List of Civil works awarded till date (01/08/2022) in FY 2022-23

Total
Total Awarded Loa Date Civil Cummulative
S.no Project Name state PIU Lanes NH (New) Mode Concessioner
Length Cost (Rs work Length
Cr)
4L Cable-stayed Naini Bridge with
1 Approaches from Km -1.117 to Km 5.41 Uttar Pradesh Prayagraj 4L 30 EPC Krishna Constructions. 2.69 19/04/2022 3.80
0.4.293 on Old NH-27 (NH-30)

Thoppur - Mettur - Bhavani - Erode


2 77 Tamil Nadu Coimbatore 4L 544H EPC Thiru. TamilRajan 34.39 14/07/2022
from km. 0.00 to km. 77.00

4L of Greenfield Alignment from


Ram Kripal Singh Construction Pvt.
3 Km. 45.000 to Km. 89.090 of Tal 44 Bihar Muzaffarpur 4L PS 119D HAM 1687.81 06/05/2022 0.00
Ltd
Dashara to Bela Nawda Section of
4L (Greenfield) Jalbhera – Shahbad
4 section from km. 0.000 to km. 22.85 Haryana Bhiwani-CHD-HR 4L 152G HAM Ceigall India Ltd. 684.00 02/06/2022
22.850 of NH-152G
Maintenance and Blackspot
Rajinder Infrastructure Private
5 rectification of Kharar-Banur-Tepla 39.53 Punjab Chandigarh 2L/4L 205A EPC 19.85 12/05/2022 0.00
Limited
section from Km.0.000 to Km.
4L from Km 219.600 (Khajuri) to Km
6 260.483 (Wyndhamganj) on NH-75 42 Jharkhand Daltonganj 4L 75 HAM MG Contractors Pvt. Ltd. 846.00 29/04/2022
(Sec-V)
4L Kodinar - Veraval (Package VI)
Kalthia Engineering & Construction
7 from km. 222.400 to km. 230.00 7.6 Gujarat Somnath 4L 51 Item Rate 162.72 07/04/2022 0.00
Ltd.
(Kodinar Bypass) of NH-8E (NH 51
Improvement and Up-Gradation of
SRSC Infra (P) Ltd.- Rajinder
8 Existing Road to 2/4L PS from Km 48.75 Uttar Pradesh Bareilly 2L PS 731 EPC 338.57 20/06/2022
Infrastructure (P) Ltd. (JV)
40.000 to 88.750, start of Khutar
4L of Haridwar – Nagina section
9 (Design Ch. LME from km 13.829 to 4.7 Uttarakhand Najibabad 4L 734 EPC Ashok kumar 120.19 18/04/2022
km 17.110 & km 26.077 to km
Rehabilitation and Upgradation to
10 2L PS configuration & 19.05 Himachal Pradesh Palampur 2L PS 154 HAM Gawar Construction Ltd 545.00 20/07/2022
Strengthening of Padhar to Bijni
Operation and Maintenance of
11 Haridwar to Muzzaffarnagar from 35.5 Uttarakhand Roorkee 4L 334 Item Rate SHRI KRISHNA AND COMPANY 13.96 07/04/2022
CH. 36.400 to CH. 71.900 section of
Remaining Works of 4 lane
12 bypasses Thanner Kulam Thozur 10.57 Tamil Nadu Chennai 4L/2L PS 205 EPC EKK Infrastructure Limited 304.88 10/05/2022
Sevapeta and Veppampattu from
4L of Kathlighat to Shakral Village
SP Singla Constructions Pvt. Ltd. -
13 from Km 128.835 to Km 146.300 of 17.465 Himachal Pradesh Shimla 4L 5 HAM 1844.70 11/07/2022
Rail Vikas Nigam Ltd. (Consortium)
NH- 5 (Shimla Bypass - Pkg I)
4L of Shakral Village to Dhalli
Gawar Construction Ltd. - Bharat
14 Section from Km 146.300 to Km 10.985 Himachal Pradesh Shimla 4L 05 HAM 2070.00 11/07/2022
Construction (India) (P) Ltd. (JV)
156.560 (Shimla Bypass - Pkg II)
4L Poanta Saheb–Mednipur from
VasantViharDehra
15 Km. 435.65 to km. 458.65 of NH- 18.7 Uttarakhand 4L 07 HAM Ram Kumar Contractor 390.00 13/06/2022 0.00
dun
07(Pkg-1)
4L Medinipur to Ballupur from Km.
VasantViharDehra
16 458.65 to Km. 487.65 of NH-07(Pkg- 26.1 Uttarakhand 4L 07 HAM MKC Infrastructure Ltd. 516.56 30/05/2022 0.00
dun
2)

Jagadhari - HR/HP Border (Ponta


17 34 Haryana Chandigarh 4L 344 EPC Raj Shyama Constructions Pvt. Ltd. 542.17 30/06/2022
Sahib)

Maintenance of 2L PS Mydukuru –
18 Dornala T Junction from Km 52 Andhra Pradesh Kadapa 2L PS 67 Item Rate 3.04 07/04/2022 0.00
589.000 to 641.000 of NH-67