KEC INTERNATIONAL LTD.

PP RAILDISPATCH PROJECT, IOCL PARADIP,ODISHA


THIRD PARTY INSPECTION DETAILS

SL.NO. NAME OF THE REG.NO./SL.NO. T.P.I. NO. DATE OF INSPECTION DUE DATE OF INSPECTION DAYS REMAINING FOR CAPACITY REMARKS
EQUIPMENT (DD-MM-YYYY) (DD-MM-YYYY) RENEWAL OF T.P.I.

1 FARANA OD-21M-3898 5/18/2021 5/17/2022 -1 16MT

2 FARANA OD-21M-4900 4/29/2021 4/28/2022 -1 15MT

PILING RIG 3/19/2021 9/18/2021 -1 3MT


3 RJ-14EA-5099
PILING RIG 9/28/2021 3/27/2022 -1 3MT

4 PILING RIG RJ-14EA-5385 4/7/2021 10/6/2021 -1 3MT

5 PILING RIG RJ-23EA-0373 4/13/2021 10/12/2021 -1 3MT

6 PILING RIG RJ-14EA-1858 4/21/2021 10/20/2021 -1 3MT

7 PILING RIG RJ-41A-0032 4/13/2021 10/12/2021 -1 3MT

10 PILING RIG RJ-14EA-5313 5/18/2021 11/17/2021 -1 3MT


KEC INTERNATIONAL LTD.
PP RAILDISPATCH PROJECT, IOCL PARADIP,ODISHA
THIRD PARTY INSPECTION DETAILS
LIFTING
Mfg SL.NO./ID DATE OF INSPECTION DUE DATE OF INSPECTION DAYS REMAINING FOR SLING
SL.NO. MACHINES/CHAINS/ROPES OF SLING T.P.I. NO. (DD-MM-YYYY) (DD-MM-YYYY) RENEWAL OF T.P.I. CAPACITY DIMENSIONS COLOUR LENGTH REMARKS
/LIFTING TACKLES

1 D-SHACKLE DS-01, DS-02 6/29/2021 12/28/2021 -1 3.25MT NA

2 WEB SLING WS-01 6/29/2021 12/28/2021 -1 5MT RED

3 D-SHACKLE DS-03,DS-04 7/27/2021 1/26/2022 -1 9.5MT NA

4 WEB SLING WS-02 7/27/2021 1/26/2022 -1 5MT RED

-1
KEC INTERNATIONAL LTD.
PP RAILDISPATCH PROJECT, IOCL PARADIP,ODISHA
THIRD PARTY INSPECTION DETAILS

NAME OF THE ID OF CHAIN DATE OF INSPECTION DUE DATE OF INSPECTION DAYS REMAINING FOR
SL.NO. REG.NO./SL.NO. T.P.I. NO. CAPACITY REMARKS
EQUIPMENT PULLEY BLOCK (DD-MM-YYYY) (DD-MM-YYYY) RENEWAL OF T.P.I.

1 HYDRAULIC JACK HJ/300/01 HJ/300/01 4/21/2021 10/20/2021 -1 300MT

2 HYDRAULIC JACK HJ/100/01 HJ/100/01 4/21/2021 10/20/2021 -1 10 Ton

-1
KEC INTERNATIONAL LTD.
PP RAILDISPATCH PROJECT, IOCL PARADIP,ODISHA
THIRD PARTY INSPECTION DETAILS

COMPRESSOR/ ID OF AIR DATE OF INSPECTION DUE DATE OF INSPECTION


SL.NO. NAME OF THE EQUIPMENT T.P.I. NO.
AIR VESSEL Sr.NO. RECEIVER (DD-MM-YYYY) (DD-MM-YYYY)
DAYS REMAINING FOR MAXIMUM PERMISSIBLE
REMARKS
RENEWAL OF T.P.I. WORKING PRESSURE

-1

-1

-1

-1