Concrete Trial Mix Checklist - 01.09.2022
Concrete Trial Mix Checklist - 01.09.2022
Source of aggregate:
Testing date:
Total weight taken:
Pan
Remarks:
Contractor Representative JSW Project Representative JSW Quality Representative OEM Representative
Name: Name: Name: Name:
Source of aggregate:
Size of aggregate:
Testing date:
Total weight taken:
20 85-100
10 0-20
4.75 0-5
Remarks:
Contractor Representative JSW Project Representative JSW Quality Representative OEM Representative
Name: Name: Name: Name:
Source of aggregate:
Size of aggregate:
Testing date:
Total weight taken:
16 100
12.5 100
10 85-100
4.75 0-45
2.36 0-10
Remarks:
Contractor Representative JSW Project Representative JSW Quality Representative OEM Representative
Name: Name: Name: Name:
Source of aggregate:
Ratio of aggregates:
Testing date:
Total weight taken:
40 100
20 95-100
12.5
10 25-55
4.75 0-10
2.36 0-10
Remarks:
Contractor Representative JSW Project Representative JSW Quality Representative OEM Representative
Name: Name: Name: Name:
Grade of Concrete:
Weight of Cement:
Admixture Name:
Quantity of Admixture:
Water Content:
Temperature of Concrete:
Initial Slump:
If workability of concrete is achieved as per requirement, then we can cast the cube samples.
NOTE: If individual sieve analysis result of aggregates is not achieved as per mix design then combined
ratio sieve analysis shall be done.
Contractor Representative JSW Project Representative JSW Quality Representative OEM Representative
Name: Name: Name: Name: