25 KV CURRENT TRANSFORMER
A Name of the Traction Sub-Station QLM TSS
B Name of the Equipment 25 KV CT
C Date of Testing 22/7/2022
RATIO TEST ( WITH PRIMARY INJECTION TEST KIT)
Current Current
Sl. % Error % Error
injected recorded in Ratio C.T. Ratio Ratio found
No. specified obtained
in primary (A) secondary (A)
Equipment No. CT -138A Maker's Sl. No. VTS/JUL/7/1/2020/4
Current Current
Sl. % Error % Error
injected in recorded in Ratio C.T. Ratio Ratio found
No. specified obtained
primary A) secondary (A)
750/5
1 75.0 0.500 750/5 150 150.000 5 0.000
2 150.0 0.990 750/5 150 151.520 5 1.010
3 225.0 1.490 750/5 150 151.010 5 0.670
4 300.0 2.020 750/5 150 148.510 5 -0.990
1500/5
1 150.0 0.501 1500/5 300 299.400 5 -0.200
2 300.0 1.000 1500/5 300 300.000 5 0.000
3 450.0 1.510 1500/5 300 298.010 5 -0.660
Equipment No. CT -138B Maker's Sl. No. VTS/JUL/7/1/2020/5
750/5
1 75.0 0.495 750 / 5 150 151.520 5 1.010
2 150.0 0.990 750 / 5 150 151.520 5 1.010
3 225.0 1.490 750 / 5 150 161.010 5 0.670
4 300.0 1.980 750 / 5 150 151.520 5 1.010
1500/5
1 150.0 0.500 1500/5 300 300.000 5 0.000
2 300.0 0.990 1500/5 300 303.030 5 1.010
3 450.0 1.490 1500/5 300 302.010 5 0.670
4 600.0 1.990 1500/5 300 301.510 5 0.500