Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

JIGAR S.

DESAI
Professional Summary

Personal Info Overall, 11 years of strong experience in Project Execution based on iOT PDP (Thingworx)
and MES (GE Proficy).
• 3 Years of experience in leading team for Implementing and Developing various digital
Phone manufacturing solutions in MES & iOT space for one of the largest Global FMCG customer.
(+91)9820968696 • 7 years of experience in implementing various MES solutions.
Email • Working directly with the 100+ plants across globe and Central IT team to gather the
requirement, designing & implementing the required solution.
[email protected]
• Experience on Full Life cycle MES (GE Proficy) Implementations.
Location
Mumbai (India) Employment History
1. Associate Consultant, TCS
Nov 2021 – Till Date

Skills a. Business Analyst for Chemical Industry.


May 2022 – Till Date
Proficy Knowledge
• Performing Analysis on different equipment’s to optimize performance by analyzing the
downtime, different process parameters, output etc.
Architecture • Implement the best industry practices like OEE, Centerline, Maintenance etc.
Knowledge • Daily connect with Stakeholders to decide on sprint-by-sprint task and progress.
• Daily connect with team members to check the progress and help in case of Blockers.
• Tools Used: OSI Pi Soft, Azure ML, Excel, Azure Devops (for Sprit planning).
Project
Management b. Proxy Product Owner for Waste Reduction Module for CPG Industry.
Nov 2021 – April 2022

• Engage with Stakeholders and Clients to understand the requirement and to propose new
Team Management ideas and enhancement in current Waste dashboard.
• Performing Data Analysis and Data crunching of waste data to create the visuals and
insights for dashboard.
Client Management • Create User stories, Logic, Graphs and PBI’s with all the functional and technical details for
internal developer team to create dashboard visualization.
• Fill the gap if any in achieving the waste reduction for Whitefield sites.
• Co-ordinate and provide understanding, requirement with different team members (Front
end, Back end, SAP team and testers) for development and deployment of sprint.
• Tools Used: Excel, Azure Devops (for Sprit planning).
Tools 2. Senior Consultant (Techno-Functional Lead), Capgemini India Pvt. Ltd.
Included Feb 2011 – Nov 2021

• Agile a. Solution Architect for OEE Module and Leading an offshore MES team.
Nov 2018 – Nov 2021
Methodology
• Proficy Plant Solution Architect:
Application (GE) • Engage with Stakeholders, Developers and Vendors to design, upgrade and enhance the
• Historian (GE OEE solution.
Fanuc) • Part of developing and rolling out Non-Productive Time solution for Client, which helps in
providing accurate downtime and production data directly through STLS web page.
• Thingworx (PTC) • Involved in preparing configuration document of NPT solution for resources.
• iFIX • Involved in reviewing functionality and preparing test cases for iODS reporting and HTML5
• RSLinx reporting, Co-ordinate with solution owners and developers to match the requirement.
• SQL Server • Prepare and Review Job Aids, Test Cases and Design Documents.
• Identify the bugs, issues and upgrade needs in current solution.
Team Lead:
Carrier • Gathering business requirements, business process analysis, and assisting in RFP’s
Achievements •
with Group Leaders.
Identify new opportunities and growth, within Whitefield and Brownfield space
• Managing the Offshore team.
• Project Star Award for • Manage project execution to ensure adherence to budget, schedule and scope.
Quarter 3 in 2012, for • Submit project deliverables, ensuring adherence to quality standards and timelines.
excellent performance • Manage solution implementations and roll outs for various plants across globe.
in the MES project • Initiate, review, or approve modifications to project plans.
• Identify consultants and or recruitment to meet project needs.
during that year. • Monitor the performance of project team members, providing and documenting
• Xtra Mile Award for performance feedback.
Quarter 3 in 2014 for
innovating UPack b. Project-Technical Lead on iOT based application Thingworx for different plants
across the globe.
System for Client.
Oct-2017 – Oct 2018
• Pat on the Back Award
for Quarter 2 in 2015 Project-Technical Lead:
for implementing • Provide technical guidance to resources to implementing the project and vendors
Making Lines for the to understand the functionality and provide proper data.
first time in project. • Engage with stakeholders, Develop Project Plan.
• Monitor and manage the project schedule, issues and escalations.
• Customer Delight
• Prepare Project Status Reports and Project Change Requests for the steering
Award for Quarter 1 in committee, all team members and other relevant stakeholders.
2018 for excellent • Ensure project meets requirements, objectives and Timeline.
Customer Service. • Organize and chair project reference group meetings, as appropriate.
• Outstanding • Validating the data received from the site.
Contribution in • Maintain project documentation.
Delivery Award for • Engagement in initiating kick-off and Project Closure.
• Distribution of task among team members
Quarter 2 in 2018 for
highest contribution c. Working on different modules of Proficy MES. Role includes implementing
with zero error. various modules like Efficiency, Production, Quality, Target, Schedule and
Maintenance on different plants of P&G across the globe.
May-2011 – Sept. 2017
Academic Implementation Manager:
Credentials • Engage with stakeholders and develop a Project Plan.
• Monitor and manage the project schedule and issues.
• Bachelor’s in • Prepare Project Status Reports and Project Change Requests for the steering
committee, all team members and other relevant stakeholders.
Electronics & • Ensure project meets requirements, objectives and timelines.
Telecommunication • Engagement in initiating kick-off and Project Closure.
o SIES Graduate School of • Distribution of task among team members
Technology – University of
Mumbai
Technical Owner:
o Sept. 2010
• Validating the data received from the site.
• Correction of data, in case any issue or missing part.
• Diploma in Electronics • Maintain project documentation.
& Telecommunication • Helping the site to understand and fetch the proper data.
o Sardar Vallabhbhai Patel • Being part of all aspects of Project work: Requirement gathering, Design,
Polytechnic - Maharashtra Configuration, Documentation, End User Support.
State Board of Technical • Provide training and technical support to
Education • team members.
o Dec. 2006
Technical Execution:
• Matriculate • Configuration on GE Proficy Plant Administrator for different modules like
o St. Lawrence High School - Efficiency, Production, Quality, Target, Schedule and Maintenance directly on the
Maharashtra State Board production server.
o Mar 2002 • Configuration of display for all the modules on Proficy Client.
• Configuration of tags on Historian and or iFIX system.
• Resolve issues as they arise across areas of the Configuration.
• Configuration of Reports for different modules.

You might also like