EVERYTHING YOU NEED TO KNOW

ABOUT THE

ARTA
PACKAGE
WHAT IS AN ARTA PACKAGE?

The Anti-Red Tape Authority (ARTA) Package is a bundle of


programs that will help the government agency be compliant to the
provisions of R.A. 11032.

Republic Act 11032 or the Ease of Doing Business and Efficient Government Service Delivery Act of 2018 is an act that
aims to streamline the current systems and procedures of government services. It is the landmark law of the Duterte
administration that addresses priority number 3 of its 0+10 Point Socio-economic Agenda. This particular agenda
pertains to improving the competitiveness of and ease of doing business in the Philippines. Signed into law on 28 May
2018, the law effectively amends Republic Act 9485 or the Anti-Red Tape Act of 2007.

The ARTA Package is a sign of commitment on the part of the government agency to serve the Filipino
people by providing the necessary tools and information to improve the quality of government
service.
The ARTA Package is currently available to two government
entities:

National Government Agencies (NGAs)

Local Government Units (LGUs), Highly Urbanized Cities


(HUCs)

NGAs and LGUs, particularly the HUCs, shall be the first recipients of the ARTA Package by
virtue of a Memorandum of Agreement between ARTA and the government agency or LGU
concerned.

WHO CAN AVAIL THE

ARTA PACKAGE?
THE ARTA PACKAGE
IN A NUTSHELL
1 ARTA HELPDESK 3 B.O.S.S.
2 CAPACITY BUILDING
Business One Stop Shop

5 L.B.A.A.
4 REGULATORY 6 PRESCRIBED PROCESSING TIME
Local Board of
REFORM (Citizen’s Charter)
Assessment Appeals
Establishment of an ARTA HELPDESK
The Anti-Red Tape Authority Helpdesk (ARTA Helpdesk) is a
desk within the agency that will be composed of existing
employees that shall be responsible for:
• undertaking compliance cost analysis
• conducting time and motion studies
• undergoing evaluation and improvement reengineering
the same

The ARTU shall include a desk which contains the


Information, Education, and Communication materials for
information dissemination.

Legal Basis: R.A. 11032 Section 5 Reengineering of Systems and Procedures

1 ARTA HELPDESK

THE ARTA PACKAGE PROGRAMS


2 CAPACITY BUILDING

THE ARTA PACKAGE PROGRAMS

We shall conduct capacity building through the Regulatory


Impact Assessment (RIA). This is a training workshop that
will expand the capacity of regulatory agencies on delivering
efficient and effective regulations through systematic,
comparative, and data-driven processes for decision making
and regulation development.

REGULATORY IMPACT ASSESSMENT (RIA)


Trainings
Legal Basis: R.A. 11032 Section 5 Reengineering of Systems and Procedures
Creation of a BUSINESS ONE-STOP SHOP

A Business One-Stop Shop (BOSS) shall be set up within


the LGU concerned for the streamlined business
registration, payment of taxes, and application of
construction permit which shall be consolidated
through an ordinance or an executive order.

Legal Basis: R.A. 11032 Section 11 Streamlined Procedures for the Issuance of Local Business
Licenses, Clearances, Permits, Certifications or Authorization.

3 BUSINESS ONE-STOP SHOP

THE ARTA PACKAGE PROGRAMS


BUSINESS ONE-STOP SHOPS

THE ARTA PACKAGE PROGRAMS

All Local Government Units shall set up a B.O.S.S.


which shall serve as a business permitting and licensing
system that will receive and process applications for
permits, licenses, certifications and authorizations

E-BOSS

Within a period of three (3) years upon the effectivity of the Act, all cities and municipalities are
mandated to automate their business permitting and licensing system or to establish an
electronic B.O.S.S.
STARTING A BUSINESS DB 2020
PROCESS FLOW
Securities and Exchange Local Government of
Bureau of Internal Revenue Social Security Agencies
Commission Quezon City

Buy special books of account at


1 Notarize articles of bookstore. Final Registration
Obtain business
incorporation and treasurer’s 4 permit
7 (1 day) 11 with SSS
affidavit at the notary (1 day,
(1 day) (6 days) Apply for COR, TIN and simultaneous
8 approval to print with previous procedure)
Receive receipts and invoices
5 inspection (3 days) Final Registration
2 Apply for company
(1 day, 12 with PhilHealth
incorporation and pre- Print receipts and (1 day,
registration for TIN, SSS, simultaneous with 9 invoices at the print shop simultaneous
PhilHealth and Pag-IBIG step 4) (1 day) with previous procedure)
(2 weeks)
Submit the Printer’s
6 Obtain barangay Certificate of Delivery of Final Registration
3 Pay the registration fees clearance. Receipts and
13 with PAGIBIG
(1 day, simultaneous with Step (1 day, simultaneous 10 Invoices (PCD) and (1 day,
2) sworn statement to the BIR simultaneous
with step 4) with previous procedure)
(1 day)

can be completed in 13 steps, 33 days


STARTING A BUSINESS
TARGET PROCESS FLOW

*co-located with Zoning Office, City 1-2 SEC


Planning and Development Office,
Department of Building Official, City
Assessor’s Office, City Health Office, 3 BPLO*
Environmental Protection and Waste
Management Department, Bureau of
Fire Protection 4 BARANGAY

5 BOOKSTORE

6-7 BIR

8 SSS

8 PhilHealth

8 Pag-IBIG
DEALING WITH CONSTRUCTION PERMITS DB 2020
PROCESS FLOW
1. Obtain a Geotechnical study/ Soil 9. Apply and Obtain FSEC form BFP Fire 16. Obtain the certificate of occupancy
test (Private firms) 15 days Mashall (BFP) 7 days from the OBO 18 days
2. Obtain a Topographical/ Geodetic 10. Apply and obtain Building permit 17.Apply for water and sewage
Survey (Private firm) 13 days and ancillary permits from OBO(
OBO 2121 connection. Manila Water 1 day
days
days)
3. Obtain Lot plan with Site map from 18. Receive inspection for water and
(Geodetic Engineer) 10 days 11. Apply for FSIC at the BFP sewage connection. Manila Water 1
1 day day
4. Obtain CTC of Land Title from
Registry of Deeds (LRA-RD) 4 days 19. Obtain water and sewage
12. Receive final inspection for the FSIC
connection from Manila Water 21 days
from the BFP 1 day
5. Obtain Barangay Clearance 1 day
13. Obtain the FSIC from the BFP 5
20. Apply for the tax declaration of
days
6. Apply for Locational Clearance improvement at CAO 1 day
(CPDO) 1 day 14. Apply for the certificate of 21. Receive inspection from the
occupancy at the OBO 1 day appraiser of CAO 1 day
7. Receive Inspection for Locational
Clearance (CPDO) 1 day 15. Receive final inspection for the 22. Obtain tax declaration of
certificate of occupancy from the OBO improvement from the CAO 3 days
8. Obtain the Locational Clearance 1 day
(CPDO) 22 days

TOTAL: 22 STEPS
120 DAYS
DEALING WITH CONSTRUCTION PERMITS
TARGET PROCESS FLOW

1 REGISTRY OF DEEDS

2 BARANGAY

3 City Planning and Development Office


4 BFP

5-7 Office of the Building Official

8-9 MANILA WATER

10 CITY ASSESSOR’S
OFFICE
PAYING TAXES DB 2020
PROCESS FLOW
Employer paid - Employer paid -
Corporate Income Employee paid -
Housing Employer's
Tax Stamp duty
development Payroll tax
(33 hours) compensation
fund

Employee paid -
Tax on check Community tax
Local Business Tax Tax on interest Social security
193 transactions certificate
contributions

Employer paid -
Social security Environmental Tax on insurance
PAYMENTS HOURS BIR certificate
Contributions tax contracts
(30 hours)
Employee paid -
Real property tax Vehicle tax
13 payments, Housing
development
171 hours fund

Value added tax *Note: Jointly-Paid Contributions are


Employer paid - not counted per DB Methodology
(VAT)
Health insurance
(108 hours)
PAYING TAXES
TAXES MEASURED

1 CORPORATE INCOME TAX 7 TAX ON INTEREST

2 LOCAL BUSINESS TAX 8 ENVIRONMENTAL TAX

3 Employer Paid– 9 VEHICLE TAX


SOCIAL SECURITY CONTRIBUTIONS
10 VALUE ADDED TAX (VAT)
4 REAL PROPERTY TAX
11 STAMP DUTY
5 Employer Paid – HEALTH
INSURANCE 12 TAX ON CHECK
TRANSACTIONS

6 Employer Paid – HOUSING DEV’T 13 TAX ON INSURANCE


FUND CONTRACTS
4 REGULATORY REFORM

THE ARTA PACKAGE PROGRAMS

The Regulatory Reform Team (RRT) will review local


ordinances to ensure a quality regulatory environment is
in place for businesses and the public.

Through this process, outdated, redundant, conflicting


and burdensome regulations will be addressed through
repeal or amendments.

Creation of a REGULATORY REFORM TEAM

Legal Basis: R.A. 11032 Section 5 Reengineering of Systems and Procedures


Activation of the LOCAL BOARD OF ASSESSMENT
APPEALS

The Local Board of Assessment Appeals (LBAA) shall


be activated to cater to the appeals of real property
estate owners.

Legal Basis: R.A. 7160 Section 230, Chapter 2 Local Government Code of 1991

5 LOCAL BOARD OF ASSESSMENT APPEALS

THE ARTA PACKAGE PROGRAMS


Compliance to the 3-7-20 PRESCRIBED
PROCESSING TIME

The prescribed processing times must be followed:


• 3 days for simple transactions,
• 7 days for complex transactions,
• 20 days for highly technical transactions.

Legal Basis: R.A. 11032 Section 9 (4) Prescribed Processing Time

6 PRESCRIBED PROCESSING TIME

THE ARTA PACKAGE PROGRAMS


LEGAL BASIS

Republic Act 11032

Ease of Doing Business and Efficient


Government Service Delivery Act of 2018 and
its Implementing Rules and Regulations

Signed last May 18, 2018, R.A. 11032. This law created ARTA who shall
implement and oversee a national policy on anti-red tape and ease of doing
business. It’s IRR was signed July 17, 2019.
Law IRR
Date signed: May 18, 2018 Date signed: July 17, 2019
Effective: June 17, 2018 Effective: August 4, 2019
LEGAL BASIS

Administrative Order 23

Eliminating Overregulation to
Promote Efficiency of Government
Process

Signed last February 21, 2020. This order requires all government
agencies to submit a compliance report to ARTA about their expedited
services.

Date signed: February 21, 2020


Deadline for compliance: May 21, 2020
LEGAL BASIS

Memorandum Circular 2020-02

Order of Automatic Approval or Automatic Extension


of Pending Transactions Beyond the Prescribed
Processing Time of 3-7-20 Working Days.

Signed last February 14, 2020. All government agencies are required to
submit a list of their pending applications by March 7, 2020.

Date signed: February 14, 2020


Deadline for compliance: March 7, 2020
The ARTA Package may be availed by signing a
Memorandum of Understanding (MoU) between
ARTA and the availing LGU. The head of agencies or
the local chief executives shall be the signatories as a
mark of commitment to improve the delivery of the
quality of government service to the Filipino people.

HOW CAN YOU AVAIL THE

ARTA PACKAGE?