F 17.09.2014 RSK SK GK REVISED AS PER CLIENT COMMENTS DATED: 26.08.

14

E 01.08.2014 RSK SK GK REVISED AS PER CLIENT COMMENTS DATED: 17.07.14

D 25.06.2014 RSK SK GK REVISED AS PER CLIENT COMMENTS DATED: 03.06.14

C 25.03.2014 RSK SK GK REVISED AS PER CLIENT COMMENTS DATED: 05.03.14

B 11.02.2014 RSK SK GK REVISED AS PER CLIENT COMMENTS DATED: 03.02.14

A 17.01.2014 RSK SK GK FOR APPROVAL

REV. DATE PREPARED CHECKED APPROVED DESCRIPTION

REVISIONS

THE WEST BENGAL POWER DEVELOPMENT


CLIENT
CORPORATION LIMITED

CONSULTANT DEVELOPMENT CONSULTANTS PRIVATE LIMITED

SAGARDIGHI THERMAL POWER PROJECT


PROJECT UNIT - 3 & 4 (2 X 500 MW) PHASE - II
PLANT WATER SYSTEM (SGPWS-2)

TITLE INPUT OUTPUT LIST - INTAKE PUMP HOUSE

L&T CONSTRUCTION
CONTRACTOR
WATER & RENEWABLE ENERGY

DOCUMENT NO SHEET NO REV.

LT DC LE130733 1 CI 503 1 of 28 F
PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
PROCESS INPUT/OUTPUT LIST
DIGITAL INPUT - (FIELD INSTRUMENTS, MOV's & LT Pumps)
LT-DG-LE130733-01-
1 PS-001 Pressure Switch VT Pump discharge (VT-01) FIELD PLC DI
M003.REV.D

2 PS-002 Pressure Switch VT Pump discharge (VT-02) - do - FIELD PLC DI

3 PS-003 Pressure Switch VT Pump discharge (VT-03) - do - FIELD PLC DI

Differential Pressure
4 DPIS-001 Strainer inlet/Outlet - do - FIELD PLC DI TWS VENDOR SCOPE
Switch
DT Pump discharge valve 001 LT-DG-LE130733-01-
5 XL-MBFV-001-LR Motorised valve 001 FIELD PLC DI
Local/Remote feedback M003.REV.A
DT Pump discharge valve 001
6 XL-MBFV-001-DIS Motorised valve 001 - do - FIELD PLC DI
distrubance feedback
DT Pump discharge valve 001
7 XL-MBFV-001-LSO Motorised valve 001 - do - FIELD PLC DI
LSO feedback
DT Pump discharge valve 001
8 XL-MBFV-001-LSC Motorised valve 001 - do - FIELD PLC DI
LSC feedback
DT Pump discharge valve 002
9 XL-MBFV-002-LR Motorised valve 002 - do - FIELD PLC DI
Local/Remote feedback
DT Pump discharge valve 002
10 XL-MBFV-002-DIS Motorised valve 002 - do - FIELD PLC DI
distrubance feedback
DT Pump discharge valve 002
11 XL-MBFV-002-LSO Motorised valve 002 - do - FIELD PLC DI
LSO feedback
DT Pump discharge valve 002
12 XL-MBFV-002-LSC Motorised valve 002 - do - FIELD PLC DI
LSC feedback
VT Pump discharge valve 003
13 XL-MBFV-003-LR Motorised valve 003 - do - FIELD PLC DI
Local/Remote feedback
VT Pump discharge valve 003
14 XL-MBFV-003-DIS Motorised valve 003 - do - FIELD PLC DI
distrubance feedback
VT Pump discharge valve 003
15 XL-MBFV-003-LSO Motorised valve 003 - do - FIELD PLC DI
LSO feedback
VT Pump discharge valve 003
16 XL-MBFV-003-LSC Motorised valve 003 - do - FIELD PLC DI
LSC feedback
VT Pump discharge valve 004
17 XL-MBFV-004-LR Motorised valve 004 - do - FIELD PLC DI
Local/Remote feedback
VT Pump discharge valve 004
18 XL-MBFV-004-DIS Motorised valve 004 - do - FIELD PLC DI
distrubance feedback
VT Pump discharge valve 004
19 XL-MBFV-004-LSO Motorised valve 004 - do - FIELD PLC DI
LSO feedback
VT Pump discharge valve 004
20 XL-MBFV-004-LSC Motorised valve 004 - do - FIELD PLC DI
LSC feedback
VT Pump discharge valve 005
21 XL-MBFV-005-LR Motorised valve 005 - do - FIELD PLC DI
Local/Remote feedback

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
VT Pump discharge valve 005
22 XL-MBFV-005-DIS Motorised valve 005 - do - FIELD PLC DI
distrubance feedback
VT Pump discharge valve 005
23 XL-MBFV-005-LSO Motorised valve 005 - do - FIELD PLC DI
LSO feedback
VT Pump discharge valve 005
24 XL-MBFV-005-LSC Motorised valve 005 - do - FIELD PLC DI
LSC feedback

25 XL-HOPV-001-LR Hydrauli valve 001 Header Valve 001 Local/Remote - do - FIELD PLC DI

Header Valve 001 Creep


26 XL-HOPV-001-CRE Hydrauli valve 001 - do - FIELD PLC DI
feedback
Header Valve 001 Crack
27 XL-HOPV-001-CRA Hydrauli valve 001 - do - FIELD PLC DI
feedback

28 XL-HOPV-001-LSC Hydrauli valve 001 Header Valve 001 Close feedback - do - FIELD PLC DI

29 XL-HOPV-001-LSO Hydrauli valve 001 Header Valve 001 Open feedback - do - FIELD PLC DI

Header Valve 001 Intermediate


30 XL-HOPV-001-IO Hydrauli valve 001 - do - FIELD PLC DI
Open

31 XL-HOPV-001-LOK Hydrauli valve 001 Header Valve 001 Locked - do - FIELD PLC DI

32 XL-HOPV-001-OLT Hydrauli valve 001 Header Valve 001 Overload Trip - do - FIELD PLC DI

33 XL-HOPV-001-OLL Hydrauli valve 001 Header Valve 001 Oil Level Low - do - FIELD PLC DI

Header Valve 001 Accumulator


34 XL-HOPV-001-AP Hydrauli valve 001 - do - FIELD PLC DI
Pressure Ok

35 UPS1-INV-FL UPS-1 Inveter Fail - do - UPS-1 PLC DI

36 UPS1-REC-FL UPS-1 Rectifier Fail - do - UPS-1 PLC DI

37 UPS1-BYP-ON UPS-1 Bypass On Feedback - do - UPS-1 PLC DI

38 UPS1-BAT-LOW UPS-1 UPS Battery Low - do - UPS-1 PLC DI

39 UPS1-SUP-FL UPS-1 UPS Mains Supply Fail - do - UPS-1 PLC DI

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS

40 UPS2-INV-FL UPS-2 Inveter Fail - do - UPS-2 PLC DI

41 UPS2-REC-FL UPS-2 Rectifier Fail - do - UPS-2 PLC DI

42 UPS2-BYP-ON UPS-2 Bypass On Feedback - do - UPS-2 PLC DI

43 UPS2-BAT-LOW UPS-2 UPS Battery Low - do - UPS-2 PLC DI

44 UPS2-SUP-FL UPS-2 UPS Mains Supply Fail - do - UPS-2 PLC DI

Desilt pump1 Drive Remote LT-DG-LE130733-01- 415V


45 XL-DTP01-AV Desilt pump1 PLC DI
feedback E402.REV.C (page 2 of 3) Swgr
415V
46 XL-DTP01-ON/OF Desilt pump1 Desilt pump1 ON feed back - do - PLC DI
Swgr
415V
47 XL-DTP01-ON/OF Desilt pump1 Desilt pump1 OFF feed back - do - PLC DI
Swgr
Desilt pump2 Fault/ Auto Trip 415V
48 XL-DTP01-FLT Desilt pump1 - do - PLC DI
feedback Swgr
Desilt pump2 Drive Remote LT-DG-LE130733-01- 415V
49 XL-DTP02-LR Desilt pump2 PLC DI
feedback E402.REV.C Swgr
415V
50 XL-DTP02-ON Desilt pump2 Desilt pump2 ON feed back - do - PLC DI
Swgr
415V
51 XL-DTP02-OFF Desilt pump2 Desilt pump2 OFF feed back - do - PLC DI
Swgr
Desilt pump2 Fault/ Auto Trip 415V
52 XL-DTP02-FLT Desilt pump2 - do - PLC DI
feedback Swgr
415V
53 XL-DWP01-ON Dewatering pump1 Dewatering pump1 ON feed back - do - PLC DI
Swgr
415V
54 XL-DWP01-ON/OF Dewatering pump1 Dewatering pump1 OFF feed back - do - PLC DI
Swgr
415V
55 XL-DWP02-ON Dewatering pump2 Dewatering pump2 ON feed back - do - PLC DI
Swgr
415V
56 XL-DWP02-OFF Dewatering pump2 Dewatering pump2 OFF feed back - do - PLC DI
Swgr

DIGITAL OUTPUT - (MOV's & Pumps)

Common header line Hydrulic LT-DG-LE130733-01-


57 HS-HOPV-001-OP Hydraulic Valve 001 PLC FIELD DO
valve 001 Open command M003.REV.D
Common header line Hydrulic
58 HS-HOPV-001-CL Hydraulic Valve 001 - do - PLC FIELD DO
valve 001 Close command

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
Common header line Hydrulic
59 HS-HOPV-001-IO Hydraulic Valve 001 - do - PLC FIELD DO
valve 001 Intermediate Open
DT Pump -1 discharge valve 001
60 HS-MBFV-001-OP Motorised valve 001 - do - PLC FIELD DO
open command
DT Pump -1 discharge valve 001
61 HS-MBFV-001-CL Motorised valve 001 - do - PLC FIELD DO
close command
DT Pump -1 discharge valve 001
62 HS-MBFV-001-SP Motorised valve 001 - do - PLC FIELD DO
stop command
DT Pump -2 discharge valve 002
63 HS-MBFV-002-OP Motorised valve 002 - do - PLC FIELD DO
open command
DT Pump -2 discharge valve 002
64 HS-MBFV-002-CL Motorised valve 002 - do - PLC FIELD DO
close command
DT Pump -2 discharge valve 002
65 HS-MBFV-002-SP Motorised valve 002 - do - PLC FIELD DO
stop command
VT Pump -1 discharge valve 003
66 HS-MBFV-003-OP Motorised valve 003 - do - PLC FIELD DO
open command
VT Pump -1 discharge valve 003
67 HS-MBFV-003-CL Motorised valve 003 - do - PLC FIELD DO
close command
VT Pump -1 discharge valve 003
68 HS-MBFV-003-SP Motorised valve 003 - do - PLC FIELD DO
stop command
VT Pump -2 discharge valve 004
69 HS-MBFV-004-OP Motorised valve 004 - do - PLC FIELD DO
open command
VT Pump -2 discharge valve 004
70 HS-MBFV-004-CL Motorised valve 004 - do - PLC FIELD DO
close command
VT Pump -2 discharge valve 004
71 HS-MBFV-004-SP Motorised valve 004 - do - PLC FIELD DO
stop command
VT Pump -3 discharge valve 005
72 HS-MBFV-005-OP Motorised valve 005 - do - PLC FIELD DO
open command
VT Pump -3 discharge valve 005
73 HS-MBFV-005-CL Motorised valve 005 - do - PLC FIELD DO
close command
VT Pump -3 discharge valve 005
74 HS-MBFV-005-SP Motorised valve 005 - do - PLC FIELD DO
stop command

75 HS-DTP01-ST Desilt pump1 Desilt pump1 Start command - do - PLC 415V Swgr DO

76 HS-DTP01-SP Desilt pump1 Desilt pump1 stop command - do - PLC 415V Swgr DO

77 HS-DTP02-ST Desilt pump2 Desilt pump2 Start command - do - PLC 415V Swgr DO

78 HS-DTP02-SP Desilt pump2 Desilt pump2 stop command - do - PLC 415V Swgr DO

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
RTD INPUTS- (HT Motors & Pumps)
LT-DG-LE130733-01-
79 RTD1-VT1-R WDG Vertical Pump1 VT Pump1 R1-Phase Winding FIELD PLC RTD
M003.REV.C

80 RTD1-VT1-R WDG Vertical Pump1 VT Pump1 R2-Phase Winding - do - FIELD PLC RTD

81 RTD1-VT1-R WDG Vertical Pump1 VT Pump1 R3-Phase Winding - do - FIELD TS RTD As per clause no 7.03.04 ,
V.IIF/S-II:8, One set of RTD's
shall be wired to Temperature
82 RTD1-VT1-R WDG Vertical Pump1 VT Pump1 R4-Phase Winding - do - FIELD TS RTD Scanner of Motor feeder panel.

83 RTD1-VT1-Y WDG Vertical Pump1 VT Pump1 Y1-Phase Winding - do - FIELD PLC RTD

84 RTD1-VT1-Y WDG Vertical Pump1 VT Pump1 Y2-Phase Winding - do - FIELD PLC RTD

85 RTD1-VT1-Y WDG Vertical Pump1 VT Pump1 Y3-Phase Winding - do - FIELD TS RTD As per clause no 7.03.04 ,
V.IIF/S-II:8, One set of RTD's
shall be wired to Temperature
86 RTD1-VT1-Y WDG Vertical Pump1 VT Pump1 Y4-Phase Winding - do - FIELD TS RTD Scanner of Motor feeder panel.

87 RTD1-VT1-B WDG Vertical Pump1 VT Pump1 B1-Phase Winding - do - FIELD PLC RTD

88 RTD1-VT1-B WDG Vertical Pump1 VT Pump1 B2-Phase Winding - do - FIELD PLC RTD

89 RTD1-VT1-B WDG Vertical Pump1 VT Pump1 B3-Phase Winding - do - FIELD TS RTD As per clause no 7.03.04 ,
V.IIF/S-II:8, One set of RTD's
shall be wired to Temperature
90 RTD1-VT1-B WDG Vertical Pump1 VT Pump1 B4-Phase Winding - do - FIELD TS RTD Scanner of Motor feeder panel.

91 RTD1-VT1-DE Vertical Pump1 VT Pump1 Driving End Bearing1 - do - FIELD PLC RTD

92 RTD1-VT1-DE Vertical Pump1 VT Pump1 Driving End Bearing2 - do - FIELD TS RTD

VT Pump1 Non - Driving End


93 RTD1-VT1-NDE Vertical Pump1 - do - FIELD PLC RTD
Bearing1
VT Pump1 Non - Driving End
94 RTD1-VT1-NDE Vertical Pump1 - do - FIELD TS RTD
Bearing2

95 RTD2-VT2-R WDG Vertical Pump 2 VT Pump 2 R1-Phase Winding - do - FIELD PLC RTD

96 RTD2-VT2-R WDG Vertical Pump 2 VT Pump 2 R2-Phase Winding - do - FIELD PLC RTD

97 RTD2-VT2-R WDG Vertical Pump 2 VT Pump 2 R3-Phase Winding - do - FIELD TS RTD As per clause no 7.03.04 ,
V.IIF/S-II:8, One set of RTD's
shall be wired to Temperature
98 RTD2-VT2-R WDG Vertical Pump 2 VT Pump 2 R4-Phase Winding - do - FIELD TS RTD Scanner of Motor feeder panel.

99 RTD2-VT2-Y WDG Vertical Pump 2 VT Pump 2 Y1-Phase Winding - do - FIELD PLC RTD

100 RTD2-VT2-Y WDG Vertical Pump 2 VT Pump 2 Y2-Phase Winding - do - FIELD PLC RTD

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS

101 RTD2-VT2-Y WDG Vertical Pump 2 VT Pump 2 Y3-Phase Winding - do - FIELD TS RTD As per clause no 7.03.04 ,
V.IIF/S-II:8, One set of RTD's
shall be wired to Temperature
102 RTD2-VT2-Y WDG Vertical Pump 2 VT Pump 2 Y4-Phase Winding - do - FIELD TS RTD Scanner of Motor feeder panel.

103 RTD2-VT2-B WDG Vertical Pump 2 VT Pump 2 B1-Phase Winding - do - FIELD PLC RTD

104 RTD2-VT2-B WDG Vertical Pump 2 VT Pump 2 B2-Phase Winding - do - FIELD PLC RTD

105 RTD2-VT2-B WDG Vertical Pump 2 VT Pump 2 B3-Phase Winding - do - FIELD TS RTD As per clause no 7.03.04 ,
V.IIF/S-II:8, One set of RTD's
shall be wired to Temperature
106 RTD2-VT2-B WDG Vertical Pump 2 VT Pump 2 B4-Phase Winding - do - FIELD TS RTD Scanner of Motor feeder panel.

107 RTD2-VT2-DE Vertical Pump 2 VT Pump 2 Driving End Bearing1 - do - FIELD PLC RTD

108 RTD2-VT2-DE Vertical Pump 2 VT Pump 2 Driving End Bearing2 - do - FIELD TS RTD

VT Pump 2 Non - Driving End


109 RTD2-VT2-NDE Vertical Pump 2 - do - FIELD PLC RTD
Bearing
VT Pump 2 Non - Driving End
110 RTD2-VT2-NDE Vertical Pump 2 - do - FIELD TS RTD
Bearing2

111 RTD3-VT3-R WDG Vertical Pump 3 VT Pump 3 R1-Phase Winding - do - FIELD PLC RTD

112 RTD3-VT3-R WDG Vertical Pump 3 VT Pump 3 R2-Phase Winding - do - FIELD PLC RTD

113 RTD3-VT3-R WDG Vertical Pump 3 VT Pump 3 R3-Phase Winding - do - FIELD TS RTD As per clause no 7.03.04 ,
V.IIF/S-II:8, One set of RTD's
shall be wired to Temperature
114 RTD3-VT3-R WDG Vertical Pump 3 VT Pump 3 R4-Phase Winding - do - FIELD TS RTD Scanner of Motor feeder panel.

115 RTD3-VT3-Y WDG Vertical Pump 3 VT Pump 3 Y1-Phase Winding - do - FIELD PLC RTD

116 RTD3-VT3-Y WDG Vertical Pump 3 VT Pump 3 Y2-Phase Winding - do - FIELD PLC RTD

117 RTD3-VT3-Y WDG Vertical Pump 3 VT Pump 3 Y3-Phase Winding - do - FIELD TS RTD As per clause no 7.03.04 ,
V.IIF/S-II:8, One set of RTD's
shall be wired to Temperature
118 RTD3-VT3-Y WDG Vertical Pump 3 VT Pump 3 Y4-Phase Winding - do - FIELD TS RTD Scanner of Motor feeder panel.

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS

119 RTD3-VT3-B WDG Vertical Pump 3 VT Pump 3 B1-Phase Winding - do - FIELD PLC RTD

120 RTD3-VT3-B WDG Vertical Pump 3 VT Pump 3 B2-Phase Winding - do - FIELD PLC RTD

121 RTD3-VT3-B WDG Vertical Pump 3 VT Pump 3 B3-Phase Winding - do - FIELD TS RTD As per clause no 7.03.04 ,
V.IIF/S-II:8, One set of RTD's
shall be wired to Temperature
122 RTD3-VT3-B WDG Vertical Pump 3 VT Pump 3 B4-Phase Winding - do - FIELD TS RTD Scanner of Motor feeder panel.

123 RTD3-VT3-DE Vertical Pump 3 VT Pump 3 Driving End Bearing1 - do - FIELD PLC RTD

124 RTD3-VT3-DE Vertical Pump 3 VT Pump 3 Driving End Bearing2 - do - FIELD TS RTD

VT Pump 3 Non - Driving End


125 RTD3-VT3-NDE Vertical Pump 3 - do - FIELD PLC RTD
Bearing1
VT Pump 3 Non - Driving End
126 RTD3-VT3-NDE Vertical Pump 3 - do - FIELD TS RTD
Bearing2
ANALOG INPUTS- (FIELD INSTRUMENTS, MOV's & Pumps)

Sludge Balnket Level At common portion of Intake LT-DG-LE130733-01-


285 SBLM-001 FIELD PLC AI
Monitor Channel M003.REV.C
Sludge Balnket Level
286 SBLM-002 Silt Trap - do - FIELD PLC AI
Monitor

287 RLT-001 Level transmitter Sump @ VT Pump - 1 - do - FIELD PLC AI

288 RLT-002 Level transmitter Sump @ VT Pump - 2 - do - FIELD PLC AI

289 RLT-003 Level transmitter Sump @ VT Pump - 3 - do - FIELD PLC AI

Clamp ON Ultrasonic Flow Vertical turbine pump common


290 UFT-001 - do - FIELD PLC AI
Meter discharge header
Vertical turbine pump common
291 PT-001 Pressure Transmitter - do - FIELD PLC AI
discharge header
Vertical turbine pump common
292 PT-002 Pressure Transmitter - do - FIELD PLC AI
discharge header
VT Pump1 Vibration feedback X-
293 VBT1-VT1-X Axis Vertical Pump 1 - do - FIELD PLC AI
Axis
VT Pump1 Vibration feedbcak Y -
294 VBT1-VT1-Y Axis Vertical Pump 1 - do - FIELD PLC AI
Axis
VT Pump2 Vibration feedback X-
295 VBT2-VT2-X Axis Vertical Pump 2 - do - FIELD PLC AI
Axis
VT Pump2 Vibration feedbcak Y -
296 VBT2-VT2-Y Axis Vertical Pump 2 - do - FIELD PLC AI
Axis
VT Pump3 Vibration feedback X-
297 VBT3-VT3-X Axis Vertical Pump 3 - do - FIELD PLC AI
Axis
VT Pump3 Vibration feedbcak Y -
298 VBT3-VT3-Y Axis Vertical Pump 3 - do - FIELD PLC AI
Axis

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
VT Pump discharge valve 003
299 XL-MBFV-003-POS Motorised valve 003 - do - FIELD PLC AI
position feed back
VT Pump discharge valve 004
300 XL-MBFV-004-POS Motorised valve 004 - do - FIELD PLC AI
position feed back
VT Pump discharge valve 005
301 XL-MBFV-005-POS Motorised valve 005 - do - FIELD PLC AI
position feed back

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS

MCC SWITCHGEAR - PLC IO DETIALS

11 KV INCOMERS & BUS COUPLER (11 KV BUS TIE)


LT-DG-LE130733-01- 11KV
1 VCB-I/C1-OP 11KV Incomer -1 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
11KV
2 VCB-I/C1-CL 11KV Incomer -1 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 11KV
3 VCB-I/C1-LR 11KV Incomer -1 - do - PLC DI Revised as per clause no.
Test/Service, Spring Charge Swgr
3.01.05, V.IIE/S-III : 59 & 60
11KV
4 VCB-I/C1-PO 11KV Incomer -1 CB Protection operated - do - PLC DI w.r.t. Incomer and Bus coupler,
Swgr
Bus tie, Bus PT of 11 kV switch
11KV gear
5 VCB-I/C1-DCF 11KV Incomer -1 DC Supply failed - do - PLC DI
Swgr
11KV
6 VCB-I/C1-UV 11KV Incomer -1 CB tripped due to Undervoltage - do - PLC DI
Swgr
11KV
7 VCB-I/C1-TCU 11KV Incomer -1 CB Trip Circuit Unhealthy - do - PLC DI
Swgr

9 VCB-I/C1-OP 11KV Incomer -1 CB Open Command - do - PLC 11 KV Swgr DO

10 VCB-I/C1-CL 11KV Incomer -1 CB Close Command - do - PLC 11 KV Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
11 VCB-I/C1-OP 11KV Incomer -1 CB Open Command - do - PLC 11 KV Swgr DO technical specifications.

12 VCB-I/C1-CL 11KV Incomer -1 CB Close Command - do - PLC 11 KV Swgr DO

LT-DG-LE130733-01- 11KV
13 VCB-I/C1-VT 11KV Incomer -1 R -Phase Voltage PLC AI 4-20mA
E402.REV.C (page 1 of 3) Swgr
11KV
14 VCB-I/C1-AT 11KV Incomer -1 R -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
15 VCB-I/C1-VT 11KV Incomer -1 Y -Phase Voltage - do - PLC AI 4-20mA
Swgr
Analog inputs from CT of each
11KV
16 VCB-I/C1-AT 11KV Incomer -1 Y -Phase Current - do - PLC AI 4-20mA phase & VT of each phase. As per
Swgr
the clause 3.01.05
11KV
17 VCB-I/C1-VT 11KV Incomer -1 B -Phase Voltage - do - PLC AI 4-20mA
Swgr
11KV
18 VCB-I/C1-AT 11KV Incomer -1 B -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
19 VCB-I/C1-WT 11KV Incomer -1 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
LT-DG-LE130733-01- 11KV
20 VCB-I/C2-OP 11KV Incomer -2 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
11KV
21 VCB-I/C2-CL 11KV Incomer -2 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 11KV
22 VCB-I/C2-LR 11KV Incomer -2 - do - PLC DI Revised as per clause no.
Test/Service, Spring Charge Swgr
3.01.05, V.IIE/S-III : 59 & 60
11KV
23 VCB-I/C2-PO 11KV Incomer -2 CB Protection Operated - do - PLC DI w.r.t. Incomer and Bus coupler,
Swgr
Bus tie, Bus PT of 11 kV switch
11KV gear
24 VCB-I/C2-DCF 11KV Incomer -2 CB DC Supply failed - do - PLC DI
Swgr
11KV
25 VCB-I/C2-UV 11KV Incomer -2 CB tripped due to Undervoltage - do - PLC DI
Swgr
11KV
26 VCB-I/C2-TCU 11KV Incomer -2 CB Trip Circuit Unhealthy - do - PLC DI
Swgr

28 VCB-I/C2-OP 11KV Incomer -2 VCB Incomer-2 Open Command - do - PLC 11 KV Swgr DO

29 VCB-I/C2-CL 11KV Incomer -2 VCB Incomer-2 Close Command - do - PLC 11 KV Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
30 VCB-I/C2-OP 11KV Incomer -2 VCB Incomer-2 Open Command - do - PLC 11 KV Swgr DO technical specifications.

31 VCB-I/C2-CL 11KV Incomer -2 VCB Incomer-2 Close Command - do - PLC 11 KV Swgr DO

LT-DG-LE130733-01- 11KV
32 VCB-I/C2-VT 11KV Incomer -2 R -Phase Voltage PLC AI 4-20mA
E402.REV.C (page 1 of 3) Swgr
11KV
33 VCB-I/C2-AT 11KV Incomer -2 R -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
34 VCB-I/C2-VT 11KV Incomer -2 Y -Phase Voltage - do - PLC AI 4-20mA
Swgr
Analog inputs from CT of each
11KV
35 VCB-I/C2-AT 11KV Incomer -2 Y -Phase Current - do - PLC AI 4-20mA phase & VT of each phase. As per
Swgr
the clause 3.01.05
11KV
36 VCB-I/C2-VT 11KV Incomer -2 B -Phase Voltage - do - PLC AI 4-20mA
Swgr
11KV
37 VCB-I/C2-AT 11KV Incomer -2 B -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
38 VCB-I/C2-WT 11KV Incomer -2 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
LT-DG-LE130733-01- 11KV
39 VCB-BC-OP 11KV Bus Coupler Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
11KV
40 VCB-BC-CL 11KV Bus Coupler Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 11KV
41 VCB-BC-LR 11KV Bus Coupler - do - PLC DI
Test/Service, Spring Charge Swgr
11KV
42 VCB-BC-PO 11KV Bus Coupler CB Protection Operated - do - PLC DI
Swgr
11KV Revised as per clause no.
43 VCB-BC-DCF 11KV Bus Coupler CB DC Supply failed - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Swgr
w.r.t. Incomer and Bus coupler,
CB Auto/Manual switch in 11KV Bus tie, Bus PT of 11 kV switch
44 VCB-BC-AM 11KV Bus Coupler - do - PLC DI
Manual Mode Swgr gear
11KV
45 VCB-BC-AF 11KV Bus Coupler CB Auto transfer failed - do - PLC DI
Swgr
11KV
46 VCB-BC-AI 11KV Bus Coupler CB Auto Transfer Inhibited - do - PLC DI
Swgr
11KV
47 VCB-BC-TCU 11KV Bus Coupler CB Trip Circuit Unhealthy - do - PLC DI
Swgr
11KV
48 VCB-BC-UV 11KV Bus Coupler CB tripped due to Undervoltage - do - PLC DI
Swgr

49 VCB-BC-OP 11KV Bus Coupler VCB Open Command - do - PLC 11 KV Swgr DO

50 VCB-BC-CL 11KV Bus Coupler VCB Close Command - do - PLC 11 KV Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
51 VCB-BC-OP 11KV Bus Coupler VCB Open Command - do - PLC 11 KV Swgr DO technical specifications.

52 VCB-BC-CL 11KV Bus Coupler VCB Close Command - do - PLC 11 KV Swgr DO

LT-DG-LE130733-01- 11KV
53 VCB-BC-VT 11KV Bus Coupler R -Phase Voltage PLC AI 4-20mA
E402.REV.C (page 1 of 3) Swgr
11KV
54 VCB-BC-AT 11KV Bus Coupler R -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
55 VCB-BC-VT 11KV Bus Coupler Y -Phase Voltage - do - PLC AI 4-20mA Analog inputs from CT of each
Swgr
phase & VT of each phase. As per
11KV the clause 3.01.05
56 VCB-BC-AT 11KV Bus Coupler Y -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
57 VCB-BC-VT 11KV Bus Coupler B -Phase Voltage - do - PLC AI 4-20mA
Swgr
11KV
58 VCB-BC-AT 11KV Bus Coupler B -Phase Current - do - PLC AI 4-20mA
Swgr
11KV Bus A -PT 11KV
59 11KV-BUSA-VT Bus PT transducer Output - do - PLC AI 4-20mA
Transducer Swgr
11KV
60 11KV-BUSA-TP 11KV Bus A MCB Bus MCB Trip - do - PLC DI
Swgr
11KV Analog inputs from each BUS PT
61 11KV-BUSA-UV 11KV Bus A MCB Bus Undervoltage Relay - do - PLC DI & since fuse fail not avail, Digital
Swgr
Input for MCB trip feedback as
RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST per clause 3.01.05 (d). Please
accept.
PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION Analog inputs from each BUS PT
INPUT/OUTPUT DETAILS & since fuse fail not avail, Digital
Input for MCB trip feedback as
11KV Bus B -PT 11KV per clause 3.01.05 (d). Please
62 11KV-BUSB-VT Bus PT transducer Output - do - PLC AI 4-20mA
Transducer Swgr accept.
11KV
63 11KV-BUSB-TP 11KV Bus A MCB Bus MCB Trip - do - PLC DI
Swgr
11KV
64 11KV-BUSB-UV 11KV Bus A MCB Bus Undervoltage Relay - do - PLC DI
Swgr
HT TRANSFORMER FEEDERS (11/3.3KV & 11/0.415KV)
LT-DG-LE130733-01- 11KV
1 VCB3-OP 11/3.3 KV AUX T/f -1 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
11KV
2 VCB3-CL 11/3.3 KV AUX T/f -1 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 11KV
3 VCB3-LR 11/3.3 KV AUX T/f -1 - do - PLC DI
Test/Service, Spring Charge Swgr
11KV Revised as per clause no.
4 VCB3-PO 11/3.3 KV AUX T/f -1 CB Protection operated - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Swgr
w.r.t. Incomer and Bus coupler,
11KV Bus tie, Bus PT of 11 kV switch
5 VCB3-DCF 11/3.3 KV AUX T/f -1 DC Supply failed - do - PLC DI
Swgr gear
11KV
6 VCB3-UV 11/3.3 KV AUX T/f -1 CB tripped due to Undervoltage - do - PLC DI
Swgr
11KV
7 VCB3-TCU 11/3.3 KV AUX T/f -1 CB Trip Circuit Unhealthy - do - PLC DI
Swgr
CB Restricted Earth Fault 11KV
8 VCB3-REF 11/3.3 KV AUX T/f -1 - do - PLC DI
operated Swgr

9 VCB3-OP 11/3.3 KV AUX T/f -1 CB Open Command - do - PLC 11 KV Swgr DO

10 VCB3-CL 11/3.3 KV AUX T/f -1 CB Close Command - do - PLC 11 KV Swgr DO

11KV
11 VCB3-AT 11/3.3 KV AUX T/f -1 R -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
12 VCB3-AT 11/3.3 KV AUX T/f -1 Y -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
13 VCB3-AT 11/3.3 KV AUX T/f -1 B -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
14 VCB3-WT 11/3.3 KV AUX T/f -1 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr
LT-DG-LE130733-01- 11KV
15 VCB4-OP 11/3.3 KV AUX T/f -2 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
11KV
16 VCB4-CL 11/3.3 KV AUX T/f -2 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 11KV
17 VCB4-LR 11/3.3 KV AUX T/f -2 - do - PLC DI
Test/Service, Spring Charge Swgr
11KV Revised as per clause no.
19 VCB4-PO 11/3.3 KV AUX T/f -2 CB Protection operated - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Swgr
w.r.t. Incomer and Bus coupler,
11KV Bus tie, Bus PT of 11 kV switch
20 VCB4-DCF 11/3.3 KV AUX T/f -2 DC Supply failed - do - PLC DI
Swgr gear

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014 Revised as per clause no.
SL INST /EQPT ALARM 3.01.05, V.IIE/S-III : 59 & 60
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION w.r.t. Incomer and Bus coupler,
Bus tie, Bus PT of 11 kV switch
INPUT/OUTPUT DETAILS
gear
11KV
21 VCB4-UV 11/3.3 KV AUX T/f -2 CB tripped due to Undervoltage - do - PLC DI
Swgr
11KV
22 VCB4-TCU 11/3.3 KV AUX T/f -2 CB Trip Circuit Unhealthy - do - PLC DI
Swgr
CB Restricted Earth Fault 11KV
23 VCB4-REF 11/3.3 KV AUX T/f -2 - do - PLC DI
operated Swgr

24 VCB4-OP 11/3.3 KV AUX T/f -2 CB Open Command - do - PLC 11 KV Swgr DO

25 VCB4-CL 11/3.3 KV AUX T/f -2 CB Close Command - do - PLC 11 KV Swgr DO

11KV
26 VCB4-AT 11/3.3 KV AUX T/f -2 R -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
27 VCB4-AT 11/3.3 KV AUX T/f -2 Y -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
28 VCB4-AT 11/3.3 KV AUX T/f -2 B -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
29 VCB4-WT 11/3.3 KV AUX T/f -2 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr
LT-DG-LE130733-01- 11KV
30 VCB2-OP 11/0.415 KV DIS T/f -1 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
11KV
31 VCB2-CL 11/0.415 KV DIS T/f -1 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 11KV
32 VCB2-LR 11/0.415 KV DIS T/f -1 - do - PLC DI
Test/Service, Spring Charge Swgr
11KV Revised as per clause no.
33 VCB2-PO 11/0.415 KV DIS T/f -1 CB Protection operated - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Swgr
w.r.t. Incomer and Bus coupler,
11KV Bus tie, Bus PT of 11 kV switch
34 VCB2-DCF 11/0.415 KV DIS T/f -1 DC Supply failed - do - PLC DI
Swgr gear
11KV
35 VCB2-UV 11/0.415 KV DIS T/f -1 CB tripped due to Undervoltage - do - PLC DI
Swgr
11KV
36 VCB2-TCU 11/0.415 KV DIS T/f -1 CB Trip Circuit Unhealthy - do - PLC DI
Swgr
CB Restricted Earth Fault 11KV
37 VCB2-REF 11/0.415 KV DIS T/f -1 - do - PLC DI
operated Swgr

38 VCB2-OP 11/0.415 KV DIS T/f -1 CB Open Command - do - PLC 11 KV Swgr DO

39 VCB2-CL 11/0.415 KV DIS T/f -1 CB Close Command - do - PLC 11 KV Swgr DO

11KV
40 VCB2-AT 11/0.415 KV DIS T/f -1 R -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
41 VCB2-AT 11/0.415 KV DIS T/f -1 Y -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
42 VCB2-AT 11/0.415 KV DIS T/f -1 B -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
43 VCB2-WT 11/0.415 KV DIS T/f -1 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
LT-DG-LE130733-01- 11KV
44 VCB5-OP 11/0.415 KV DIS T/f -2 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
11KV
45 VCB5-CL 11/0.415 KV DIS T/f -2 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 11KV
46 VCB5-LR 11/0.415 KV DIS T/f -2 - do - PLC DI
Test/Service, Spring Charge Swgr
11KV Revised as per clause no.
47 VCB5-PO 11/0.415 KV DIS T/f -2 CB Protection operated - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Swgr
w.r.t. Incomer and Bus coupler,
11KV Bus tie, Bus PT of 11 kV switch
48 VCB5-DCF 11/0.415 KV DIS T/f -2 DC Supply failed - do - PLC DI
Swgr gear
11KV
49 VCB5-UV 11/0.415 KV DIS T/f -2 CB tripped due to Undervoltage - do - PLC DI
Swgr
11KV
50 VCB5-TCU 11/0.415 KV DIS T/f -2 CB Trip Circuit Unhealthy - do - PLC DI
Swgr
CB Restricted Earth Fault 11KV
51 VCB5-REF 11/0.415 KV DIS T/f -2 - do - PLC DI
operated Swgr

52 VCB5-OP 11/0.415 KV DIS T/f -2 CB Open Command - do - PLC 11 KV Swgr DO

53 VCB5-CL 11/0.415 KV DIS T/f -2 CB Close Command - do - PLC 11 KV Swgr DO

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
11KV
54 VCB5-AT 11/0.415 KV DIS T/f -2 R -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
55 VCB5-AT 11/0.415 KV DIS T/f -2 Y -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
56 VCB5-AT 11/0.415 KV DIS T/f -2 B -Phase Current - do - PLC AI 4-20mA
Swgr
11KV
57 VCB5-WT 11/0.415 KV DIS T/f -2 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr

3.3 KV INCOMERS & BUS COUPLER (3.3 KV BUS TIE)

LT-DG-LE130733-01- 3.3KV
1 VCB-I/C1-OP 3.3KV Incomer -1 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
3.3KV
2 VCB-I/C1-CL 3.3KV Incomer -1 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 3.3KV
3 VCB-I/C1-LR 3.3KV Incomer -1 - do - PLC DI Revised as per clause no.
Test/Service, Spring Charge Swgr
3.01.05, V.IIE/S-III : 59 & 60
3.3KV
4 VCB-I/C1-PO 3.3KV Incomer -1 CB Protection operated - do - PLC DI w.r.t. Incomer and Bus coupler,
Swgr
Bus tie, Bus PT of 3.3 KV switch
3.3KV gear
5 VCB-I/C1-DCF 3.3KV Incomer -1 DC Supply failed - do - PLC DI
Swgr
3.3KV
6 VCB-I/C1-UV 3.3KV Incomer -1 CB tripped due to Undervoltage - do - PLC DI
Swgr
3.3KV
7 VCB-I/C1-TCU 3.3KV Incomer -1 CB Trip Circuit Unhealthy - do - PLC DI
Swgr

8 VCB-I/C1-OP 3.3KV Incomer -1 CB Open Command - do - PLC 3.3KV Swgr DO

9 VCB-I/C1-CL 3.3KV Incomer -1 CB Close Command - do - PLC 3.3KV Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
10 VCB-I/C1-OP 3.3KV Incomer -1 CB Open Command - do - PLC 3.3KV Swgr DO technical specifications.

11 VCB-I/C1-CL 3.3KV Incomer -1 CB Close Command - do - PLC 3.3KV Swgr DO

LT-DG-LE130733-01- 3.3KV
12 VCB-I/C1-VT 3.3KV Incomer -1 R -Phase Voltage PLC AI 4-20mA
E402.REV.C (page 1 of 3) Swgr
3.3KV
13 VCB-I/C1-AT 3.3KV Incomer -1 R -Phase Current - do - PLC AI 4-20mA
Swgr
3.3KV
14 VCB-I/C1-VT 3.3KV Incomer -1 Y -Phase Voltage - do - PLC AI 4-20mA
Swgr
Analog inputs from CT of each
3.3KV
15 VCB-I/C1-AT 3.3KV Incomer -1 Y -Phase Current - do - PLC AI 4-20mA phase & VT of each phase. As per
Swgr
the clause 3.01.05
3.3KV
16 VCB-I/C1-VT 3.3KV Incomer -1 B -Phase Voltage - do - PLC AI 4-20mA
Swgr
3.3KV
17 VCB-I/C1-AT 3.3KV Incomer -1 B -Phase Current - do - PLC AI 4-20mA
Swgr
3.3KV
18 VCB-I/C1-WT 3.3KV Incomer -1 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
LT-DG-LE130733-01- 3.3KV
19 VCB-I/C2-OP 3.3KV Incomer -2 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
3.3KV
20 VCB-I/C2-CL 3.3KV Incomer -2 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 3.3KV
21 VCB-I/C2-LR 3.3KV Incomer -2 - do - PLC DI Revised as per clause no.
Test/Service, Spring Charge Swgr
3.01.05, V.IIE/S-III : 59 & 60
3.3KV
22 VCB-I/C2-PO 3.3KV Incomer -2 CB Protection Operated - do - PLC DI w.r.t. Incomer and Bus coupler,
Swgr
Bus tie, Bus PT of 3.3 KV switch
3.3KV gear
23 VCB-I/C2-DCF 3.3KV Incomer -2 CB DC Supply failed - do - PLC DI
Swgr
3.3KV
24 VCB-I/C2-UV 3.3KV Incomer -2 CB tripped due to Undervoltage - do - PLC DI
Swgr
3.3KV
25 VCB-I/C2-TCU 3.3KV Incomer -2 CB Trip Circuit Unhealthy - do - PLC DI
Swgr

26 VCB-I/C2-OP 3.3KV Incomer -2 VCB Incomer-2 Open Command - do - PLC 3.3KV Swgr DO

27 VCB-I/C2-CL 3.3KV Incomer -2 VCB Incomer-2 Close Command - do - PLC 3.3KV Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
28 VCB-I/C2-OP 3.3KV Incomer -2 VCB Incomer-2 Open Command - do - PLC 3.3KV Swgr DO technical specifications.

29 VCB-I/C2-CL 3.3KV Incomer -2 VCB Incomer-2 Close Command - do - PLC 3.3KV Swgr DO

LT-DG-LE130733-01- 3.3KV
30 VCB-I/C2-VT 3.3KV Incomer -2 R -Phase Voltage PLC AI 4-20mA
E402.REV.C (page 1 of 3) Swgr
3.3KV
31 VCB-I/C2-AT 3.3KV Incomer -2 R -Phase Current - do - PLC AI 4-20mA
Swgr
3.3KV
32 VCB-I/C2-VT 3.3KV Incomer -2 Y -Phase Voltage - do - PLC AI 4-20mA
Swgr
Analog inputs from CT of each
3.3KV phase & VT of each phase. As per
33 VCB-I/C2-AT 3.3KV Incomer -2 Y -Phase Current - do - PLC AI 4-20mA
Swgr the clause 3.01.05
3.3KV
34 VCB-I/C2-VT 3.3KV Incomer -2 B -Phase Voltage - do - PLC AI 4-20mA
Swgr
3.3KV
35 VCB-I/C2-AT 3.3KV Incomer -2 B -Phase Current - do - PLC AI 4-20mA
Swgr
3.3KV
36 VCB-I/C2-WT 3.3KV Incomer -2 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
LT-DG-LE130733-01- 3.3KV
37 VCB-BC-OP 3.3KV Bus Coupler Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
3.3KV
38 VCB-BC-CL 3.3KV Bus Coupler Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 3.3KV
39 VCB-BC-LR 3.3KV Bus Coupler - do - PLC DI
Test/Service, Spring Charge Swgr
3.3KV
40 VCB-BC-PO 3.3KV Bus Coupler CB Protection Operated - do - PLC DI
Swgr
3.3KV Revised as per clause no.
41 VCB-BC-DCF 3.3KV Bus Coupler CB DC Supply failed - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Swgr
w.r.t. Incomer and Bus coupler,
CB Auto/Manual switch in 3.3KV Bus tie, Bus PT of 3.3KV switch
42 VCB-BC-AM 3.3KV Bus Coupler - do - PLC DI
Manual Mode Swgr gear
3.3KV
43 VCB-BC-AF 3.3KV Bus Coupler CB Auto transfer failed - do - PLC DI
Swgr
3.3KV
44 VCB-BC-AI 3.3KV Bus Coupler CB Auto Transfer Inhibited - do - PLC DI
Swgr
3.3KV
45 VCB-BC-TCU 3.3KV Bus Coupler CB Trip Circuit Unhealthy - do - PLC DI
Swgr
3.3KV
46 VCB-BC-TP 3.3KV Bus Coupler CB tripped due to Undervoltage - do - PLC DI
Swgr

47 VCB-BC-OP 3.3KV Bus Coupler VCB Open Command - do - PLC 3.3KV Swgr DO

48 VCB-BC-CL 3.3KV Bus Coupler VCB Close Command - do - PLC 3.3KV Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
49 VCB-BC-OP 3.3KV Bus Coupler VCB Open Command - do - PLC 3.3KV Swgr DO technical specifications.

50 VCB-BC-CL 3.3KV Bus Coupler VCB Close Command - do - PLC 3.3KV Swgr DO

LT-DG-LE130733-01- 3.3KV
51 VCB-BC-VT 3.3KV Bus Coupler R -Phase Voltage PLC AI 4-20mA
E402.REV.C (page 1 of 3) Swgr
3.3KV
52 VCB-BC-AT 3.3KV Bus Coupler R -Phase Current - do - PLC AI 4-20mA
Swgr
3.3KV
53 VCB-BC-VT 3.3KV Bus Coupler Y -Phase Voltage - do - PLC AI 4-20mA Analog inputs from CT of each
Swgr
phase & VT of each phase. As per
3.3KV the clause 3.01.05
54 VCB-BC-AT 3.3KV Bus Coupler Y -Phase Current - do - PLC AI 4-20mA
Swgr
3.3KV
55 VCB-BC-VT 3.3KV Bus Coupler B -Phase Voltage - do - PLC AI 4-20mA
Swgr
3.3KV
56 VCB-BC-AT 3.3KV Bus Coupler B -Phase Current - do - PLC AI 4-20mA
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
3.3KV
57 3.3KV-BUSA-VT 3.3KV Bus A -PT Bus PT transducer Output - do - PLC AI 4-20mA
Swgr
3.3KV
58 3.3KV-BUSA-TP 3.3KV Bus A MCB Bus MCB Trip - do - PLC DI
Swgr
3.3KV Analog inputs from each BUS PT
59 3.3KV-BUSA-UV 3.3KV Bus A MCB Bus Undervoltage Relay - do - PLC DI & since fuse fail not avail, Digital
Swgr
Input for MCB trip feedback as
3.3KV per clause 3.01.05 (d). Please
60 3.3KV-BUSB-VT 3.3KV Bus B -PT Bus PT transducer Output - do - PLC AI 4-20mA
Swgr accept.
3.3KV
61 3.3KV-BUSB-TP 3.3KV Bus A MCB Bus MCB Trip - do - PLC DI
Swgr
3.3KV
62 3.3KV-BUSA-UV 3.3KV Bus A MCB Bus Undervoltage Relay - do - PLC DI
Swgr

MOTOR FEEDERS ON 3.3 KV BUS

LT-DG-LE130733-01- 3.3KV
1 VCB1-OP 3.3KV Motor Feeder-1 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 2 of 3) Swgr
3.3KV
2 VCB1-CL 3.3KV Motor Feeder-1 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 3.3KV Revised as per clause no.
3 VCB1-LR 3.3KV Motor Feeder-1 - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Test/Service, Spring Charge Swgr
w.r.t. Incomer and Bus coupler,
3.3KV Bus tie, Bus PT of 3.3KV switch
4 VCB1-PO 3.3KV Motor Feeder-1 CB Protection operated - do - PLC DI
Swgr gear
3.3KV
5 VCB1-DCF 3.3KV Motor Feeder-1 CB DC Supply failed - do - PLC DI
Swgr
3.3KV
6 VCB1-UV 3.3KV Motor Feeder-1 CB tripped due to Undervoltage - do - PLC DI
Swgr

7 VCB1-OP 3.3KV Motor Feeder-1 VT Pump- 1 Start Command - do - PLC 3.3KV Swgr DO
DIGITAL OUTPUTS
8 VCB1-CL 3.3KV Motor Feeder-1 VT Pump- 1 Stop Command - do - PLC 3.3KV Swgr DO

3.3KV
9 VCB1-AT 3.3KV Motor Feeder-1 R -Phase Current - do - PLC AI 4-20mA
Swgr Load current on each phase as
3.3KV per Clause no. 3.01.05(e), V.IIE/S-
10 VCB1-AT 3.3KV Motor Feeder-1 Y -Phase Current - do - PLC AI 4-20mA
Swgr III : 60 w.r.t. 3.3 KV Motor
3.3KV Feeders.
11 VCB1-AT 3.3KV Motor Feeder-1 B -Phase Current - do - PLC AI 4-20mA
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
LT-DG-LE130733-01- 3.3KV
12 VCB2-OP 3.3KV Motor Feeder-2 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 2 of 3) Swgr
3.3KV
13 VCB2-CL 3.3KV Motor Feeder-2 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 3.3KV Revised as per clause no.
14 VCB2-LR 3.3KV Motor Feeder-2 - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Test/Service, Spring Charge Swgr
w.r.t. Incomer and Bus coupler,
3.3KV Bus tie, Bus PT of 11 kV switch
15 VCB2-PO 3.3KV Motor Feeder-2 CB Protection operated - do - PLC DI
Swgr gear
3.3KV
16 VCB2-DCF 3.3KV Motor Feeder-2 CB DC Supply failed - do - PLC DI
Swgr
3.3KV
17 VCB2-UV 3.3KV Motor Feeder-2 CB tripped due to Undervoltage - do - PLC DI
Swgr

18 VCB2-ST 3.3KV Motor Feeder-2 VT Pump- 2 Start Command - do - PLC 3.3KV Swgr DO
DIGITAL OUTPUTS
19 VCB2-SP 3.3KV Motor Feeder-2 VT Pump- 2 Stop Command - do - PLC 3.3KV Swgr DO

3.3KV
20 VCB2-AT 3.3KV Motor Feeder-2 R -Phase Current - do - PLC AI 4-20mA
Swgr Load current on each phase as
3.3KV per Clause no. 3.01.05(e), V.IIE/S-
21 VCB2-AT 3.3KV Motor Feeder-2 Y -Phase Current - do - PLC AI 4-20mA
Swgr III : 60 w.r.t. 3.3 KV Motor
3.3KV Feeders.
22 VCB2-AT 3.3KV Motor Feeder-2 B -Phase Current - do - PLC AI 4-20mA
Swgr
LT-DG-LE130733-01- 3.3KV
23 VCB3-OP 3.3KV Motor Feeder-3 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 2 of 3) Swgr
3.3KV
24 VCB3-CL 3.3KV Motor Feeder-3 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 3.3KV Revised as per clause no.
25 VCB3-LR 3.3KV Motor Feeder-3 - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Test/Service, Spring Charge Swgr
w.r.t. Incomer and Bus coupler,
3.3KV Bus tie, Bus PT of 11 kV switch
26 VCB3-PO 3.3KV Motor Feeder-3 CB Protection operated - do - PLC DI
Swgr gear
3.3KV
27 VCB3-DCF 3.3KV Motor Feeder-3 CB DC Supply failed - do - PLC DI
Swgr
3.3KV
28 VCB3-UV 3.3KV Motor Feeder-3 CB tripped due to Undervoltage - do - PLC DI
Swgr

29 VCB3-ST 3.3KV Motor Feeder-3 VT Pump- 3 Start Command - do - PLC 3.3KV Swgr DO
DIGITAL OUTPUTS
30 VCB3-SP 3.3KV Motor Feeder-3 VT Pump- 3 Stop Command - do - PLC 3.3KV Swgr DO

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
3.3KV
31 VCB3-AT 3.3KV Motor Feeder-3 R -Phase Current - do - PLC AI 4-20mA
Swgr Load current on each phase as
3.3KV per Clause no. 3.01.05(e), V.IIE/S-
32 VCB3-AT 3.3KV Motor Feeder-3 Y -Phase Current - do - PLC AI 4-20mA
Swgr III : 60 w.r.t. 3.3 KV Motor
3.3KV Feeders.
33 VCB3-AT 3.3KV Motor Feeder-3 B -Phase Current - do - PLC AI 4-20mA
Swgr

415V INCOMERS & BUS COUPLER (415V BUS TIE)

LT-DG-LE130733-01- 415V
1 ACB-I/C1-OP 415V Incomer -1 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 3 of 3) Swgr
415V
2 ACB-I/C1-CL 415V Incomer -1 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 415V
3 ACB-I/C1-LR 415V Incomer -1 - do - PLC DI Revised as per clause no.
Test/Service, Spring Charge Swgr
3.01.05, V.IIE/S-III : 59 & 60
415V
5 ACB-I/C1-PO 415V Incomer -1 CB Protection operated - do - PLC DI w.r.t. Incomer and Bus coupler,
Swgr
Bus tie, Bus PT of 415V switch
415V gear
6 ACB-I/C1-DCF 415V Incomer -1 DC Supply failed - do - PLC DI
Swgr
415V
7 ACB-I/C1-UV 415V Incomer -1 CB tripped due to Undervoltage - do - PLC DI
Swgr
415V
8 ACB-I/C1-TCU 415V Incomer -1 CB Trip Circuit Unhealthy - do - PLC DI
Swgr

10 ACB-I/C1-OP 415V Incomer -1 CB Open Command - do - PLC 415V Swgr DO

11 ACB-I/C1-CL 415V Incomer -1 CB Close Command - do - PLC 415V Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
12 ACB-I/C1-OP 415V Incomer -1 CB Open Command - do - PLC 415V Swgr DO technical specifications.

13 ACB-I/C1-CL 415V Incomer -1 CB Close Command - do - PLC 415V Swgr DO

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
LT-DG-LE130733-01- 415V
14 ACB-I/C1-VT 415V Incomer -1 R -Phase Voltage PLC AI 4-20mA
E402.REV.C (page 3 of 3) Swgr
415V
15 ACB-I/C1-AT 415V Incomer -1 R -Phase Current - do - PLC AI 4-20mA
Swgr
415V
16 ACB-I/C1-VT 415V Incomer -1 Y -Phase Voltage - do - PLC AI 4-20mA
Swgr
Analog inputs from CT of each
415V
17 ACB-I/C1-AT 415V Incomer -1 Y -Phase Current - do - PLC AI 4-20mA phase & VT of each phase. As per
Swgr
the clause 3.01.05
415V
18 ACB-I/C1-VT 415V Incomer -1 B -Phase Voltage - do - PLC AI 4-20mA
Swgr
415V
19 ACB-I/C1-AT 415V Incomer -1 B -Phase Current - do - PLC AI 4-20mA
Swgr
415V
20 ACB-I/C1-WT 415V Incomer -1 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr
LT-DG-LE130733-01- 415V
21 ACB-I/C2-OP 415V Incomer -2 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 3 of 3) Swgr
415V
22 ACB-I/C2-CL 415V Incomer -2 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 415V
23 ACB-I/C2-LR 415V Incomer -2 - do - PLC DI Revised as per clause no.
Test/Service, Spring Charge Swgr
3.01.05, V.IIE/S-III : 59 & 60
415V
25 ACB-I/C2-PO 415V Incomer -2 CB Protection Operated - do - PLC DI w.r.t. Incomer and Bus coupler,
Swgr
Bus tie, Bus PT of 415V switch
415V gear
26 ACB-I/C2-DCF 415V Incomer -2 CB DC Supply failed - do - PLC DI
Swgr
415V
27 ACB-I/C2-UV 415V Incomer -2 CB tripped due to Undervoltage - do - PLC DI
Swgr
415V
28 ACB-I/C2-TCU 415V Incomer -2 CB Trip Circuit Unhealthy - do - PLC DI
Swgr

30 ACB-I/C2-OP 415V Incomer -2 VCB Incomer-2 Open Command - do - PLC 415V Swgr DO

31 ACB-I/C2-CL 415V Incomer -2 VCB Incomer-2 Close Command - do - PLC 415V Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
32 ACB-I/C2-OP 415V Incomer -2 VCB Incomer-2 Open Command - do - PLC 415V Swgr DO technical specifications.

33 ACB-I/C2-CL 415V Incomer -2 VCB Incomer-2 Close Command - do - PLC 415V Swgr DO

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS
LT-DG-LE130733-01- 415V
34 ACB-I/C2-VT 415V Incomer -2 R -Phase Voltage PLC AI 4-20mA
E402.REV.C (page 3 of 3) Swgr
415V
35 ACB-I/C2-AT 415V Incomer -2 R -Phase Current - do - PLC AI 4-20mA
Swgr
415V
36 ACB-I/C2-VT 415V Incomer -2 Y -Phase Voltage - do - PLC AI 4-20mA
Swgr
Analog inputs from CT of each
415V
37 ACB-I/C2-AT 415V Incomer -2 Y -Phase Current - do - PLC AI 4-20mA phase & VT of each phase. As per
Swgr
the clause 3.01.05
415V
38 ACB-I/C2-VT 415V Incomer -2 B -Phase Voltage - do - PLC AI 4-20mA
Swgr
415V
39 ACB-I/C2-AT 415V Incomer -2 B -Phase Current - do - PLC AI 4-20mA
Swgr
415V
40 ACB-I/C2-WT 415V Incomer -2 Watt Trasducer Input - do - PLC AI 4-20mA
Swgr
LT-DG-LE130733-01- 415V
41 ACB-BC-OP 415V Bus Coupler Circuit Breaker Open feedback PLC DI
E402.REV.C (page 3 of 3) Swgr
415V
42 ACB-BC-CL 415V Bus Coupler Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 415V
43 ACB-BC-LR 415V Bus Coupler - do - PLC DI
Test/Service, Spring Charge Swgr
415V
45 ACB-BC-PO 415V Bus Coupler CB Protection Operated - do - PLC DI
Swgr
415V Revised as per clause no.
46 ACB-BC-DCF 415V Bus Coupler CB DC Supply failed - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Swgr
w.r.t. Incomer and Bus coupler,
CB Auto/Manual switch in 415V Bus tie, Bus PT of 11 kV switch
47 ACB-BC-AM 415V Bus Coupler - do - PLC DI
Manual Mode Swgr gear
415V
48 ACB-BC-AF 415V Bus Coupler CB Auto transfer failed - do - PLC DI
Swgr
415V
49 ACB-BC-AI 415V Bus Coupler CB Auto Transfer Inhibited - do - PLC DI
Swgr
415V
50 ACB-BC-TCU 415V Bus Coupler CB Trip Circuit Unhealthy - do - PLC DI
Swgr
415V
51 ACB-BC-UV 415V Bus Coupler CB tripped due to Undervoltage - do - PLC DI
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS

52 ACB-BC-OP 415V Bus Coupler VCB Open Command - do - PLC 415V Swgr DO

53 ACB-BC-CL 415V Bus Coupler VCB Close Command - do - PLC 415V Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
54 ACB-BC-OP 415V Bus Coupler VCB Open Command - do - PLC 415V Swgr DO technical specifications.

55 ACB-BC-CL 415V Bus Coupler VCB Close Command - do - PLC 415V Swgr DO

LT-DG-LE130733-01- 415V
56 ACB-BC-VT 415V Bus Coupler R -Phase Voltage PLC AI 4-20mA
E402.REV.C (page 3 of 3) Swgr
415V
57 ACB-BC-AT 415V Bus Coupler R -Phase Current - do - PLC AI 4-20mA
Swgr
415V
58 ACB-BC-VT 415V Bus Coupler Y -Phase Voltage - do - PLC AI 4-20mA Analog inputs from CT of each
Swgr
phase & VT of each phase. As per
415V the clause 3.01.05
59 ACB-BC-AT 415V Bus Coupler Y -Phase Current - do - PLC AI 4-20mA
Swgr
415V
60 ACB-BC-VT 415V Bus Coupler B -Phase Voltage - do - PLC AI 4-20mA
Swgr
415V
61 ACB-BC-AT 415V Bus Coupler B -Phase Current - do - PLC AI 4-20mA
Swgr
415V Bus A -PT 415V
62 415V-BUSA Bus PT transducer Output - do - PLC AI 4-20mA
Transducer Swgr
415V
63 415V-BUSA 415V Bus A MCB Bus MCB Trip - do - PLC DI
Swgr
415V Analog inputs from each BUS PT
64 415V-BUSA 415V Bus A MCB Bus Undervoltage Relay - do - PLC DI & since fuse fail not avail, Digital
Swgr
input for MCB trip feedback as
415V Bus B -PT 415V per clause 3.01.05 (d). Please
65 415V-BUSB Bus PT transducer Output - do - PLC AI 4-20mA
Transducer Swgr accept.
415V
66 415V-BUSB 415V Bus A MCB Bus MCB Trip - do - PLC DI
Swgr
415V
67 415V-BUSA 415V Bus A MCB Bus Undervoltage Relay - do - PLC DI
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS

MAIN LIGHTING DISTRIBUTION BOARD

LT-DG-LE130733-01- 415V
1 ACB-I/C1-OP MLDB Incomer -1 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
415V
2 ACB-I/C1-CL MLDB Incomer -1 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 415V Revised as per clause no.
3 ACB-I/C1-L/R MLDB Incomer -1 - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Test/Service, Spring Charge Swgr
w.r.t. Incomer and Bus coupler,
415V Bus tie, Bus PT of 11 kV switch
4 ACB-I/C1-DCF MLDB Incomer -1 DC Supply failed - do - PLC DI
Swgr gear
415V
5 ACB-I/C1-TCU MLDB Incomer -1 CB Trip Circuit Unhealthy - do - PLC DI
Swgr
415V
6 ACB-I/C1-PO MLDB Incomer -1 CB Protection Operated - do - PLC DI
Swgr

7 ACB-I/C1-OP MLDB Incomer -1 CB Open Command - do - PLC 415V Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
8 ACB-I/C1-CL MLDB Incomer -1 CB Close Command - do - PLC 415V Swgr DO technical specifications.

415V
9 ACB-I/C1-AT MLDB Incomer -1 AT Current Feedback - do - PLC AI Revised
Swgr
LT-DG-LE130733-01- 415V
10 ACB-I/C2-OP MLDB Incomer -2 Circuit Breaker Open feedback PLC DI
E402.REV.C (page 1 of 3) Swgr
415V
11 ACB-I/C2-CL MLDB Incomer -2 Circuit Breaker Close feedback - do - PLC DI
Swgr
CB in Local/Remote, 415V Revised as per clause no.
12 ACB-I/C2-L/R MLDB Incomer -2 - do - PLC DI 3.01.05, V.IIE/S-III : 59 & 60
Test/Service, Spring Charge Swgr
w.r.t. Incomer and Bus coupler,
415V Bus tie, Bus PT of 11 kV switch
13 ACB-I/C2-DCF MLDB Incomer -2 CB DC Supply failed - do - PLC DI
Swgr gear
415V
14 ACB-I/C2-PO MLDB Incomer -2 CB Protection Operated - do - PLC DI
Swgr
415V
15 ACB-I/C2-TCU MLDB Incomer -2 CB Trip Circuit Unhealthy - do - PLC DI
Swgr

16 ACB-I/C2-OP MLDB Incomer -2 ACB Incomer-2 Open Command - do - PLC 415V Swgr DO Redundant Digital Output as per
Clause 8.01.01 (iv) Contract
17 ACB-I/C2-CL MLDB Incomer -2 ACB Incomer-2 Close Command - do - PLC 415V Swgr DO technical specifications.

415V
18 ACB-I/C2-AT MLDB Incomer -2 AT Current Feedback - do - PLC AI Revised
Swgr

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS

DCDB CHARGER

LT-DG-LE130733-01-
1 DCDB-CHG1-FLT DCDB CHARGER -1 Float Charger Fault (AC Supply) DCDB PLC DI
E485. REV.C (page 1 of 1)
Float Cum Boost Charger Fault
2 DCDB-CHG1-FLT DCDB CHARGER -1 - do - DCDB PLC DI
(DC Supply)

3 DCDB-CHG1-FLT DCDB CHARGER -1 Charger Common Fault - do - DCDB PLC DI

4 DCDB-CHG2-FLT DCDB CHARGER -2 Float Charger Fault (AC Supply) - do - DCDB PLC DI

Float Cum Boost Charger Fault


5 DCDB-CHG2-FLT DCDB CHARGER -2 - do - DCDB PLC DI
(DC Supply)

6 DCDB-CHG2-FLT DCDB CHARGER -2 Charger Common Fault - do - DCDB PLC DI

AUXILARY & DISTRIBUTION TRANSFORMERS (11/3.3KV & 11/0.415KV)

1 HT-TRF1-OL 11/3.3 KV/HT TRF -1 Oil Temperature Alarm AUX TRF PLC DI

2 HT-TRF1-OL 11/3.3 KV/HT TRF -1 Oil Temperature Trip - do - AUX TRF PLC DI

3 HT-TRF1-WDG 11/3.3 KV/HT TRF -1 Winding Temperature Alarm - do - AUX TRF PLC DI

4 HT-TRF1-WDG 11/3.3 KV/HT TRF -1 Winding Temperature Trip - do - AUX TRF PLC DI

5 HT-TRF1-BUC 11/3.3 KV/HT TRF -1 Buchholz Alarm - do - AUX TRF PLC DI

6 HT-TRF1-BUC 11/3.3 KV/HT TRF -1 Buchholz Trip - do - AUX TRF PLC DI

7 HT-TRF1-PRV 11/3.3 KV/HT TRF -1 PRV Trip - do - AUX TRF PLC DI

8 HT-TRF1-MOG 11/3.3 KV/HT TRF -1 MOG Oil Level Low Alarm - do - AUX TRF PLC DI

9 HT-TRF2-OL 11/3.3 KV/HT TRF -1 Oil Temperature - do - AUX TRF PLC AI

10 HT-TRF2-WDG 11/3.3 KV/HT TRF -1 Winding Temperature - do - AUX TRF PLC AI

11 HT-TRF2-OL 11/3.3 KV/HT TRF -2 Oil Temperature Alarm - do - AUX TRF PLC DI

12 HT-TRF2-OL 11/3.3 KV/HT TRF -2 Oil Temperature Trip - do - AUX TRF PLC DI

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS

13 HT-TRF2-WDG 11/3.3 KV/HT TRF -2 Winding Temperature Alarm - do - AUX TRF PLC DI

14 HT-TRF2-WDG 11/3.3 KV/HT TRF -2 Winding Temperature Trip - do - AUX TRF PLC DI

15 HT-TRF2-BUC 11/3.3 KV/HT TRF -2 Buchholz Alarm - do - AUX TRF PLC DI

16 HT-TRF2-BUC 11/3.3 KV/HT TRF -2 Buchholz Trip - do - AUX TRF PLC DI

17 HT-TRF2-PRV 11/3.3 KV/HT TRF -2 PRV Trip - do - AUX TRF PLC DI

18 HT-TRF2-MOG 11/3.3 KV/HT TRF -2 MOG Oil Level Low Alarm - do - AUX TRF PLC DI

19 HT-TRF2-OL 11/3.3 KV/HT TRF -2 Oil Temperature - do - AUX TRF PLC AI

20 HT-TRF2-WDG 11/3.3 KV/HT TRF -2 Winding Temperature - do - AUX TRF PLC AI

21 LT-TRF1-WD-AL 11/0.415 KV/HT TRF -1 Widning Temperature High Alarm MCC PLC DI

22 HT-TRF1-WD-TP 11/0.415 KV/HT TRF -1 Winding Temperature High Trip - do - MCC PLC DI

DIST
23 LT-TRF1-WDG 11/0.415 KV/HT TRF -1 Widning Temperature - do - PLC AI
TRF

24 LT-TRF2-WD-AL 11/0.415 KV/HT TRF -2 Widning Temperature High Alarm - do - MCC PLC DI

25 HT-TRF2-WD-TP 11/0.415 KV/HT TRF -2 Winding Temperature High Trip - do - MCC PLC DI

DIST
26 LT-TRF1-WDG 11/0.415 KV/HT TRF -2 Widning Temperature - do - PLC AI
TRF

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST


PROJECT :SAGARDIGHI THERMAL POWER PROJECT , UNIT 3 & 4 (2x500 MW) PHASE-II PLANT WATER
LTCD-WET-EDRC-C&I
SYSTEM(SGPWS-2)
LARSEN & TOUBRO LTD
PREPARED BY : RSK
CLIENT: WEST BENGAL POWER DEVELOPMENT CORPORATION LIMITED
CHECKED BY : SK
REVISION NO: F
DOC NO :LT-DC-LE130733-1-CI-503 DOCUMENT NAME: INPUT/OUTPUT LIST-INTAKE PUMPHOUSE
DATE: 17/09/2014
SL INST /EQPT ALARM
INST / EQPT DESCRIPTION SERVICE DESCRIPTION REF. P&ID NO/ SLD NO SOURCE DESTINATION TYPE OF I/O TRIP REMARKS
NO TAG NO. INDICATION
INPUT/OUTPUT DETAILS

LIST OF LEGENDS

PLC- PROGRAMMABLE MOTORISED BUTTERFLY 11 KV


PLC MBFV 11KV SWITCHGEAR
LOGIC CONTROLLER VALVE Swgr
HYDRAULIC OPERATED 3.3KV
I/O INPUT/OUTPUT HOPV 3.3KV SWITCHGEAR
VALVE Swgr
MOTOR CONTROL 415V
DI DIGITAL INPUT MCC 415V SWITCHGEAR
CENTER Swgr
VERTICAL TURBINE
DO DIGITAL OUTPUT VT PT VOLTAGE TRANSDUCER
PUMP

AI ANALOG INPUT T/F TRANSFORMER AT CURRENT TRANSDUCER

RADAR LEVEL DIRECT CURRENT


RLT DCDB ACB AIR CIRCUIT BREAKER
TRANSMITTER DISTRIBUTION BOX
ULTRASONIC FLOW PRESSURE
UFT PT VCB VACCUM CIRCUIT BREAKER
TRANSMITTER TRANSMITTER

RIVER WATER INTAKE PUMP HOUSE INPUT OUTPUT LIST