Professional Documents
Culture Documents
F. A1 Overview of RA 9275 Philippine Clean Water Act
F. A1 Overview of RA 9275 Philippine Clean Water Act
KUNG
KULANG OR
WALANG
TUBIG?
Water
3. RAIN WATER
FRESH WATER
IS ONLY 1% OF
THE TOTAL
WATER ON
EARTH
ALMOST
50% OF
FRESH
WATER
SOURCES
ARE
DEPLETED
Major Issues
WATER SCARCITY
The Human Right to Water is
indespensable for leading a life in
human dignity. It is essential for
the realization of all human
rights.
UN GENERAL ASSEMBLY. 28JULY2010
CONTINUED SUPPLY OF CLEAN
WATER WATER FOR HUMAN USE AND
OTHER LIVING THINGS.
2. MANAGEMENT
3. CLEAR GOAL
Water Quality Guidelines (Table 3. DAO
2016-08)
Primary Parameter for Fresh waters
DISCHARGES
GENERAL EFFLUENT
STANDARDS
(Section 7 . DAO 2016-08)
•Discharge of sewage
or trade effluent are
PROTECTED prohibited or not
WATERS allowed to all
protected waters
(Class AA and SA)
GENERAL
EFFLUENT
STANDARD
(domestic sources)
Significant Effluent Quality Parameter
per Sector (Table 8. DAO 2016-08)
USING Table 9 (DA0 2016-08)
1 2 3
1. IDENTIFY 2. IDENTIFY 3. IDENTIFY
SIGNIFICANT RECEIVING BODY OF CLASSIFICATION OF
PARAMETER (Table WATER RECEIVING BODY OF
8) WATER
EFFLUENT STANDARD (56)
EFFLUENT
STANDARD
37000
EFFLUENT QUALITY MONITORING
Laboratory
sampling analysis
Recommend
action to be Evaluation of results
taken
Recommended
Volume,
Container Type
and Preservative
and Holding Time
OBJECTIVE:
WASTEWATER
CHARGE Reduce pollutants and wastewater
SYSTEM discharge into the environment
• Basis for payment to the government for
discharging wastewater into the water
bodies
• Computed on the net waste load
Discharge Legal authorization
granted by DENR to
Permits discharge wastewater
into the environment
• Include:
Quality/quantity of effluent
Compliance Schedule
Monitoring requirements
Who must secure • ANY PERSON THAT
a Discharge SHALL DISCHARGE IN
Permit: ANY MANNER
WASTEWATER INTO
THE PHILIPPINE
WATERS AND/OR LAND
SHALL SECURE A
WASTEWATER
DISCHARGE PERMIT
Fixed fee
Fees: Wastewater load-Based fee
Filling fee
FIXED FEE
Waste Load Discharge Fee = Ln X RL
RL = initially fixed at P5.00/kg BOD or TSS
Ln = [(cf x Qf x Nf)-(Ca x Qa x Na)] 0.001
WASTE •
•
Cf = effluent concentration limit (mg/L)
Qf = flow rate measurement (m3/day)
LOAD •
•
Nf = total number of discharge days/yr
BASED FEE •
(mg/L)
Qa = average flow rate of abstracted
flow rate (m3/day)
• Na = total number of abstraction day
(day/yr)
CAN BE EXEMPTED FROM SECURING
WASTEWATER A DISCHARGE PERMIT IF 100% OF
WASTEWATER IS TREATED BY THE
DISCHARGE CENTRAL TREAMENT FACILITY
INTO A
CENTRAL MUST SECURE AND SUBMIT
TREATMENT “CERTIFICATE OF CONNECTION”
1. MUST SECURE A DISCHARGE PERMIT
WASTEWATER IS
USED FOR LAND
2. MUST SUBMIT CERTIFICATION FROM
APPLICATION DEPT. OF AGRICULTURE CERTIFYING
THAT THE QUANTITY AND QUALITY
APPLIED FOR RE-USE ARE SUITABLE FOR
AGRICULTURAL PURPOSES.
Application form
Engineer’s Report
• - vicinity map
FOR NEW • - nature of business
• - production capacity
APPLICATION(on- • - physical/chemical composition of wastewater
line) • - total daily volume of discharge of raw
wastewater
• - treatment process and efficiency
• - total daily volume of water consumption and
final effluent
• - name of the receiving body of water
• - flow measuring equipment
RENEWAL(on-line)
PCO Accreditation
Copies of SMR submitted
Payment of administrative fee
2. SITE SPECIFIC
SELF
MONITORING
REPORT 3. SHOWS THAT THE PLANT COMPLIES
WITH THE CONDITIONS/REQUIREMENTS
OF THE DISCHARGE PERMIT.
4. SHOULD INCLUDE
ADJUSTMENTS/PROBLEMS INCURRED
1. BE TRANSPARENT
COMPLIANCE
MONITORING
INSPECTION 2. PRIOR TO SAMPLING, AGREE
ON METHOD AND PROCEDURES
AND QUALITY CONTROL ISSUES.
IF POSSIBLE, CONDUCT SPLIT
SAMPLING.
Our
responsibility