CONSTRUCTION OF 5MLD STP AT

KWA SITE AT ELAMKULAM IN


KOCHI

DETAILED PROJECT
REPORT

VOLUME II
DRAWINGS

8/5288-I, Near Kuttiady Irrigation Project Office


Moottoli, Kakkodi P.O., Calicut – 673611
Mob: 9446048233, 0495-4025433
CIVIL DRAWINGS
EXISTING INLET PIPE TO STP ( PUMPING LINE)

AREA OF EXISTING STP

3
AREA FOR PROPOSED STP

5
ST P
TO
PIPE

Units
RUCTION OF 5MLD SEWAGE
LET
G IN

REATMENT PLANT AT
STIN

ELAMKULAM, KOCHI
EXI

KERALA WATER AUTHORITY


KOCHI

ENTRY RAM BIOLOGICALS


CALICUT

DETAILS OF EXISTING UNITS

Units length (m) Breadth (m) Depth(m)


DRAWING TITLE Rev
1 GRIT CHAMBER 36 0.60 1.05
2 AERATION TANK 41.5 21.7 8 EXISTING STP LAYOUT
3 DRYING BED 80 40 1.5 00
4 MIXING TANK 8.1m dia 5 DRAWING NO
LAYOUT OF EXISTNG SEWERAGE TREATMENT PLANT 5 DIGESTION TANK 18.25m dia 10 RAM-KWA-STP-C-001
6 SEC. DIGESTION TANK 10.6m dia 5.5
7 PRIMARY SETTLING TANK 15.25 m dia 3.6
Drawn By
8 FINAL SETTLING TANK 19.8 m dia 5 Sheet No
VYSHAK P.T 01
Checked By Sheet Size
SOORAJ M A-3
Date Scale
05-01-2018 NTS
27.20

EXISTING INLET PIPE TO STP ( PUMPING LINE)


3

LAYOUT OF FUTURE STP


5

LAYOUT OF PROPOSED STP


STP
TO
PIPE

Units
LET
G IN
ST IN
EXI

RUCTION OF 5MLD SEWAGE


REATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI
ENTRY

RAM BIOLOGICALS
CALICUT

DETAILS OF EXISTING 4. 5MLD S


E Rev

Sl.no Units length (m) ERALL PLANT LAYOUT


1 GRIT CHAMBER 36 00
2 AERATION TANK 41.5

3 DRYING BED 80 RAM-KWA-STP-C-002


4 MIXING TANK 8.1m dia
5 DIGESTION TANK 18.25m dia
Sheet No
6 SEC. DIGESTION TANK 10.6m dia
VYSHAK P.T 01
7 PRIMARY SETTLING TANK 15.25 m dia
8 FINAL SETTLING TANK 19.8 m dia Sheet Size
SOORAJ M A-3
Scale
05-01-2018 NTS
WALKWAY

EXISTING INLET PIPE TO STP ( PUMPING LINE)

LAYOUT OF FUTURE STP

LAYOUT OF PROPOSED STP

RUCTION OF 5MLD SEWAGE


REATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

E Rev

RANGEMENT OF PROPOSED STP


UTURE CONSIDERATION 00
RAM-KWA-STP-C-003

Sheet No
VYSHAK P.T 01
Checked By Sheet Size
5M

7M WIDE CONCRETE PAVER BLOCK ROAD SOORAJ M A-3


Date Scale
05-01-2018
107.30 NTS
WALKWAY

EXISTING INLET PIPE TO STP ( PUMPING LINE)

LAYOUT OF PROPOSED STP

RUCTION OF 5MLD SEWAGE


REATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

E
RANGEMENT OF PROPOSED STP
T FUTURE CONSIDERATION 00
RAM-KWA-STP-C-004

Sheet No
VYSHAK P.T 01
Checked By Sheet Size
5M

7M WIDE CONCRETE PAVER BLOCK ROAD SOORAJ M A-3


Date Scale
05-01-2018
107.30 NTS
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. PILE LAYOUT IS DESIGNED BASED ON THE GEOTECH
INVESTIGATION REPORT GIVEN BY THE CLIENT
04. CONTRACTOR SHALL DO THE DETAILED SOIL PROFILE
ANALYSIS BEFORE COMMENCEMENT OF WORK
05. PILE CAP THICKNESS FOR 750mm PILES SHALL BE
MINIMUM OF 1MTR & FOR 600mm PILES SHALL BE
75cm

750mm Dia Pile 600mm Dia Pile

FOR ESTIMATION PURPOSE ONLY

MBBR TANK
EQUALIZATION TANK CLARIFIER CONSTRUCTION OF 5MLD SEWAGE
TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

SLUDGE THICKENER TREATED WATER TANK


FILTER FOUNDATIONS
RAM BIOLOGICALS
CALICUT

DRAWING TITLE Rev

GENERAL ARRANGEMENT OF PILE LAYOUT


00
DRAWING NO
RAM-KWA-STP-C-005

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
CONSTRUCTION OF 5MLD SEWAGE
TREATMENT PLANT AT
M25 RCC BEAM - B1 ELAMKULAM, KOCHI
M25 RCC BEAM - B1

M25 RCC BEAM 1.95


1.45 0.30 1.45
M25 RCC BEAM -PB-1 M25 RCC BEAM -PB-1

GL 0.45 0.45 GL

SECTION: A-A

SECTION: A-A
GL GL
M25 RCC COLUMN
C2 C2 (4Nos of 30 x 30)

2.00 2.00
2.60 M25 RCC RAFT 2.60
(4Nos of 30 x 30)
PCC 1:3:6
PB-1, B-1 GRIT PB-1, B-1 0.40 0.40
CHAMBER 7.82 4.40
0.20 0.20
3.00 1.10
PB-1, B-1
01 3.20 1.30
PB-1 PB-1, B-1
C1 C1
C1 C1 C1 SECTION: A-A SECTION: B-B
PB-1
A A
8.05 2.26
DISTRIBUTION
PARSHALL FLUME - 01 & 02 C2 C2 PB-1, B-1 PB-1, B-1
RECEIVING PB-1, B-1 1.90
CHAMBER SCREEN CHANNEL
PB-1, B-1 CHAMBER B
PB-1, B-1 B
C1 C1
C1 C1 C1 A A
PB-1 PB-1 PB-1, B-1

PB-1, B-1 12.22


GRIT
6.80
PB-1, B-1
CHAMBER
PB-1, B-1
02
PLAN B
B
PB-1, B-1
C2 C2
COLUMN LAYOUT - C1 COLUMN LAYOUT - C2
4.15 PLAN
PLAN

DRAWING TITLE Rev


COLUMNS & BEAMS LAYOUT - TYPICAL FOR RECEIVING
CHAMBER, SCREEN CHANNEL, GRIT CHAMBER &
KERALA WATER AUTHORITY PARSHALL FLUME 00
KOCHI DRAWING NO
RAM-KWA-STP-C-006

Drawn By
Sheet No
VYSHAK P.T 02
Checked By Sheet Size
RAM BIOLOGICALS
SOORAJ M A-3
CALICUT
Date Scale
05-01-2018 NTS
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
0.80
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
0.60 0.50 MENTIONED OTHERWISE
0.20 0.70 SCREEN
70° 70°
04. ALL BEAMS ARE OF SIZE 30 x 30 (cm)
0.25 0.70 0.40 M30 RCC WALL
05. COLUMN & BEAM DESIGNS SHALL BE AS PER THE
GRIT CHAMBER 0.70
DISTRIBUTION RECEIVING
DETAILED LAYOUT
CHAMBER 0.20 CHAMBER 2.00 06. DASHED LINES ARE SUPPORTS BELOW THE BASE SLAB.
M25 RCC COLUMN M30 RCC BASE REFER DETAILED DRAWING FOR THE SAME
1.95 0.20 0.20
M25 RCC BEAM 0.20 150 NB SV
1.45 FOR ESTIMATION PURPOSE ONLY
GL 0.45 GL

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
SECTION: A-A ELAMKULAM, KOCHI

1000 MM WIDE WALKWAY

KERALA WATER AUTHORITY


GRIT KOCHI
CHAMBER
01

3.65
1000 MM WIDE WALKWAY
RAM BIOLOGICALS
SCREEN 0.40 CALICUT
A A
RECEIVING
SCREEN 0.45
CHAMBER
1.50
SCREEN 0.45
DRAWING TITLE Rev
7.00 4.00 GENERAL ARRANGEMENT OF RECEIVING
3.65 CHAMBER, SCREEN CHANNEL & GRIT CHAMBER 00
DRAWING NO
GRIT 3.18 RAM-KWA-STP-C-006
CHAMBER
02
Drawn By
Sheet No
VYSHAK P.T 01
0.50 3.65 PLAN Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
0.20 SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
1.40 03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
0.20 0.20 0.20 MENTIONED OTHERWISE
04. ALL BEAMS ARE OF SIZE 30 x 30 (cm)
05. COLUMN & BEAM DESIGNS SHALL BE AS PER THE
DETAILED LAYOUT
0.20 06. DASHED LINES ARE SUPPORTS BELOW THE BASE SLAB.
M25 RCC BEAM M25 RCC BEAM REFER DETAILED DRAWING FOR THE SAME
1.45
FOR ESTIMATION PURPOSE ONLY
GL GL

SECTION: A-A
CONSTRUCTION OF 5MLD SEWAGE
TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

2.00 3.00 RAM BIOLOGICALS


CALICUT
0.83 0.38
A 0.50 A
DISTRIBUTION
1.86 CHAMBER
DRAWING TITLE Rev

GENERAL ARRANGEMENT OF PARSHALL FLUME


& DISTRIBUTION CHAMBER 00
DRAWING NO
PARSHALL FLUME - 01 & 02 RAM-KWA-STP-C-007

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size
PLAN SOORAJ M A-3
Date Scale
05-01-2018 NTS
EQUALIZATION TANK 01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
Monorail Support MENTIONED OTHERWISE
Beam & Columns
Monorail Crane
2 MS Platform With Handrail TO MBBR TANK

FOR ESTIMATION PURPOSE ONLY


M30 RCC - Wall
GL 4.5 4.00 GL

0.3
2 M30 RCC - Pile Cap

1
PCC 1:3:6 - 10cm Thick
CONSTRUCTION OF 5MLD SEWAGE
15.7
15.9 TREATMENT PLANT AT
ELAMKULAM, KOCHI

SECTION AA
1M WIDE PLATFORM KERALA WATER AUTHORITY
KOCHI

RAM BIOLOGICALS
A A CALICUT

14.5M DIA
DRAWING TITLE Rev

GENERAL ARRANGEMENT OF
EQUALIZATION TANK 00
DRAWING NO
RAM-KWA-STP-C-008

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
1M WIDE PLATFORM
05-01-2018 NTS

PLAN
MS Platform With Handrail
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
FROM EQUALISATION TANK SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
0.50 MENTIONED OTHERWISE

0.50
0.20
M30 RCC - Wall
4.5 MBBR MEDIA

0.3 FOR ESTIMATION PURPOSE ONLY

0.75
M30 RCC - Pile Cap
GL GL

PCC 1:3:6 - 10cm Thick

10.2 CONSTRUCTION OF 5MLD SEWAGE


10.4 TREATMENT PLANT AT
ELAMKULAM, KOCHI
SECTION AA

2
-0
BR
1M WIDE PLATFORM

MB
KERALA WATER AUTHORITY

TO
0.5M WIDE LAUNDER KOCHI

A A
RAM BIOLOGICALS
CALICUT

9.0M DIA
DRAWING TITLE Rev

GENERAL ARRANGEMENT OF
MBBR TANK - 01 00
DRAWING NO
RAM-KWA-STP-C-009

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
1M WIDE PLATFORM
05-01-2018 NTS

PLAN
MS Platform With Handrail
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
FROM EQUALISATION TANK SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
0.50 MENTIONED OTHERWISE

0.50
0.20
M30 RCC - Wall
4.5 MBBR MEDIA

0.3 FOR ESTIMATION PURPOSE ONLY

0.75
M30 RCC - Pile Cap
GL GL

PCC 1:3:6 - 10cm Thick

10.2 CONSTRUCTION OF 5MLD SEWAGE


10.4 TREATMENT PLANT AT
ELAMKULAM, KOCHI
SECTION AA

2
-0
BR
1M WIDE PLATFORM

MB
KERALA WATER AUTHORITY

TO
0.5M WIDE LAUNDER KOCHI

A A
RAM BIOLOGICALS
CALICUT

9.0M DIA
DRAWING TITLE Rev

GENERAL ARRANGEMENT OF
MBBR TANK - 02 00
DRAWING NO
RAM-KWA-STP-C-010

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
1M WIDE PLATFORM
05-01-2018 NTS

PLAN
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE
04. WALL THICKNESS IS 30cm & PILE CAP IS 1.0m THICK
05. PCC UNDER THE PILE CAP SHALL BE CONSIDERED

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

GENERAL ARRANGEMENT OF SECONDARY


CLARIFIER TANK

RAM-KWA-STP-C-011

M30 RCC - Wall

M30 RCC -GLPile Cap


GL
VYSAKH T

SOORAJ M A-3

05-01-2018 NTS
SLUDGE SUMP 01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
GL GL 02.
03.
ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE
M30 RCC - Wall TO SLUDGE THICKENER

2.5 FOR ESTIMATION PURPOSE ONLY

M30 RCC Base Slab

PCC 1:3:6
CONSTRUCTION OF 5MLD SEWAGE
4.15 TREATMENT PLANT AT
4.75 ELAMKULAM, KOCHI
4.95
SECTION AA
KERALA WATER AUTHORITY
KOCHI

A A RAM BIOLOGICALS
CALICUT

3.75M DIA DRAWING TITLE Rev

GENERAL ARRANGEMENT OF SLUDGE SUMP


00
DRAWING NO
RAM-KWA-STP-C-012

Drawn By
Sheet No
VYSAKH T 01
Checked By Sheet Size

SOORAJ M A-3
Date
PLAN 05-01-2018
Scale
NTS
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE
04. WALL THICKNESS IS 30cm & RAFT THICKNESS IS 30cm

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

GENERAL ARRANGEMENT OF SLUDGE


THICKENER TANK

RAM-KWA-STP-C-013

M30 RCC - Wall

M30 RCC -GLPile Cap


GL
VYSAKH T

SOORAJ M A-3

05-01-2018 NTS
THICKENED SLUDGE SUMP 01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
GL GL 02.
03.
ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE
M30 RCC - Wall TO SLUDGE THICKENER

2.5 FOR ESTIMATION PURPOSE ONLY

M30 RCC Base Slab

PCC 1:3:6
CONSTRUCTION OF 5MLD SEWAGE
4.15 TREATMENT PLANT AT
4.75 ELAMKULAM, KOCHI
4.95
SECTION AA
KERALA WATER AUTHORITY
KOCHI

A A RAM BIOLOGICALS
CALICUT

3.75M DIA DRAWING TITLE Rev

GENERAL ARRANGEMENT OF THICKENED


SLUDGE SUMP 00
DRAWING NO
RAM-KWA-STP-C-014

Drawn By
Sheet No
VYSAKH T 01
Checked By Sheet Size

SOORAJ M A-3
Date
PLAN 05-01-2018
Scale
NTS
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
TO FILTER FEED PUMP 03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE

M30 RCC WALL

3.5
3 FOR ESTIMATION PURPOSE ONLY

0.25
M30 RCC BASE SLAB
GL GL

0.75
CONSTRUCTION OF 5MLD SEWAGE
8.1
TREATMENT PLANT AT
ELAMKULAM, KOCHI
8.3

SECTION AA

KERALA WATER AUTHORITY


KOCHI

A A
RAM BIOLOGICALS
FILTER FEED TANK CALICUT
7.00 x 5.00 X 3.50

DRAWING TITLE Rev


GENERAL ARRANGEMENT OF
FILTER FEED TANK
00
DRAWING NO
RAM-KWA-STP-C-015

PLAN Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
FROM FILTER FEED TANK 03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE

M30 RCC WALL

3.5
3 FOR ESTIMATION PURPOSE ONLY

0.25
M30 RCC BASE SLAB
GL GL

0.75
CONSTRUCTION OF 5MLD SEWAGE
8.1
TREATMENT PLANT AT
ELAMKULAM, KOCHI
8.3

SECTION AA

KERALA WATER AUTHORITY


KOCHI

A A
RAM BIOLOGICALS
TREATED WATER TANK CALICUT
7.00 x 5.00 X 3.50

DRAWING TITLE Rev


GENERAL ARRANGEMENT OF
TREATED WATER TANK
00
DRAWING NO
RAM-KWA-STP-C-016

PLAN Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
AIR RELIEF AIR RELIEF AIR RELIEF
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
INLET FROM FILTER FEED PUMP
TO
TREATED WATER TANK
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
2.5 MENTIONED OTHERWISE

1.5 1.5

FOR ESTIMATION PURPOSE ONLY

GL 0.75
GL

CONSTRUCTION OF 5MLD SEWAGE


15 TREATMENT PLANT AT
SECTION AA ELAMKULAM, KOCHI
1.5

KERALA WATER AUTHORITY


KOCHI

1.5

RAM BIOLOGICALS
A A
ACTIVATED CARBON FILTER CALICUT
1.5
10.5

DRAWING TITLE Rev

GENERAL ARRANGEMENT OF FILTERS


3 WITH FILTER FOUNDATION 00
DRAWING NO
RAM-KWA-STP-C-017

Drawn By
Sheet No
PRESSURE SAND FILTER VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3

15 Date
05-01-2018
Scale
NTS

PLAN All Dimensions are in Mtrs


01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE
04. 200MM DI PIPE SHALL BE USED AT OUTFALL

FOR ESTIMATION PURPOSE ONLY

10cm Thick RCC 1:2:4 Wall

CONSTRUCTION OF 5MLD SEWAGE


1.0 20cm Thick RCC 1:2:4 Base Slab TREATMENT PLANT AT
ELAMKULAM, KOCHI
10cm Thick 1:3:6 PCC Bed
GL

LS SECTION AT OUTFALL KERALA WATER AUTHORITY


SECTION TO CHETTITHARA
CANAL KOCHI

RAM BIOLOGICALS
CALICUT
0.50M WIDE TREATED WATER
CHANNEL
TO CHETTITHARA DRAWING TITLE Rev
GENERAL ARRANGEMENT OF
CANAL EFFLUENT WATER CHANNEL
00
PLAN DRAWING NO
RAM-KWA-STP-C-018

Length of Channel : 30m Drawn By


Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL DIMENSIONS ARE IN METERS UNTIL UNLESS IT
IS SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHOULD BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED SEPERATE
04. DEATILS OF COLUMNS & BEAMS SHALL BE TAKEN
FROM COLUMN LAYOUT OF SCREEN CHANNEL

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

GENERAL ARRANGEMENT OF
CENTRIFUGE BUILDING

RAM-KWA-STP-C-019

VYSHAK P.T

SOORAJ M
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE
04. ALL BEAMS ARE OF SIZE 30 x 30 (cm)
05. COLUMN & BEAM DESIGNS SHALL BE AS PER THE
M25 RCC BEAM
DETAILED LAYOUT
06. REFER TRUSS DRAWING FOR THE ROOF TRUSS DETAILING

M25 RCC WALL

FOR ESTIMATION PURPOSE ONLY


M25 RCC LINTEL

4.5
M25 RCC PLINTH BEAM CONSTRUCTION OF 5MLD SEWAGE
PCC 1:3:6
TREATMENT PLANT AT

0.45
GL GL GL GL

ELAMKULAM, KOCHI
6.7
ELEVATION

SECTION AA

C2 C2 KERALA WATER AUTHORITY


KOCHI

A A
C2 SLUDGE STORAGE C2 RAM BIOLOGICALS
ROOM CALICUT
6.00 x 6.00

DRAWING TITLE Rev


GENERAL ARRANGEMENT OF
SLUDGE STORAGE YARD
C2 C2 00
RAMP DRAWING NO
RAM-KWA-STP-C-020
PLAN
Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE
04. ALL BEAMS ARE OF SIZE 30 x 30 (cm)
05. COLUMN & BEAM DESIGNS SHALL BE AS PER THE
DETAILED LAYOUT
06. DASHED LINES ARE SUPPORTS BELOW THE BASE SLAB.
REFER DETAILED DRAWING FOR THE SAME
07. REFER SPECIFICATION REPORT FOR DETAILED
GL GL GL GL
SPECIFICATIONS
FOR ESTIMATION PURPOSE ONLY
FRONT ELEVATION SIDE ELEVATION

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


GL GL GL GL KOCHI
SECTION AA

SECTION BB

B B
RAM BIOLOGICALS
V W3 W3 W3 V W3
A
D3 Toilet
A A
D Toilet
D A
CALICUT
1.5x1.5 1.5x1.5

Store Room Chemical


Reception Transformer Room RS Visitors Room W3
W3 W3 2.8x4 Dosing Room
4x4 6x4 4x4
3x4

D1 D Rev
D1 DRAWING TITLE
METER READING ROOM D2
ENTRANCE CG 3.00 x 1.50
GENERAL ARRANGEMENT OF TRANSFORMER

11.3
(1.5m wide)
D1 D HOUSING, CONTROL ROOM & LABORATORY
00
UP
DRAWING NO
W3 W3 RAM-KWA-STP-C-021
Control Room Laboratory Room
7x5 7x5

Drawn By
Sheet No
VYSHAK P.T 01
W3 W3 W3 W3

B B 10.6
Checked By Sheet Size
GROUND FLOOR
PLAN
GROUND FLOOR
PLAN SOORAJ M A-3
Date Scale
05-01-2018 NTS
All Dimensions are in Mtrs
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
CENTRATE SUMP 02.
03.
ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE

0.2 GL

FOR ESTIMATION PURPOSE ONLY


TO EQUALIZATION TANK
0.2

2.5
CONSTRUCTION OF 5MLD SEWAGE
TREATMENT PLANT AT
ELAMKULAM, KOCHI

0.3
1.5
2.5 KERALA WATER AUTHORITY
2.7 KOCHI
SECTION AA

RAM BIOLOGICALS
CALICUT

A A DRAWING TITLE Rev

GENERAL ARRANGEMENTS OF
1.5M DIA CENTRATE SUMP 00
DRAWING NO
RAM-KWA-STP-C-022

Drawn By Sheet No
VYSAKH T 01

PLAN Checked By

SOORAJ M
Sheet Size

A-3
Date Scale
05-01-2018 NTS
TOTAL AREA OF DEVELOPMENT : 9600SQM
AREA OF WALKWAY : 800SQM
AREA OF LANDSCAPING : 1950SQM
WALKWAYS AT GL AREA OF INTERNAL ROADS : 1325SQM

CONCRETE PAVER BLOCK ROADS

27.20
GREEN BELT AREA

GREEN BELT

67.
CONSTRUCTION OF 5MLD SEWAGE

50
TREATMENT PLANT AT

77.80
LANDSCAPE
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

7M WIDE CONCRETE PAVER BLOCK ROAD


2NOS OF 600MM DI PUMPING LINE(EXTENTION) RAM BIOLOGICALS
CALICUT

72.30
DRAWING TITLE Rev
4M WIDE CONCRETE PAVER BLOCK ROAD

GENERAL ARRANGEMENT OF INTERNAL ROADS,


WALKWAYS, DRAINS, LANDSCAPING LAYOUT
00
DRAWING NO
RAM-KWA-STP-C-022

7M WIDE CONCRETE PAVER BLOCK ROAD Drawn By


Sheet No
VYSHAK P.T 01
107.30 Checked By Sheet Size

SOORAJ M A-3
Date Scale
LAYOUT OF SEWERAGE TREATMENT PLANT AT ELAMKULAM 05-01-2018 NTS
01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
RCC Slab 0.15x3x3 03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE

0.15
Laterite wall
FOR ESTIMATION PURPOSE ONLY
2.4

0.4000 0.4
CONSTRUCTION OF 5MLD SEWAGE
GL GL TREATMENT PLANT AT
RR Packing ELAMKULAM, KOCHI

0.45
0.45
0.6

0.6
0.6 0.6
ELEVATION
SECTION A-A
KERALA WATER AUTHORITY
KOCHI

RAM BIOLOGICALS
0.2000
CALICUT

Pumphouse
A A GENERAL ARRANGEMENTS OF
3x3
PUMP HOUSE - TYPICAL 00
RAM-KWA-STP-C-024

D VYSAKH T 01

SOORAJ M A-3

PLAN 05-01-2018 NTS


01. ALL DIMENSIONS ARE IN METERS UNLESS IT IS
SPECIALLY MENTIONED
02. ONLY WRITTEN DIMENSIONS SHALL BE FOLLOWED
03. THICKENESS OF PCC SHALL BE TAKEN AS 10CM IF NOT
MENTIONED OTHERWISE

FOR ESTIMATION PURPOSE ONLY


0.4

6.2
SECTION A-A
CONSTRUCTION OF 5MLD SEWAGE
TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

4
A A GENERAL ARRANGEMENTS OF
GENERATOR FOUNDATION 00
RAM-KWA-STP-C-025

VYSAKH T

6
01

SOORAJ M A-3

05-01-2018 NTS
STRUCTURAL
DRAWINGS
01. ALL THE PCC WHEREVER MENTIONED IN THE
STRUCTURAL/CIVIL DRAWING SHALL BE OF PCC 1:3:6.
02. ALL THE REBARS USED FOR THE STP COMPONENTS HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF Fe415
EPOXY COATED HYSD BARS
03. ALL THE RCC WORKS OF STP COMPONENTS WHERE HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF M30
CONCRETE WITH SRC CEMENT. MINIMUM OF CEMENT SHALL
BE 350kg/m3
04. EFFECTIVE COVER OF ALL WATER TANKS SHALL BE 50mm
05. NOMINAL COVER FOR ALL OTHER STRUCTURAL COMPONENTS
SHALL BE AS PER IS 456:2000.
06. THE ENTIRE WATER TANK INSIDE SHALL BE PAINTED WITH TWO
COATS OF WATER PROOFING CEMENT PAINT OF APPROVED
QUALITY.

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

DRAWING TITLE Rev


STRUCTURAL DETAILING OF
EQUALIZATION TANK
00
DRAWING NO
RAM-KWA-STP-S-001

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL THE PCC WHEREVER MENTIONED IN THE
STRUCTURAL/CIVIL DRAWING SHALL BE OF PCC 1:3:6.
02. ALL THE REBARS USED FOR THE STP COMPONENTS HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF Fe415
EPOXY COATED HYSD BARS
03. ALL THE RCC WORKS OF STP COMPONENTS WHERE HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF M30
CONCRETE WITH SRC CEMENT. MINIMUM OF CEMENT SHALL
BE 350kg/m3
04. EFFECTIVE COVER OF ALL WATER TANKS SHALL BE 50mm
05. NOMINAL COVER FOR ALL OTHER STRUCTURAL COMPONENTS
SHALL BE AS PER IS 456:2000.
06. THE ENTIRE WATER TANK INSIDE SHALL BE PAINTED WITH TWO
COATS OF WATER PROOFING CEMENT PAINT OF APPROVED
QUALITY.

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

DRAWING TITLE

STRUCTURAL DETAILING OF MBBR TANK


00
DRAWING NO
RAM-KWA-STP-S-002

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL THE PCC WHEREVER MENTIONED IN THE
STRUCTURAL/CIVIL DRAWING SHALL BE OF PCC 1:3:6.
02. ALL THE REBARS USED FOR THE STP COMPONENTS HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF Fe415
EPOXY COATED HYSD BARS
03. ALL THE RCC WORKS OF STP COMPONENTS WHERE HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF M30
CONCRETE WITH SRC CEMENT. MINIMUM OF CEMENT SHALL
BE 350kg/m3
04. EFFECTIVE COVER OF ALL WATER TANKS SHALL BE 50mm
05. NOMINAL COVER FOR ALL OTHER STRUCTURAL COMPONENTS
SHALL BE AS PER IS 456:2000.
06. THE ENTIRE WATER TANK INSIDE SHALL BE PAINTED WITH TWO
COATS OF WATER PROOFING CEMENT PAINT OF APPROVED
QUALITY.

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

DRAWING TITLE Rev


STRUCTURAL DETAILING OF
SECONDARY CLARIFIER
00
DRAWING NO
RAM-KWA-STP-S-005

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL THE PCC WHEREVER MENTIONED IN THE
STRUCTURAL/CIVIL DRAWING SHALL BE OF PCC 1:3:6.
02. ALL THE REBARS USED FOR THE STP COMPONENTS HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF Fe415
EPOXY COATED HYSD BARS
03. ALL THE RCC WORKS OF STP COMPONENTS WHERE HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF M30
CONCRETE WITH SRC CEMENT. MINIMUM OF CEMENT SHALL
BE 350kg/m3
04. EFFECTIVE COVER OF ALL WATER TANKS SHALL BE 50mm
05. NOMINAL COVER FOR ALL OTHER STRUCTURAL COMPONENTS
SHALL BE AS PER IS 456:2000.
06. THE ENTIRE WATER TANK INSIDE SHALL BE PAINTED WITH TWO
COATS OF WATER PROOFING CEMENT PAINT OF APPROVED
QUALITY.

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

DRAWING TITLE Rev

STRUCTURAL DETAILING OF SLUDGE SUMP &


THCIKENED SLUDGE SUMP 00
DRAWING NO
RAM-KWA-STP-S-004

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL THE PCC WHEREVER MENTIONED IN THE
STRUCTURAL/CIVIL DRAWING SHALL BE OF PCC 1:3:6.
02. ALL THE REBARS USED FOR THE STP COMPONENTS HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF Fe415
EPOXY COATED HYSD BARS
03. ALL THE RCC WORKS OF STP COMPONENTS WHERE HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF M30
CONCRETE WITH SRC CEMENT. MINIMUM OF CEMENT SHALL
BE 350kg/m3
04. EFFECTIVE COVER OF ALL WATER TANKS SHALL BE 50mm
05. NOMINAL COVER FOR ALL OTHER STRUCTURAL COMPONENTS
SHALL BE AS PER IS 456:2000.
06. THE ENTIRE WATER TANK INSIDE SHALL BE PAINTED WITH TWO
COATS OF WATER PROOFING CEMENT PAINT OF APPROVED
QUALITY.

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

DRAWING TITLE Rev


STRUCTURAL DETAILING OF
SLUDGE THICKENER TANK
00
DRAWING NO
RAM-KWA-STP-S-005

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet Size

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL THE PCC WHEREVER MENTIONED IN THE
STRUCTURAL/CIVIL DRAWING SHALL BE OF PCC 1:3:6.
02. ALL THE REBARS USED FOR THE STP COMPONENTS HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF Fe415
EPOXY COATED HYSD BARS
03. ALL THE RCC WORKS OF STP COMPONENTS WHERE HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF M30
CONCRETE WITH SRC CEMENT. MINIMUM OF CEMENT SHALL
BE 350kg/m3
04. EFFECTIVE COVER OF ALL WATER TANKS SHALL BE 50mm
05. NOMINAL COVER FOR ALL OTHER STRUCTURAL COMPONENTS
SHALL BE AS PER IS 456:2000.
06. THE ENTIRE WATER TANK INSIDE SHALL BE PAINTED WITH TWO
COATS OF WATER PROOFING CEMENT PAINT OF APPROVED
QUALITY.

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

LONG WALL

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

DRAWING TITLE Rev


STRUCTURAL DETAILING OF
FILTER FEED TANK
00
DRAWING NO
RAM-KWA-STP-S-006

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet No

SOORAJ M A-3
Date
SHORT WALL 05-01-2018
Scale
NTS
01. ALL THE PCC WHEREVER MENTIONED IN THE
STRUCTURAL/CIVIL DRAWING SHALL BE OF PCC 1:3:6.
02. ALL THE REBARS USED FOR THE STP COMPONENTS HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF Fe415
EPOXY COATED HYSD BARS
03. ALL THE RCC WORKS OF STP COMPONENTS WHERE HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF M30
CONCRETE WITH SRC CEMENT. MINIMUM OF CEMENT SHALL
BE 350kg/m3
04. EFFECTIVE COVER OF ALL WATER TANKS SHALL BE 50mm
05. NOMINAL COVER FOR ALL OTHER STRUCTURAL COMPONENTS
SHALL BE AS PER IS 456:2000.
06. THE ENTIRE WATER TANK INSIDE SHALL BE PAINTED WITH TWO
COATS OF WATER PROOFING CEMENT PAINT OF APPROVED
QUALITY.

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

LONG WALL

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

DRAWING TITLE Rev


STRUCTURAL DETAILING OF
TREATED WATER TANK
00
DRAWING NO
RAM-KWA-STP-S-007

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet No

SOORAJ M A-3
Date
SHORT WALL 05-01-2018
Scale
NTS
01. ALL THE PCC WHEREVER MENTIONED IN THE
STRUCTURAL/CIVIL DRAWING SHALL BE OF PCC 1:3:6.
02. ALL THE REBARS USED FOR THE STP COMPONENTS HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF Fe415
EPOXY COATED HYSD BARS
03. ALL THE RCC WORKS OF STP COMPONENTS WHERE HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF M30
CONCRETE WITH SRC CEMENT. MINIMUM OF CEMENT SHALL
BE 350kg/m3
04. EFFECTIVE COVER OF ALL WATER TANKS SHALL BE 50mm
05. NOMINAL COVER FOR ALL OTHER STRUCTURAL COMPONENTS
SHALL BE AS PER IS 456:2000.
06. THE ENTIRE WATER TANK INSIDE SHALL BE PAINTED WITH TWO
COATS OF WATER PROOFING CEMENT PAINT OF APPROVED
QUALITY.

FOR ESTIMATION PURPOSE ONLY

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

DRAWING TITLE Rev


STRUCTURAL DETAILING OF
CENTRATE SUMP
00
DRAWING NO
RAM-KWA-STP-S-008

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet No

SOORAJ M A-3
Date Scale
05-01-2018 NTS
01. ALL THE PCC WHEREVER MENTIONED IN THE
STRUCTURAL/CIVIL DRAWING SHALL BE OF PCC 1:3:6.
02. ALL THE REBARS USED FOR THE STP COMPONENTS HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF Fe415
EPOXY COATED HYSD BARS
03. ALL THE RCC WORKS OF STP COMPONENTS WHERE HAVING
DIRECT CONTACT WITH EFFLUENT SHALL BE OF M30
CONCRETE WITH SRC CEMENT. MINIMUM OF CEMENT SHALL
BE 350kg/m3
04. EFFECTIVE COVER OF ALL WATER TANKS SHALL BE 50mm
05. NOMINAL COVER FOR ALL OTHER STRUCTURAL COMPONENTS
SHALL BE AS PER IS 456:2000.
06. THE ENTIRE WATER TANK INSIDE SHALL BE PAINTED WITH TWO
COATS OF WATER PROOFING CEMENT PAINT OF APPROVED
QUALITY.

FOR ESTIMATION PURPOSE ONLY

GENERATOR FOUNDATION
CONSTRUCTION OF 5MLD SEWAGE
TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

DRAWING TITLE Rev

STRUCTURAL DETAILING OF GENERATOR


FOUNDATION 00
DRAWING NO
RAM-KWA-STP-S-009

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet No

SOORAJ M A-3
Date Scale
05-01-2018 NTS
All Dimensions are in Mtrs
8cm Thick M30 Concrete Paver Blocks

5cm Thick Compacted Sand


10cm Thick RCC 1:2:4 Wall
0.3
0.40
10cm Thick RCC 1:2:4 Base
0.3

FOR ESTIMATION PURPOSE ONLY


WALKWAY SECTION 0.50
IN DETAIL SWD SECTION
IN DETAIL
CONSTRUCTION OF 5MLD SEWAGE
GL TREATMENT PLANT AT
ELAMKULAM, KOCHI

SECTION
KERALA WATER AUTHORITY
KOCHI

30cm Wide SWD


RAM BIOLOGICALS
CALICUT

1.5m Wide Walkways


STRUCTURAL DETAILING OF INTERNAL ROADS,
WALK WAYS AND STORM WATER DRAINS 00
RAM-KWA-STP-S-010

VYSHAK P.T 01

SOORAJ M A-3

PLAN 05-01-2018 NTS


10cm Thick 20cm Height Kerb Stone
10cm RCC 1:2:4 Wall
10cm Thick M40 Concrete Paver Blocks

40mm Thick Compacted Sand

75mm Thick 6mm Stone Aggregate


0.5

0.60 10cm RCC


250mm Thick Quarry Muck 1:2:4
0.5 Base

Compacted exisitng Surface


FOR ESTIMATION PURPOSE ONLY
0.70
ROAD SECTION SWD SECTION
IN DETAIL IN DETAIL
CONSTRUCTION OF 5MLD SEWAGE
TREATMENT PLANT AT
GL ELAMKULAM, KOCHI

SECTION KERALA WATER AUTHORITY


KOCHI

50cm Wide SWD


RAM BIOLOGICALS
CALICUT

7m Wide Concrete Paver Road


STRUCTURAL DETAILING OF INTERNAL ROADS,
WALK WAYS AND STORM WATER DRAINS 00
RAM-KWA-STP-S-010

VYSHAK P.T 02

SOORAJ M A-3

PLAN 05-01-2018 NTS


1 1

2
6 6
5 5

4 4

7
CONSTRUCTION OF 5MLD SEWAGE
TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

RAM BIOLOGICALS
CALICUT

MEMBERS
STRUCTURAL DETAILING OF ROOF TRUSS
1 Length:3.61,50mm, GI Pipe,4.08kg/m SLUDGE STORAGE YARD 00
2 Length:2m,50mm, GI Pipe,4.08kg/m
3 Length:6m,65mm, GI Pipe,5.71kg/m RAM-KWA-STP-S-011
4 Length:1m.25mm, GI Pipe,1.98kg/m
5 Length:1.74m, 40mm, GI Pipe, 3.23kg/m
VYSHAK P.T 01
6 Length:2.5m,40mm, GI Pipe, 3.23kg/m
7 Length:4.0,100mm, GI Pipe,12.2kg/m A-3
SOORAJ M

05-01-2018 NTS
MECHANICAL
DRAWINGS
CONSTRUCTION OF 5MLD SEWAGE
HYDRAULIC DIAGRAM TREATMENT PLANT AT
ELAMKULAM, KOCHI

EL+104.50 EL+103.95
EL+104.00 EL+103.45 EL+104.00
EL+103.5 EL+103.50 EL+103.50
EL+103.15 EL+103.00 EL+103.00
EL+102.65 EL+102.55 EL+102.50
EL+102.50 EL+102.50 EL+102.50
EL+102.15 EL+102.00

EL+101.25

GRIT CHAMBER PARSHALL

PSF ACF
EL+100.00 EL+100.00

D PUMP CLEAR WATER CHANNEL


TREATED WATER TANK

CHETTITHARA CANAL

CENTR

HYDRAULIC DIAGRAM
00
RAM-KWA-STP-M-001

VYSHAK P.T 01

SOORAJ M A-3

05-01-2018 NTS
27.20

67.
50
FOR ESTIMATION PURPOSE ONLY
STP
TO

Receiving Chamber
PIPE

Units I
LET
G IN
ST IN

00
EXI

23
2Nos of 600mm DI Pumping Mains - Extension
400
CONSTRUCTION OF 5MLD SEWAGE
1750 9750 TREATMENT PLANT AT
ELAMKULAM, KOCHI

72.30
KERALA WATER AUTHORITY
KOCHI
107.30

RAM BIOLOGICALS
CALICUT

GL

EXTENSION OF 2NOS OF DI 600 PUMPING MAINS


160

COMPACTED SOIL LAYERS


PIPING LAYOUT 00
250

RAM-KWA-STP-M-002
90

GRAVEL PACKING VYSHAK P.T 01

SOORAJ M A-3
1200
2400
05-01-2018 NTS
LENGTH OF PIPE LINE : 130mtrs TYPICAL CROSS SECTION OF PIPE
LAYING
TO
150mm DI PIPE CENTRATE PUMP

OUTLET

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
ELAMKULAM, KOCHI

ACTIVATED CARBON FILTER


150mm DI PIPE 250mm DI PIPE
KERALA WATER AUTHORITY
INLET KOCHI

RAM BIOLOGICALS
CALICUT

PRESSURE SAND FILTER

GENERAL PIPING LAYOUT FILTERS


00
RAM-KWA-STP-M-003

PIPING LAYOUT
VYSHAK P.T 01

SOORAJ M A-3

05-01-2018 NTS
All Dimensions are in Mtrs
PROCESS AND INSTRUMENTATION
LAYOUT
(P&I LAYOUT)

PS-3
PS-5

Inlet Raw Sewage Mechanical Screen Grit Chamber-1


PS-1
Parshal Flume

MBBR -01 MBBR-02


PS-2

Equalisation Tank
Blower CONSTRUCTION OF 5MLD SEWAGE
Recieving
Chamber
Manual Screen
PS-4
PS-6
Grit Chamber-2
TREATMENT PLANT AT
ELAMKULAM, KOCHI

Secondary Clarifier-1

KERALA WATER AUTHORITY


Chlorine Contact Tank
To Trip
L-AL
L-AL
KOCHI
(CCT)
Pump
L-AL
L-AL To Trip To Start
Pump Pump
To Start Sludge Sump
Pump Gas Chlorinator L-SL

Sluice Valve
L-SL
NRV
Pen Stock
Pressure Guage
Gravity Line
RAM BIOLOGICALS
PSF ACF
Sludge Thickener Feed Pump
House
Pumping Line
CALICUT
Filter Feed Pump
House Sludge Thickener

To
Chettithara
Canal Out Flow L-AL
L-AL To Trip
Pump
To Start
Pump
PROCESS AND INSTRUMENTATION LAYOUT
L-SL
L-SL L-AL
(P&I LAYOUT) 00
L-AL To Trip
CF-1 CF-2 Pump
To Start
Pump
RAM-KWA-STP-M-005
L-SL

L-SL

Centrifuge
Sludge VYSHAK P.T 01
Outlet
Centrifuge Feed Pump Thickened
House Sludge Sump

Centrate Sump Centrate Pump House SOORAJ M A-3

05-01-2018 NTS
ELECTRICAL
DRAWINGS
LEGEND

EXISTING 01. THE LINE DIAGRAM IS PREPARED BASED ON THE


11kV O/H LINE OVERALL REQUIREMENT OF THE PLANT
02. CONTRACTOR SHALL PREPARE THE DETAILED
Proposed 250KVA Transformer DESIGN FOR EACH ITEM SEPERATE
03. ALL THE WIRES MENTIONED IN THIS DRAWING IS
BASED ON THE RELEVANT IEC
04. THIS DRAWING IS PREPARED SOLELY FOR THE
PREPARATION OF THE DETAILED ESTIMATE AND
BOQ FOR THE ELECTRICAL ITEMS.
METERING PANEL
CT OPERATED
250/5A KWH METER
CT
KWH

G
FOR ESTIMATION PURPOSE ONLY

MAIN CONTROL PANEL INTERLOCKING

AMF

CONSTRUCTION OF 5MLD SEWAGE


G
TREATMENT PLANT AT
ELAMKULAM, KOCHI

KERALA WATER AUTHORITY


KOCHI

TRANSFORMER HOUSING , CONTROL ROOM & LABORATORY CENTRIFUGE BUILDING OUTDOOR LIGHTING (15 METER)
DB-1
DB-3
DB-2
RAM BIOLOGICALS
CALICUT

DRAWING TITLE

SINGLE LINE DIAGRAM-POWER DISTRIBUTION

DRAWING NO
RAM-KWA-STP-E-001

Drawn By
Sheet No
VYSHAK P.T 01
Checked By Sheet No

SOORAJ M A-3
Date Scale
05-01-2018 NTS
STAR DELTA WIRING DIAGRAM

L-1 L-1
L-2 L-2
L-3 L-3
N

CONSTRUCTION OF 5MLD SEWAGE


TREATMENT PLANT AT
A1
ELAMKULAM, KOCHI
MAIN-C DELTA-C STAR-C
NO NC NC Y

A1 A2-N A1 A2-N A1 A2-N KERALA WATER AUTHORITY


KOCHI
u1 v1 w1
Motor
v2 w2 u2

RAM BIOLOGICALS
NO NC CALICUT
TIMER
ON OFF

NO NC

A2 A1 PUSH PUSH
GENERAL ARRANGEMENT OF
BUTTON BUTTON
STAR-DELTA CONNECTION - TYPICAL 00
N
24V-AC 220V-AC
RAM-KWA-STP-E-002

VYSHAK P.T 01

SOORAJ M A-3

05-01-2018 NTS
THREE PHASE DOL STARTER
CONNECTION DIAGRAM

N R Y B
CONSTRUCTION OF 5MLD SEWAGE
4 POLE MCCB TREATMENT PLANT AT
NC STOP
ELAMKULAM, KOCHI
START NO
K12
K11
K13
K11
P P
K12
A1
coil NO KERALA WATER AUTHORITY
A2 CONTACTOR KOCHI
MCCB

RAM BIOLOGICALS
NC OLR
CALICUT
K1
K11
(Over Load Relay)

GENERAL ARRANGEMENT OF
DOL CONNECTION - TYPICAL
00
RAM-KWA-STP-E-003
Induction
Motor
VYSHAK P.T 01

SOORAJ M A-3

05-01-2018 NTS