SSO should be activated during the UAT phase by logging an SR if it is part
of the pre-approved SSO list. Should it be out of 27 preapproved SSO list,
Project Managers should scope an integration effort to build the solution.
SSO should be planned and activated at the solution design phase. Customer
SSO should be part of the preapproved list – activation may be requested
via a Service Request (SR).
Correct!
29. During your implementation, to manage the password policy what you
should do? Select the TWO appropriate answers:
(Choose all correct answers)
(0/1) Points
You should work with Customer to follow their password policy and ignore
the Fusion application password policy.
Fusion password policy is flexible enough to adopt to Customer security
needs.
You need to raise an SR, to activate the password policy
You can raise an SR to change the password policy to match Customer
security
You cannot change Passwords
Incorrect. Please review Cloud Security
33. What are the key use cases for ATP (Autonomous Transaction
processing) in a Project?
(1/1) Points
Modernize Oracle Forms
All of the above
Replace Spreadsheets
Extend Enterprise apps
Rapid app development for LOB
Correct!
34. Your Telco Industry Customer requires their core CRM system available
24/7 and cannot afford any downtime as part of Transition to the new CX
Cloud Application. To cater for this requirement, which of the following
strategies allows you to move Data and maintain future Data changes using
Real-Time Processes?
(0/1) Points
Trickle Data Migration Strategy
Phased Data Migration Strategy
Big Bang Data Migration Strategy
Transformative Data Migration Strategy
This Approach is Not Possible
Incorrect. Please review Data Management and Migration Plan to find the correct answer.
35. Customer would like to delete certain data from their environments.
What guidance would you provide for the feasibility of the requirement?
(1/1) Points
Run the delete Scripts and delete the data for the Customer
This is a paid service performed by Oracle – so request must be made
through My Oracle Support
Engage the Oracle Cloud technologist team with Customer to run a detailed
workshop for the requirements
Guide the partner through the Cloud hosting and delivery policy
documentation for the Customer’s Services on oracle.com to understand the
feasibility
Customer can never delete/block any data stored in Cloud environments.
Correct!
36. The tool(s) that may be used to migrate data into Oracle SaaS Cloud
is/are -
(1/1) Points
WebServices (REST and Public APIs)
All of the above
File based (e.g. FBDI)
ADF Desktop Integrator
ODI Cloud Services
Correct!
38. Which of the following is NOT considered as a key principle and goal for
a Move and Improve Project?
(0/1) Points
The target hosting Environment is mostly SaaS and PaaS
All the above
The target hosting environment is mostly SaaS and IaaS
The target hosting Environment is mostly IaaS and PaaS
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.
39. Your Customer’s back office Finance and HRMS is run on E-Business
Suite at their Data Centre. The application is heavily customised to meet
legislative requirements and the hosting servers will be going out of support
in the near future. They are keen to move to Cloud but require an interim
and long-term strategy to achieve their Cloud First vision, safe-guarding the
legislative interests. What approach is suggested in this case?
(1/1) Points
Split the journey in 2 sequential phases (a) Move and Improve EBS to OCI,
(b) Migrate EBS-ERP to Oracle ERP Cloud and EBS-HRMS to Oracle HCM
Cloud
A big bang migration of Finance & HRMS to Oracle Cloud, discard all
customisations
Split the journey in 2 parallel phases (a) Move and Improve EBS-FINANCE to
OCI, (b) Move and Improve EBS-HRMS to OCI
Split the journey in 2 sequential phases (a) Move EBS to OCI, (b) Improve
EBS by converting the database tier to Autonomous
Correct!
40. As a Project Manager, you are defining the scope of a Move and Improve
to OCI Project along with your architects. What are the dimensions that
drive the scope definition for such a Project?
(0/1) Points
Current CPUs, Target Cloud, Networking
Workload nature, Deployment environments, Target Architecture
All the above
Technologies, Databases, Packaged Apps
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.
41. A Customer calls for an open tender for ‘Lift and Shift’ of their PeopleSoft
applications running on Oracle Databases. You’d like to submit a competitive
bid with accelerated implementation timelines. What might your proposal
leverage?
(0/1) Points
All the above
Make a proposal to host the Database tier on Autonomous and the
application tier on OCI
Leverage Oracle Cloud Manager to accelerate the Move of PeopleSoft to OCI
42. Select the TWO knowledge components that are relevant to an IMPROVE
extension of a MOVE Project
(Choose all correct answers)
(0/1) Points
Location and Connectivity
Multi-Cloud and OCI
All of the above
Oracle Management Cloud
Oracle Autonomous fundamentals
Incorrect. Please review Implementation Approach for OCI Move and Improve to find the
correct answer.
45. What are the TWO initial things to consider when you decide to migrate
a legacy application to Cloud
(Choose all correct answers)
(1/1) Points
Assess the Business need
Provision the Cloud resources and install the application package
Perform analysis to verify the Cloud compatibility and estimate migration
effort
Discard the old legacy application and adopt a new and modern Cloud based
application offering the same functionalities
Correct!
46. You are engaged in a CX project with Sales Cloud, Service Cloud, CPQ,
Field Service (TOA) in Scope and want to use the Modern Business Processes
(MBP) as a basis of your information gathering workshops and map activity
level Business Processes. What challenges might you encounter in leveraging
the assets?
(0/1) Points
Information gathering can happen regardless of the available MBPs provided
the requirements are not in conflict with the company’s overall mission and
objectives
None of the above
MBPs are only applicable for Fusion products. They include the base
functionality complemented by analytics ONLY.
The MBP diagrams are only at Level 2 and some features are spread across
different applications
Some of the CX Cloud Services don’t have Level 3 Process diagrams
published yet – so not all areas have assets that may be re-used.
Incorrect. Please review Implementation Approach for SaaS Applications to find the correct
answer.
48. Your Customer refers to an RFP (Request for Proposal) appendix matrix
listed with system requirements for SaaS Finance, HCM and Procurement in
5 countries. Planning and preparing for CRP (Conference Room Pilot)
sessions, what is the Best Practice approach to mitigate any Solution Gaps
you may encounter?
(0/1) Points
Review the Customer objectives and pain areas. Walk through the Modern
Best Practice (MBP) diagrams during the CRPs to identify solution Gaps.
Conduct detailed Requirements gathering workshops and create a
traceability matrix following the CRPs. Design a global solution based on the
traceability Matrix to address Customer requirements.
Leverage a Set Up questionnaire mapped to MBP to capture necessary
information to Configure the system activities and identify Gaps.
Engage appropriate key users and stakeholders at the early phases of the
Project to reinforce a No customization approach for SaaS Solutions.
Incorrect. Please review Implementation Approach for SaaS Applications to find the correct
answer.
49. For a 3 years' Cloud subscription service, which of the following prove a
successful Cloud Implementation from the Customer's perspective?
(0/1) Points
All of the above
Project finished on Time - on Budget
The Customer has realized the benefits & value of their Cloud investment
Customer celebrated the Go-Live event and is planning to renew in a few
years’ time.
Customer success story with a reference
Incorrect. Please review Introduction to Cloud Project Management and Delivery Framework to
find the correct answer.
50. What is/are the most important Cloud knowledge area(s) for a Project
Manager to be familiar with, for Cloud Projects Delivery readiness?
(1/1) Points
Cloud Environments Management
High level understanding of how the Cloud Services in SaaS/PaaS/OCI work
52. You can optimise Implementation timelines for ERP, SCM and WMS
Cloud Integrations by leveraging -
(0/1) Points
ERP Connectivity Packages
Prebuilt Adapters
Integration Recipes
REST and SOAP APIs to build adapters
Integration Extensions
Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.
53. You are engaged in a Project to identify all possible Integration Use
Cases for scoping purposes. Which of the following Use Cases may be
eliminated for Integration Scope?
(1/1) Points
File Transfers
Stream Processing using Streaming Analytics
None of the options listed may be eliminated– All of them are potential
Scope areas.
Business Decisions (Business Rules)
Process Automation and Case Management
Correct!
55. Your Project scope includes On-Premise Database migration to the Cloud
using Data Integration Platform Cloud Services (DIPC). What are the TWO
pre-requisite Services to be activated to use DIPC and therefore to be
considered as part of the Universal Credits Project costs?
(Choose all correct answers)
(1/1) Points
Oracle Integration Cloud
Database Cloud Service
Storage Cloud
Cloud Computing
Analytics Cloud
Correct!
56. What is the major initial Differentiator for the API - First Lifecycle from
Traditional Approach?
(0/1) Points
It uses the approach of Documenting and publishing APIs for reuse
Prototyping quickly to collaborate and align faster
Creating APIs and checking against the contracts
It is a Flexible gateway deployment and has built-in security
Conducting many Iterations of design, build, test, Redesign
Incorrect. Please review Implementation Approach for Cloud Integrations to find the correct
answer.
57. For a Cloud Project to be successful in the longer run, the Sustainment
Plan and Adoption Strategy should include the following:
(1/1) Points
A detailed Customer Support plan with detailed SLAs to address issues
through tracking tools and ensure Customer satisfaction
Ensure that KPIs set at the beginning of the Project are met at the end of
the Project and the Customer realized the benefit for their investments
Focus on Business value realization and value assessment with periodical
Business review workshops
Proactive and reactive Customer engagement to address issues, help
Customer realize value and progressively update solution to adopt new
features and Best Practices
Oracle provides the needful Customer support for the Cloud services
subscribed through MOS - My Oracle Support and Cloud Portal; A reference
to this should be enough.
Correct!
58. What are the main influencing factors in defining and planning ongoing
Support and Sustainment for Cloud Projects?
(1/1) Points
Cloud Services Entitlements, Environments Management and working with
My Oracle Support (MOS)
All of the above
Release upgrade cycles of the different Cloud applications (like Fusion, CPQ,
EPM, Field Service etc)
The Business Operations Key Events/Processes and dates
Number of Cloud distinct Environments (PROD /TEST) and the Data Centre
locations
Correct!
59. The Customer Project Manager calls for a meeting to discuss skills and
knowledge capabilities required to manage, maintain and evolve the Cloud
environments of SaaS/PaaS/OCI on an ongoing basis. Which of the following
should be considered for forming BAU (Business as Usual) Operations team
for the Customer?
(1/1) Points
Lifecycle, Configuration and Release Management; Continuous Validation and
Testing
User Adoption and Change Management; Solution Management;
Cloud Infrastructure Architecture; Cloud Administration
All of the above
Issue Management (MOS/Hlepdesk), Environments Management and
Monitoring
Correct!
60. Which of the following Post Go-Live handover activities form part of your
‘Train the Trainer’ and ‘Transition’ activities for Customer IT team in a Cloud
Project?
(1/1) Points
Functional flows overview and configuration walkthroughs
Cloud Operations and Security review; hands on set up documentation for
the OCI/PaaS/SaaS applications
All of the above
Technical overview on the application customizations, integrations and
analytical reporting tools along with respective documentation
Orientation to data Conversion tools and processes
Correct!
61. Your Project scope includes Cloud ERP, HCM, Payroll, Talent Management
with OIC integrations to On-Premise Time recording System. Oracles
Analytics Cloud is used for reporting. The Customer PM would like to identify
Customer Business SMEs that will require training. Who do you classify as
Business trainees?
(0/1) Points
Train everyone in the organization on Cloud
Train all the Key Users, IT Applications development team, Infrastructure
team and Help desk teams
Train the Infrastructure team on migrating E-Business to Cloud and on how
to monitor integrations
Identify the impacted departments ONLY and train the key SMEs. Manage
the overall Change with needful communication
Train all HR Key Users for system use. Train IT team to develop the
applications, integrations, and build reporting dashboards.
Incorrect. Please review Training and Knowledge Transfer Strategy and Plan to find the correct
answer.
62. You are assigned to a Customer Project in EMEA region who has
subscribed to SaaS Applications of Fusion ERP, SCM, Sales and HCM.
Customer has not activated the services yet. What considerations should be
made before activation of the Services?
(1/1) Points
Language Packs
Timezones
Data Centre location in view of Data Residency requirements
All of the above
Geographic locations
Correct!
63. A Customer has completed the UAT of a Cloud Fusion ERP and HCM
Project and is close to Go-Live. The Customer insists to have a Gold Instance
- i.e. have a back-up of the Production Instance to restore from in case
PROD Data Migration went wrong. Is this possible?
(0/1) Points
Ask the Customer to buy an extra environment which will serve as Gold
instance, to carry out this activity
There are alternative solutions in PaaS/OCI to be explored
No need for Gold Instance, conduct a P2T after production configuration and
the Test Instance may be used to restore to PROD if necessary
This is an on-premise strategy and may be used for Cloud implementations.
64. What is the Welcome E-mail that Oracle sends to its Cloud Customers?
(1/1) Points
It’s a declaration sent to Customer administrator informing that Oracle has
initiated the provisioning of instances
It’s a declaration sent to Customer administrator informing that Oracle has
received the Order from the Sales Manager.
It’s a declaration sent to Customer administrator informing that Oracle has
completed provisioning and the instance is ready to be used.
It’s a declaration sent to Customer administrator informing that Oracle is
about to start the provisioning.
It has important list of action the Cloud admin should do.
Correct!
68. The best approach to monitor OCI workloads costs for a Project is to
leverage:
(1/1) Points
Group each workload under one Policy
Avoid using compartments
None of the above
Build Subnets
Tagging feature
Correct!
69. You have just concluded UAT for a Fusion Cloud Project and received a
Quarterly Update notification which has new functionality and some bug
fixes. What mitigation planning/action should be carried out?
(0/1) Points
Test the known issues and bug fixes and opt-in to enable all the new
features for the Customer
Update cycles are mandatory and predictable; hence all planning should
have been done. Execute Update activities as planned. (Regression tests
followed by implementing mandatory features)
Log an SR to skip the update
Conduct a pros and cons analysis whether to carry out the Update
Log an SR with Oracle and request postponing the Update to next month as
the System Sign-Off is complete and Configuration is baselined.
Incorrect. Please review Cloud Environments Provisioning and Management to find the correct
answer.
72. Your Customer would like to conduct exploratory analysis using real data
through the DV content packs to generate analytics. Which tool may be
leveraged to meet this requirement?
(1/1) Points
Data Visualization
Data Ingest
Data Blending
Data Enrichment
Data Augmentation
Correct!
73. The Analytics Category that enables Businesses to optimise their end-to-
end processes by providing an enterprise wide view of Data, including a
trend over a period of time is known as -
(0/1) Points
Operational Analytics
Augmented Analytics
Strategic Analytics
Visual Analytics
Transactional Analytics
Incorrect. Please review Implementation Appraoch for Reporting and Business Analytics to find
the correct answer.
75. Which of the following reporting tools may be used to leverage the pre-
built ETL to extract data from operational tables and load it into a
Datawarehouse
(1/1) Points
Oracle Transactional Business Intelligence
Oracle Business Intelligence Enterprise Edition
Oracle Analytics Cloud
Oracle Business Intelligence Application
Oracle Business Intelligence Publisher
Correct!
76. Cloud Products receive continuous updates around the year, with slightly
variant time tables across the Product sets. In multi-Cloud Projects, Project
Managers can minimise risk to TIMELINES and COSTS by
(0/1) Points
Considering relocation of the Data Center for latency
Factoring the number of patching cycles over the duration of the Project
Logging an SR and postponing all the updates for after Go-Live.
Scheduling Concurrent Patching for all the Environments across Product Sets
77. Your Customer has raised a concern and Risk regarding Constraints on
Security testing for SaaS Products. Which of the following would provide
further information on standard security testing coverage as part of the
Service, that you may point to the Customer to address their concerns?
(1/1) Points
Oracle Advanced Customer Services Contracts
Cloud Services and Service Descriptions
Oracle Moat Services
Cloud Support Service agreements
Cloud Services Hosting and Delivery Policies
Correct!
78. As you approach Go-Live, you encounter an unexpected issue with the
application. You’ve raised an SR with Support as Sev 2, however you are not
getting the expected response – what is the next step as per the Support
Process?
(1/1) Points
Update the SR every 4 hours
Call the regional support Hub, request an escalation and a Manager call
back.
Postpone the Go-Live and inform the Customer to speak to Oracle Sales
account Manager.
Call Oracle Sales Account Manager and ask him to escalate the issue.
Correct!
79. Your team opened an SR (Service Request), the Support Engineer added
Product Development to this SR by raising a Bug. This means the following:
(0/1) Points
A Bug with Oracle support means a code change is expected involving a full
QA and release process.
The Support engineer has identified a product malfunction and hence
engaged development to fix it.
The Support engineer engaged Product Development for further research
and investigation. It may end up with no code change
Incorrect. Please review Cloud Risk Management to find the correct answer.
82. In a joint Enterprise Architecture review with your Project Architect, you
identify that the Customer Departments seldom share Customers or
Suppliers. Departmental transactions are unique to individual Business Units
with independent Business Processes and little Data Standards. What is this
Operating Model classified as?
(0/1) Points
Unification
Standardization
Replication
Diversification
Coordination
Incorrect. Please review Cloud Architecture Envisioning and Planning to find the correct
answer.
85. You are assigned as the PM of a new win Oracle Cloud Project. As part of
the Bid to Delivery transition, which of the following needs prioritising over
other activities to ensure alignment between Sales & Delivery?
(1/1) Points
Review the contract and scope of work internally first and then with the
Client so that there is a common understanding of the scope, timelines, cost
and terms and conditions
Understand Client’s objectives and Business strategies
Validate Cloud services subscribed, establish the Project infrastructure and
collaborative environment
Start compiling the Project Management Plan and agree Project approach
with the Customer
Don’t hesitate to re-engage the sales or management team to reset
expectations.
Correct!
86. Setting Project objectives and KPIs is important in the context of Cloud
Implementations because:
(1/1) Points
Customers might measure ROI based on Project Objectives
Subscription based Cloud model relies on successful Projects with
measurable Objectives linking back to Business Goals
All of the above
If the Project delivers the desired outcome the Customer might not renew
the contract.
Shifting from CAPEX to OPEX budget might be impacted by Project failure
Correct!
87. Cloud Services Entitlements impact the Testing Strategy & Plan. What
are the key points to take into consideration for Test activity planning?
(0/1) Points
All of the above
Lead times to Enable additional Cloud Services e.g. IP Whitelisting, VPN,
SSO, etc…
Lead times for Provisioning ATE (Additional Test Environments)
Lead times for Sizing evaluation & Concurrent patching requests
Incorrect. Please review Continuous Testing Strategy and Plan to find the correct answer.
88. What is (are) the advantage(s) of considering and adopting a Risk Based
Testing approach after going Live for Cloud Projects?
(1/1) Points
Risk Based Testing approach optimises testing through prioritization
All of the Above
Risk Based Testing Approach expedites software regression and validation
testing without substantial increase in risk to the enterprise
Risk Based Testing is based on factors of Business and quality impact
Risk Based Testing suggests what to test when faced with schedule
constraints
Correct!