Agile Devops PDF
Agile Devops PDF
a.
Change Management
b.
Update Management
c.
Modification Management
Feedback
Your answer is correct.
The correct answer is: Change Management
Question 2
Correct
Mark 1.00 out of 1.00
Flag question
Question text
From the options select the configuration items that are eligible for configuration management
Select one or more:
a.
Design Document
b.
SRS
c.
Test Report
d.
Source code document
Feedback
Your answer is correct.
The correct answers are: Source code document, Test Report, SRS, Design Document
Question 3
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Tom and Peter works on the same project. Tom does his work and update the local copy back to the
configuration management server. This process is called as
Select one:
a.
Check-out
b.
Management
c.
Check-in
d.
Baseline
Feedback
Your answer is correct.
The correct answer is: Check-in
Question 4
Correct
Mark 1.00 out of 1.00
Flag question
Question text
____________ ensures that when two different people does the work and update parallelly, one should
not over write the other
Select one:
a.
Baseline
b.
Check-out
c.
Check-in
d.
Synchronization control
Feedback
Your answer is correct.
The correct answer is: Synchronization control
Question 5
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Which is the software configuration concept that ensures that change should be done in a controlled and
authorized environment
Select one:
a.
Baseline
b.
Configuration database
c.
Audit
d.
SVN
Feedback
Your answer is correct.
The correct answer is: Baseline
-Collaborative and co-operative approach among all the stake holders is important. This is a feature of
the _______________ Agile Methodology
Select one:
a.
b.
Scrum
c.
Collaborative and co-operative approach among all the stake holders is given importance in Dynamic
system development method
The correct answer is: Dynamic system development method,
Question 2
Correct
Flag question
Question text
Match the phases and objectives of Dynamic System Development Method
Answer 1
Feasibility study Assess cost, time and technical factors
Answer 2
Design and build Product is developed in iterations
Answer 3
Business study
Analyzing the process and the users who are a part of it and their needs
Answer 4
Functional model Studying the business processes and converting these business process into model
Implementation Answer 5
phase Delivers the tested system along with the documentation to the end users
Feedback
Your answer is correct.
Question 3
Correct
Flag question
Question text
Arrange the phases of Feature Driven Development
Feedback
Your answer is correct.
1.Develop overall Model
2. Build a Features List
3. Plan by Feature
4. Design by Feature
5. Build by Feature
Question 4
Correct
Flag question
Question text
Match the principles and objectives of Lean Software Development
Unnecessary work
Eliminate waste Answer 1
Create knowledge Learn and share with others and empower self
Answer 5
Feedback
Your answer is correct.
Flag question
Question text
Match the roles and responsibilities of the scrum agile methodology
Produ Answer 1
ct Client/Customer
owner
Answer 2
Team
Programmer, a designer, a tester or an architect
Mem
ber
Scru
m Answer 3
maste Coordinator responsible for controlling , handling discussions, communications and removing any barrier or problems during the scrum process
r
Feedback
Your answer is correct.
a.
FALSE
b.
TRUE
Feedback
Your answer is correct.
The correct answer is: FALSE
Question 2
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Which agile methodology divides the development into sprint cycles, in which a Specified set of features
are delivered? Choose from the following:
Select one:
a.
SCRUM
b.
Lean Software Development
c.
Extreme programming
Feedback
Your answer is correct.
The correct answer is: SCRUM
Question 3
Correct
Mark 1.00 out of 1.00
Flag question
Question text
__________ is an iterative and incremental approach that embraces principles of agile development,
including continuous user/customer involvement.
Select one:
a.
Increment Method
b.
Static System Development Method
c.
Dynamic System Development Method
d.
Loop creation method
Feedback
Your answer is correct.
The correct answer is: Dynamic System Development Method
Question 4
Correct
Mark 1.00 out of 1.00
Flag question
Question text
What are the roles in dynamic system development method? Choose from the following:
Select one or more:
a.
Technical Coordinator
b.
System Analyst
c.
Scribe Facilitator
d.
Designer
Feedback
Your answer is correct.
The correct answers are: Scribe Facilitator, Technical Coordinator
Question 5
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Which of the following agile methodologies depends on the cohesiveness of the team and individual
commitment of the team members?
Select one:
a.
Feature Driven Development
b.
SCRUM
c.
Extreme programming
d.
Lean Software Development
Feedback
Your answer is correct.
The correct answer is: Lean Software Development
Question 6
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Arrange the Scrum practices in the correct order
Feedback
Your answer is correct.
Since time is a fixed resource, Prioritization is applied to requirements, tasks, products and user cases.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 2
Correct
Flag question
Question text
Which of the following MoSCoW Requirements describes a requirement which is considered desirable but
not necessary?
Select one:
Must have
Should have
Won't have
Could have
Feedback
The correct answer is: Could have
Question 3
Correct
Flag question
Question text
Which of the following activities belong to Deployment Phase?
Deploy
Assemble
Review
Test
Feedback
The correct answers are: Assemble, Review, Deploy
Question 4
Correct
Flag question
Question text
In DSDM, Analysis, Design and Development phases can overlap.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 5
Correct
Flag question
Question text
Which of the following DSDM products provides a vision and a justification for the project from a business
perspective?
Select one:
Business Case
Timebox Plan
Delivery Plan
Feasibility Assessment
Feedback
The correct answer is: Business Case
Question 6
Correct
Flag question
Question text
Which of the following steps belong to DSDM Structured Timebox?
Select one or more:
Refinement
Consolidation
Investigation
Collaboration
Feedback
The correct answers are: Investigation, Refinement, Consolidation
Question 7
Correct
Flag question
Question text
A DSDM project will always deliver a viable solution, on time and on cost, as long as the practices of
MoSCoW and timeboxing are followed.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 8
Correct
Question text
Which of the following roles in DSDM coordinates all aspects of management of the project at a high
level?
Select one:
Business Analyst
Project Manager
Business Ambassador
Solution Developer
Feedback
The correct answer is: Project Manager
Question 9
Correct
Flag question
Question text
Foundations phase should last no longer than a few weeks, even for large and complex projects.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 10
Correct
Flag question
Question text
In which of the following DSDM principles, after each project increment or Timebox is delivered, the
project priorities and viability are re-assessed ?
Select one:
Develop iteratively
Demonstrate control
Deliver on time
Feedback
The correct answer is: Build incrementally from firm foundations
Which of the following roles could be multiple stakeholders or a community
Select one:
Coach
Developer
Manager
Customer
Feedback
The correct answer is: Customer
Question 2
Correct
Flag question
Question text
Which of the following roles falls in the middle between Coach and Tracker
Select one:
Developer
Manager
Designer
Customer
Feedback
The correct answer is: Manager
Question 3
Correct
Flag question
Question text
Extreme Programming is much more flexible with possible changes within iterations
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 4
Correct
Flag question
Question text
In coding phase, the actual code is created by implementing specific XP practices like _____
Select one:
Metaphor
Small Releases
Testing
Planning Game
Feedback
The correct answer is: Metaphor
Question 5
Correct
Flag question
Question text
Which of the following are considered as the Extreme Programming(XP) Values?
Refactoring
Simplicity
Respect
Testing
Feedback
The correct answers are: Simplicity, Respect
Question 6
Correct
Flag question
Question text
Extreme programming gives priority to the actual coding over all other tasks such as documentation to
ensure that the customer receives something substantial in value at the end of the day
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 7
Correct
Flag question
Question text
______ is a daily activity whose value hinges not only on the technical aspects but also upon team
communication and the big picture behind the project
Select one:
Daily Stand-up
Pair Programming
Acceptance Test
Small Releases
Feedback
The correct answer is: Daily Stand-up
Question 8
Correct
Flag question
Question text
Which of the following phases in Extreme Programming uses CRC cards to contribute ideas?
Select one:
Coding
Designing
Testing
Planning
Feedback
The correct answer is: Designing
Question 9
Correct
Flag question
Question text
Extreme Programming works towards providing iterative and recurrent software releases throughout the
project.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 10
Correct
Question text
Which of the following practices requires two programmers to work jointly on the same code?
Select one:
Metaphor
Planning Game
Collective Ownership
Pair Programming
Feedback
The correct answer is: Pair Programmin
Code written using the same rules encourages collective ownership.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 2
Correct
Flag question
Question text
Which of the following phases is related to simplicity, one of the main XP values?
Select one:
Testing
Planning
Coding
Designing
Feedback
The correct answer is: Designing
Question 3
Correct
Question text
Which of the following phases is about constant communication and feedback?
Select one:
Planning
Coding
Designing
Listening
Feedback
The correct answer is: Listening
Question 4
Correct
Flag question
Question text
Scrum has sprints that are shorter taking 1 to 2 weeks , while XP iterations are 2 to 4 weeks long.
Select one:
True
False
Feedback
The correct answer is 'False'.
Question 5
Correct
Flag question
Question text
Each feedback of the customer becomes the basis of a new design, and the process of design-coding-
tests-listening repeats itself.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 6
Correct
Flag question
Question text
In Continuous Integration, while the first developer focuses on writing, the other one reviews code and
suggests improvements.
Select one:
True
False
Feedback
The correct answer is 'False'.
Question 7
Correct
Question text
Which of the following roles in Extreme programming is optional?
Select one:
Coach
Customer
Tracker
Developer
Feedback
The correct answer is: Tracker
Question 8
Correct
Flag question
Question text
Which of the following provides peer feedback in seconds?
Select one:
Unit testing
Acceptance test
Pair programming
Code Review
Feedback
The correct answer is: Pair programming
Question 9
Correct
Flag question
Question text
In Extreme Programming, Customer writes/collects stories, whereas in DSDM, facilitated workshops
identify high level requirements.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 10
Correct
Flag question
Question text
Which of the following roles in Extreme Programming is an external consultant?
Select one:
Tracker
Coach
Manager
Customer
Feedback
The correct answer is: Coach
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 2
Correct
Flag question
Question text
Which of the following pillars of Lean management gives employees an opportunity to master their craft?
Select one:
Continuous Improvement
Identify Value
Feedback
The correct answer is: Respect For People
Question 3
Correct
Flag question
Question text
________ represent different stages of the workflow.
Select one:
Kanban Cards
Kanban Swimlanes
Kanban Rows
Kanban Columns
Feedback
The correct answer is: Kanban Columns
Question 4
Correct
Question text
Which of the following allow teams to divide the development process into smaller, manageable
segments?
Select one:
Feedback
The correct answer is: Agile Kanban Boards
Question 5
Correct
Flag question
Question text
Which of the following Kanban Metrics measures the total amount of work delivered in a certain time
period?
Select one:
Throughput
Work In Progress
Feedback
The correct answer is: Throughput
Question 6
Correct
Flag question
Question text
You can start building the Kanban system by setting up Kanban board with _________ as one of it’s
basic columns.
Select one:
Over
Completed
Requested
Required
Feedback
The correct answer is: Requested
Question 7
Correct
Question text
Kanban card represents the actual state of your workflow with all its risks and specifications.
Select one:
True
False
Feedback
The correct answer is 'False'.
Question 8
Correct
Flag question
Question text
Kanban focuses on visualization, flow, and limiting work in progress.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 9
Correct
Flag question
Question text
WIP limits point out areas of chronic idleness or overload.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 10
Correct
Flag question
Question text
Which of the following helps to facilitate collaboration between product managers and designers for
prioritizing and designing features?
Select one:
Feedback
The correct answer is: Product Design Board
For teams and companies that want to be more agile, implementing feedback loops is a mandatory step
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 2
Correct
Flag question
Question text
Each column on the Kanban board represents a work item.
Select one:
True
False
Feedback
The correct answer is 'False'.
Question 3
Correct
Flag question
Question text
Which of the following are the pillars of Lean methodology?
Eliminate waste
Identify value
Feedback
The correct answers are: Respect for people, Continuous improvement
Question 4
Correct
Flag question
Question text
It is wise to provide an indication and a reason, whenever WIP limit exceeds in Kanban.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 5
Correct
Flag question
Question text
Which of the following Kanban Key Metrics measures how much time a task spends going through the
process?
Select one:
Cycle Time
Throughput
Work In Progress
Feedback
The correct answer is: Cycle Time
Question 6
Correct
Flag question
Question text
Any other activity or process that doesn’t bring value to the end product is considered waste
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 7
Correct
Flag question
Question text
Which of the following are the benefits of Kanban Board?
No fixed sprints
Feedback
The correct answers are: No fixed sprints, No pre-fixed release schedule, Tasks are ordered by priority
Question 8
Correct
Flag question
Question text
Which of the following uses laptop, tablet or smartphone to visualize, manage your workflow, and engage
in real-time collaboration on various projects with the team members?
Select one:
Feedback
The correct answer is: Online Kanban Boards
Question 9
Correct
Flag question
Question text
You can either use a limit on the total number of tasks that can be in progress simultaneously on your
board or put individual limits on each stage of your workflow.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 10
Correct
Flag question
Question text
Conducting Daily stand up meeting is one of the techniques used for continuous improving the process.
Select one:
True
False
devops
Each service runs in its own process and communicates with other services through a well-defined
interface in Microservices
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 2
Correct
Flag question
Question text
Which of the following CI/CD tools is a continuous integration server developed by Atlassian?
Select one:
Jenkins
GitLab
Bamboo
TeamCity
Feedback
The correct answer is: Bamboo
Question 3
Correct
Question text
Which of the following is the final phase of the DevOps cycle?
Select one:
Deploy
Operate
Release
Monitor
Feedback
The correct answer is: Monitor
Question 4
Correct
Flag question
Question text
Which of the following CI/CD tools is known for its ease of setup, out-of-the-box usability, and beautiful
user interface?
Select one:
CircleCI
Bamboo
TeamCity
Jenkins
Feedback
The correct answer is: TeamCity
Question 5
Correct
Flag question
Question text
The applications with Azure CI/CD pipelines can be deployed to multiple target environments
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 6
Correct
Flag question
Question text
In which of the following pipelines, all the new changes run through a consistent set of quality checks?
Select one:
Azure pipeline
AWS codpipeline
GitLab pipeline
Bitbucket pipeline
Feedback
The correct answer is: AWS codpipeline
Question 7
Correct
Flag question
Question text
Before DevOps, there is a significant delay between development and operations
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 8
Correct
Flag question
Question text
Which of the following CI/CD toolsprovides support for .Net framework?
Select one:
TeamCity
Bamboo
GitLab
CircleCI
Feedback
The correct answer is: TeamCity
Question 9
Correct
Flag question
Question text
In which of the following, there is no human intervention and only a failed test will prevent a new change
to be deployed to production?
Select one:
Continuous Delivery
Continuous monitoring
Continuous Deployment
Continuous Integration
Feedback
The correct answer is: Continuous Deployment
Question 10
Correct
Flag question
Question text
In YAML file used for BitBucket pipeline, you can use different types of container for each step by
selecting different images
Select one:
True
False
Feedback
The correct answer is 'True'.
In Continuous Integration, build status is reported to developers when they are changing the code.
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 2
Correct
Flag question
Question text
Which of the following uses a version control system and a central code repository for tracking the code
changes made by developers?
Select one:
Continuous Delivery
Continuous Monitoring
Continuous Integration
Continuous Deployment
Feedback
The correct answer is: Continuous Integration
Question 3
Correct
Flag question
Question text
You can either define the pipeline using YAML syntax or through the user interface in Azure pipeline
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 4
Correct
Flag question
Question text
Which of the following are the services provided by Azure DevOps?
Azure Boards
Azure Agents
Azure Artifacts
Azure Repos
Feedback
The correct answers are: Azure Boards, Azure Artifacts, Azure Repos
Question 5
Correct
Flag question
Question text
Which of the following CI/CD tools is suitable for small projects?
Select one:
TeamCity
CircleCI
GitLab
Bamboo
Feedback
The correct answer is: CircleCI
Question 6
Correct
Flag question
Question text
The __________is used to record the code changes made by developers so that these changes can be
shared to others
Select one:
Trello Board
Repository
Feedback
The correct answer is: Version control system
Question 7
Correct
Flag question
Question text
In _________, developed code is continuously delivered until the programmer considers it is ready to
ship.
Select one:
Continuous Deployment
Continuous Monitoring
Continuous Integration
Continuous Delivery
Feedback
The correct answer is: Continuous Delivery
Question 8
Correct
Flag question
Question text
Pipe uses a script that lives in a Docker container
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 9
Correct
Flag question
Question text
Which of the following CI/CD tools is designed to handle anything from a simple CI server to a complete
CD hub?
Select one:
Jenkins
TeamCity
Bamboo
CircleCI
Feedback
The correct answer is: Jenkins
Question 10
Correct
Flag question
Question text
In GitLab, pipes are agents that run the CI/CD Jobs
Select one:
True
False
Question 1
Correct
Question text
Jenkins pipeline definition is written in text files called________
Select one:
jenkinsfolder
jenkins pipeline
jenkins file
jenkinsfile
Feedback
The correct answer is: jenkinsfile
Question 2
Correct
Flag question
Question text
Complex pipelines are difficult to write and maintain in classic UI
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 3
Correct
Flag question
Question text
Which built-in utility is used for creating bits of code for individual steps as well as discovering new steps
provided by the plugins?
Select one:
functionlist
Snippet Generator
jenkinsfolder
Pipeline
Feedback
The correct answer is: Snippet Generator
Question 4
Correct
Flag question
Question text
_________ is a machine that can be a part of the Jenkins environment and it is capable of executing a
Pipeline.
Select one:
Node
Pipeline
step
stage
Feedback
The correct answer is: Node
Question 5
Correct
Flag question
Question text
Document is also linked as _________ in the side bar in pipeline project
Select one:
pipeline syntax
function syntax
variable syntax
filtered syntax
Feedback
The correct answer is: pipeline syntax
Question 1
Correct
Flag question
Question text
Which type of pipeline syntax has more recent feature of jenkins pipeline
Select one:
scripted
function
variable
declarative
Feedback
The correct answer is: declarative
Question 2
Correct
Flag question
Question text
Continuous delivery pipeline is a process which involves building the software in reliable and repeatable
manner
Select one:
True
False
Feedback
The correct answer is 'True'.
Question 3
Correct
Flag question
Question text
_____helps you to setup a pipeline project and automatically creates and writes your pipeline
Select one:
Classic UI
variables
scm
Blue ocean
Feedback
The correct answer is: Blue ocean
Question 4
Correct
Flag question
Question text
Which one enables you to implement different jenkinsfiles for different branches of the same project?
Select one:
Environment variables
Classic UI
single branch
Multibranch
Feedback
The correct answer is: Multibranch
Question 5
Correct
Flag question
Question text
Pipelines can be created through__________
step functions
Blue ocean
Classic UI
variables
Feedback
The correct answers are: Blue ocean, Classic UI