Site Test Report

Contract No. – N-6166.1


New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108106082
Contractor: CSE Equipment: 7UT613
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F871
Substation: 132/11 kV SS at ADNEC Page: 1 of 6

Inspection Testing and Secondary Injection of Differential Protection Relay Type


7UT613

1) - General data:

Ordered MLFB: 7UT6131-5EB91-1AC0 --OS Serial No.: BF1108106082


Built in MLFB: 7UT6131-5EB91-1AC0 --OS Ordered Version: V4 Built-in Version: 4.64

Built-in rated current IN: 1A 5A Built-in rated auxiliary voltage (DC): 110 V DC
Software Used:       DIGSI: 4 Ver. 4.84
Device ID : -F871 Relay address :
CT ratio: HV: 600 / 400 /1 A LV:2500 /1 A

2) - Configuration of protection functions:

a) Differential Protection Configured Not Configured


b) Backup O/C time Protection Configured Not Configured
c) Thermal Overload Protection Configured Not Configured
d) Over flux Protection (Overexitation) Configured Not Configured
e) Lock out (86) Configured Not Configured

3) - General inspection & testing:

S NO B-General inspection & testing: Checked


1 Installation & wiring correct to relevant drawings Yes
2 Relay case connected to local earth bar Yes
3 Measured value check Yes
4 Relay binary input and output checked Yes
5 Visual inspection of unit Yes
6 Fault recorder Yes

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name Vijay Kumar
Date 15.08.2012 Date 15.08.2012 Date 15.08.2012
CSE ENERGO CONSULT TRANSCO
\641617132.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108106082
Contractor: CSE Equipment: 7UT613
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F871
Substation: 132/11 kV SS at ADNEC Page: 2 of 6

4) – Transformer Data:
Transformer Data Primary Winding Secondary Winding
VT ratio (UN) 132kV +12.5%, -17.5% (128,7kV) 11/0.11kV (11.5 kV)
Capacity – PN 40MVA 40 MVA
Load Current – IN 175 A ( 179.44 A) 2008 A
CT Ratio (IN) 400/1 A 2500/1 A
Percentage Impedance (uk/%) 25% 25%

5) - Differential relay setting 1: Please ref attached DIGSI print outs


I diff > : I/ IN : 0.3I/InO t diff > delayed 0.0 s
I diff >> : I/ IN 7.5In/InO t diff >> delayed 0.0 s
2nd. Harmonic: 15% Slope 1: 0.25
5th. Harmonic : 30% Base Point 2: 2.5
Vector Group:  YNyn0(d)         Slope 2: 0.5
CT Star Point HV: towards line: towards Object: CT Star Point LV: towards line: towards Object:

6) – General measured values:


Injection sec.* Measured [A]
Phase Winding
[A]/[V] Primary I diff I/In (R/Y/B) I Rest I/In (R/Y/B)
R 0.1 40 0.15/0.08/0.08 0.15/0.08/0.08
Y HV 1 0.1 40 0.07/0.15/0.07 0.08/0.15/0.08
B 0.1 40 0.08/0.07/0.15 0.08/0.07/0.15
R 0.1 40 0.15/0.07/0.07 0.15/0.08/0.08
Y HV 2 0.1 40 0.08/0.15/0.07 0.08/0.15/0.08
B 0.1 40 0.07/0.07/0.15 0.08/0.07/0.15
R 0.1 250 0.08/0.04/0.04 0.08/0.04/0.04
Y MV 0.1 250 0.04/0.08/0.04 0.05/0.09/0.05
B 0.1 250 0.04/0.04/0.08 0.05/0.05/0.09
R 63.51/110 6.35/11.0 kV
Y MV (VT's) 63.51/110 6.35/11.0 kV
B 63.51/110 6.35/11.0 kV
*current injection - each phase separately, voltage injection - 3ph

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name Vijay Kumar
Date 15.08.2012 Date 15.08.2012 Date 15.08.2012
CSE ENERGO CONSULT TRANSCO
\641617132.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108106082
Contractor: CSE Equipment: 7UT613
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F871
Substation: 132/11 kV SS at ADNEC Page: 3 of 6

7) - Binary input function check

Bin. input Function Terminal Terminal Drawing Checked Remarks


(+)-X331:2
Relay Page No.
(-)-X331:16
BI 1 Protection Blocked F5-F10 -X331:23 /MAA1.2 Key switch - "OUT"
BI 2 Spare F6-F10 -X331:24 /MAA1.3
BI 3 Test Mode F7-F10 -X331:25 /MAA1.3 Test plug inserted
BI 4 Spare F8-F10 -X331:26 /MAA1.4
BI 5 Spare F9-F10 -X331:27 /MAA1.4

8) - Binary output check

Output Function Terminal Drawing Checked Remarks


Relay TB Page No.
BO1 Differential Trip P1-P5 X871.2:4 NAA3.2 Trip to LOR1
BO2 Differential Trip P2-P5 X871.2:16 NBA1.4 Trip to K871.1
BO3 Th. Overload alarm P3-P5 X871.2:18 NBA1.4 Trip to K871.2
BO4 Overflux (U/f) alarm P4-P5 X871.2:20 NBA1.5 Trip to K871.3
BO5 Spare P6-P5 - ZA1.3 pickup (for test only)
BO6 Differential Trip P7-P8 X871.1:2 NAA1.2 Trip to TC1

BO7 Differential Trip P9-P10 X871.1:16/18 NEA1.2 Trip to MV1

BO8 Differential Trip P11-P12 X871.1:20 MBA1.2 Start BF protection

Live Cont. F3-F4 RAA2.2 Ccubicle alarm

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name Vijay Kumar
Date 15.08.2012 Date 15.08.2012 Date 15.08.2012
CSE ENERGO CONSULT TRANSCO
\641617132.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108106082
Contractor: CSE Equipment: 7UT613
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F871
Substation: 132/11 kV SS at ADNEC Page: 4 of 6

9) - LED function
S no Led no Function Checked Remarks
1 LED 1 Trip / General trip
2 LED 2 Pickup / General pickup
3 LED 3 Differential Trip R /
4 LED 4 Differential Trip Y /
5 LED 5 Differential Trip B /
6 LED 6 Idif > / 87T.1
7 LED 7 Idiff >> / 87T.2
8 LED 8 Thermal Overload Alarm / 49.1
9 LED 9 Thermal Overload Trip / 49.2
10 LED 10 U/f > Alarm / 24.1 U/f>
11 LED 11 U/f > Trip / 24.2 U/f>>, U/f
Thermal
12 LED 12 Protection Blocked / Key switch "OUT"
13 LED 13 Measurement supervision /
14 LED 14 Summary Alarm / summary alarm
event

10) Secondary injection test


Record measured results or attach Omicron test results print-out

Transformer Differential Protection

Measurement of IDIFF>pick-up values and operating time


Phase Id (group 1- HV1) [ A ] Id (group 2- HV2) [ A ] Id (group 3- MV ) [ A ] t [ ms ]
expected expected expected expected
1Ph-N 0.202 ±5% 0.202 ±5% 0.361 ±5%
Ph-Ph 0.134 ±5% 0.134 ±5% 0.241 ±5% 30 ±10

3Ph 0.134 ±5% 0.134 ±5% 0.241 ±5%


1Ph-N Ipickup expected = 0.3 x InO x 1.5 = 0.202 A for HV; =0.361 A for MV
Ph-Ph(3Ph) Ipickup expected= 0.3 x InO = 0.134 A for HV; = 0.241A for MV
drop-off expected = 0.7 x Ipick-up

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name Vijay Kumar
Date 15.08.2012 Date 15.08.2012 Date 15.08.2012
CSE ENERGO CONSULT TRANSCO
\641617132.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108106082
Contractor: CSE Equipment: 7UT613
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F871
Substation: 132/11 kV SS at ADNEC Page: 5 of 6

Measurement of IDIFF>>pick-up values and operating time


Phase Id (group 1- HV1) [ A ] Id (group 2- HV2) [ A ] Id (group 3- MV ) [ A ] t [ ms ]
expected expected expected expected
Ph-N 5.04 ±5%
5.04 ±5%
9.03 ±5%
20 ±10

Ph-N Ipickup expected = 7.5 x InO x1.5 = = 5.046 A for HV = 9.036 A for MV

Check of the operating characteristic (±5%IN)

Ibias (xIn) 0.5 1.0 2.0 4.0 6.0 12 16


Idiff exp. (xIn)* 0.30 0.30 0.50 1.00 1.75 4.75 6.75

Check of the inrush (2nd harmonic) restraint characteristic (±5%IN)

Idiff (xIn) 0.5 1.0 3.0 5.0 7.0


I2 exp. (%) 15 15 15 15 15
* measured for 3ph fault

Check of the 5th harmonic restraint characteristic (±5%IN)

Idiff (xIn) 0.5 1.0 1.4 1.6 4


I5 exp. (%) 30 30 30  

Thermal Overload Protection (MV side)

Settings: K=1.00; Thermal constant= 1min or 2 min; Th. alarm=80%; InO=0.803A

Operating time thermal OL tripping characteristic ( ±3%/or 1.2s


)
Time Pre-load Thermal 2In=1.606 A [s] 4In=3.212 A [s] 6In=4.820 A [s]
constant current (A) level expect. expect. expect.
Alarm (80%) 13.80 3.096 1.352
1 min 0.0
Trip (100%) 17.26 3.870 1.690
Alarm (80%) 27.60 6.190 2.704
2 min 0.0
Trip (100%) 34.52 7.740 3.380

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name Vijay Kumar
Date 15.08.2012 Date 15.08.2012 Date 15.08.2012
CSE ENERGO CONSULT TRANSCO
\641617132.doc
Site Test Report
Contract No. – N-6166.1
New 132/11kV Substations at E12, Zayed Sports City, CONSORTIUM
ADNEC Capital Centre, 132/22kV Substations at New SIEMENS-
Airport and Capital District and All Related 132kV ELECTROMECHANICAL
Cable Works
Relay Sl.No: BF1108106082
Contractor: CSE Equipment: 7UT613
Consultant: ENERGO CONSULT Feeder/Circuit: =E05+R1-F871
Substation: 132/11 kV SS at ADNEC Page: 6 of 6

Overflux Protection

Settings: U/f>=1.10Un/fn; tU/f>=10s; Un=115/3V


U/f>>=1.40Un/fn; tU/f>>=0.1s; Un=115/3V

Measurement of pick-up values and operating time

U/f> Pick-up U/f>> Pick-up U/f> time U/f>> Pick-up U/f>> Pick-up U/f>> time
Phase
expected [ V ] expected [Hz] expected [s] expected [ V ] expected [Hz] expected [s]
R-Y-B 73.03 ±3%
fn = 50 92.95 ±3%
fn = 50 10.0 ±3%
±3%
10.0 ±3% ±3%
R-Y-B Un= 115/3 45.45 Un= 115/3 35.71 1.0 s ±3%
Upickup(at fn)=U/f>xUn/3; fpickup=fn/(U/f>) *) at 75V/50 Hz

Operating time U/f-thermal tripping characteristic (at U> with fn)


±5%/±600ms
Operating time t [ s ]*
1.20 Un/fn (79.67V) 1.30 Un/fn (86.31V ) 1.35 Un/fn (89.63V)
expected expected expected
60.0 19.0 13.0

11) Instrument Used

Equip. 1 Equip. 2 Equip. 3


Instrument: CMC256-6

Serial No.: JG697S

Calibration Date: 31.05.2012

Remark :
- Omicron print outs will be attached along with the test report for Pickup/Drop off & Characteristics

TESTED BY WITNESSED BY WITNESSED/APPROVED BY


Signature Signature Signature
Name Josip Spolador Name C. Senthil Kumar Name Vijay Kumar
Date 15.08.2012 Date 15.08.2012 Date 15.08.2012
CSE ENERGO CONSULT TRANSCO