700htp 2 Manual
700htp 2 Manual
Before you connect the Pump to the Unit Under Test (UUT), the
Pump must be filled with fluid and primed for use. Follow the
directions below to prepare the Pump for use.
11/99
PN 4096896
September 2011
2011 Fluke Corporation. All rights reserved. Printed in U.S.A.
Fluke-Direct .com
All product names are trademarks of their respective companies.
[email protected] 1.888.610.7664
Features
gsp002.eps
gsp001.eps
Figure 1. Test Configuration
No. Item Function
How to Operate the Test Pump
Master Port for Fluke 700 Series Pressure W Warning
Instrument Port Module, 1/4-inch NPT female.
To prevent a violent release of pressure, open the
Test Pressure Port for pressure instrument under Pressure Bleed Knob (item ) very slowly before you
disconnect pressure lines. Do not connect the Pump to
Port test, 1/4-inch NPT female.
an external pressure source.
Pressure Relief Port for an optional Fluke 700PRV-1 W Caution
Valve Port Pressure Relief Valve (plugged).
To prevent damage when a Pressure Module or Pressure
Vernier Fine Lets you adjust the applied pressure Instrument is connected that could be damaged by
pressures of 690 bar (10,000 psi), install and correctly
Adjustment Knob in small increments.
set a relief valve in the system or an optional Fluke
Holds 100 cc of mineral based 700PRV-1 Pressure Relief Valve on the Pump.
Hydraulic Fluid
hydraulic oil, distilled water, or
Reservoir 1. Connect a 700 Series Pressure Module (the Pressure Module)
hydraulic oil.
to the Master Instrument Port (item .) To connect to a 700P
1/4-inch NPT Tee High Pressure Module (700P29, P30, or P31) install a male
For master and test ports. ®
1/4-inch NPT Adapter. Use Teflon tape or equivalent on the
Fitting
NPT thread connections to prevent leaks.
Handle Limiter Limits the travel of the handles. 2. Fill and Prime the Pump. See “How to Prime the Test Pump”.
3. Connect the Pressure Module to the calibrator as shown in
Reservoir Filler Cap which seals the hydraulic fluid
Figure 1.
Cap reservoir. Install before you pump.
4. Connect the input of the Pressure Unit Under Test (UUT) to the
Test Pressure Port (item ) on the Test Pump.
Pressure Bleed Lets you release pressure in small
5. Loosen the Pressure Bleed Knob (item ) to release pressure
Knob increments.
from the Pump.
Reservoir Nut Remove nut to clean reservoir. 6. Use the Calibrator to zero the Pressure Module. Refer to the
Users Manual for instructions.
7. Turn the Vernier Fine Adjustment Knob (item ) to the
middle-range.
8. Turn the Pressure Bleed Knob (item ) clockwise until it stops
in the full closed position.
9. Squeeze the handles together to pump fluid which will increase
pressure. See the Notes in step 2 of the “How to Prime the Test
Pump” procedure.
W Caution
To prevent damage, do not let the pressure increase to
more than the pressure rating of the equipment under
test. Pressure can increase quickly if the pressurized
volume is small.
10. For incremental pressure adjustments, use the Vernier Fine
Adjustment Knob.
11. Once the test is done, slowly turn the Pressure Bleed Knob
(item ) counter-clockwise to release pressure.