Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SRINIDHI,# 938,10th B main,2nd cross, AGB Layout, Bangalore-560090

CONTACT: 9538439591 | Email: [email protected]

PROFESSIONAL SUMMARY:

• Around 5 years of experience as SAP PP functional consultant and 5 years as Production Planner.
• Experience in diverse Industrial sectors such as Manufacturing.
• Worked in Discrete industry and have knowledge of Repetitive and Process manufacturing Industries also.
• Configuration and implementation experience of PP master data such as Bill of Materials (BOM), Routing,
Rate-Routing, Work Center, and other PP application like Demand management, Planning strategies, Lot
sizing procedures, MPS and Material -requirement Planning.
• Experienced in design and conceptualization of various planning strategies, Make-to-order, Make-to-Stock,
Planning with Final Assembly, Consumption based planning, etc.
• Post implementation support for PP on MRP, Production orders, Confirmations and Goods Movement.
• Experienced in Procure to Pay, Order to cash, Material Master, Inventory Management, and Material
requirements planning, GR, GI, Movement Types, Transfer Posting, Stock Transfer, Physical Inventory
process.
• Knowledge about Resources, Master Recipes, Batch Management, Classification and Process order.
• Implemented SAP using ASAP methodology and Significant experience with involvement in various stages of
implementation right from Business Process analysis, Blueprinting, Realization, Go-Live & Production Support
including Configuration, Customization, Master Data Setup and Data Conversion, As-Is and To-Be designing,
customization post live production support, User Acceptance Testing (UAT), User training and documentation.
• Data Migration from Legacy system to SAP for upgrade / new implementation / integration, import data from any
other external system to SAP using LSMW.

Areas of Expertise
• Master data – Configuration and maintenance of BOM, standard parameters of Work Center, routing/rate
routing, work-center formulas.
• LTP- Creation and releasing of planning scenarios, Creation of PIRs ,transfering to Demand Management.
• Maintained master data for MRP like defining MRP Controllers, Check MRP Types. Conversion of planned
procurement proposals into production order/purchase order.
• Demand management, MRP planning, generating PIR’s. Maintained master data for MRP like defining MRP
Controllers, Check MRP Types. Conversion of planned procurement proposals into production order/purchase
order.
• MPS-Total planning run, configuring planning time fence, processing the planning results interactively and
evaluating the MPS run.
• Configuration of planning strategies Make-to-Stock (MTS), Make-to-order (MTO), Consumption based
planning.
• Configuration of order type parameters, order type dependent parameters, scheduling parameters,
availability parameters, confirmation parameters.
EDUCATION:
B.E Mechanical Engineering, from P.A College of Engineering, Mangalore, affiliated to Visvesvaraya Technological
University, passed in 2011 with aggregate of 65.00%.

TECHNICAL SKILLS

ERP : SAP S/4 Hana, MFG+


Operating Systems : Windows 97,2000,2010
Management Tools : MS Office, AUTO CAD, Solid Works.

PROFESSIONAL EXPERIENCE:

Ace Manufacturing Systems Ltd CURRENT ORGANIZATION


Role : EXEC-5

Responsibilities:
▪ Working with Users to help resolve the day to day issues in PP module.
▪ Implemented alternate parts functionality to ensure the inventory accuracies.
▪ Involved in PP related month end activities and ensure a timely closure of the activities.
▪ Implemented Discrete Manufacturing with Make–to-Stock and Make-to-order strategies for business
requirements.
▪ Responsible for any customization of Discrete Manufacturing with Make –to-Stock and Make-to-order
strategies according to the business requirements.
▪ Worked on and trained end users in building Material Master, BOM, Routing and Work Center.
▪ Defined Work Center categories, capacity categories, shift sequence for estimating available capacity, work
center formula and key for performance efficiency rate for costing.
▪ Maintained plant parameters for MRP and defined MRP settings for Single item/ multi-level MRP runs and
defined MRP types.
▪ Extensively worked with Shop floor Control activities and particularly with all phases in the Make – to – Stock
and Make to Order scenario.
▪ Configured the person responsible for production locations, capacity planner, production orders.
▪ Ran the steps for production order execution process.
▪ Provided post-go-live support.

Projects:
SAP Implementation:
• 1 End to End implementation experience in SAP PP.
• Responsible for Configuring, testing and implementing as per ASAP methodology.
• Project Duration Apr 2016 to Mar 2017.

Support Role-Enhancements/Reports:
• Creation of new customized transaction/reports as per the end users /management requirement with the technical
team and Responsible for changing the configuration like order types, MRP parameters or any other shop floor
control activities.
1. Configured and implemented Reorder point and forecast based consumption planning post implementation.
2. Created new order types, order type related parameters for Sub assembly stock production orders post
implementation.
3. Created customized transaction and report for confirmation of production orders.
4. Created customized transaction for allocation of components in production orders based on sort string.
5. Created customized report for committed Machine cost v/s Actual consumption.
6. Created customized report for planning the special requirements from the customer.
7. Created transaction and report for swapping the components in between 2 production orders.
8. Project Duration Apr 2017 till present.

Personal Data:
Date of Birth : 22 AUG,1989
Sex : Male
Nationality : Indian
Marital Status : Married
Languages : English, Kannada, Hindi

Current Location: BANGALORE SRINIDHI

You might also like