REVISION CERTIFICATE EDSD REV. NO.

DATE JO/EWO DESCRIPTION ENG'G CERT PMT OPRNS


THIS INDICATES THAT REV. NO. ____________ VERIFICATION

OF THIS DRAWING IS COVERED, FOR ALL C 7-MAY-19 34-15430-3002 ISSUED FOR REVIEW RC MM

meeta.mahendra
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
D 24-MAY-19 34-15430-3002 ISSUED FOR PROPOSAL JF MM

AGENCY
PROJECT
ENGINEER
ENGINEER

CERTIFIED
DISCIPLINE
BY DRAWING COMPLETION CERTIFICATE BY: ______________

OPERATIONS
john.foster2

CONSTRUCTION

_______________

DATE ___________
DATE ___________
DATE ___________
DATE ___________
DATE ___________

________________
________________
________________
________________
(DCC)NO. _______________________________ E 4-JULY-19 34-15430-3002 ISSUED FOR PROPOSAL JF MM
DATE _____________

6701-8230-SP-0009 _ D2
JAFURAH
Saudi Aramco 2616-ENG (10/2002)

NOZZLE ALLOWABLES
PROJECT SPECIFICATION

JFGP COMMON FACILITIES


DOC
DWG.TYPE
JAFURAH

SAUDI ARABIA
861
PLANT .NO
NOZZLE ALLOWABLES
PROJECT SPECIFICATION

JFGP COMMON FACILITIES

L
INDEX
SAUDI ARABIAN OIL COMPANY

JO / EWO 34-15430-3002
DOC CLASS: 4B
DRAWING NO.

TD-821108
1

12
OF
SHT. NO.

DSN: 12130
E
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

REVISION O3 D1 D2
Signature Signature Signature
CERT

DATE 7-MAY-19 24-MAY-19 04-JULY-19


MM

MM

MM

ORIG. BY J.Foster JF J.Foster JF J.Foster john.foster2


ENG'G

RC

JF

JF

APP. BY M.Mahendra MM M.Mahendra MM M.Mahendra meeta.mahendra

APP. BY D.Humphreys DH D.Humphreys DH D.Humphreys debbie.humphreys

TABLE OF CONTENTS
DESCRIPTION

1. GENERAL 3
2. REFERENCES 3
3.
34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL

APPLICABLE CODES AND STANDARDS 3


34-15430-3002 ISSUED FOR REVIEW

3.1 Codes, Standards and Regulations 3


3.2 Definitions 5
3.3 Abbreviations 5
4. ALLOWABLE NOZZLE LOADS 5
JO/EWO

4.1 Compressors 5
4.2 Steam Turbines 5
4-JULY-19
24-MAY-19
DATE

7-MAY-19

4.3 Centrifugal Pumps 6


REV. NO.

4.4 Static Equipment 6


C

DISCIPLINE
ENGINEER 5. INSTALLATION TEMPERATURE 7
________________

DATE ___________
ATTACHMENT 1 – MINIMUM NOZZLE LOADS 8
PROJECT
ENGINEER

________________

DATE ___________

CERTIFIED

________________

DATE ___________

CONSTRUCTION
AGENCY

________________

DATE ___________

OPERATIONS

_______________

DATE ___________
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 2


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

1. GENERAL
CERT

MM

MM

MM

This document provides the allowable nozzle loads required for the static and
ENG'G

rotating equipment in Jafurah Field Development Project.


RC

JF

JF

Any deviation or addition to this document can only be implemented with prior
approval from the COMPANY.

2. REFERENCES

TD-821950 Basic Engineering Design Data (BEDD)


DESCRIPTION

TD-821201 Civil and Structural Design Criteria

SABP-L-005 Piping Vibration Measurements and Assessment


34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL


34-15430-3002 ISSUED FOR REVIEW

SABP-L-006 Piping Stress Analysis Review

SABP-L-009 Piping Spring Supports Design, Construction Inspection


and Maintenance Guidelines
SAES-A-004 General Requirements for Pressure Testing
SAES-A-112 Meteorological and Seismic Design Data
JO/EWO

SAES-L-100 Applicable Codes & Standards for Pressure Piping


Systems
4-JULY-19
24-MAY-19
DATE

7-MAY-19

SAES-L-105 Piping Line Classes


REV. NO.

SAES-L-120 Piping Flexibility Analysis


C

DISCIPLINE
ENGINEER SAES-L-150 Pressure Testing of Plant Piping & Pipelines
________________

DATE ___________ SAES-L-310 Design of Plant Piping


PROJECT
ENGINEER SAES-L-410 Design of Pipelines
________________

DATE ___________
SAES-L-610 Non-metallic Piping for In-Plant
CERTIFIED SAES-L-620 Design of Reinforced Thermosetting Resins (RTR) Piping
________________
in Hydrocarbon & Water Injection Systems
DATE ___________

31-SAMSS-003 Reciprocating Compressors for Process Air or Gas


CONSTRUCTION
AGENCY Service
________________

DATE ___________ 31-SAMSS-009 Positive Displacement Pumps – Controlled Volume


OPERATIONS

_______________
27-SAMSS-003 Field Erected Cooling Towers
DATE ___________

3. APPLICABLE CODES AND STANDARDS


CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

3.1
EDSD

Codes, Standards and Regulations

All piping and equipment shall meet the requirements of this document and
other referenced Project Standards, relevant international Codes, Local and
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________

Statutory Regulations (where applicable).


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 3


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

API 520 Sizing, Selection and Installation of Pressure Relieving


CERT

Devices in Refineries
MM

MM

MM
ENG'G

API 610 Centrifugal Pumps for Petroleum, Petrochemical and


RC

JF

JF

Natural Gas Industries

API 617 Axial & Centrifugal Compressors and Expander-


compressors for Petroleum, Chemical and Gas Industry
Service
API 618 Reciprocating Compressors for Petroleum, Chemical and
Gas Industry Service
DESCRIPTION

API 619 Rotating Type Positive Displacement Compressors for


Petroleum, Petrochemical and Natural Gas Industries
34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL


34-15430-3002 ISSUED FOR REVIEW

API 650 Welded Tanks for Oil Storage


API 660 Shell & Tube Heat Exchangers
API 661 Air-Cooled Heat Exchangers for General Refinery Service
API 662-1 Plate Heat Exchangers for General Refinery Services
JO/EWO

API 663 Hair pin type Heat Exchangers


ALPEMA Braced Aluminium Plate-Fin Heat Exchangers
4-JULY-19
24-MAY-19
DATE

7-MAY-19

API 674 Positive Displacement Pumps - Reciprocating


REV. NO.

API 675 Positive Displacement Pumps - Controlled Volume


C

DISCIPLINE
ENGINEER ASCE 7-05 Medium Design Loads for Buildings and Other Structures
________________

DATE ___________
ASME B31.3 Process Piping
PROJECT
ENGINEER
ASME B73.1 Specification for End Suction Centrifugal Pumps for
________________
Chemical Process
DATE ___________
ASME B73.2 Specification for Vertical In-line Centrifugal Pumps for
CERTIFIED

________________
Process
DATE ___________
ASME Sect. VIII Boiler and Pressure Vessel Code
CONSTRUCTION
AGENCY ASTM Material Testing / Certification
________________

DATE ___________ ISO 14692 Glass Reinforced Plastic (GRP) Piping System Design
OPERATIONS
NFPA 20 Installation of Stationary Pumps for Fire Protection
_______________

DATE ___________ RC Bulletin 297 Local Stresses in Cylindrical Shells due to External
Loadings on Nozzles – Supplement to WRC Bulletin 107
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

WRC Bulletin 449 Guidelines for the Design and Installation of Pump Piping
EDSD

Systems
WRC Bulletin 537 Precision Equations and Enhanced Diagrams for Local
Stresses in Spherical and Cylindrical Shells due to External
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Loadings for Implementation of WRC Bulletin 107


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 4


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

3.2 Definitions
CERT

MM

MM

MM

Refer to Schedule A, paragraph 1 for contract definitions.


ENG'G

RC

JF

JF

3.3 Abbreviations

ASME American Society of Mechanical Engineers


API American Petroleum Institute
ASTM American Society for Testing and Materials
BEDD Basic Engineering Design Data
DESCRIPTION

ISO International Organisation for Standardisation


34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL

NEMA National Electrical Manufacturers Association


34-15430-3002 ISSUED FOR REVIEW

NFPA National Fire Protection Agency


WRC Welding Research Council
LLI Long Lead Item
GA General Arrangement Drawing
JO/EWO

4. ALLOWABLE NOZZLE LOADS


4-JULY-19
24-MAY-19
DATE

7-MAY-19

4.1 Compressors
REV. NO.

4.1.1 Centrifugal compressors


C

DISCIPLINE
ENGINEER Allowable nozzle loads:
________________

DATE ___________
Minimum Normal Continuous operation: allowable of 1.0 x API 617
PROJECT
ENGINEER

________________
Minimum Nitrogen, upset, recycle, etc. allowable of 1.0 x API 617
DATE ___________
Minimum Short Term Occasional (seismic, wind) allowable of 1.0 x API 617
CERTIFIED

________________

DATE ___________
4.2 Steam Turbines

CONSTRUCTION 4.2.1 General Purpose Steam Turbines


AGENCY

________________

DATE ___________
Allowable nozzle loads:
OPERATIONS
Minimum Normal Continuous operation: allowable of 1.0 x API 611
_______________

DATE ___________
Minimum Nitrogen, upset, recycle, etc. allowable of 1.0 x API 611
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

Minimum Short Term Occasional (seismic, wind) allowable of 1.0 x API 611
EDSD

4.2.2 Special Purpose Steam Turbines

Allowable nozzle loads:


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

Minimum Normal Continuous operation: allowable of 1.0 x API 612

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 5


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

Minimum Nitrogen, upset, recycle, etc. allowable of 1.0 x API 612


CERT

MM

MM

MM

Minimum Short Term Occasional (seismic, wind) allowable of 1.0 x API 612
ENG'G

RC

JF

JF

4.3 Centrifugal Pumps

4.3.1 Horizontal pumps

The allowable nozzle loads shall be as per the allowable loads specified in API
610 Table 5.
DESCRIPTION

4.3.2 Vertical In-line pumps

The allowable nozzle loads shall be as per the allowable loads specified in API
34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL

610 Table 5.
34-15430-3002 ISSUED FOR REVIEW

For pump casings constructed of materials other than steel or alloy steel or for
pumps with nozzles larger than DN 400 (NPS 16), the Vendor shall submit
allowable nozzle loads

4.3.3 ANSI/ASME B 73.1/ISO 5199/2858 Pumps


JO/EWO

The allowable nozzle loads shall be as per ANSI / HI 9.6.2.


4-JULY-19
24-MAY-19

4.4 Static Equipment


DATE

7-MAY-19

4.4.1 Cooling Towers


REV. NO.

DISCIPLINE
ENGINEER
Vendor shall provide nozzle allowable loads on GAs depending upon materials
________________ and operating parameters.
DATE ___________

PROJECT
Cooling Towers shall be designed according to 27-SAMSS-003 Field Erected
ENGINEER
Cooling Towers Vertical In-line pumps
________________

DATE ___________
4.4.2 Air Coolers
CERTIFIED

________________
The allowable nozzle loads shall be as per the allowable loads specified in API
DATE ___________
661 Table 4.
CONSTRUCTION
AGENCY
4.4.3 Storage Tanks
________________

DATE ___________
The allowable nozzle loads of API storage tanks shall be 70% of 150 Rating
OPERATIONS
Load table specified in Attachment 1.
_______________

DATE ___________
The allowable nozzle loads of Non-API storage tanks shall be as per the
agreement with Vendor.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD

4.4.4 Shell and Tube Heat Exchangers

The allowable nozzle loads shall be as per the allowable loads specified in API
660 Table 2.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

For nozzle sizes greater than those listed in Table 2 of API 660, Forces and
moments shall be specified by the Vendor.

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 6


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

4.4.5 Braced Aluminium Exchangers


CERT

MM

MM

MM

The allowable nozzle loads shall be as per the allowable loads specified in
ENG'G

ALPEMA Table 5-1.


RC

JF

JF

4.4.6 Hairpin Type Heat Exchangers

The allowable nozzle loads shall be as per the allowable loads specified in API
663 Table 2.

4.4.7 Pressure Vessels/Spheres


DESCRIPTION

The allowable nozzle loads shall be as per the allowable loads specified in
Attachment 1.
34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL


34-15430-3002 ISSUED FOR REVIEW

Columns

The allowable nozzle loads shall be as per the allowable loads specified in
Attachment 1

Allowable on nozzles in conic walls shall be 2 X the allowable loads specified


JO/EWO

in Attachment 1. For occasional wind and earthquake cases, allowable shall


be 3 times the standard.
4-JULY-19
24-MAY-19

4.4.8 Vendor Packages


DATE

7-MAY-19

The allowable nozzle loads shall be as per the allowable loads specified in
REV. NO.

Attachment 1
DISCIPLINE
ENGINEER

________________ 5. INSTALLATION TEMPERATURE


DATE ___________

PROJECT All equipment expansion shall be provided by the Vendor for static and
ENGINEER
rotating equipment.
________________

DATE ___________
For hot lines (lines connected to equipment operating at a higher temperature
CERTIFIED
than the installation temperature of T=28 °F (-2 °C)), Vendor shall use the
________________
installation temperature T=28 °F (-2 °C) to calculate equipment expansion in
DATE ___________
operating, design and upset conditions.
CONSTRUCTION
AGENCY
For cold lines (lines connected to equipment operating at a temperature lower
than T=28 °F (-2 °C)), Vendor’s shall use T=131 °F (55 °C) as installation
________________

DATE ___________
temperature to calculate equipment expansion in operating, design and upset
OPERATIONS
conditions.
_______________

DATE ___________
The Vendor shall use the maximum differential temperature to calculate
thermal expansion on equipment for every operating and design case.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 7


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

ATTACHMENT 1 – MINIMUM NOZZLE LOADS


CERT

MM

MM

MM

Fz
ENG'G

RC

JF

JF

Mz
DESCRIPTION

Mx
34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL

Fx My Fy
34-15430-3002 ISSUED FOR REVIEW

For Minimum Nozzle Load values, refer to the following tables and
accompanying notes.
JO/EWO

1.1 Loads for 150 LB Rating Nozzles (Refer to Design Notes, Para 2)

NOZZLE DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)
4-JULY-19
24-MAY-19

VESSELS & HEAT EXCH VESSELS HEAT EXCHANGERS


DATE

7-MAY-19

NPS DN FX FY FZ MX MY MZ MX MY MZ
REV. NO.

2 50 0.9 0.9 1.2 0.2 0.2 0.3 0.2 0.2 0.2


C

DISCIPLINE 3 80 1.7 1.7 2.4 0.6 0.6 0.8 0.6 0.6 0.6
ENGINEER

________________ 4 100 2.3 2.3 3.2 1.1 1.1 1.5 1.1 1.1 1.0
DATE ___________ 6 150 3.4 3.4 4.8 2.4 2.4 3.4 2.4 2.4 2.5
PROJECT
ENGINEER
8 200 4.7 4.7 6.6 4.2 4.2 5.9 4.2 4.2 5.0
________________ 10 250 6.2 6.2 8.7 6.4 6.4 9.1 6.4 6.4 7.0
DATE ___________
12 300 7.7 7.7 10.9 9.4 9.4 13.3 8.0 8.0 8.0
CERTIFIED

________________
14 350 9.3 9.3 13.2 12.5 12.5 17.6 9.0 9.0 10.0
DATE ___________ 16 400 11.1 11.1 15.7 16.7 16.7 23.6 10.0 10.0 14.0
18 450 12.8 12.8 18.1 21.1 21.1 29.8 12.0 12.0 17.0
CONSTRUCTION
AGENCY
20 500 14.5 14.5 20.5 25.2 25.2 35.6 15.0 15.0 21.0
________________

DATE ___________
22 550 16.2 16.2 22.9 29.6 29.6 41.8 17.0 17.0 25.0
OPERATIONS
24 600 17.9 17.9 25.3 33.8 33.8 47.7 20.0 20.0 28.0
_______________ 26 650 19.7 19.7 27.9 37.8 37.8 53.4 22.0 22.0 32.0
DATE ___________
28 700 21.4 21.4 30.2 42.0 42.0 59.3 25.0 25.0 35.0
30 750 23.0 23.0 32.5 46.1 46.1 65.2 27.0 27.0 39.0
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

32 800 24.6 24.6 34.6 52.5 52.5 74.2 31.0 31.0 44.0
EDSD

34 850 26.1 26.1 36.8 59.2 59.2 83.7 35.0 35.0 50.0
36 900 27.6 27.6 39.0 66.4 66.4 93.9 39.0 39.0 56.0
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 8


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

MM

MM

MM

1.2 Loads for 300 LB Rating Nozzles (Refer to Design Notes, Para 2)
ENG'G

RC

JF

JF

DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)


NOZZLE
VESSELS & HEAT EXCH VESSELS HEAT EXCHANGERS

NPS DN FX FY FZ MX MY MZ MX MY MZ
2 50 1.1 1.1 1.5 0.2 0.2 0.3 0.2 0.2 0.2
3 80 2.0 2.0 2.9 0.7 0.7 1.0 0.6 0.6 0.6
4 100 2.7 2.7 3.8 1.3 1.3 1.8 1.2 1.2 1.2
6 150 4.0 4.0 5.7 2.9 2.9 4.1 2.9 2.9 3.0
DESCRIPTION

8 200 5.6 5.6 7.9 5.0 5.0 7.1 5.0 5.0 6.0
10 250 7.4 7.4 10.4 7.7 7.7 10.9 7.7 7.7 8.0
34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL

12 300 9.3 9.3 13.1 11.2 11.2 15.9 9.0 9.0 9.0
34-15430-3002 ISSUED FOR REVIEW

14 350 11.2 11.2 15.8 15.0 15.0 21.2 10.0 10.0 12.0
16 400 13.3 13.3 18.8 20.0 20.0 28.3 12.0 12.0 16.0
18 450 15.4 15.4 21.7 25.3 25.3 35.8 15.0 15.0 21.0
20 500 17.4 17.4 24.6 30.2 30.2 42.7 18.0 18.0 25.0
22 550 19.4 19.4 27.5 35.5 35.5 50.2 21.0 21.0 30.0
JO/EWO

24 600 21.5 21.5 30.4 40.6 40.6 57.2 24.0 24.0 34.0
26 650 23.6 23.6 33.5 45.4 45.4 64.1 27.0 27.0 38.0
28 700 25.6 25.6 36.3 50.4 50.4 71.2 30.0 30.0 42.0
4-JULY-19
24-MAY-19

30 750 27.6 27.6 39.1 55.3 55.3 78.2 33.0 33.0 46.0
DATE

7-MAY-19

32 800 29.4 29.4 41.7 62.9 62.9 89.0 37.0 37.0 53.0
34 850 31.3 31.3 44.3 71.0 71.0 100.4 42.0 42.0 60.0
REV. NO.

36 900 33.1 33.1 46.9 79.6 79.6 112.6 47.0 47.0 67.0
DISCIPLINE
ENGINEER

________________
1.3 Loads for 600 LB Rating Nozzles (Refer to Design Notes, Para 2)
DATE ___________

PROJECT NOZZLE DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)
ENGINEER VESSELS & HEAT EXCH VESSELS HEAT EXCHANGERS
________________

DATE ___________
NPS DN FX FY FZ MX MY MZ MX MY MZ
CERTIFIED
2 50 1.2 1.2 1.7 0.3 0.3 0.4 0.3 0.3 0.3
________________ 3 80 2.4 2.4 3.4 0.8 0.8 1.1 0.8 0.8 0.8
DATE ___________ 4 100 3.2 3.2 4.5 1.5 1.5 2.1 1.5 1.5 1.5
6 150 4.7 4.7 6.7 3.4 3.4 4.7 3.0 3.0 3.0
CONSTRUCTION
AGENCY 8 200 6.5 6.5 9.2 5.8 5.8 8.3 5.8 5.8 7.0
________________ 10 250 8.6 8.6 12.1 9.0 9.0 12.7 9.0 9.0 10.0
DATE ___________
12 300 10.8 10.8 15.3 13.1 13.1 18.6 12.0 12.0 12.0
OPERATIONS 14 350 13.1 13.1 18.5 17.4 17.4 24.7 14.0 14.0 14.0
_______________
16 400 15.5 15.5 22.0 23.4 23.4 33.0 16.0 16.0 19.0
DATE ___________
18 450 17.9 17.9 25.3 29.5 29.5 41.8 18.0 18.0 25.0
20 500 20.3 20.3 28.7 35.2 35.2 49.8 20.0 20.0 29.0
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

22 550 22.7 22.7 32.1 41.4 41.4 58.5 24.0 24.0 35.0
EDSD

24 600 25.1 25.1 35.4 47.3 47.3 66.8 28.0 28.0 40.0
26 650 27.6 27.6 39.1 52.9 52.9 74.8 31.0 31.0 44.0
28 700 29.9 29.9 42.4 58.7 58.7 83.1 35.0 35.0 49.0
30 750 32.2 32.2 45.6 64.5 64.5 91.3 38.0 38.0 54.0
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

32 800 34.3 34.3 48.6 73.4 73.4 103.9 44.0 44.0 62.0
REVISION CERTIFICATE

34 850 36.5 36.5 51.7 82.8 82.8 117.3 49.0 49.0 70.0
36 900 38.6 38.6 54.7 92.9 92.9 131.5 55.0 55.0 78.0

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 9


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

1.4 Loads for 900 LB Rating Nozzles (Refer to Design Notes, Para 2)
CERT

MM

MM

MM

NOZZLE DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)
VESSELS & HEAT EXCH VESSELS HEAT EXCHANGERS
ENG'G

RC

JF

JF

NPS DN FX FY FZ MX MY MZ MX MY MZ
2 50 1.4 1.4 1.9 0.3 0.3 0.5 0.3 0.3 0.3
3 80 2.7 2.7 3.8 0.9 0.9 1.2 0.9 0.9 1.0
4 100 3.6 3.6 5.1 1.7 1.7 2.4 1.7 1.7 1.7
6 150 5.3 5.3 7.6 3.8 3.8 5.3 3.3 3.3 3.3
8 200 7.4 7.4 10.4 6.6 6.6 9.4 6.6 6.6 9.0
DESCRIPTION

10 250 9.7 9.7 13.7 10.2 10.2 14.4 10.2 10.2 12.0
12 300 12.2 12.2 17.3 14.8 14.8 21.0 14.0 14.0 14.0
14 350 14.8 14.8 20.9 19.7 19.7 27.9 16.0 16.0 16.0
34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL


34-15430-3002 ISSUED FOR REVIEW

16 400 17.5 17.5 24.9 26.5 26.5 37.3 18.0 18.0 22.0
18 450 20.3 20.3 28.6 33.4 33.4 47.3 22.0 22.0 28.0
20 500 23.0 23.0 32.5 39.8 39.8 56.4 24.0 24.0 33.0
22 550 25.7 25.7 36.3 46.8 46.8 66.2 28.0 28.0 39.0
24 600 28.4 28.4 40.1 53.5 53.5 75.6 32.0 32.0 45.0
26 650 31.2 31.2 44.2 59.9 59.9 84.6 35.0 35.0 50.0
JO/EWO

28 700 33.8 33.8 48.0 66.4 66.4 94.0 39.0 39.0 56.0
30 750 36.4 36.4 51.6 73.0 73.0 103.3 43.0 43.0 61.0
32 800 38.8 38.8 55.0 83.1 83.1 117.6 49.0 49.0 70.0
4-JULY-19
24-MAY-19
DATE

7-MAY-19

34 850 41.3 41.3 58.5 93.7 93.7 132.7 56.0 56.0 79.0
36 900 43.7 43.7 61.9 105. 105.1 148.8 63.0 63.0 89.0
REV. NO.

1
C

1.5 Loads for 1500 LB Rating Nozzles (Refer to Design Notes, Para 2)
DISCIPLINE
ENGINEER

NOZZLE DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)
________________
VESSELS & HEAT EXCH VESSELS HEAT EXCHANGERS
DATE ___________

PROJECT NPS DN FX FY FZ MX MY MZ MX MY MZ
ENGINEER

________________ 2 50 1.5 1.5 2.1 0.4 0.4 0.5 0.4 0.4 0.4
DATE ___________ 3 80 3.0 3.0 4.3 1.0 1.0 1.4 1.0 1.0 1.2
CERTIFIED 4 100 4.0 4.0 5.6 1.9 1.9 2.6 1.9 1.9 2.0
________________ 6 150 5.9 5.9 8.4 4.3 4.3 5.9 3.5 3.5 3.5
DATE ___________
8 200 8.2 8.2 11.5 7.3 7.3 10.4 7.3 7.3 11.0
CONSTRUCTION 10 250 10.8 10.8 15.2 11.3 11.3 15.9 11.3 11.3 14.0
AGENCY

________________
12 300 13.5 13.5 19.2 16.4 16.4 23.3 16.0 16.0 16.0
DATE ___________
14 350 16.4 16.4 23.2 21.8 21.8 31.0 18.0 18.0 18.0
OPERATIONS
16 400 19.4 19.4 27.6 29.4 29.4 41.4 20.0 20.0 24.0
_______________ 18 450 22.5 22.5 31.7 37.0 37.0 52.4 24.0 24.0 31.0
DATE ___________ 20 500 25.5 25.5 36.0 44.2 44.2 62.5 26.0 26.0 37.0
22 550 28.5 28.5 40.3 51.9 51.9 73.4 31.0 31.0 44.0
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

24 600 31.5 31.5 44.4 59.3 59.3 83.8 35.0 35.0 50.0
EDSD

26 650 34.6 34.6 49.0 66.4 66.4 93.8 39.0 39.0 56.0
28 700 37.5 37.5 53.2 73.6 73.6 104.2 44.0 44.0 62.0
30 750 40.4 40.4 57.2 80.9 80.9 114.5 48.0 48.0 68.0
THIS INDICATES THAT REV. NO. ____________

32 800 43.0 43.0 61.0 92.1 92.1 130.3 55.0 55.0 78.0
APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

34 850 45.8 45.8 64.9 103. 103.9 147.1 62.0 62.0 88.0
36 900 48.4 48.4 68.6 9
116. 116.5 165.0 69.0 69.0 99.0
5
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 10


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT

1.6 Loads for 2500 LB Rating Nozzles (Refer to Design Notes, Para 2)
CERT

MM

MM

MM
ENG'G

DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)


RC

NOZZLE
JF

JF

VESSELS & HEAT EXCH VESSELS HEAT EXCHANGERS

NPS DN FX FY FZ MX MY MZ MX MY MZ
2 50 1.7 1.7 2.3 0.4 0.4 0.6 0.4 0.4 0.5
3 80 3.3 3.3 4.7 1.1 1.1 1.5 1.1 1.1 1.5
4 100 4.4 4.4 6.2 2.1 2.1 2.9 2.1 2.1 2.5
DESCRIPTION

6 150 6.5 6.5 9.2 4.7 4.7 6.5 4.0 4.0 4.0
8 200 9.0 9.0 12.7 8.0 8.0 11.4 8.0 8.0 11.4
10 250 11.8 11.8 16.7 12.4 12.4 17.5 12.4 12.4 16.0
34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL


34-15430-3002 ISSUED FOR REVIEW

12 300 14.9 14.9 21.1 18.0 18.0 25.6 18.0 18.0 18.0

ATTACHMENT 1 DESIGN NOTES

1. Unless larger loads are specified in the Data Sheet or the Material
JO/EWO

Requisition, the design of nozzles shall be based on the minimum loads


specified in the tables from Paragraph 1. Loads shall only be analysed using
Welding Research Council (WRC) Bulletin 297/ 537 or FEA. Calculations
4-JULY-19
24-MAY-19
DATE

7-MAY-19

shall be performed with the Vessel in the corroded condition.


REV. NO.

2. Calculations shall be in accordance with ASME Sec VIII div 1/ 2.


C

DISCIPLINE
ENGINEER
3. All loadings shall be considered coincidental with the Design Pressure
________________
multiplied by the appropriate Stress Concentration Factor (SCF).
DATE ___________

PROJECT
ENGINEER 4. Loads shall apply to all process flow nozzles, including spares, they do not
________________ apply to nozzles such as manways and instrument connections.
DATE ___________

CERTIFIED 5. All loads shall be considered at the nozzle to shell / head junction and, if
________________ applicable, at the edge of the reinforcement pad.
DATE ___________

CONSTRUCTION
6. Radial load Fz shall be checked for both positive and negative directions at
AGENCY the specified value. Positive load shall be checked with internal pressure.
________________ Negative load shall be checked with no internal pressure.
DATE ___________

OPERATIONS 7. Where vacuum is a Design consideration, deflection should be checked at


_______________
nozzle to shell junction and limited to ∂ ≤ 0.0025R, where R = shell or head
DATE ___________
radius.
CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION

8. The effect of nozzle loads should be considered when designing equipment


EDSD

supports.
THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 11


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130
Saudi Aramco 2616-ENG (10/2002)

OPRNS SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT

9. The Vendor’s General Arrangement drawing shall include a table of


MM

MM

MM

Maximum Allowable Nozzle Loads, it shall reflect the loads specified in this
ENG'G

Standard and be verified by calculations. The format of the table shall


RC

JF

JF

typically be as follows:-

MAXIMUM ALLOWABLE NOZZLE LOADS


FORCES (KN) MOMENTS (KNm)
Nozzle
DESCRIPTION

Fx Fy Fz Mx My Mz
N1 6.2 6.2 8.7 6.4 6.4 9.1
34-15430-3002 ISSUED FOR PROPOSAL

34-15430-3002 ISSUED FOR PROPOSAL

N2 12.8 12.8 18.1 21.1 21.1 29.8


34-15430-3002 ISSUED FOR REVIEW

N3 3.4 3.4 4.8 2.4 2.4 3.4


N4 3.4 3.4 4.8 2.4 2.4 3.4
N4 7.6 0.9 0.6 0.9 1.1 6.4
JO/EWO

The General Arrangement drawing shall also include a sketch, similar to the
sketch in Para 1, to show direction of loads.
If a special one off case has also been agreed, then these loads shall be added
4-JULY-19
24-MAY-19
DATE

7-MAY-19

to the table, refer to bottom line in example table.


REV. NO.

10. Except as indicated below, all nozzles shall have a 2 times nozzle outside
C

DISCIPLINE
diameter, reinforcing pad.
ENGINEER

________________
a) Heavily loaded nozzles requiring special consideration.
DATE ___________
c) Nozzles requiring integral reinforcement.
PROJECT
ENGINEER
d) When thickened shell or head section plus thickened nozzle neck is used.
________________

DATE ___________ 11. The Vendor shall notify the BUYER of any cases where the equipment design
CERTIFIED
thickness has to be increased, over the required thickness for pressure and
________________ other related loadings, to accommodate the specified nozzle loads. The
DATE ___________ Vendor shall also advise the BUYER of the maximum allowable nozzle loads
that the equipment can accommodate, without increasing the thickness.
CONSTRUCTION
AGENCY Note, calculations shall be provided by Vendor to verify. BUYER shall advise,
________________ on a case by case basis, if nozzle loads can be reduced.
DATE ___________

OPERATIONS 12. Nozzles larger than 36” NB, shall be designed to withstand the loads as
_______________ computed from the formulae below, where D = Nozzle Diameter:-
Forces:-Fx = (Fx for 36” nozzle at same flange rating) x (D / 36)
DATE ___________

Moments:-Mx = (Mx for 36” nozzle at same flange rating) x (D / 36)²


CONTROL NUMBER

DATE _____________
BY: ______________
VERIFICATION
EDSD

Note, same formulae applies for Fy, Fz, My and Mz.


THIS INDICATES THAT REV. NO. ____________

APPROVAL/CERTIFICATION REQUIREMENTS,

(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


REVISION CERTIFICATE

PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.

NOZZLE ALLOWABLES DOC 12


861 L TD-821108
JFGP COMMON FACILITIES OF E
JAFURAH SAUDI ARABIA JO / EWO 34-15430-3002 12
6701-8230-SP-0009 _ D2 DOC CLASS: 4B DSN: 12130

You might also like