002 - WMS - For - Scaffolding & Erection of Pipe Rack Area PS29 To PS38
002 - WMS - For - Scaffolding & Erection of Pipe Rack Area PS29 To PS38
002 - WMS - For - Scaffolding & Erection of Pipe Rack Area PS29 To PS38
01 Scope of works 4
Construction Procedure
03 5
Conference Criteria
04 6
07 Environmental requirements
7
1. Scope of work
The scope of this procedure applies specifically and only for the execution of
“Perstorp Elephant Project”. This procedure covers supervision and method used for
Scaffolding Erection and Dismantling at Pipe Rack Area
2. Personal Rules and responsibility
Project Manager:
Project Manager is responsible for developing and managing technology projects and
their cost, time and scope. Responsibilities include: project plan, communication plan,
allocating tasks and setting milestone.
Management of the safety control supervisors to check the site condition in the safety
concern
Report to the Site Manager in relation to the health, safety and environment protection
activities.
Workers: The Project Worker's main function is to manage the day-to-day activities of a
project or part of a service. The Project Worker will also assist the Service Manager to
develop and support a range of flexible, creative and responsive community-based
initiatives for people with dementia and their careers.
Before the work is started, a brief safety tool box talk shall be given on the scope of
work and the hazards associated with the work to all the concerned for safety
awareness.
Display of cautionary sign boards.
Before Start work Provide the proper PPE.
Barricading of the work area shall be done by caution tape to avoid unauthorized
persons entering
inside the work area.
All M.S Scaffolding & Tools tackles should be cleaned Properly & physical inspection is
must before executing the job.
Only trained/experienced persons should be allowed to operation.
General work permit, work at Height.
Ensure Safety compliance, PPE's, tool box talk & statutory compliance.
Coordinator-
Supervisor: -
Safety officer: -
Scaffolder.……………… Nos.
Supervisor……………………........... Nos.
Rigger …………………………………
6-Method statement for Installation of MS Scaffolding of pipe Rack. for hot work
activity. EX Welding, Grinding Work.
Appropriate and sufficient arrangements have been made for the initiation of
emergency response and, where necessary, rescue of persons from pipe rack.
Permanent supervision is provided at the site (attendant).
All Tools to be used on site must be suitable for the work intended. the scaffolders
must ensure that the tools are inspected.
All the Scaffolder working with scaffold shall be made available with tools carrying
Scaffolding operation shall commence only after appropriate are secured ( Permit,
Work at height).
All Scaffolds shall be erected, altered and Dismantled only under the competent
supervisor
Limited workers shall be allowed to work for scaffolding work – two scaffolders and 2
helpers.
Devise an appropriate emergency plan before the work starts. The following is an
elaboration of these basic principles and what you need to do.
safety officer registered under the Factories and Industrial Undertakings (Safety
Officers and Safety Supervisors) Regulations.
Fall Protection. Full body harness belt, shine board, railing system. ( (Toe guard,
Mid rail, Top rail ).
. Safety Net if required.
Close the work permit with good housekeeping.
7- Environmental requirements:
Prevent noise pollution by using environment friendly machines and equipment’ s and oils.
Follow govt. guidelines on the air pollutions. Must have PUC certificate
Ensure to collect and dispose of the oil spillage (if any) as per local govt. rules
This method statement should be reviewed by the site management team and a copy of it will
be circulated to those nominated for comment and the nominated staff member to be finally
approved all comments should be recorded on the approval sheet.