Corrosion loop
Corrosion loop development of oil development
and gas piping system based on
machine learning and group
technology method
Andika Rachman and R.M. Chandima Ratnayake Received 2 July 2018
Revised 16 January 2019
Department of Mechanical and Structural Engineering and Materials Science, Accepted 12 August 2019
University of Stavanger – UiS, Stavanger, Norway
Abstract
Purpose – Corrosion loop development is an integral part of the risk-based inspection (RBI) methodology.
The corrosion loop approach allows a group of piping to be analyzed simultaneously, thus reducing non-value
adding activities by eliminating repetitive degradation mechanism assessment for piping with similar
operational and design characteristics. However, the development of the corrosion loop requires rigorous
process that involves a considerable amount of engineering man-hours. Moreover, corrosion loop
development process is a type of knowledge-intensive work that involves engineering judgement and
intuition, causing the output to have high variability. The purpose of this paper is to reduce the amount of
time and output variability of corrosion loop development process by utilizing machine learning and group
technology method.
Design/methodology/approach – To achieve the research objectives, k-means clustering and
non-hierarchical classification model are utilized to construct an algorithm that allows automation and a
more effective and efficient corrosion loop development process. A case study is provided to demonstrate the
functionality and performance of the corrosion loop development algorithm on an actual piping data set.
Findings – The results show that corrosion loops generated by the algorithm have lower variability and
higher coherence than corrosion loops produced by manual work. Additionally, the utilization of the
algorithm simplifies the corrosion loop development workflow, which potentially reduces the amount of time
required to complete the development. The application of corrosion loop development algorithm is expected to
generate a “leaner” overall RBI assessment process.
Research limitations/implications – Although the algorithm allows a part of corrosion loop development
workflow to be automated, it is still deemed as necessary to allow the incorporation of the engineer’s
expertise, experience and intuition into the algorithm outputs in order to capture tacit knowledge and refine
insights generated by the algorithm intelligence.
Practical implications – This study shows that the advancement of Big Data analytics and artificial
intelligence can promote the substitution of machines for human labors to conduct highly complex tasks
requiring high qualifications and cognitive skills, including inspection and maintenance management area.
Originality/value – This paper discusses the novel way of developing a corrosion loop. The development of
corrosion loop is an integral part of the RBI methodology, but it has less attention among scholars in
inspection and maintenance-related subjects.
Keywords Inspection, k-means, Machine learning, Risk-based inspection, Risk assessment,
Asset integrity management, Lean maintenance, Predictive maintenance, Piping system, Corrosion loop
Paper type Research paper
1. Introduction
Equipment used in oil and gas production and processing system is exposed to various
degradation mechanisms (e.g. corrosion, cracking, fatigue, erosion, etc.). Consequently, their
technical integrity degrades during their operational lifetime. The inability to control
degradation mechanisms may cause failure (e.g. leakages, ruptures, bursts, etc.) that yields
significant impact on the personnel, environment and financial of the organization (Singh
and Pokhrel, 2018). Regular inspection is normally performed to understand the current Journal of Quality in Maintenance
Engineering
operational conditions of the equipment. By understanding the equipment current © Emerald Publishing Limited
1355-2511
conditions, any circumstances that pose significant hazards to the technical integrity of the DOI 10.1108/JQME-07-2018-0058
JQME assets can be mitigated by carrying out the necessary maintenance, modification or
replacement (Ratnayake, 2015; Vinod et al., 2014). However, comprehensive inspection for all
equipment in the system is not financially feasible due to the high cost of performing
inspection. Prescriptive/time-based inspection used to be the industry standard for
developing the inspection plan for individual equipment (Schröder and Kauer, 2004).
In recent years, prescriptive inspection planning has been replaced by risk-based inspection
(RBI) planning, which emphasizes on inspecting equipment that possesses the most risk to
the system (Shishesaz et al., 2013).
One of integral parts of RBI assessment is corrosion loop development (Chang et al.,
2005). The corrosion loop approach enables a systematic simplification of degradation
mechanism analysis in the RBI assessment, by grouping a set of piping and equipment with
similar operational and design characteristics. This approach allows a group of piping and
equipment to be analyzed simultaneously, thus reducing non-value adding activities by
eliminating repetitive degradation mechanism assessment for piping and equipment with
similar operational and design characteristics. However, the process of developing corrosion
loop itself is laborious and has repetitive nature. Furthermore, corrosion loop development
process is a knowledge-intensive work that has high output variability because it implicates
engineers’ judgement and intuition. This variation can cause underinspection of higher-risk
equipment and overinspection of lower-risk equipment (Geary, 2002), and threaten the
overall integrity of the system.
The advancement of Big Data analytics and artificial intelligence facilitates the
substitution of machines for human labors to conduct highly complex tasks requiring
high qualifications and cognitive skills (Brynjolfsson and McAfee, 2011, 2014). The
potential productivity enhancement and the reduction of knowledge workers costs
offered by autonomous information processing tasks and can produce stimulus
that accelerate “machine-for-human” replacement (Loebbecke and Picot, 2015).
Productivity improvement is achieved, in the sense that machine intelligence evidently
has considerably more processing and computational capabilities and scalability than
human labors, thus accelerating the completion of tasks and reducing lead time (Frey and
Osborne, 2017; Ekbia et al., 2015). Furthermore, the computer algorithm is considered to be
less susceptible to human biases (Frey and Osborne, 2017) and less error-prone than
humans (Acemoglu and Autor, 2011), which can be the determinants for improving the
quality of knowledge-intensive works.
Based on the above argument, this paper aims to develop a computer algorithm, based
on k-means clustering and non-hierarchical classification method, to reduce the lead time
and the output variability inherent in the corrosion loop development process. k-means
clustering is a type of unsupervised machine learning algorithm to divide n data
points into k clusters so that each data point belongs to the cluster that has the closest
distance with the data point. Meanwhile, non-hierarchical classification model comes from
a manufacturing concept called group technology, which is intended to analyze and to
arrange parts spectrum and the relevant manufacturing process according to the
design and machining similarity so that a basis of groups and families can be established
for rationalizing the production process (Shunk, 1985). k-means clustering and
non-hierarchical classification model are selected because they solve problems that
resemble corrosion loop development process, i.e. to cluster a set of piping with similar
degradation mechanisms into the same group. The integration of k-means clustering and
non-hierarchical classification model is expected to allow a more effective and efficient
corrosion loop development process and generate a “leaner” overall RBI assessment
process. To demonstrate the functionality and performance of the algorithm, a case study
of corrosion loop development for the piping system of an offshore petroleum production
and processing platform is provided.
The remainder of this paper is structured as follow. Section 2 provides an overview of Corrosion loop
RBI and corrosion loop concept. Section 3 elaborates the elements that construct the development
corrosion loop development algorithm. k-means clustering and non-hierarchical
classification model are briefly reviewed in this section. In Section 4, a case study is
provided to demonstrate the functionality and performance of the corrosion loop
development algorithm on an actual piping data set. Comparison between the output
(i.e. corrosion loop) generated by the corrosion development algorithm and human
intelligence (i.e. manual work) is performed to examine the impact of applying the algorithm
on the output variability. Additionally, process modeling is performed to examine the
impact of algorithm integration in the typical corrosion loop development process, by
comparing the process before and after the algorithm integration. Section 5 gives the results
and discussion corresponding to the case study. Section 6 concludes the paper.
Consequence of
failure assessment
Data and
Inspection plan and
information Risk ranking
mitigation (if any)
collection
Probability of
failure assessment
Reassessment
Figure 1.
RBI methodology
Source: API (2016)
JQME performing RBI assessment because assessing degradation mechanism for every individual
piping in the entire production system entails a significant number of man-hours and costs
to complete. The corrosion loop approach enables a systematic simplification of degradation
mechanism assessment by grouping a set of piping with similar operational and design
characteristics (Mohammed et al., 2017). This approach allows a group of piping to be
analyzed simultaneously, thus reducing non-value adding activities by eliminating
repetitive degradation mechanism assessment for piping and equipment with similar
operational and design characteristics. It reduces the magnitude of RBI assessment by
simplifying the identification of credible damage mechanisms and ensuring the applied
inspection techniques are suitable with the corresponding damage mechanisms and piping
metallurgy (Matthews et al., 2014).
In practice, various terms are used for this approach, e.g. corrosion loop, corrosion circuit,
piping group, piping circuit, etc. No consensus regarding the definition and distinction of
each term has been made and they are often used interchangeably. In this paper, the term
corrosion loop is used and defined as a group of piping that has similar operational and
design characteristics, and thus undergo similar degradation mechanisms and rates.
The essential key in implementing corrosion loop is defining the boundary features
(i.e. the features that are used to separate piping into different corrosion loops), which are
referred to distinguish one corrosion loop with the others. A detailed explanation about
boundary features is given in Section 3.2. In practice, each organization may have a different
set of boundary features for developing corrosion loops. Boundary features normally
include the operational and design characteristics of piping that influence the occurrence
and rate of particular degradation mechanisms, such as:
• process conditions, e.g. temperature and/or pressure changes, fluid type and phase
transition, removal/addition of fluid constituents, etc.;
• piping materials of construction;
• piping external condition, e.g. the presence of piping insulation and coating; and
• process units’ battery limits.
In practice, engineers develop corrosion loops manually by referring to particular guidelines
and documentations that exhibit information regarding piping design and operational
characteristics. Additional premises based on engineering judgement and experience are
normally added during the corrosion loop development process. For instance, it is common for
RBI/corrosion engineers to assume that non-hydrocarbon containing units (e.g. firewater
system, air compressor system, corrosion inhibitor injection system, etc.) are less susceptible
to corrosion, i.e. significant difference in operating pressure and temperature of piping in these
units would not affect the type of damage mechanisms and degradation rate of the piping.
This causes the engineers to loosen the boundary requirements, such as grouping a set of
piping into the same corrosion loop even though their operating pressure and temperature are
considerably different. This type of assumption reflects engineers’ unique interpretation
regarding the degradation mechanisms and rates similarity of certain piping, which is the
basic premise to develop a corrosion loop. As each person has different knowledge and
experience, and a unique mental model to approach the essence of a corrosion loop, the
outputs of the corrosion loops development process are uncertain and highly varied. Even the
same engineer can make different assumption for different piping and corrosion loops.
Consequently, it is challenging to determine whether particular outputs are satisfactory or not,
which makes the establishment of benchmarks for evaluating corrosion loop development
process outcomes to be challenging (Alvesson, 1993). Furthermore, due to the involvement of
engineering knowledge, judgement and experience, corrosion loop development can be
considered as a knowledge-intensive work (Drucker, 1999).
Corrosion loop is normally visualized by marking a process flow diagram (PFD) or a Corrosion loop
process and instrumentation diagram with different colors, with each color representing a development
corrosion loop. An example of PFD marking to visualize corrosion loops in a gas lift
compressor system in an offshore production system is shown in Figure 2.
A typical corrosion loop development workflow is shown in Figure 3. It can be inferred
that corrosion loop development process is inherently a clustering problem with repetitive
nature because the workflow has to be performed repeatedly for all the piping in the RBI
CL-5
Op. Cond.: 45 barg/50°C
Fluid: Gas Lift
Material: SS316L
Ext. Cond.: Uninsulated
Figure 2.
1st Stage Gas Lift
Compressor Suction
An example of PFD
Scrubber marking to visualize
CL-3
Op. Cond.: 20 barg/39°C
corrosion loops in a
Fluid: Condensate
Material: SS316L
gas lift compressor
Ext. Cond.: Uninsulated To HP
Flare Header
system
Start
End the process
all of the piping in
the RBI assessment
scope have been
analyzed Review and refer to Review and refer to
End line list PIDs/PFDs
Analye individual
piping tag
Start analyzing
Is there a change in Yes new piping tag
Start new corrosion Mark the piping tag
the external
loop on PIDs/PFDs
condition?
No
Maintain corrosion
loop of the
Is there a change in Yes adjacent
operating pressure/ piping/equipment
temperature?
No
Figure 3.
Note: The shaded part of the workflow is replaced and performed by the algorithm based on A typical corrosion
loop development
k-means clustering and non-hierarchical classification model workflow
Source: Adapted from Mohammed et al. (2017)
JQME assessment scope (see the shaded area of Figure 3). Clustering can be defined as the task of
classifying a set of objects by comparing the similarity between objects based on multiple
variables. In the case of corrosion loop development, the objects are the piping and the
variables are the boundary features. The aim of this paper is to create an algorithm based on
k-means clustering and non-hierarchical classification model to automate the corrosion
loop development process. The algorithm will replace the shaded part of the workflow
shown in Figure 3.
3. Algorithm development
This section discusses the elements that construct the corrosion loop development
algorithm. This section comprises of three main parts. The first part (Section 3.1) provides
an overview of key methods that construct the corrosion loop development algorithm
(i.e. non-hierarchical classification model and k-means clustering). The second part
(Section 3.2) discusses the concept of boundary feature and requirement, which are the
foundational features of the algorithm to cluster a set of individual piping into corrosion
loops. The third part (Section 3.3) discusses the corrosion loop development algorithm and
its corresponding pseudocode.
X1, 1
X2, j
Xn, 1 (X1, i–m, X2, j–m, ..., Xn–1, k–m, Xn, l)
X1, i
X2, j
Xn, 1 (X1, i , X2, j , ..., Xn–1, k, Xn, 1)
Figure 4.
An illustration of
Xn–1, k piping classification
based on
Xn, l (X1, i , X2, j , ..., Xn–1, k, Xn, 1)
non-hierarchical
classification model
Feature 1 Feature 2 Feature n–1 Feature n Group name
other clusters (Žalik, 2008). The term “similar”, in a clustering problem, means proximate by
a defined similarity measure (Khan and Ahmad, 2004). Clustering analysis is commonly
used in areas such as pattern recognition, data mining, information retrieval and knowledge
discovery (Kanungo et al., 2002).
Clustering task has an exploratory nature that reveals structure in data ( Jain, 2010).
Moreover, clustering is inherently a subjective matter that requires interpretation using
particular domain knowledge. Among machine learning clustering techniques, k-means is the
most widely used for clustering purpose due to its simplicity and efficiency (Huang et al., 2005;
Žalik, 2008). The objective of k-means clustering is to partition a set of n data points in
m-dimensional space into k distinct clusters. In k-means clustering, each cluster is represented
by a centroid or cluster center, and the distance between the centroids and the data points are
computed. Then, the data points are assigned to the cluster that has the closest cluster center.
Let X ¼ {xi|i ¼ 1, 2, …, n} be a set of n data points and B ¼ {bj|j ¼ 1, 2, …, k} be a set of k
cluster centers with each bj containing nj data points, 0onj on, the k-means algorithm aims
to minimize the following function (Žalik, 2008; Khan and Ahmad, 2004):
k X
X
Cost ¼ distðxt ; bj ; (1)
j¼1 xt A Bj
where xt represents the member of cluster Bj with bj as the cluster center. The cluster centers are
computed and learned by performing the following steps (Žalik, 2008; Khan and Ahmad, 2004):
(1) Initialize k cluster centers b1, b2, …, bk using random sampling.
(2) Determine the membership of each data point xi in one of the clusters by finding the
nearest cluster center.
(3) Compute the new cluster centers bj as:
P
xt A Bj xt
bj ¼ ; (2)
Bj
where |Bj| is the number of data points that are the members of the jth cluster.
JQME (4) Iterate step 2 and 3 until all centers converge, i.e. no change in all cluster centers values.
In general, k-means clustering entails three user-specified parameters ( Jain, 2010):
(1) Number of clusters: k-means clustering requires the number of clusters k to be
pre-determined. This situation creates a major challenge as the initial estimation of k
requires a priori knowledge regarding the data. Performing a number of clustering
attempts with varied value of k is a way to find the most appropriate value of k for a
particular data set (Wagstaff et al., 2001);
(2) Cluster initialization: k-means clustering starts with locating cluster centers arbitrarily.
Consequently, different cluster initialization may lead to different clustering because
k-means only converges to local minima ( Jain, 2010). The downside of this method is
the sensitivity of the algorithm outputs to the initial positions of the cluster centers.
To overcome this, numerous runs of k-means clustering are conducted to achieve the
optimal clusters, i.e. clusters that achieve the lowest cost function value (Likas et al.,
2003; Jain, 2010);
(3) Distance metric: As referred in the cost function (Equation 1), k-means clustering
requires the distance metric dist(xt, bj) to be specified. The sum of squared of
Euclidean distance between each cluster center bj and data point xt is commonly
used as the distance metric (Likas et al., 2003):
2
distðxt ; bj ¼ :xt bj : : (3)
This metric is also commonly known as inertia, a measure of how internally coherent the
clusters are (Pedregosa et al., 2011). Consequently, the clusters typically have spherical
shape, which makes k-means clustering poor in handling clusters with irregular shapes
( Jain, 2010).
where:
8
< 0 if qðkhÞ ¼ qðkhÞ
d qðkht Þ ; qðkhz Þ ¼
t z
; (5)
: 1 if qðkhÞ aqðkhÞ
t z
To ensure all elements of a corrosion loop to have identical categorical features values, dj
shall be equal to 0.
3.2.2 Boundary requirements for numerical boundary features. Let K ¼ {ki|i ¼ 1, 2, …, n}
be the total set of n piping tag in the facility, P ¼ {p(g)|g ¼ 1, 2, …, v} be a set of v numerical
boundary features, pðkgt Þ be the value of gth numerical boundary feature for a single piping
tag kt ∈ Cj, thus:
n o n o
DP ðCgjÞ ¼ max pðkgt Þ 9kt A C j min pðkgt Þ 9kt A C j ; (6)
where DP ðCgjÞ is the difference between maximum and minimum value of the gth numerical
boundary feature of a set of piping, which are members of the jth corrosion loop (Cj). The
boundary requirement for numerical boundary features in Cj is defined, such that:
C j ¼ kt 9kt A C j 3 DP ðC1jÞ oað1Þ 4 DP ðC2jÞ oað2Þ 4. . .4 DP ðCvjÞ o aðvÞ ; (7)
JQME where a(1), a(2) , …, a(v) is the boundary requirement values for the corresponding numerical
boundary features p(1), p(2) , …, p(v). Let A ¼ {a(g)|g ¼ 1, 2, …, v} be a set of boundary
requirement values corresponding to P, A is defined such that it is consistent for all
corrosion loops.
4. Case study
A case study is provided to demonstrate the functionality and performance of the corrosion
loop development algorithm on an actual piping data set. In this case study, a MacBook Pro
(16GB 2133 MHz LPDDR3 memory, 2.8 GHz Intel Core i7 processor, 256 GB of flash storage,
and macOS 10.14 as the operating system) with Python 3.7 (with the necessary packages such
as NumPy, Pandas and Scikit-learn (Pedregosa et al., 2011)) and Jupyter Notebook are used to
implement the corrosion loop development algorithm and input the data set into the algorithm.
The construction of the algorithm is described in Section 3.3. A piping data set of an offshore
petroleum production and processing platform is used in this case study. The detailed
description of the data set is given in Section 4.1. The selection of boundary features and
requirements for the algorithm is given in Section 4.2. In order to evaluate the ability of the
corrosion loop development algorithm to perform its intended function, a set of indices are
constructed as described in Section 4.3.
Figure 5. Legend
The main process of Oil
the offshore petroleum Gas
production and From oil/gas Oil-gas To oil
processing platform storage Oil-gas mixture
wells separation unit
Boundary
feature Type Boundary requirement
Fluid type Categorical Piping within a corrosion loop shall have identical fluid type
Fluid phase Categorical Piping within a corrosion loop shall have identical fluid phase
Process unit Categorical Piping within a corrosion loop shall have identical process unit
Material of Categorical Piping within a corrosion loop shall have identical material of construction
construction
Table I. Insulation type Categorical Piping within a corrosion loop shall have identical insulation type
Boundary features Coating type Categorical Piping within a corrosion loop shall have identical coating type
and their boundary Operating Numerical The difference of operating pressure between piping within the same
requirement and value pressure corrosion loop shall not exceed 1barg
type for corrosion loop Operating Numerical The difference of operating temperature between piping within the same
development temperature corrosion loop shall not exceed 10 °C
both operating pressure and temperature. If operating pressure is described as p(1) and Corrosion loop
operating temperature is described as p(2), the boundary requirement for numerical development
boundary feature is defined, such that:
C j ¼ kt 9kt A C j 3 DP ðC1jÞ o 1 barg 4 DP ðC2jÞ o101C : (8)
In other words, the difference of operating pressure and temperature between piping within
the same corrosion loop shall not exceed 1 barg and 10 °C, respectively. The limit values of
1barg and 10 °C are set based on expert knowledge. Thus, it is assumed that if the difference
of operating pressure and temperature between a set of piping is 1 barg and 10 °C,
respectively, the damage mechanisms and rate of these piping is approximately similar,
given the other boundary features are the same for this set of piping.
It should be noted that the aforementioned boundary features and requirements are
specific for this case study as they are derived from a project documentation of a certain
facility. In reality, they may differ between organizations as there is still no consensus
regarding on how to develop corrosion loops and what boundary features and requirements
to be included.
The data set is considered as raw data as it still contains incomplete, inconsistent and
contains many errors. Therefore, data preprocessing is required to transform the data set
into readable and understandable format by the algorithm and to ensure that the data
are prepared for further processing (Han et al., 2011). The following data preprocessing
is performed:
• remove all features that do not contribute to corrosion loop development process;
• remove all piping tags that have incomplete values in the features included in
corrosion loop development process; and
• format the data into the appropriate data type to resolve inconsistencies.
After data preprocessing, the line list document contains 4,510 piping tags with eight
features, which correspond to the boundary features listed in Table I.
If VICat ¼ 0, then all corrosion loops fulfill the categorical boundary requirement.
(2) Numerical boundary requirement verification index: if operating pressure
is described as p(1) and operating temperature is described as p(2), and DP ðC1jÞ and
DP ðC2jÞ are the difference between maximum and minimum value of operating
pressure and temperature of a set of piping members of jth corrosion loop,
respectively, as defined in Section 3.2.2; thus, the verification index for operating
pressure and temperature is described as follows:
n o
V I ðN1Þum ¼ max DP ðC1jÞ 9j ¼ 1; 2; . . .; m ; (10)
n o
V I ðNum
2Þ
¼ max DP ðC2jÞ 9j ¼ 1; 2; . . .; m : (11)
If V I ðN1Þum o1barg and V I ðN2Þum o10 °C, then the model satisfies all numerical boundary
requirements stated in the previous section.
4.3.2 Coherency and variability index. Besides verifying the ability of the algorithm to
meet the boundary requirements of each boundary feature, it is important to understand the
capability of the algorithm to create highly coherence and low variability corrosion loops.
To achieve that, coherency and variability index is defined. Before defining the index, the
concept of inertia is introduced. Let R ¼ {r(s)|s ¼ 1, 2, …, w} be a set of all corrosion loop
boundary features (i.e. R ¼ Q∪P), the inertia of corrosion loop Cj is described as follows:
w
X X 2
Ij ¼ r ðkst Þ mrCðjsÞ ; (12)
kt A C j s¼1
where r ðsÞ
kt is the value of the sth boundary feature of piping kt, where kt is a member of
ðsÞ
corrosion loop Cj, and mrC j is the average value of the sth boundary feature of all piping
members of Cj. In other words, the inertia of a corrosion loop Ij is the sum of squared of the
Euclidean distance between each boundary feature value and the corresponding average
boundary feature value in a particular corrosion loop. Thus, the average inertia (μI) for a set
of corrosion loops C ¼ {Cj|j ¼ 1, 2, …, m} is described as follows:
Pm
j¼1 I j
mI ¼ ; (13)
m
where Ij is the inertia of the jth corrosion loop and m is the total number of corrosion loops.
μI is set as the index to determine the coherency and variability in the corrosion loops. Corrosion loop
Lower μI value indicates higher coherency and lower variability between piping within a development
corrosion loop, i.e. the members of the corrosion loop have higher similarity among each
other. As the computation μI involves the calculation and Euclidean distance and Euclidean
distance requires all features to be numerical, thus all categorical values are converted into
binary numbers. For instance, if the coating type feature has two values, which are coated
and uncoated, the feature will be divided into two features: coating type coated and coating
type uncoated with 1 and 0 being the possible values for each feature. If a piping is coated,
then it has 1 as the value for feature coating type coated and 0 for feature coating type
uncoated. Additionally, as the range of values between boundary features varies, it is
necessary to standardize boundary features values to create equal comparison and
contribution on the μI value. Standardized feature is rescaled by removing its mean and
scaling to its variance, thus it will have the properties of a standard normal distribution with
μ ¼ 0 and σ ¼ 1.
There is a need to compare μI to the corrosion loops generated by the algorithm and μI to
the corrosion loops generated by the manual work in order to understand whether the
algorithm can produce corrosion loops with higher coherency and lower coherency than
corrosion loops generated by the manual work. The data set used in this case study contains
corrosion loop information for each piping, which was generated by manual work. These
data are used for comparative analysis. To establish an equal comparison, the evaluation of
μI value is made when the algorithm and the manual work achieve the same total number of
corrosion loops.
4.3.3 Process modeling. Process modeling is performed to examine the impact of
algorithm integration to the corrosion loop development process by comparing process
before and after the algorithm implementation. The flow chart technique is used to represent
the sequence of work in the corrosion loop development process. A flow chart is selected
because it is flexible, easy to communicate and can provide a high level of detail of the
process being examined (Aguilar-Saven, 2004).
Table III.
Coherency and
variability index
comparisons between Number of corrosion
corrosion loops Method loops μI
generated by the
algorithm and Algorithm 256 0.39
manual work Manual work 256 26.6
Figure 6.
Corrosion loop
Mark PIDs/PFDs development workflow
Modify corrosion Review marked based algorithm after the utilization of
loop (if necessary) PIDs/PFDs outputs the algorithm
JQME 6. Conclusion and practical implications
This paper aims to reduce the amount of time and output variability of corrosion loop
development process by utilizing k-means clustering and non-hierarchical classification
method. An algorithm is constructed based on these two techniques. Python and Jupyter
Notebook are used as the tools for constructing the algorithm. A case study from the
corrosion loop development of an offshore petroleum production and processing platform is
provided to demonstrate the approach. Verification is performed to ensure that the
algorithm can produce outputs that fulfill the pre-defined conditions stated in the task
guideline. The outputs generated by the algorithm and manual work (i.e. work performed by
the engineer) are compared. It is evident that the algorithm is able to produce outputs with
lower variability than the manual work. A workflow analysis is conducted to examine the
changes in the workflow of a corrosion loops development after the implementation of
the algorithm. The inclusion of the algorithm into the workflow enables the simplification of
the overall corrosion loop development process by giving away the repetitive part to be
performed by the algorithm. The algorithm also allows more convenient modifications and
revisions if there are any changes regarding the corrosion loop boundary requirements.
Overall, the algorithm based on k-means clustering and non-hierarchical classification
model has the potential to generate a “leaner” corrosion loop development process by
reducing the required engineering man-hours and outputs variability. Although the
algorithm allows a part of corrosion loop development workflow to be automated, it is still
deemed as necessary to allow the incorporation of engineer’s expertise, experience and
intuition into the algorithm outputs in order to capture tacit knowledge and to refine
insights generated by the algorithm intelligence.
References
Acemoglu, D. and Autor, D. (2011), “Skills, tasks and technologies: implications for employment and
earnings”, Handbook of Labor Economics, Vol. 4, pp. 1043-1171.
Aguilar-Saven, R.S. (2004), “Business process modelling: review and framework”, International Journal
of Production Economics, Vol. 90 No. 2, pp. 129-149.
Alvesson, M. (1993), “Organizations as rhetoric: knowledge-intensive firms and the struggle with
ambiguity”, Journal of Management Studies, Vol. 30, pp. 997-1015.
API (2011), API Recommended Practice 571: Damage Mechanisms Affecting Fixed Equipment in the
Refining Industry, 2nd ed., API.
API (2016), Risk-Based Inspection: API Recommended Practice 580, 3rd ed., API, Washington, DC.
Billo, R.E. and Bidanda, B. (1995), “Representing group technology classification and coding techniques
with object oriented modeling principles”, IIE Transactions, Vol. 27 No. 4, pp. 542-554.
Bortolotti, T. and Romano, P. (2012), “ ‘Lean first, then automate’: a framework for process
improvement in pure service companies: a case study”, Production Planning & Control, Vol. 23
No. 7, pp. 513-522.
Browning, T.R., Fricke, E. and Negele, H. (2006), “Key concepts in modeling product development
processes”, Systems Engineering, Vol. 9 No. 2, pp. 104-128.
Brynjolfsson, E. and McAfee, A. (2011), Race Against the Machine: How the Digital Revolution is
Accelerating Innovation, Driving Productivity, and Irreversibly Transforming Employment and
the Economy, Digital Frontier Press, Lexington.
Brynjolfsson, E. and McAfee, A. (2014), The Second Machine Age: Work, Progress, and Prosperity in a
Time of Brilliant Technologies, W. W. Norton & Company, New York, NY.
Chang, M.-K., Chang, R.-R., Shu, C.-M. and Lin, K.-N. (2005), “Application of risk based inspection
in refinery and processing piping”, Journal of Loss Prevention in the Process Industries, Vol. 18
Nos 4-6, pp. 397-402.
Drucker, P. (1999), “Knowledge-worker productivity: the biggest challenge”, California Management Corrosion loop
Review, Vol. 41 No. 2, pp. 79-94. development
Ekbia, H., Mattioli, M., Kouper, I., Arave, G., Ghazinejad, A., Bowman, T., Suri, V.R., Tsou, A.,
Weingart, S. and Sugimoto, C.R. (2015), “Big Data, bigger dilemmas: a critical review”, Journal of
the Association for Information Science and Technology, Vol. 66 No. 8, pp. 1523-1545.
Frey, C.B. and Osborne, M.A. (2017), “The future of employment: how susceptible are jobs to
computerisation?”, Technological Forecasting and Social Change, Vol. 114, pp. 254-280.
Geary, W. (2002), Risk Based Inspection: A Case Study Evaluation of Offshore Process Plant, Health and
Safety Laboratory, Sheffield.
Günther, W.A., Rezazade Mehrizi, M.H., Huysman, M. and Feldberg, F. (2017), “Debating Big Data: a
literature review on realizing value from Big Data”, The Journal of Strategic Information
Systems, Vol. 26 No. 3, pp. 191-209.
Han, J., Pei, J. and Kamber, M. (2011), Data Mining: Concepts and Techniques, Elsevier,
San Francisco, CA.
Hartshorn, S. (2015), “Hypothesis testing: a visual introduction to statistical significance”.
Hendriks, P.H. and Vriens, D.J. (1999), “Knowledge-based systems and knowledge management: friends
or foes?”, Information & Management, Vol. 35 No. 2, pp. 113-125.
Huang, J.Z., Ng, M.K., Rong, H. and Li, Z. (2005), “Automated variable weighting in k-means
type clustering”, IEEE Transactions on Pattern Analysis and Machine Intelligence, Vol. 27 No. 5,
pp. 657-668.
Huang, Z. (1998), “Extensions to the k-means algorithm for clustering large data sets with categorical
values”, Data Mining and Knowledge Discovery, Vol. 2 No. 3, pp. 283-304.
Jain, A.K. (2010), “Data clustering: 50 years beyond k-means”, Pattern Recognition Letters, Vol. 31 No. 8,
pp. 651-666.
Kanungo, T., Mount, D.M., Netanyahu, N.S., Piatko, C.D., Silverman, R. and Wu, A.Y. (2002), “An
efficient k-means clustering algorithm: analysis and implementation”, IEEE Transactions on
Pattern Analysis and Machine Intelligence, Vol. 24 No. 7, pp. 881-892.
Khan, S.S. and Ahmad, A. (2004), “Cluster center initialization algorithm for k-means clustering”,
Pattern Recognition Letters, Vol. 25 No. 11, pp. 1293-1302.
Knight, W. (1998), Group Technology, Concurrent Engineering and Design for Manufacture and
Assembly, Group Technology and Cellular Manufacturing, Springer, pp. 15-36.
Likas, A., Vlassis, N. and Verbeek, J.J. (2003), “The global k-means clustering algorithm”, Pattern
Recognition, Vol. 36 No. 2, pp. 451-461.
Loebbecke, C. and Picot, A. (2015), “Reflections on societal and business model transformation arising
from digitization and Big Data analytics: a research agenda”, The Journal of Strategic
Information Systems, Vol. 24 No. 3, pp. 149-157.
Matthews, S., Al Jaberi, M.S. and Mundyath, D. (2014), “Risk based inspection implementation for
upstream offshore operator: case study”, Abu Dhabi International Petroleum Exhibition and
Conference, Society of Petroleum Engineers, Abu Dhabi.
Mohammed, M., Farah, M.M. and Abdi Adus, W. (2017), Corrosion Looping for Down Stream Petroleum
Plants: An Enigma for RBI Engineers, A Perspective from the Review of Mechanical Integrity
Systems, CORROSION 2017, NACE International, New Orleans, LA.
Pedregosa, F., Varoquaux, G., Gramfort, A., Michel, V., Thirion, B., Grisel, O., Blondel, M.,
Prettenhofer, P., Weiss, R. and Dubourg, V. (2011), “Scikit-learn: machine learning in python”,
Journal of Machine Learning Research, Vol. 12, pp. 2825-2830.
Ralambondrainy, H. (1995), “A conceptual version of the k-means algorithm”, Pattern Recognition
Letters, Vol. 16 No. 11, pp. 1147-1157.
Ratnayake, R.M.C. (2015), “Mechanization of static mechanical systems inspection planning process”,
Journal of Quality in Maintenance Engineering, Vol. 21 No. 2, pp. 227-248.
JQME Schröder, H.-C. and Kauer, R. (2004), “Regulatory requirements related to risk-based inspection and
maintenance”, International Journal of Pressure Vessels and Piping, Vol. 81, pp. 847-854.
Sharma, R., Mithas, S. and Kankanhalli, A. (2014), “Transforming decision-making processes: a
research agenda for understanding the impact of business analytics on organisations”,
European Journal of Information Systems, Vol. 23 No. 4, pp. 433-441.
Shishesaz, M.R., Nazarnezhad Bajestani, M., Hashemi, S.J. and Shekari, E. (2013), “Comparison of
API 510 pressure vessels inspection planning with API 581 risk-based inspection planning
approaches”, International Journal of Pressure Vessels and Piping, Vol. 111-112,
November–December, pp. 202-208.
Shollo, A. and Galliers, R.D. (2016), “Towards an understanding of the role of business intelligence
systems in organisational knowing”, Information Systems Journal, Vol. 26 No. 4, pp. 339-367.
Shunk, D.L. (1985), “Group technology provides organized approach to realizing benefits of CIMS”,
Industrial Engineering, 4th ed., Vol. 17, pp. 74-76, 78.
Singh, M. and Pokhrel, M. (2018), “A fuzzy logic-possibilistic methodology for risk-based inspection
(RBI) planning of oil and gas piping subjected to microbiologically influenced corrosion (MIC)”,
International Journal of Pressure Vessels and Piping, Vol. 159, January, pp. 45-54.
Spear, S. and Bowen, H.K. (1999), “Decoding the DNA of the Toyota production system”, Harvard
Business Review, Vol. 77, pp. 96-106.
Staats, B.R., Brunner, D.J. and Upton, D.M. (2011), “Lean principles, learning, and knowledge work:
evidence from a software services provider”, Journal of Operations Management, Vol. 29 No. 5,
pp. 376-390.
Tsoukas, H. and Vladimirou, E. (2001), “What is organizational knowledge?”, Journal of Management
Studies, Vol. 38 No. 7, pp. 973-993.
Vinod, G., Sharma, P.K., Santosh, T.V., Hari Prasad, M. and Vaze, K.K. (2014), “New approach for risk
based inspection of H2S based process plants”, Annals of Nuclear Energy, Vol. 66, pp. 13-19.
Wagstaff, K., Cardie, C., Rogers, S. and Schrödl, S. (2001), “Constrained k-means clustering with
background knowledge”, ICML, pp. 577-584.
Žalik, K.R. (2008), “An efficient k′-means clustering algorithm”, Pattern Recognition Letters, Vol. 29,
pp. 1385-1391.
Corresponding author
Andika Rachman can be contacted at: [email protected]
For instructions on how to order reprints of this article, please visit our website:
www.emeraldgrouppublishing.com/licensing/reprints.htm
Or contact us for further details: [email protected]