Plano 03

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B D E F G

2.05 4.00 3.87 4.00 2.05

A
5
.2

.2
5
C-5 C-5
1 1
C-1 C-1

A
48

2.
2.

48
2.17

2.17
ELEVACION 04

5
.2

.2
5
2 C-5 C-5 2

3.92

3.92
A A
A A

C-1 C-1
3 3

ELEVACION 01 ELEVACION 02
A A
C-2
3.80

3.80
A A

PIEDRA CHANCADA DE 1/2"


MATERIAL DE RELLENO e=0.15cm

1 Ø 1/2" @ 0.20
1 Ø 1/2" @ 0.20

C-1
4 4
1.00

Z= 1.20 M

1.00
2.49

3.89
Z= 1.20 M A A
1 Ø 1/2" @ 0.20

C-2
5
1.00

1 Ø 1/2" @ 0.20
1.40

1.00 1.00 .80 .25 1.86


C-4
C-3
.25

P-01
6 C-5 P-02 C-5 6
.70

.71
.2

CASETA 1
5

.25
.5
9

C-4 SH
ELEVACION 03
2.42
2.17

2.17
1.12
1.21
1.

1.21

48
3

2.
0

A
C-3 C-1 C-1 C-1
.5

7 7
9

C-5 C-5
A

A
.2
5

2.05 1.98 .28 1.74 3.87 4.00 2.05

A B CC' D E F G

You might also like