Bifurcation of New Machiwal Sub Division Revised
Bifurcation of New Machiwal Sub Division Revised
COMRISON FIGURESOF RECOVERY & LOSSES IN MILLIONS AND PERCENTAGE FOR THE YEAR,
2016-17, 2017-18, 2018-19,2019-20, 2020-21 & 2021 & 2021-22 (PROJECTED) REGARDING EXISTING,
MODIFIED AND NEWLY CREATED.
Analysis of Work Load of Existing / Modified / and Newly Proposed (OP) Sub Divisions
Sr.N
Total No. of
o Name of Sub Division Urban Rural
Connections
Existing (OP) Sub Modified (OP) Sub Proposed (OP) Sub Division
Financial Year
Division City Division City (Machiwal)
Analysis of % Recovery of Existing / Modified & Newly proposed created (OP) Sub Division
Existing (OP) Sub Modified (OP) Sub Proposed (OP) Sub Division
Financial Year
Division City Division City Machiwal
FY 2014-15 103.08 100.10 99.25
FY 2015-16 99.46 99.40 98.27
FY 2016-17 96.81 97.80 97.85
FY 2017-18 94.77 96.00 98.02
FY 2018-19 94.69 97.85 96.85
FY 2019-20 99.82 98.25 98.85
FY 2020-21 104.10 99.90 103.40
1
(B). COSTS BENEFIT ANANLYSIS OF CREATION OF NEW (OP) SUB DIVISION / DIVISION IN ALL ASPECTS
I.E. RECOVERY, LOSSES, COMPLAINTS & OVERALL FINANCIAL ANALYSIS ETC.
Financial implication after bifurcation / creation of offices would be to the tune of Rs. __42.85__ (M) per annum. The
detail is as under:-
C. TOTAL NUMBERS OF FEEDERS / SUB DIVISION WITH WORK LOAD, LENGTH OF HT & LT LINES,
TOTAL NUMBERS OF DISTRIBUTION OF TRANFORMERS OF EXISTING MODIFIED AND NEWLY
CREATED PROPOSED (OP) SUB DIVISIONS / DIVISIONS.
2
(i) Work load of Existing (Operation) Sub-Division Thingi under XEN (Op) Division Vehari before
bifurcation
(ii). Work load of Existing (Operation) Sub-Division Tibba Sultan Pur under XEN (Op) Division Mailsi before
bifurcation
3
Modified (Operation) Sub-Division Thingi
Length of Lines
Tariff wise No. of connections
Sr. Name of Urban / (KM)
No. Feeder Rural Dome Comm Indust Tube
Other Total H.T L.T
stic ercial rial Well
1. District Jail Indepndt 0 0 0 0
02 2 3.13 0
2. Balal Urban 4695 295 21 07
56 5074 30.908 13.961
3. Water Works Urban 1530 83 6 0
13 1632 17.918 5.451
4. MES Thingi Rural 6249 368 61 127
21 6826 87.43 51.427
5. T.R.W Vehari Indpndnt 0 0 0 01 1 0.50 00
6. Piply Rural 4852 273 26 100
15 5266 81.328 64.823
7. 24/WB Rural 6635 266 51 218
41 7211 98.618 77.13
Akram
8. Rural 7153 242 25 113 24 7557 68.518 27.31
Shaheed
Khalil
9. Rural 3875 88 23 159 22 4167 87.667 22.171
Shaheed
10. Industrial State Indepndt 0 0 1 0 0 1 12.36 1.00
Total 0 0 34989 1615 214 724 195 37737
(iv). Work load of Modified (Operation) Sub-Division Tibba Sultan Pur under XEN (Op) Division Mailsi after
bifurcation
(vi). Analysis of Work load of Existing / Modified & Newly proposed (Op) Sub-Divisions
4
Total
Sr.
Name of S/Division Urban Rural No. of
No.
connections
(Op) Sub-Division Thingi 6706 55053 61759
1. Existing
(Op) Sub-Division Tibba Sultan Pur - 47035 47035
(Op) Sub-Division Thingi 6706 31631 37737
2. Modified
(Op) Sub-Division Tibba Sultan Pur - 41069 41069
Newly proposed
3. (Op) Sub-Division Garha Mor - 29988 29988
(to be created)
D. ALL CATEGORY WISE NUMBER OF CONSUMERS I.E. DOMESTIC, COMMERCIAL, INDUSTRIAL AND
AGRICULTURE OF EACH SUB DIVISIONS / DIVISIONS).
5
(i) Work Load of Existing (Operation) Sub Division City Under XEN (OP) Division Vehari.
Before Bifurcation
Existing (Operation) Sub – Division CITY
Sr.N No. of Connections Length of Line
Name of Urben /
o Domest Commerc Industria Tubwe Othe
Feeder Rural Total H.T L.T
ic ial l ll r
1 C/Factory Rural 2115 127 13 22 9 2286 14.363 9.848
Chak
2 Rural 5589 192 41 218 30 6070 119.211 49.388
22/WB
Chak
3 Rural 6006 115 30 136 25 6312 87.475 34.863
37/WB
Urban
4 City No 01 2623 2604 39 3 62 4631 12.295 10.948
ii-a) Work Load of Modified (Operation) Sub Division City Under XEN (OP) MEPCO Division Vehari
After Bifurcation
Modified (Operation) Sub – Division City Newly Purposed Machiwal Sub Division
Sr. Urben No. of Connections Length of Line
Name of
No / Domesti Commerci Industri
Feeder Tubwell Other Total H.T L.T
Rural c al al
Chak
1 Rural 5589 192 41 218 30 6070 119.211 49.388
22/WB
Machiwal
2 Rural 8511 1066 81 67 42 9767 53.322 43.618
(m.Pakhi)
Chak
3 Rural 6895 121 30 196 24 7266 95.214 51.598
182/EB
Jungle
4 Rural 6006 192 27 215 27 6467 120.365 42.119
Burali
TOTAL 0 0 27001 1571 179 696 123 29570
Analysis of Work Load of Existing / Modified / and Newly Proposed (OP) Sub Divisions
7
E. CLEAR COLORFUL GEOGRAPHICAL MAPS OF EXISTING / MODIFIED / PROPOSED (OP) SUB
DIVISIONS SHOWING LOCATION OF FEEDERS AND ITS SURROUNDING AREA / NUMBERS OF
CONNECTIONS OF EACH SUB DIVISIONS/ DIVISION
(ATTACHED).
F. ADEQUATE JUSTIFICATION REQUIRED FOR DECISION & ANY OTHER RELEVANT INFORMATION.
It is submitted that Op. Sub Division City consisting of 50000 above connections due to which problems such as
continuity of electric supply, huge No. of consumers complaints, Maintenance of HT/ LT networks are being faced
bifurcation of existing sub division under MEPCO Division Vehari & Mailsi is essential and proposed Op. Sub Division
namely Machiwal is required in order to improve the existing system and to achieve the targets fixed by authority.
TECHNICAL JUSTIFICATION
8
H. INTRODUCTION OF NEW TECHNOLOGIES TO IMPROVE THE OPERATIONAL EFFICIENCY AND
CUSTOMER SERVICES.
a) With the help of GIS Mapping of H.T and L.T network load management can be much easier than
manually prepare single line diagrams.
b) Analysis of H.T and L.T lines on Syner GEE Electric Software (Designed for load flow analysis) can help
to improve the existing system as well as to improve the continuity of electric supply to the consumers.
The technical can also be minimized through bifurcation area planning. Installation of capacitors and
installation of new industrial / agriculture connections with help of GIS theft control.
c) Updation of yardstick will automatically increase the progress of operational and complaints management
activities.