Power BI Desktop

Elements of Cost Work Package and Control Account Sub-Control Account


Cost Control Dashboard


All  All  All 

Origial Selling Revised Selling Budget At Revised Budget At Varianc At Cost Vaiance
Amount Amount Completion Completion Competion (VAC) (CV)

27.00M 32.06M 22.57M 26.45M 134.16K 711.55K


EAC VS Revised BAC by Work Package and Control CV VS VAC by Work Package and Control Account
Account Sum of CV Sum of VAC

Sum of EAC Sum of Revised BAC


CIVL WORK PACKAGE 349K
-299K
22M
20M SITE PRELIMIARIES 218K
43K
2M 1M 1M 1M 0M 0M Staff Salaries 157K
0M 340K
0M
CIVL … Staff Sa… Site Fac… ARCH … SITE P… Site Eq… Consult… Markup -200K 0K 200K 400K

ARCH WORK PACKAGE Percent of Each Cost Sub-Control Account Sum of CPI (To Sum of CPI (At Planned GP VS Forcasted GP
date) completion)
0.00
Sum of EV
0.00
Sum of AC
Element   4.43M
Accommodation 0.00 0.75
Element… Markup DIRECT WORK PAC…
Backfilling 0.00 0.96
CIVL WORK PACKAGE Clark 0.00 1.33
6,970,845.54 6,622,071.73
3.77M (11.76%) 5.61M
(17.5%) Consultant Expenses 0.00 1.90 0.00M 5.74M 11.49M
Sum of EV Sum of AC Contengency 0.00 0.00
Cranes 0.00 1.73
Consultant / Engineering Service Engineering Service 0.00 2.78
Revised BAC VS EAC
127,450.00 0.00 Fences &Shed & 0.00 0.00 26.45M
Sum of EV Sum of AC Billboards
Finanace Charges 0.00 0.00
Markup Gypsum Boards & 0.00 1.00
22.68M
767,275.00 767,275.00 (70.74%)
False Ceilings
0.00M 26.31M 52.63M
Sum of EV Sum of AC Insurance ( policies ) 0.00 0.00