Local Media3069143240818893861
Local Media3069143240818893861
JUL-AMRI E, IBRAHIM
JUNE 2022
i
ACCEPTANCE PAGE
An OJT Narrative Report prepared and submitted by Jul-Amri Eleca Ibrahim
in partial fulfillment of the requirements for the degree of Bachelor of Science in
Hospitality Management is hereby accepted.
__________________ __________________
Date Signed Date Signed
______________________________
Date Signed
___________________________
Date Signed
ii
BIOGRAPHICAL SKETCH
Jul-amri Eleca Ibrahim was born on May 13, 1998 in Mapun Tawi -
Tawi. He was the second among the three children of Mrs. Alnata
Muhammad Eleca and Mr. Nan Adjula Ibrahim. He is currently living in
Barangay Buki Mapun Tawi-Tawi.
iii
ACKNOWLEDGMENT
iv
TABLE OF CONTENTS
TITLE PAGE i
ACCEPTANCE PAGE ii
BIOGRAPHICAL SKETCH iii
ACKNOWLEDGEMENT iv
TABLE OF CONTENTS v-vi
WPU VISION vii
WPU MISSION
CBM GOALS
BSHM PROGRAM OBJECTIVES viii
OBJECTIVES OF OJT viiii
CHAPTER PAGE
I INTRODUCTION 1
Background of the Establishment 2
Products and Services 3
Amenities 4
Facilities 5-6
Mission 7
Vision 8
v
APPENDICES
vi
WESTERN PHILIPPINES UNIVERSITY VISION 2020
Western Philippines University: The leading knowledge center for sustainable
development of West Philippines and beyond.
3. To equip students with knowledge and skills who aimed to seek employment and
assume entry level jobs in the areas of Food and Beverage, Front Office and
Housekeeping Operations.
vii
BSHM PROGRAM OBJECTIVES
viii
ON-THE-JOB TRAINING PROGRAM OBJECTIVES
General Objectives
Specific Objectives
viii
CHAPTER I
INTRODUCTION
1
BACKGROUND OF THE BUILDING
Finnigan hall John Henry this is to inform you that upon final inspection of
the Above-Mentioned contract by WPU inspectorate team the same was found to be
satisfactorily completed in accordance with approved plans and specifications.
During the one 1 Year defects liability period it is your obligation and
responsibility to undertake the repair works at your own expense of any damage to
the project on account of the use of materials equipment of inferior quality within
ninety (90) days form the time this office has issued an order to undertake repair
failure to comply the aforesaid obligation and responsibility the provisions of
sections 62.2 and 62.2.1 of IRR of RA 9184 shall be imposed.
Be issued food that final acceptance of the project shall be issued to you after
the lapse of one (1) year Defects liability period and upon putting up warranty
security.
2
PRODUCT AND SERVICES OFFERED
Registrar Office
Office of the Student Services (OSS)
Library
University store
Infirmary
Individually controlled air-conditioning unit
Computer Training Institute (CTI)
room accommodation
free food for the guest
3
AMENITIES
4
FACILITIES
Function room.
5
Guest room – 12 rooms, individually controlled air-conditioning system, warm
shower,
6
FINIGAN HALL MISSION
WPU commits to develop quality human resources and green technologies for a
dynamic economy and sustainable development through relevant instruction,
research and extension services.
7
FINIGAN HALL VISION
The leading knowledge center for sustainable development of west Philippines and
beyond.
8
CHAPTER II
Summary of Learning’s/Experiences
The trainee was able to do the following tasks for this week:
. We just cleaned the floor and ceiling and walls of the room
The first time we went on duty, we didn't have any guests, we just cleaned
the hallway of the hotel and mop, when we finished the finnigan, we hid
in the rooms, swept and fixed the curtains.
Food safety
Can learned through observations
Ability to listen to experts
Ability to accept criticism
Multitasking
Learn to adopt
After the guests ate, we immediately cleaned up and immediately washed all the food
so that we could organize it so that we could prepare the next activity which also in
the kitchen department decided to wash the dishes which is the work that is assigned
to them and it is easy on him because he is expert on dish washing. After we washed
the dishes, we immediately took a mop and cleaned the floor and after we did our
rule we rested for a while so that each of us could rest.
The trainee was able to do the following tasks for this week:
Before the HM accreditors started, we prepared to clean up all the finnigan and
hometel areas and we also trimmed the flowers and we removed the grass around the
Finnigan hall. And in preparing the guest's drinking water we should properly
handle the stem so that it is pleasant, and I also learned the proper process of
drinking water it should be on the right side of the guests and we found out that
before performing any service we must first get the guest’s attention to avoid
unnecessary things while serving the guest and to make the service flow smooth.
Week 5: may 24 - 2022
The trainee was able to do the following tasks for this week:
10
CHAPTER III
11
SIGNIFICANT ACCOMPLISHMENT
The trainee help him to improve his self confidence, and importance of time
management.
He know how to handle and use proper equipment inside of different facilities.
He know how to communicate with confidence in a front of their guest.
The ojts gained new learned and knowledge such as wine presentation that
was new to them.
He develops his interpersonal skills
He knows the proper way of serving food the proper sequence of food service
He now builds his self-esteem in communicating with others
After my on-the-job training on May 31 2022 I learned a lot in the method of
food preparation but also in engaging in discussion and in understanding his
character as a person and his personality and preferences and right That he is
with the guest house, finnigan, hometel. The important lesson that I have
learned especially in the field of Bachelor of Science and hospitality
management is to have a good attitude, and many others that I can use in
future work and be a part of others.
12
PROBLEMS ENCOUNTERED AND SOLUTIONS DONE
The first problem the trainee encountered was closed-circuit television or CCTV.
A second problem on the front office side is that it does not have materials
such as sanitizer, face mask, and thermometer used to prevent the spread of
covid-19 disease and to prevent contamination of guess, faculty and trainees.
A third problem in the kitchen part is that many utensils are lacking such
as plates, glasses, spoons, forks, water dispensers, soaps, cookware and lack of a
table when there is an occasion that guesses and trainees really need.
Four other problems on the part of this CR are clogged, lack of facilities,
overflow and limited dish washing and tissue only.
Fifth problem in this part of the room is the broken bed, lack of bed sheets,
pillows, blankets, curtains and weak air con.
The sixth problem with this front door is that it lacks the lock which requires
a double lock for safety first of all.
13
RECOMMENDATIONS
Continue to create, produce and develop more powerful, competitive, skilled and
talented.
14
APPENDICES
MAIN, CAMPUS
KITCHEN DEPARTMENT
15
HOUSEKEEPING DEPARTMENT
16
WAIVER
17
PARENT CONSENT
18
CERTIFICATE OF COMPLETION
19
PICTURES AND PHOTOGRAPH WITH CAPTION
KITCHEN DEPARTMENT
While the trainee was busy washing all the kitchen equipment, all the
dishes.
20
HOUSEKEEPING DEPARTMENT
21
The Trainee While Sweeping the Hometel Hallway
22
FUNCTION ROOM
While he was busy in his tasks and during some of his free time
23
Preparation for the HM accreditors
24
The trainee while Doing Table skirting
25
swiping in front yard off Finnigan hall
26
During the trainee’s free time and out at the end of their daily duty
27
Ttutorial of sir Ommar Palao
28
PHOTO COPY OF DTR
29
JUL-AMRI E. IBRAHIM
E-mail: [email protected]
OBJECTIVE
PERSONAL SKILL
Driving
Technical Drafting
Cooking
PERSONAL INFORMATION
Age: 24
Citizenship: Filipino
Height: 5’6
Weight: 65 Klgs.
Religion: Islam
Occupation: Farmer
Occupation: Housewife
30
EDUCATIONAL BACKGROUND
SY:2021-2022
Course: HUMSS
SY: 2017-2018
SY: 2015-2016
SY: 2012-2012
SIMINAR ATTENDED
WORK EXPERIENCE
OJT
Dieser
Salesboy
Bagger
Striker
31
CHARACTER REFERENCES
I hereby that the above information is true correct to the best my knowledge and belief.
JUL-AMRI E. IBRAHIM
Applicant
32