GA-Drawing - (ZVV-100-25)
GA-Drawing - (ZVV-100-25)
7
DUE TO PROCESS OF CONTINUOUS UPGRADATION DESIGN IS SUBJECTED TO CHANGE WITHOUT NOTICE.
01 07 03 08 02 09 04
3
P.O. No. : SHREE/PHED/702 DATED 08-FEB-2022
C PROJECT : GROUP PIPED WATER SUPPLY SCHEME UNDER C
HYDROSTATIC BODY
BY PASS ARRANGEMENT END FLANGE AS PER TEST PRESSURE : 25 Kg/cm²
IS:6392 PN25
QTY. : 02 Nos.
B ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. PROJECTION B
1)
NOTE:-
ALL DIM. HAS OPEN TOLERANCES UNLESS OTHERWISE SPECIFIED.
JA SH SCALE:-NTS DATE:-16.02.22
Appd By R.JAIN
2) REMOVE ALL SHARP EDGES JASH ENGINEERING LIMITED
INDORE (INDIA)
Chkd By
3) PAINTING INSIDE & OUTSIDE :- BLACK COAL TAR EPOXY PAINT TOTAL DRY FILM R.M.
THICKNESS INCLUSIVE OF PRIMING 200 MICRONS. DESCRIPTION:- Drwn By A
A
Rev. Description Rev. Chkd. Date GENERAL ARRANGEMENT DETAILS DRG. No. REV.
4) FOR ENVIROMENTAL PROTECTION SAFE HANDLING AND DISPOSAL AFTER USEFUL by by OF SURESEAL ZERO VELOCITY
LIFE OF DIFFRENT MATERIAL USED IN THIS EQUIPMENT, REFER O & M MANUAL. REVISION TABLE VALVE SIZE ∅100 GA-C-JAD-MP-00070001 R0
This drawing is the propery of JASH ENGINEERING LTD., INDORE and should not be reproduced 0r copied without owner's permission.
12 11 10 9 8 7 6 5 4 3 2 1 A3