Knox County Tennessee Stormwater Management Manual

General Application
4.3.7 Infiltration Trench Stormwater BMP

Description: An infiltration trench is


an excavated trench filled with stone
aggregate used to capture and allow
infiltration of stormwater runoff into
the surrounding soils from the bottom
and sides of the trench.

KEY CONSIDERATIONS STORMWATER MANAGEMENT


SUITABILITY
DESIGN GUIDELINES:
• Soil infiltration rate of 0.5 in/hr or greater required.
• Excavated trench (3 to 8 foot depth) filled with stone
9 Water Quality

media (1.5- to 2.5-inch diameter); pea gravel and Ñ Channel Protection


sand filter layers.
Overbank Flood Protection
• A sediment forebay and grass channel or equivalent
pretreatment must be provided. Extreme Flood Protection
• Observation well to monitor percolation.
• 5 acre maximum drainage area. Accepts Hotspot Runoff: No
Ñ in certain situations
ADVANTAGES / BENEFITS:
• Provides for groundwater recharge.
• Good for small sites with porous soils.
FEASIBILITY CONSIDERATIONS
DISADVANTAGES / LIMITATIONS:
M
• Potential for groundwater contamination. Land Requirement
• High clogging potential; should not be used on sites H Capital Cost
with clays or silts in the drainage area.
• Significant setback requirements. H Maintenance Burden
• Restrictions in karst areas. Residential Subdivision Use: Yes
• Two geotechnical test borings per trench required.
High Density/Ultra-Urban: Yes
MAINTENANCE REQUIREMENTS: Drainage Area: 5 acres max.
• Inspect for clogging.
Soils: Pervious soils required
• Remove sediment from forebay. (0.5 in/hr or greater)
• Replace pea gravel layer as needed.
L=Low M=Moderate H=High

POLLUTANT REMOVAL OTHER CONSIDERATIONS:


H Total Suspended Solids • Must not be placed under pavement
or concrete
M Nutrients - Total Phosphorus / Total Nitrogen
H Metals - Cadmium, Copper, Lead, and Zinc
H Pathogens - Coliform, Streptococci, E.Coli

Volume 2 (Technical Guidance) Page 4-125


January 2008
Knox County Tennessee Stormwater Management Manual

4.3.7.1 General Description


Infiltration trenches are excavations typically filled with stone to create an underground reservoir for
stormwater runoff (see Figure 4-36). This runoff volume gradually infiltrates through the bottom and sides
of the trench into the subsoil over a 2-day period and eventually reaches the water table. By diverting
runoff into the soil, an infiltration trench not only treats the water quality volume, but also helps to
preserve the natural water balance on a site and can recharge groundwater and preserve baseflow. Due
to this fact, infiltration systems are limited to areas with highly porous soils where the water table and/or
bedrock are located well below the bottom of the trench. In addition, infiltration trenches must be carefully
sited to avoid the potential of groundwater contamination.

Infiltration trenches are not intended to trap sediment and must always be designed with a sediment
forebay and grass channel or filter strip, or other appropriate pretreatment measures to prevent clogging
and failure. Due to their high potential for failure, these facilities must only be considered for sites where
upstream sediment control can be ensured.

Figure 4-36. Infiltration Trench Example

4.3.7.2 Stormwater Management Suitability


Infiltration trenches are designed primarily for stormwater quality. However, they can provide limited runoff
quantity control, particularly for smaller storm events. For some smaller sites, trenches can be designed to
capture and infiltrate the channel protection volume (CPv) in addition to the water quality volume (WQv). An
infiltration trench will need to be used in conjunction with another structural BMP to provide overbank and
extreme flood protection, if required.

Water Quality (WQv)


Using the natural filtering properties of soil, infiltration trenches can remove a wide variety of pollutants from
stormwater through sorption, percolation, filtering, and bacterial and chemical degradation. Sediment load
and other suspended solids are removed from runoff by pretreatment measures in the facility that treats flows
before they reach the trench surface.

Channel Protection (CPv)


For smaller sites, an infiltration trench may be designed to capture and infiltrate the entire CPv in either
an off- or on-line configuration. For larger sites, or where only the WQv is diverted to the trench, another
structural BMP must be used to provide CPv extended detention.

Overbank Flood Protection (up to Qp25) and Extreme Flood Protection (Qp100)

Volume 2 (Technical Guidance) Page 4-126


January 2008
Knox County Tennessee Stormwater Management Manual

Another structural BMP, such as a conventional detention pond, must be used in conjunction with an
infiltration trench system to provide flood protection. All infiltration trench facilities must provide flow
diversion and/or be designed to safely pass extreme storm flows and protect the filter bed and facility.
The volume of runoff removed and treated by the infiltration trench may be considered in the calculations
for overbank and extreme flood protection. Volume 2, Chapter 3 of this manual will provide additional
information on the design and sizing calculations.

4.3.7.3 Pollutant Removal Capabilities


An infiltration trench is presumed to be able to remove 90% of the total suspended solids load in typical
urban post-development runoff when sized, designed, constructed and maintained in accordance with the
recommended specifications. The TSS removal performance is reduced for undersized, poorly designed,
or unmaintained infiltration trenches.

Additionally, research has shown that use of infiltration trenches will have benefits beyond the removal of
TSS, such as the removal of other pollutants (i.e., phosphorous, nitrogen, fecal coliform and heavy
metals), as well, which is useful information should the pollutant removal criteria change in the future.
The following design pollutant removal rates are conservative average pollutant reduction percentages for
design purposes derived from sampling data, modeling and professional judgment. In a situation where a
removal rate is not deemed sufficient, additional controls may be put in place at the given site in a series or
“treatment train” approach.

• Total Suspended Solids – 90%


• Total Phosphorus – 60%
• Total Nitrogen – 60%
• Pathogens – 90%
• Heavy Metals – 90%

For additional information and data on pollutant removal capabilities for infiltration trenches, see the
National Pollutant Removal Performance Database (2nd Edition) available at www.cwp.org and the
International Stormwater Best Management Practices (BMP) Database at www.bmpdatabase.org.

4.3.7.4 Application and Site Feasibility Criteria


Infiltration trenches are generally suited for medium-to-high density residential and commercial
developments where the subsoil is sufficiently permeable to provide a reasonable infiltration rate and the
water table is low enough to prevent groundwater contamination. They are applicable primarily for
impervious areas where there are not high levels of fine particulates (clay/silt soils) in the runoff and
should only be considered for sites where the sediment load is relatively low.

Infiltration trenches can either be used to capture sheet flow from a drainage area or function as an off-
line device. Due to the relatively narrow shape, infiltration trenches can be adapted to many different
types of sites and can be utilized in retrofit situations. Unlike some other structural stormwater BMPs,
they can easily fit into the margin, perimeter, or other unused areas of developed sites.
To protect groundwater from potential contamination, infiltration trenches cannot be utilized to treat runoff
from land uses that require a Special Pollution Abatement Permit without additional upstream best
management practices (BMPs) that are designed to capture and/or treat the SPAP pollutants. Further,
infiltration trenches will not be allowed for other pollutant hotspot land uses or activities, as identified by
the Director of Engineering and Public Works (the Director). For example, infiltration trenches should not
be used for manufacturing and industrial sites, where there is a potential for high concentrations of
soluble pollutants and heavy metals, or for areas that may have a high pesticide concentration. Infiltration
trenches are also not suitable in areas with karst geology without adequate geotechnical testing by
qualified individuals.

The following criteria should be evaluated to ensure the suitability of an infiltration trench for meeting
stormwater management objectives on a site or development.

Volume 2 (Technical Guidance) Page 4-127


January 2008
Knox County Tennessee Stormwater Management Manual

General Feasibility
• Suitable for use in a residential subdivision
• Suitable for use in high density/ultra-urban areas
• Not suitable for use as a regional (i.e., off-site or treating more than one site) stormwater control

Physical Feasibility - Physical Constraints at Project Site


• Drainage Area – 5 acres maximum
• Space Required – Will vary depending on the depth of the facility
• Site Slope – No more than 6% slope (for pre-construction facility footprint) across the location of the
infiltration trench
• Minimum Head – Elevation difference needed from the inflow of the infiltration trench to the outflow:
1 foot
• Minimum Depth to Water Table – 4 feet recommended between the bottom of the infiltration trench
and the elevation of the seasonally high water table
• Soils – Infiltration rate greater than 0.5 inches per hour required (typically hydrologic group “A”, some
group “B” soils); to be verified with a minimum of two geotechnical borings or one boring per 5,000
SF, whichever is greater.

Other Constraints/Considerations
• Wellhead Protection – Reduce potential groundwater contamination (in required wellhead protection
areas) by preventing infiltration of hotspot runoff. May require liner for type “A” and “B” soils; pretreat
hotspots; provide 2 to 4 foot separation distance from water table.

4.3.7.5 Planning and Design Standards


The following standards are to be considered minimum standards for the design of an infiltration trench
facility. Consult with Knox County Engineering to determine if there are any variations to these criteria or
additional standards that must be followed.

A. CONSTRUCTION SEQUENCING
• Ideally, the construction of an infiltration trench should take place after the construction site has been
stabilized to avoid deposition of sediment in the media. In the event that the trench is not constructed
after site stabilization, diversion of site runoff around the trench and installation and maintenance of
appropriate erosion prevention and sediment controls prior to site stabilization is required. Erosion
prevention and sediment controls shall be maintained around the infiltration trench to prevent runoff
and sediment from entering the trench during construction.
• Alternatively, the empty infiltration trench can be used as a sediment trap while the site is
unstabilized. The media, however, cannot be placed into the trench until all sediment has been
removed and the site completely stabilized.
• During and after excavation of the infiltration trench, all excavated materials shall be placed
downstream, away from the trench, to prevent redeposit of the material during runoff events.

B. LOCATION AND SITING


• To be suitable for infiltration, underlying soils should have an infiltration rate (fc) of 0.5 inches per hour
or greater, as initially determined from NRCS soil textural classification, and subsequently confirmed
by field geotechnical tests. The minimum geotechnical testing is one test hole per 5,000 square feet,
with a minimum of two borings per facility (taken within the proposed limits of the facility). Infiltration
trenches cannot be used in fill soils.
• Heavy equipment shall not be utilized in the area where the infiltration trench will be located. Soil
compaction will adversely affect the performance of the trench. Infiltration trench sites should be
roped-off and flagged during construction.

Volume 2 (Technical Guidance) Page 4-128


January 2008
Knox County Tennessee Stormwater Management Manual

• During excavation and trench construction, only light equipment such as backhoes or wheel and
ladder type trenchers should be used to minimize compaction of surrounding soils.
• Infiltration trenches should have a contributing drainage area of 5 acres or less.
• Soils on the drainage area tributary to an infiltration trench should have a clay content of less than
20% and a silt/clay content of less than 40% to prevent clogging and failure.
• There should be at least 4 feet between the bottom of the infiltration trench and the elevation of the
seasonally high water table.
• Infiltration rate shall be based on the most restrictive clay lenses, bedrock or other restrictive layers
between the trench bottom and water table.

Minimum setback requirements for infiltration trench facilities (when not specified by Knox County):
¾ From a building foundation – 25 feet
¾ From a private well – 100 feet
¾ From a public water supply well – 1,200 feet
¾ From a septic system tank/leach field – 100 feet
¾ From surface waters – 100 feet
¾ From surface drinking water sources – 400 feet (100 feet for a tributary)
• When used in an off-line configuration, the water quality volume (WQv) is diverted to the infiltration
trench through the use of a flow splitter. Stormwater flows greater than the WQv are diverted to other
controls or downstream using a diversion structure or flow splitter.
• To reduce the potential for costly maintenance and/or system reconstruction, it is strongly
recommended that the trench be located in an open or lawn area, with the top of the structure as
close to the ground surface as possible. Infiltration trenches shall not be located beneath paved
surfaces, such as parking lots.
• Infiltration trenches are designed for intermittent flow and must be allowed to drain and allow
reaeration of the surrounding soil between rainfall events. They must not be used on sites with a
continuous flow from groundwater, sump pumps, or other sources.

C. GENERAL DESIGN
• A well-designed infiltration trench consists of:
(1) Excavated shallow trench backfilled with sand, coarse stone, and pea gravel, and lined with a
filter fabric;
(2) Appropriate pretreatment measures; and
(3) One or more observation wells to show how quickly the trench dewaters or to determine if the
device is clogged.

Figure 4-37 provides a plan view and profile schematic for the design of an off-line infiltration trench
facility. An example of an observation well is shown in Figure 4-38.

D. PHYSICAL SPECIFICATIONS / GEOMETRY


• The required trench storage volume is equal to the water quality volume (WQv). For smaller sites, an
infiltration trench can be designed with a larger storage volume to include the channel protection
volume (CPv).
• A trench must be designed to fully dewater the entire WQv within 24 to 48 hours after a rainfall event.
The slowest infiltration rate obtained from tests performed at the site should be used in the design
calculations.

Volume 2 (Technical Guidance) Page 4-129


January 2008
Knox County Tennessee Stormwater Management Manual

• Trench depths should be between 3 and 8 feet, to provide for easier maintenance. The width of a
trench must be less than 25 feet.
• Broad, shallow trenches reduce the risk of clogging by spreading the flow over a larger area for
infiltration.
• The surface area required is calculated based on the trench depth, soil infiltration rate, aggregate void
space, and fill time (assume a fill time of 2 hours for most designs).
• The bottom slope of a trench should be flat across its length and width to evenly distribute flows,
encourage uniform infiltration through the bottom, and reduce the risk of clogging.
• The stone aggregate used in the trench should be washed, bank-run gravel, 1.5 to 2.5 inches in
diameter with a void space of about 40%. Aggregate contaminated with soil shall not be used. A
porosity value (void space/total volume) of 0.32 should be used in calculations, unless aggregate
specific data exist.
• A 6-inch layer of clean, washed sand is placed on the bottom of the trench to encourage drainage
and prevent compaction of the native soil while the stone aggregate is added.
• The infiltration trench is lined on the sides and top by an appropriate geotextile filter fabric that
prevents soil piping but has greater permeability than the parent soil. The top layer of filter fabric is
located 2 to 6 inches from the top of the trench and serves to prevent sediment from passing into the
stone aggregate. Since this top layer serves as a sediment barrier, it will need to be replaced more
frequently and must be readily separated from the side sections.
• The top surface of the infiltration trench above the filter fabric is typically covered with pea gravel.
The pea gravel layer improves sediment filtering and maximizes the pollutant removal in the top of the
trench. In addition, it can easily be removed and replaced should the device begin to clog.
Alternatively, the trench can be covered with permeable topsoil and planted with grass in a
landscaped area.
• An observation well must be installed in every infiltration trench and should consist of a perforated
PVC pipe, 4 to 6 inches in diameter, extending to the bottom of the trench. The observation well will
show the rate of dewatering after a storm, as well as provide a means of determining sediment levels
at the bottom and when the filter fabric at the top is clogged and maintenance is needed. It should be
installed along the centerline of the structure, flush with the ground elevation of the trench. A visible
floating marker should be provided to indicate the water level. The top of the well should be capped
and locked to discourage vandalism and tampering.
• The trench excavation should be limited to the width and depth specified in the design. Excavated
material should be placed away from the open trench so as not to jeopardize the stability of the trench
sidewalls. The bottom of the excavated trench shall not be loaded in a way that causes soil
compaction, and should be scarified prior to placement of sand. The sides of the trench shall be
trimmed of all large roots. The sidewalls shall be uniform with no voids and scarified prior to
backfilling. All infiltration trench facilities should be protected during site construction and should be
constructed after upstream areas have been stabilized.
• Smearing of the soil at its interface with the trench bottom or sides must be avoided or corrected.
Smearing can be corrected by raking or roto-tilling.

E. PRETREATMENT / INLETS
• Pretreatment facilities must always be used in conjunction with an infiltration trench to prevent
clogging and failure.
• For a trench receiving sheet flow from an adjacent drainage area, the pretreatment system should
consist of a vegetated filter strip with a minimum 25-foot length. A vegetated buffer strip around the
entire trench is required if the facility is receiving runoff from both directions. If the infiltration rate for
the underlying soils is greater than 2 inches per hour, 50% of the WQv should be pretreated by
another method prior to reaching the infiltration trench.

Volume 2 (Technical Guidance) Page 4-130


January 2008
Knox County Tennessee Stormwater Management Manual

• For an off-line configuration, pretreatment should consist of a sediment forebay, vault, plunge pool, or
similar sedimentation chamber (with energy dissipators) sized to 25% of the water quality volume
(WQv). Exit velocities from the pretreatment chamber must be non-erosive for the 2-year design
storm.

F. OUTLET STRUCTURES
• Outlet structures are not required for infiltration trenches.

G. EMERGENCY SPILLWAY
• Typically for off-line designs, there is no need for an emergency spillway. However, a non-erosive
overflow channel should be provided to safely pass flows that exceed the storage capacity of the
trench to a stabilized downstream area or watercourse.

H. MAINTENANCE ACCESS
• A minimum 20’ wide maintenance right-of-way or drainage easement shall be provided for an
infiltration trench, from a driveway, public or private road. The maintenance access easement shall
have a maximum slope of no more than 15% and shall have a minimum unobstructed drive path
having a width of 12 feet, appropriately stabilized to withstand maintenance equipment and vehicles.
Adequate access must be provided to the grates to the filter bed for perimeter sand filter design.
Facility designs must enable maintenance personnel to easily remove and replace upper layers of the
infiltration media.

I. SAFETY FEATURES
• In general, infiltration trenches are not likely to pose a physical threat to the public and do not need to
be fenced.

J. LANDSCAPING
• Vegetated filter strips and buffers should fit into and blend with surrounding area. Native grasses are
preferable, if compatible. The trench may be covered with permeable topsoil and planted with grass
in a landscaped area

K. ADDITIONAL SITE-SPECIFIC DESIGN CRITERIA AND ISSUES


There are a number of additional site specific design criteria and issues (listed below) that must be
considered in the design of a infiltration trench.
Physiographic Factors - Local terrain design constraints
• High Relief – Maximum site slope of 6%
• Karst – Not suitable without adequate geotechnical testing

Special Downstream Watershed Considerations


• Wellhead Protection – Reduce potential groundwater contamination (in required wellhead protection
areas) by preventing infiltration of hotspot runoff. May require liner for type “A” and “B” soils; Pretreat
hotspots; provide a minimum 4 foot separation distance from water table.

4.3.7.6 Design Procedures


Step 1. Compute runoff control volumes
Calculate WQv, CPv, Qp2, Qp10, Qp25, and Qp100, in accordance with the guidance presented in
Volume 2, Chapter 3.

Step 2. Determine if the development site and conditions are appropriate for the use of an infiltration
trench.
Consider the Application and Site Feasibility Criteria in subsections 4.3.7.4 and 4.3.7.5-B (Location
and Siting).

Volume 2 (Technical Guidance) Page 4-131


January 2008
Knox County Tennessee Stormwater Management Manual

Step 3. Confirm design criteria and applicability


Consider any special site-specific design conditions/criteria from subsection 4.3.7.5-K (Additional
Site-Specific Design Criteria and Issues).

Check with Knox County and other agencies to determine if there are any additional restrictions
and/or surface water or watershed requirements that may apply.

Step 4. Compute WQv peak discharge (Qwq)


The peak rate of discharge for water quality design storm is needed for sizing of off-line diversion
(see Volume 2, Chapter 3 for more information).

Step 5. Size flow diversion structure, if needed


A flow regulator (or flow splitter diversion structure) should be supplied to divert the WQv to the
infiltration trench.

Size low flow orifice, weir, or other device to pass Qwq.

Step 6. Size infiltration trench


The area of the trench can be determined from the following equation:

WQv
A=
(nd + kT / 12)
where:
A = Surface Area
WQv = Water Quality Volume (or total volume to be infiltrated)
n = porosity
d = trench depth (feet)
k = percolation (inches/hour)
T = Fill Time (time for the practice to fill with water), in hours

A porosity value n = 0.32 should be used.

All infiltration systems should be designed to fully dewater the entire WQv within 24 to 48 hours
after the rainfall event.

A fill time T=2 hours can be used for most designs.


See subsection 4.3.7.5-D (Physical Specifications/Geometry) for more specifications.

Step 7. Determine pretreatment volume and design pretreatment measures


Size pretreatment facility to treat 25% of the water quality volume (WQv) for off-line configurations.
See subsection 4.3.7.5-E (Pretreatment / Inlets) for more details.

Step 8. Design spillway(s)


Adequate stormwater outfalls should be provided for the overflow exceeding the capacity of the
trench, ensuring non-erosive velocities on the down-slope.

Volume 2 (Technical Guidance) Page 4-132


January 2008
Knox County Tennessee Stormwater Management Manual

4.3.7.7 Maintenance Requirements and Inspection Checklist


Note: Section 4.3.7.7 must be included in the Operations and Maintenance Plan that is recorded with the deed.

Regular inspection and maintenance is critical to the effective operation of an infiltration trench as designed. It is the responsibility
of the property owner to maintain all stormwater BMPs in accordance with the minimum design standards and other guidance
provided in this manual. The Director has the authority to impose additional maintenance requirements where deemed necessary.

This page provides guidance on maintenance activities that are typically required for infiltration trenches, along with a suggested
frequency for each activity. Individual trenches may have more, or less, frequent maintenance needs, depending upon a variety of
factors including the occurrence of large storm events, overly wet or dry (i.e.., drought) regional hydrologic conditions, and any
changes or redevelopment in the upstream land use. Each property owner shall perform the activities identified below at the
frequency needed to maintain the infiltration trench in proper operating condition at all times.

Inspection Activities Suggested Schedule


• A record should be kept of the dewatering time (i.e., the time required to drain the infiltration After Rain Events
trench completely after a storm event) of the trench to determine if maintenance is necessary.
The trench should drain completely in about 24 hours after the end of the rainfall. Ponded
water inside the trench (as visible from the observation well or on the surface) longer than 48
hours or several days after a storm event is an indication that the trench is clogged.
• Check that the area draining to the trench, the trench and its inlets are clear of debris. Monthly
• Check the area draining to the trench for evidence of erosion.
• Check observation wells following 3 days of dry weather. Failure to percolate within this time Semi-annual Inspection
period indicates clogging.
• Inspect pretreatment devices and diversion structures for sediment build-up and structural
damage.

Maintenance Activities Suggested Schedule


• Remove sediment and oil/grease from pretreatment devices, as well as overflow structures. Monthly

• Mow grass filter strips as necessary. Remove grass clippings.


• Remove trees that start to grow in the vicinity of the trench. Semi-annual Inspection

• Replace pea gravel/topsoil and top surface filter fabric (when clogged). Removed sediment As needed
and media may usually be disposed of in a landfill.
• Stabilize (i.e., vegetate or cover) areas of erosion in the area draining to the trench.
• Perform total rehabilitation of the trench to maintain design storage capacity. Upon Failure

• Excavate trench walls to expose clean soil.

Knox County encourages the use of the inspection checklist that is presented on the next page to guide the property owner in the
inspection and maintenance of an infiltration trench. The Director can require the use of this checklist or other form(s) of
maintenance documentation when and where deemed necessary in order to ensure the long-term proper operation of the trench.
Questions regarding stormwater facility inspection and maintenance should be referred to the Knox County Department of
Engineering and Public Works, Stormwater Management Division.

Volume 2 (Technical Guidance) Page 4-133


January 2008
Knox County Tennessee Stormwater Management Manual

INSPECTION CHECKLIST AND MAINTENANCE GUIDANCE (continued)


INFILTRATION TRENCH INSPECTION CHECKLIST
Location: __ Owner Change since last inspection? Y N
Owner Name, Address, Phone: ______________________________________________________________________________
Date: ___________ Time: ______________ Site conditions:_______________________________________________________

Satisfactory (S) or
Inspection Items Comments/Corrective Action
Unsatisfactory (U)
Inspection List
Complete drainage of the filter in about 24 to
48 hours after a rain event?
Clogging of trench surface?
Clogging of inlet/outlet structures?
Standing water in observation well after three
rainless days?
Trench clear of debris and functional?
Evidence of leaks or seeps?
Animal burrows in trench?
Cracking, spalling, bulging or deterioration of
concrete?
Erosion in area draining to trench?
Erosion around inlets, trench, or outlets?
Pipes and other structures in good condition?
Undesirable vegetation growth?
Other (describe)?
Hazards
Have there been complaints from residents?
Public hazards noted?

If any of the above inspection items are UNSATISFACTORY, list corrective actions and the corresponding completion dates below:

Corrective Action Needed Due Date

Inspector Signature: ________________________________ Inspector Name (printed)____________________________

Volume 2 (Technical Guidance) Page 4-134


January 2008
Knox County Tennessee Stormwater Management Manual

4.3.7.8 Example Schematics


Figure 4-37. Schematic of an Infiltration Trench
(Source: Center for Watershed Protection)

Volume 2 (Technical Guidance) Page 4-135


January 2008
Knox County Tennessee Stormwater Management Manual

Figure 4-38. Observation Well Detail


SCREW TOP LID

FINISHED GRADE

Volume 2 (Technical Guidance) Page 4-136


January 2008
Knox County Tennessee Stormwater Management Manual

4.3.7.9 Design Form


Knox County recommends the use of the following design procedure forms when designing infiltration
trenches. Proper use and completion of the form may allow a faster review of the Stormwater
Management Plan by Knox County Engineering.

Design Procedure Form: Infiltration Trench


PRELIMINARY HYDROLOGIC CALCULATIONS
1a. Compute WQv volume requirements
Compute Runoff Coefficient, Rv Rv =
Compute WQv WQv = acre-ft
1b. Estimate CPv CPv = acre-ft

1c. Estimate storage volumes release rate = cfs


Estimate storage volume required for 2-year storm 2-year storage = acre-ft
Estimate storage volume required for 10-year storm 10-year storage = acre-ft
Estimate storage volume required for 25-year storm 25-year storage = acre-ft
Estimate storage volume required for 100-year storm 100-year storage = acre-ft
INFILTRATION TRENCH DESIGN
2. Is the use of an infiltration trench appropriate? See subsections 4.3.7.4 and 4.3.7.5 - B
3. Confirm local design criteria and applicability. See subsection 4.3.7.5 - K
4. Compute WQv peak discharge (Qwq)
Compute Curve Number CN =
Compute Time of Concentration tc tc = hour
Compute Qwq Qwq = cfs
5. Size infiltration trench Area = ft2
Width must be less than 25 ft Width = ft
Length = ft
6. Size the flow diversion structures
Low flow orifice from orifice equation
Q = CA(2gh)0.5 A= ft2
C varies with orifice condition diam. = inch
Overflow weir from weir equation
Q = CLH3/2 Length = ft
7. Pretreatment volume (for offine designs)
Volpre = 0.25(WQv) Volpre = ft3
8. Design spillway(s)

9. Verify peak flow control, water quality drawdown time and


channel protection detention time

Volume 2 (Technical Guidance) Page 4-137


January 2008
Knox County Tennessee Stormwater Management Manual

4.3.7.10 References
AMEC. Metropolitan Nashville and Davidson County Stormwater Management Manual Volume 4 Best
Management Practices. 2006.

Atlanta Regional Council (ARC). Georgia Stormwater Management Manual Volume 2 Technical
Handbook. 2001.

Center for Watershed Protection. Manual Builder. Stormwater Manager’s Resource Center, Accessed
July 2005. www.stormwatercenter.net.

Federal Highway Administration (FHWA). Stormwater Best Management Practices in an Ultra-Urban


Setting: Selection and Monitoring. United States Department of Transportation, Accessed
January 2006. http://www.fhwa.dot.gov/environment/ultraurb/index.htm

4.3.7.11 Suggested Reading


California Storm Water Quality Task Force. California Storm Water Best Management Practice
Handbooks. 1993.

City of Austin, TX. Water Quality Management. Environmental Criteria Manual, Environmental and
Conservation Services, 1988.

City of Sacramento, CA. Guidance Manual for On-Site Stormwater Quality Control Measures.
Department of Utilities, 2000.

Claytor, R.A., and T.R. Schueler. Design of Stormwater Filtering Systems. The Center for Watershed
Protection, Silver Spring, MD, 1996.

US EPA. Storm Water Technology Fact Sheet: Storm Water Wetlands. EPA 832-F-99-025. Office of
Water, 1999.

Faulkner, S. and C. Richardson. Physical and Chemical Characteristics of Freshwater Wetland Soils.
Constructed Wetlands for Wastewater Treatment, ed. D. Hammer, Lewis Publishers, 831 pp,
1991.

Guntenspergen, G.R., F. Stearns, and J. A. Kadlec. Wetland Vegetation. Constructed Wetlands for
Wastewater Treatment, ed. D. A. Hammer, Lewis Publishers, 1991.

Maryland Department of the Environment. Maryland Stormwater Design Manual, Volumes I and II.
Prepared by Center for Watershed Protection (CWP), 2000.

Metropolitan Washington Council of Governments (MWCOG). A Current Assessment of Urban Best


Management Practices: Techniques for Reducing Nonpoint Source Pollution in the Coastal
Zone. March, 1992.

Volume 2 (Technical Guidance) Page 4-138


January 2008