T821108001pe - Nozzle Allowables
T821108001pe - Nozzle Allowables
OF THIS DRAWING IS COVERED, FOR ALL C 7-MAY-19 34-15430-3002 ISSUED FOR REVIEW RC MM
meeta.mahendra
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
D 24-MAY-19 34-15430-3002 ISSUED FOR PROPOSAL JF MM
AGENCY
PROJECT
ENGINEER
ENGINEER
CERTIFIED
DISCIPLINE
BY DRAWING COMPLETION CERTIFICATE BY: ______________
OPERATIONS
john.foster2
CONSTRUCTION
_______________
DATE ___________
DATE ___________
DATE ___________
DATE ___________
DATE ___________
________________
________________
________________
________________
(DCC)NO. _______________________________ E 4-JULY-19 34-15430-3002 ISSUED FOR PROPOSAL JF MM
DATE _____________
6701-8230-SP-0009 _ D2
JAFURAH
Saudi Aramco 2616-ENG (10/2002)
NOZZLE ALLOWABLES
PROJECT SPECIFICATION
SAUDI ARABIA
861
PLANT .NO
NOZZLE ALLOWABLES
PROJECT SPECIFICATION
L
INDEX
SAUDI ARABIAN OIL COMPANY
JO / EWO 34-15430-3002
DOC CLASS: 4B
DRAWING NO.
TD-821108
1
12
OF
SHT. NO.
DSN: 12130
E
REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (10/2002)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
REVISION O3 D1 D2
Signature Signature Signature
CERT
MM
MM
RC
JF
JF
TABLE OF CONTENTS
DESCRIPTION
1. GENERAL 3
2. REFERENCES 3
3.
34-15430-3002 ISSUED FOR PROPOSAL
4.1 Compressors 5
4.2 Steam Turbines 5
4-JULY-19
24-MAY-19
DATE
7-MAY-19
DISCIPLINE
ENGINEER 5. INSTALLATION TEMPERATURE 7
________________
DATE ___________
ATTACHMENT 1 – MINIMUM NOZZLE LOADS 8
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
_______________
DATE ___________
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
1. GENERAL
CERT
MM
MM
MM
This document provides the allowable nozzle loads required for the static and
ENG'G
JF
JF
Any deviation or addition to this document can only be implemented with prior
approval from the COMPANY.
2. REFERENCES
7-MAY-19
DISCIPLINE
ENGINEER SAES-L-150 Pressure Testing of Plant Piping & Pipelines
________________
DATE ___________
SAES-L-610 Non-metallic Piping for In-Plant
CERTIFIED SAES-L-620 Design of Reinforced Thermosetting Resins (RTR) Piping
________________
in Hydrocarbon & Water Injection Systems
DATE ___________
_______________
27-SAMSS-003 Field Erected Cooling Towers
DATE ___________
DATE _____________
BY: ______________
VERIFICATION
3.1
EDSD
All piping and equipment shall meet the requirements of this document and
other referenced Project Standards, relevant international Codes, Local and
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
Devices in Refineries
MM
MM
MM
ENG'G
JF
JF
7-MAY-19
DISCIPLINE
ENGINEER ASCE 7-05 Medium Design Loads for Buildings and Other Structures
________________
DATE ___________
ASME B31.3 Process Piping
PROJECT
ENGINEER
ASME B73.1 Specification for End Suction Centrifugal Pumps for
________________
Chemical Process
DATE ___________
ASME B73.2 Specification for Vertical In-line Centrifugal Pumps for
CERTIFIED
________________
Process
DATE ___________
ASME Sect. VIII Boiler and Pressure Vessel Code
CONSTRUCTION
AGENCY ASTM Material Testing / Certification
________________
DATE ___________ ISO 14692 Glass Reinforced Plastic (GRP) Piping System Design
OPERATIONS
NFPA 20 Installation of Stationary Pumps for Fire Protection
_______________
DATE ___________ RC Bulletin 297 Local Stresses in Cylindrical Shells due to External
Loadings on Nozzles – Supplement to WRC Bulletin 107
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
WRC Bulletin 449 Guidelines for the Design and Installation of Pump Piping
EDSD
Systems
WRC Bulletin 537 Precision Equations and Enhanced Diagrams for Local
Stresses in Spherical and Cylindrical Shells due to External
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
3.2 Definitions
CERT
MM
MM
MM
RC
JF
JF
3.3 Abbreviations
7-MAY-19
4.1 Compressors
REV. NO.
DISCIPLINE
ENGINEER Allowable nozzle loads:
________________
DATE ___________
Minimum Normal Continuous operation: allowable of 1.0 x API 617
PROJECT
ENGINEER
________________
Minimum Nitrogen, upset, recycle, etc. allowable of 1.0 x API 617
DATE ___________
Minimum Short Term Occasional (seismic, wind) allowable of 1.0 x API 617
CERTIFIED
________________
DATE ___________
4.2 Steam Turbines
________________
DATE ___________
Allowable nozzle loads:
OPERATIONS
Minimum Normal Continuous operation: allowable of 1.0 x API 611
_______________
DATE ___________
Minimum Nitrogen, upset, recycle, etc. allowable of 1.0 x API 611
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
Minimum Short Term Occasional (seismic, wind) allowable of 1.0 x API 611
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
MM
MM
MM
Minimum Short Term Occasional (seismic, wind) allowable of 1.0 x API 612
ENG'G
RC
JF
JF
The allowable nozzle loads shall be as per the allowable loads specified in API
610 Table 5.
DESCRIPTION
The allowable nozzle loads shall be as per the allowable loads specified in API
34-15430-3002 ISSUED FOR PROPOSAL
610 Table 5.
34-15430-3002 ISSUED FOR REVIEW
For pump casings constructed of materials other than steel or alloy steel or for
pumps with nozzles larger than DN 400 (NPS 16), the Vendor shall submit
allowable nozzle loads
7-MAY-19
DISCIPLINE
ENGINEER
Vendor shall provide nozzle allowable loads on GAs depending upon materials
________________ and operating parameters.
DATE ___________
PROJECT
Cooling Towers shall be designed according to 27-SAMSS-003 Field Erected
ENGINEER
Cooling Towers Vertical In-line pumps
________________
DATE ___________
4.4.2 Air Coolers
CERTIFIED
________________
The allowable nozzle loads shall be as per the allowable loads specified in API
DATE ___________
661 Table 4.
CONSTRUCTION
AGENCY
4.4.3 Storage Tanks
________________
DATE ___________
The allowable nozzle loads of API storage tanks shall be 70% of 150 Rating
OPERATIONS
Load table specified in Attachment 1.
_______________
DATE ___________
The allowable nozzle loads of Non-API storage tanks shall be as per the
agreement with Vendor.
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
The allowable nozzle loads shall be as per the allowable loads specified in API
660 Table 2.
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
For nozzle sizes greater than those listed in Table 2 of API 660, Forces and
moments shall be specified by the Vendor.
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
MM
MM
MM
The allowable nozzle loads shall be as per the allowable loads specified in
ENG'G
JF
JF
The allowable nozzle loads shall be as per the allowable loads specified in API
663 Table 2.
The allowable nozzle loads shall be as per the allowable loads specified in
Attachment 1.
34-15430-3002 ISSUED FOR PROPOSAL
Columns
The allowable nozzle loads shall be as per the allowable loads specified in
Attachment 1
7-MAY-19
The allowable nozzle loads shall be as per the allowable loads specified in
REV. NO.
Attachment 1
DISCIPLINE
ENGINEER
PROJECT All equipment expansion shall be provided by the Vendor for static and
ENGINEER
rotating equipment.
________________
DATE ___________
For hot lines (lines connected to equipment operating at a higher temperature
CERTIFIED
than the installation temperature of T=28 °F (-2 °C)), Vendor shall use the
________________
installation temperature T=28 °F (-2 °C) to calculate equipment expansion in
DATE ___________
operating, design and upset conditions.
CONSTRUCTION
AGENCY
For cold lines (lines connected to equipment operating at a temperature lower
than T=28 °F (-2 °C)), Vendor’s shall use T=131 °F (55 °C) as installation
________________
DATE ___________
temperature to calculate equipment expansion in operating, design and upset
OPERATIONS
conditions.
_______________
DATE ___________
The Vendor shall use the maximum differential temperature to calculate
thermal expansion on equipment for every operating and design case.
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
MM
MM
MM
Fz
ENG'G
RC
JF
JF
Mz
DESCRIPTION
Mx
34-15430-3002 ISSUED FOR PROPOSAL
Fx My Fy
34-15430-3002 ISSUED FOR REVIEW
For Minimum Nozzle Load values, refer to the following tables and
accompanying notes.
JO/EWO
1.1 Loads for 150 LB Rating Nozzles (Refer to Design Notes, Para 2)
NOZZLE DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)
4-JULY-19
24-MAY-19
7-MAY-19
NPS DN FX FY FZ MX MY MZ MX MY MZ
REV. NO.
DISCIPLINE 3 80 1.7 1.7 2.4 0.6 0.6 0.8 0.6 0.6 0.6
ENGINEER
________________ 4 100 2.3 2.3 3.2 1.1 1.1 1.5 1.1 1.1 1.0
DATE ___________ 6 150 3.4 3.4 4.8 2.4 2.4 3.4 2.4 2.4 2.5
PROJECT
ENGINEER
8 200 4.7 4.7 6.6 4.2 4.2 5.9 4.2 4.2 5.0
________________ 10 250 6.2 6.2 8.7 6.4 6.4 9.1 6.4 6.4 7.0
DATE ___________
12 300 7.7 7.7 10.9 9.4 9.4 13.3 8.0 8.0 8.0
CERTIFIED
________________
14 350 9.3 9.3 13.2 12.5 12.5 17.6 9.0 9.0 10.0
DATE ___________ 16 400 11.1 11.1 15.7 16.7 16.7 23.6 10.0 10.0 14.0
18 450 12.8 12.8 18.1 21.1 21.1 29.8 12.0 12.0 17.0
CONSTRUCTION
AGENCY
20 500 14.5 14.5 20.5 25.2 25.2 35.6 15.0 15.0 21.0
________________
DATE ___________
22 550 16.2 16.2 22.9 29.6 29.6 41.8 17.0 17.0 25.0
OPERATIONS
24 600 17.9 17.9 25.3 33.8 33.8 47.7 20.0 20.0 28.0
_______________ 26 650 19.7 19.7 27.9 37.8 37.8 53.4 22.0 22.0 32.0
DATE ___________
28 700 21.4 21.4 30.2 42.0 42.0 59.3 25.0 25.0 35.0
30 750 23.0 23.0 32.5 46.1 46.1 65.2 27.0 27.0 39.0
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
32 800 24.6 24.6 34.6 52.5 52.5 74.2 31.0 31.0 44.0
EDSD
34 850 26.1 26.1 36.8 59.2 59.2 83.7 35.0 35.0 50.0
36 900 27.6 27.6 39.0 66.4 66.4 93.9 39.0 39.0 56.0
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT
MM
MM
MM
1.2 Loads for 300 LB Rating Nozzles (Refer to Design Notes, Para 2)
ENG'G
RC
JF
JF
NPS DN FX FY FZ MX MY MZ MX MY MZ
2 50 1.1 1.1 1.5 0.2 0.2 0.3 0.2 0.2 0.2
3 80 2.0 2.0 2.9 0.7 0.7 1.0 0.6 0.6 0.6
4 100 2.7 2.7 3.8 1.3 1.3 1.8 1.2 1.2 1.2
6 150 4.0 4.0 5.7 2.9 2.9 4.1 2.9 2.9 3.0
DESCRIPTION
8 200 5.6 5.6 7.9 5.0 5.0 7.1 5.0 5.0 6.0
10 250 7.4 7.4 10.4 7.7 7.7 10.9 7.7 7.7 8.0
34-15430-3002 ISSUED FOR PROPOSAL
12 300 9.3 9.3 13.1 11.2 11.2 15.9 9.0 9.0 9.0
34-15430-3002 ISSUED FOR REVIEW
14 350 11.2 11.2 15.8 15.0 15.0 21.2 10.0 10.0 12.0
16 400 13.3 13.3 18.8 20.0 20.0 28.3 12.0 12.0 16.0
18 450 15.4 15.4 21.7 25.3 25.3 35.8 15.0 15.0 21.0
20 500 17.4 17.4 24.6 30.2 30.2 42.7 18.0 18.0 25.0
22 550 19.4 19.4 27.5 35.5 35.5 50.2 21.0 21.0 30.0
JO/EWO
24 600 21.5 21.5 30.4 40.6 40.6 57.2 24.0 24.0 34.0
26 650 23.6 23.6 33.5 45.4 45.4 64.1 27.0 27.0 38.0
28 700 25.6 25.6 36.3 50.4 50.4 71.2 30.0 30.0 42.0
4-JULY-19
24-MAY-19
30 750 27.6 27.6 39.1 55.3 55.3 78.2 33.0 33.0 46.0
DATE
7-MAY-19
32 800 29.4 29.4 41.7 62.9 62.9 89.0 37.0 37.0 53.0
34 850 31.3 31.3 44.3 71.0 71.0 100.4 42.0 42.0 60.0
REV. NO.
36 900 33.1 33.1 46.9 79.6 79.6 112.6 47.0 47.0 67.0
DISCIPLINE
ENGINEER
________________
1.3 Loads for 600 LB Rating Nozzles (Refer to Design Notes, Para 2)
DATE ___________
PROJECT NOZZLE DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)
ENGINEER VESSELS & HEAT EXCH VESSELS HEAT EXCHANGERS
________________
DATE ___________
NPS DN FX FY FZ MX MY MZ MX MY MZ
CERTIFIED
2 50 1.2 1.2 1.7 0.3 0.3 0.4 0.3 0.3 0.3
________________ 3 80 2.4 2.4 3.4 0.8 0.8 1.1 0.8 0.8 0.8
DATE ___________ 4 100 3.2 3.2 4.5 1.5 1.5 2.1 1.5 1.5 1.5
6 150 4.7 4.7 6.7 3.4 3.4 4.7 3.0 3.0 3.0
CONSTRUCTION
AGENCY 8 200 6.5 6.5 9.2 5.8 5.8 8.3 5.8 5.8 7.0
________________ 10 250 8.6 8.6 12.1 9.0 9.0 12.7 9.0 9.0 10.0
DATE ___________
12 300 10.8 10.8 15.3 13.1 13.1 18.6 12.0 12.0 12.0
OPERATIONS 14 350 13.1 13.1 18.5 17.4 17.4 24.7 14.0 14.0 14.0
_______________
16 400 15.5 15.5 22.0 23.4 23.4 33.0 16.0 16.0 19.0
DATE ___________
18 450 17.9 17.9 25.3 29.5 29.5 41.8 18.0 18.0 25.0
20 500 20.3 20.3 28.7 35.2 35.2 49.8 20.0 20.0 29.0
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
22 550 22.7 22.7 32.1 41.4 41.4 58.5 24.0 24.0 35.0
EDSD
24 600 25.1 25.1 35.4 47.3 47.3 66.8 28.0 28.0 40.0
26 650 27.6 27.6 39.1 52.9 52.9 74.8 31.0 31.0 44.0
28 700 29.9 29.9 42.4 58.7 58.7 83.1 35.0 35.0 49.0
30 750 32.2 32.2 45.6 64.5 64.5 91.3 38.0 38.0 54.0
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
32 800 34.3 34.3 48.6 73.4 73.4 103.9 44.0 44.0 62.0
REVISION CERTIFICATE
34 850 36.5 36.5 51.7 82.8 82.8 117.3 49.0 49.0 70.0
36 900 38.6 38.6 54.7 92.9 92.9 131.5 55.0 55.0 78.0
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
1.4 Loads for 900 LB Rating Nozzles (Refer to Design Notes, Para 2)
CERT
MM
MM
MM
NOZZLE DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)
VESSELS & HEAT EXCH VESSELS HEAT EXCHANGERS
ENG'G
RC
JF
JF
NPS DN FX FY FZ MX MY MZ MX MY MZ
2 50 1.4 1.4 1.9 0.3 0.3 0.5 0.3 0.3 0.3
3 80 2.7 2.7 3.8 0.9 0.9 1.2 0.9 0.9 1.0
4 100 3.6 3.6 5.1 1.7 1.7 2.4 1.7 1.7 1.7
6 150 5.3 5.3 7.6 3.8 3.8 5.3 3.3 3.3 3.3
8 200 7.4 7.4 10.4 6.6 6.6 9.4 6.6 6.6 9.0
DESCRIPTION
10 250 9.7 9.7 13.7 10.2 10.2 14.4 10.2 10.2 12.0
12 300 12.2 12.2 17.3 14.8 14.8 21.0 14.0 14.0 14.0
14 350 14.8 14.8 20.9 19.7 19.7 27.9 16.0 16.0 16.0
34-15430-3002 ISSUED FOR PROPOSAL
16 400 17.5 17.5 24.9 26.5 26.5 37.3 18.0 18.0 22.0
18 450 20.3 20.3 28.6 33.4 33.4 47.3 22.0 22.0 28.0
20 500 23.0 23.0 32.5 39.8 39.8 56.4 24.0 24.0 33.0
22 550 25.7 25.7 36.3 46.8 46.8 66.2 28.0 28.0 39.0
24 600 28.4 28.4 40.1 53.5 53.5 75.6 32.0 32.0 45.0
26 650 31.2 31.2 44.2 59.9 59.9 84.6 35.0 35.0 50.0
JO/EWO
28 700 33.8 33.8 48.0 66.4 66.4 94.0 39.0 39.0 56.0
30 750 36.4 36.4 51.6 73.0 73.0 103.3 43.0 43.0 61.0
32 800 38.8 38.8 55.0 83.1 83.1 117.6 49.0 49.0 70.0
4-JULY-19
24-MAY-19
DATE
7-MAY-19
34 850 41.3 41.3 58.5 93.7 93.7 132.7 56.0 56.0 79.0
36 900 43.7 43.7 61.9 105. 105.1 148.8 63.0 63.0 89.0
REV. NO.
1
C
1.5 Loads for 1500 LB Rating Nozzles (Refer to Design Notes, Para 2)
DISCIPLINE
ENGINEER
NOZZLE DIRECT LOADS (KN) MOMENT LOADS (KNm) MOMENT LOADS (KNm)
________________
VESSELS & HEAT EXCH VESSELS HEAT EXCHANGERS
DATE ___________
PROJECT NPS DN FX FY FZ MX MY MZ MX MY MZ
ENGINEER
________________ 2 50 1.5 1.5 2.1 0.4 0.4 0.5 0.4 0.4 0.4
DATE ___________ 3 80 3.0 3.0 4.3 1.0 1.0 1.4 1.0 1.0 1.2
CERTIFIED 4 100 4.0 4.0 5.6 1.9 1.9 2.6 1.9 1.9 2.0
________________ 6 150 5.9 5.9 8.4 4.3 4.3 5.9 3.5 3.5 3.5
DATE ___________
8 200 8.2 8.2 11.5 7.3 7.3 10.4 7.3 7.3 11.0
CONSTRUCTION 10 250 10.8 10.8 15.2 11.3 11.3 15.9 11.3 11.3 14.0
AGENCY
________________
12 300 13.5 13.5 19.2 16.4 16.4 23.3 16.0 16.0 16.0
DATE ___________
14 350 16.4 16.4 23.2 21.8 21.8 31.0 18.0 18.0 18.0
OPERATIONS
16 400 19.4 19.4 27.6 29.4 29.4 41.4 20.0 20.0 24.0
_______________ 18 450 22.5 22.5 31.7 37.0 37.0 52.4 24.0 24.0 31.0
DATE ___________ 20 500 25.5 25.5 36.0 44.2 44.2 62.5 26.0 26.0 37.0
22 550 28.5 28.5 40.3 51.9 51.9 73.4 31.0 31.0 44.0
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
24 600 31.5 31.5 44.4 59.3 59.3 83.8 35.0 35.0 50.0
EDSD
26 650 34.6 34.6 49.0 66.4 66.4 93.8 39.0 39.0 56.0
28 700 37.5 37.5 53.2 73.6 73.6 104.2 44.0 44.0 62.0
30 750 40.4 40.4 57.2 80.9 80.9 114.5 48.0 48.0 68.0
THIS INDICATES THAT REV. NO. ____________
32 800 43.0 43.0 61.0 92.1 92.1 130.3 55.0 55.0 78.0
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
34 850 45.8 45.8 64.9 103. 103.9 147.1 62.0 62.0 88.0
36 900 48.4 48.4 68.6 9
116. 116.5 165.0 69.0 69.0 99.0
5
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
1.6 Loads for 2500 LB Rating Nozzles (Refer to Design Notes, Para 2)
CERT
MM
MM
MM
ENG'G
NOZZLE
JF
JF
NPS DN FX FY FZ MX MY MZ MX MY MZ
2 50 1.7 1.7 2.3 0.4 0.4 0.6 0.4 0.4 0.5
3 80 3.3 3.3 4.7 1.1 1.1 1.5 1.1 1.1 1.5
4 100 4.4 4.4 6.2 2.1 2.1 2.9 2.1 2.1 2.5
DESCRIPTION
6 150 6.5 6.5 9.2 4.7 4.7 6.5 4.0 4.0 4.0
8 200 9.0 9.0 12.7 8.0 8.0 11.4 8.0 8.0 11.4
10 250 11.8 11.8 16.7 12.4 12.4 17.5 12.4 12.4 16.0
34-15430-3002 ISSUED FOR PROPOSAL
12 300 14.9 14.9 21.1 18.0 18.0 25.6 18.0 18.0 18.0
1. Unless larger loads are specified in the Data Sheet or the Material
JO/EWO
7-MAY-19
DISCIPLINE
ENGINEER
3. All loadings shall be considered coincidental with the Design Pressure
________________
multiplied by the appropriate Stress Concentration Factor (SCF).
DATE ___________
PROJECT
ENGINEER 4. Loads shall apply to all process flow nozzles, including spares, they do not
________________ apply to nozzles such as manways and instrument connections.
DATE ___________
CERTIFIED 5. All loads shall be considered at the nozzle to shell / head junction and, if
________________ applicable, at the edge of the reinforcement pad.
DATE ___________
CONSTRUCTION
6. Radial load Fz shall be checked for both positive and negative directions at
AGENCY the specified value. Positive load shall be checked with internal pressure.
________________ Negative load shall be checked with no internal pressure.
DATE ___________
DATE _____________
BY: ______________
VERIFICATION
supports.
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT
MM
MM
Maximum Allowable Nozzle Loads, it shall reflect the loads specified in this
ENG'G
JF
JF
typically be as follows:-
Fx Fy Fz Mx My Mz
N1 6.2 6.2 8.7 6.4 6.4 9.1
34-15430-3002 ISSUED FOR PROPOSAL
The General Arrangement drawing shall also include a sketch, similar to the
sketch in Para 1, to show direction of loads.
If a special one off case has also been agreed, then these loads shall be added
4-JULY-19
24-MAY-19
DATE
7-MAY-19
10. Except as indicated below, all nozzles shall have a 2 times nozzle outside
C
DISCIPLINE
diameter, reinforcing pad.
ENGINEER
________________
a) Heavily loaded nozzles requiring special consideration.
DATE ___________
c) Nozzles requiring integral reinforcement.
PROJECT
ENGINEER
d) When thickened shell or head section plus thickened nozzle neck is used.
________________
DATE ___________ 11. The Vendor shall notify the BUYER of any cases where the equipment design
CERTIFIED
thickness has to be increased, over the required thickness for pressure and
________________ other related loadings, to accommodate the specified nozzle loads. The
DATE ___________ Vendor shall also advise the BUYER of the maximum allowable nozzle loads
that the equipment can accommodate, without increasing the thickness.
CONSTRUCTION
AGENCY Note, calculations shall be provided by Vendor to verify. BUYER shall advise,
________________ on a case by case basis, if nozzle loads can be reduced.
DATE ___________
OPERATIONS 12. Nozzles larger than 36” NB, shall be designed to withstand the loads as
_______________ computed from the formulae below, where D = Nozzle Diameter:-
Forces:-Fx = (Fx for 36” nozzle at same flange rating) x (D / 36)
DATE ___________
DATE _____________
BY: ______________
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.