Pro Safety MCQS
Pro Safety MCQS
A- hammer
B- knife
C- Spreader Beam✔️
A- 1 month
B- 3 months
C- 6 months✔️
A- load cell
B- anemometer✔️
C- Tensionometer
5: which one is used to measure load on rope
A- Tensionometer✔️
B- anemometer
C- inclinometer
A- anemometer
B- inclinometer✔️
C- Tensionometer
A- Tensionometer
B- inclinometer
C- load cell✔️
A- 180°
B- 360°✔️
C- 120°
9: crane operator should have
A- Aramco license
A- crane✔️
B- crane operator
C- Spreader Beam
A- 5:1
B: 6:1✔️
C- 4:1
B- Manufacturer certificate
C- Daily checklist
D- All✔️
B- false✔️
A- Operator
B- Rigger✔️
A- true✔️
B- False
A- Color
B- Thread lines
C- Tag✔️
17: Lifting Hardware's weight will be included in total weight lifted by crane.
A- true✔️
B- False
18: SLI stands for
A- on site
C- following Rigger
A- Low temperature
A- Anemometer
B- Lux Meter✔️
C- Thermometer
A- Heat only
C- Heat+Relative humidity✔️
A- Cold weather
B- Night time
C- Thunderstorm ✔️
A- 10 feet
B- 15 feet
C- 20 feet✔️
8- If only one sign board is required, which one is must for lifting
A- Ear protection
B- lifting in progress✔️
C- PPEs required
9- JSA means
A-True✔️
B-False
A- 50°
B- 40°
C- 60°✔️
3- Floating should be
A- 5 seconds
B- 10 Seconds
C- 3 seconds✔️
A- True
B- False✔️
B- Never
A- 5 feet
B- 3 feet
C- 9 feet✔️
A- 10 feet
B- 20 feet
C- 21 feet✔️
8- we must keep away excavating equipment from live pipe line minimum.
A- 5 meters
B- 4 meters
C- 3 meters✔️
9- We need Aramco work permit if we are going to work inside............. Radius from wellhead
A- 50 meters
B- 23 meters✔️
C- 15 meters
C- Using bombs
2- A bus should stay away from excavation edge if excavation is 1.5 meter deep.
A- 1.5 meter
B-. 2 meters✔️
C- 3 meters
3-A bus should stay away from excavation edge if excavation is 3 meter deep.
A- 2 meters
B- 6 meters
C- 3 meters✔️
A- 2 meters
B- 4 meters
C- No limit ✔️
A- 2 meters
B- 1 meter✔️
C- 3 meters
A- Benching
B- Sloping
A- 1/1.5( 34°)
B- 1/1(45°)
C- 1/0.75(53°)
A- 1 foot
B- 3 feet
C- 2 feet✔️
B- 15 meters ( 50 feet)✔️
C- 10 meters
10- An access should be away from a worker inside the trench maximum.
A- 50 feet
B- 15 feet
C- 25 feet✔️
11- at Saudi Aramco projects, restricted area is...... Meters radius from live pipelines.
A- 15 meters
B- 30 meters
C- 23 meters✔️
12- we are gonna dig a trench near 2 meters of live pipelines , we should
A- Use Excavator
A- 2 meters
B- 4 meters✔️
C- 3 meters
D 5 meters ✔️
A- 15 feet
B-. 20
C-. 21
A- Fire protection
B- Hearing protection✔️
C- Barricades
1. What is the preferred space between two rungs as per Saudi Aramco?
1. 16"
2. 10"-14"✔️
3. 12"
4. 4"
1. 2:1 (16°)
2. 3:1 (22°)
3. 4:1 (75°)✔️
5. 4:1 (85°)
4. What should be the maximum height of first rung from the ground, if the ladder is attached to a
scaffolding at 90°?
1. 2 feet✔️
2. 1 feet
3. 5 feet
4. 0.6 feet
A- 3eet✔️
B- 4 feet
C- 5 feet
6. How many points of contact should be maintained while ascending, descending or working on a
ladder?
A- 2
B- 3 ✔️
C- 4
7-Without defector plates, minimum distance from the face of the ladder to nearest fixed object
(climbing side) should be
A- 12"
B- 30"✔️
C- 24"
A. 13"
B. 16"✔️
C. 14"
A. 8"
B. 4"✔️
C.9"
A. 5 feet
B. 4 feet✔️
C. 6 feet
B- 10 desibel✔️
C- 20 desibel
A- Operator's cabin✔️
B- Engine
C- Bucket
A- Fall of operator
B- Fire protection
C- Falling Objects ✔️
A- 220°
B- 250°
C- 360°✔️
6- When Equipment's noise is....... Desibel, Ear protection must be worn
A- 85 desibel
C- 90 desibel
A- shout loudly
8- All machins should be away from excavation edge except excavating equipment s, if the depth is 1.5
meter
A- 1.5 meter
B- 2 meters✔️
C- 3 meters
A- 2 cameras ( front,back)
10- Which person we need during heavy equipment operation in Armaco territory
A- Fire watch
B- Flagman
C- Both✔️
4- Sole board should be under 2 posts, if not practicable then it should be under 1 post but its length
should be
A- 20" maximum
B- 30" maximum
C- 30" minimum√
D- 25" minimum
A- Asphalt
B- Compacted soil
C- Levelled concrete √
D- Use it always
C- Suspended scaffold
D- Underhung scaffold
A- Light duty
B- Medium duty
C- Special duty√
D- Underhung scaffold
B- Dry chemical
C- Wet chemical
D- Water
9- Which feature is the number one to declare some space as confined space
A- Oxygen deficiency
D- Darkness
A- Fire watcher
B- Flagman
C- Stand-by man.√
D- foreman
11- When there's no smell of hydrogen Sulphide. It means there's no Hydrogen Sulphide present.
A- False√
B- True
A- Work normally✓
14- When there's H2S release. Will will move towards assembly area following wind direction
A- Upwind or crosswind√
B- Downwind
C- Upwind
D- Any direction
A- Permit/Entry plan
B- Stand-by man
D- All of above√
B- System Scaffold√
C- Underhung scaffold
17- Which hazard is more dangerous in confined space when working in oil and gas
A- Oxygen deficiency
B- Hydrogen Sulphide√
C- Improper access
D- Darkness
A- Iron
B- Wood
C- Copper√
D- Glass
A- Method statement
B- JSA/Risk assessment
C- Work permit
D- All correct√
A- Ledger
B- Transom
C- Post/standard√
D- Toe board
1- Oxidizers should be away from fuel gases horizontally
A- 20 feet maximum
B- 20 feet minimum ☑️
C- 5 feet maximum
D- 5 feet minimum
A- 20 feet maximum
B- 20 feet minimum
C- 5 feet maximum
D- 5 feet minimum☑️
A- 2
B- 3
C- 1.5☑️
D- 2.5
5- adjustable base plate should not be adjusted more than........ Of total threaded area
A- 1/3
B- 1/4
C- 2/3☑️
D- 3/2
6- barrier between oxidizers and fuel gases should have fire rated capacity
A- 40 minutes minimum
B- 30 minutes minimum ☑️
C- 40 minutes maximum
D- 30 minutes maximum
A- labeled
B- Under Shade
D- all of above ☑️
A- Oxygen deficiency
B- oxygen enrichment
C- Both A and B ☑️
A- 4x4" minimum
B- 6x6" maximum
A- Fire watcher
B- Flagman
C- Stand-by man.☑️
D- foreman
A- 25" minimum
B- 27" maximum
C- 40" minimum
D- 27" minimum ✔️
B- 40" maximum
C- 45" maximum
D- A and C✔️
A- 2" maximum
B- 1" minimum✔️
A- 4" maximum
B- 6" minimum✔️ ❌
C- 4" minimum
D- 6" maximum
A- 1" maximum
B- 6 mm. Minimum
C- 2 "
D- 6 mm. Maximum✔️
B- 30 kg maximum
C- 23 kg minimum✔️
D- 25 kg maximum
A- 100 kg maximum
B- 90 kg maximum
C- 80 kg minimum
D- 90 kg minimum✔️
A- 1" minimum
B- 1" maximum✔️
C- 2" minimum
D- 2 " maximum
A- Using plywoods✔️
D- leave it open
10- Gaps more than 2 feet should be covered
A- Using plywoods
C- fire blanket
D- Leave it open
A- 6 feet✔️
B- 8 feet
C- 5 feet
D- 10 feet
12- protective mesh to protect material from falling is used. Holes' gape should be.....
A- 20mm maximum
B- 13 mm maximum✔️
C- 15 mm maximum
D- 10 mm maximum
A- 10" maximum
B- 12 " maximum
C- 12" minimum✔️
D- 15" minimum
14- LVL Planks should be thick
A- 2" minimum
B- 1" minimum
C- 1.5" minimum✔️
A- 10" minimum
D. 9" maximum.
A- Rigger 1
B- Rigger 2
C- Rigger 3
D- A and B ✓
A- Rigger 3
B- Rigger 2
C- Rigger 1✓
D- A and C
3- For which critical lifting rigger level 1 must stay at site. Select all possible answers.
C- Tandem lifting✓
D- Rubber lifting ✓
A- 39 Tons
B- 40 Tons✓
C- 41 Tons✓
D-. 20 tons
A- Turning lift
B- Tailing lift ✓
D- None of them
D- None of above
A- 85%✓
B- 86%❌
C- 75%
D- 70%
8- During Tandem, tailing turning lifts. Crane's load chart will be derated
A- 50%
B- 25% ✓
C- 75%
D- 85%
10- We're going to lift near energized power lines. What extra thing to do?
1- JSA
B- method of statement
A- Rigger 1✅
B- Rigger 2✅
C- Rigger 3
D- Crane operator
A- Rigger 3
B- Rigger 2
C- Rigger 1✅
D- A and C
3- For man Basket Lift, Load chart will be de rated by
A- 75%
B- 25%
C- 50%✅
D- 40%
A- Rigger level 1
B- Rigger level 2
C- Rigger level 3
D-. 1 or 2✅
B- JSA
6- We are going to change the position of the crane, moving it from one place to another while Using
man Basket. We need
A- 85%
B- 86%✅
C- 75%
D- 70%
8- During Tandem, tailing turning lifts. Crane's load chart will be derated
A- 50%
B- 25%✅
C- 75%
D- 85%
10- What should be written on man Basket's display plate. Select all that apply.
1- ID number
B- Empty weight
C- maximum riders
D- all above✅
A- 34°√
B- 35°
C- 45°
D- 53°
B- 3 meters √
D- 1 meter
A- 1 foot minimum
B- 2 feet maximum
C- 2 feet minimum √
D- 3 feet
B- anemometre √
A- Foam
C- Carbon dioxide √
D- water
A- 30 feet minimum
B- 20 feet maximum
C- 10 feet
D- 20 feet minimum √
A- 30 Kph
B- 32 Kph√
C- 25 kph
D- 40 Kph
8- During Tandem, tailing turning lifts. Crane's load chart will be derated
A- 50%
B- 25%√
C- 75%
D- 85%
A- Asphalt √
B- compacted soil
C- level concrete ❌
D- any concrete
1- 38"
B- 40"
C- 45"√
D- 35"
A- 12" minimum
B- 4" minimum❌
C- 6" minimum √
D- 8" minimum
12- Without SCBA work can be performed if H2S concentration is
A- Under 10 PPM√
B- 20 PPM
C- 50 ppm
D- 100 PPM
A- 6x6" maximum
B- 4x4" maximum
C- 6x 6" minimum√
D- 8x8" minimum
A- Operator's cabin√
B- Engine
C- Bucket
D- Lights
16- When equipment noice is more than....... desibel, we need ear protection
A- 45
B- 85√
C- 80
D- 50
A- 1:4
B- 3:1
C- 4:1√
D- 1:3
A- maximum 3 feet
B- minimum 3 feet √
C- maximum 4 feet
D- 3 meters
19- A loader is involved in backfilling activity. It should stay away from excavation edge
A- 2 meter √
B- 3 meters
C- 4 meters
D- No limit❌
B- 15 meters maximum❌
C- 15 meters minimum
D- 15 feet minimum √
1- We're going to install 3rd platform, which ladder is the best option.
A- External ladder
B- Stepladder
C- Internal ladder √
2- While using external ladder, step through opening in the guardrail should be wide
A- 27" - 30"❌
B- 25"- 30"√
C- 30"- 35"
D- None of them
A- 25"
B- 27" √
C- 30"
D- 36"
A- 30"
B- 35"
C- 27"
D-. 36" √
6- We are going to apply ties on a scaffold, total number of the ties is 8. How many reveal ties can we
apply?
A- maximum 3
B- minimum 4
C- maximum 4 √
D- all 8
A- 8 feet maximum
B- 9 meters minimum
C- 8 meters minimum
D- 8 meters maximum √
8- horizontal distance between 2 ties should be
A- 8 feet maximum
B- 9 meters minimum
C- 8 meters minimum
D- 9 meters maximum √
A- 6 meters minimum
1- min 60 - max 70
B- min 65 - max 75 √
C- min 70 - max 80
D- max 50 - 70 min
A- 45°
B- 55°
C- 35°✓
D- 65°
A- 45°
B- 55°✓
C- 35°
D- 65°
4- We're going to install X bracing on the width of the Scaffold, how many maximum Open lifts can be
without bracing vertically?
A- 3
B- 2✓
C- 1
D-. 4
A- 10"
B- 12"✓
C- 14"
D- 15"
6- We're going to make a splice of two bracing tube. Minimum area of the tubes should be spliced is
A- 10"
B- 14"
C- 12"✓
D- 15"
A- 6" maximum
B- 4" minimum ✓
C- 5" maximum
D- 4" maximum
A- 36"
B- 35"
C- 38"✓
D- 45"
B- 1:4
C- 3:1
D. 1:3
A- 36"
B- 35"
C- 38"
D- 45"✓
A- 7" √
B- 10"
C- 5"
D-. 4"
2- Height of mobile/tower scaffold should not exceed..........Times of the minimum Base dimension
A- 2
B- 3
C- 4 √
D- 5
3- We're going to push mobile scaffold to transfer from one place to another. At what height it should
be pushed.
A- at 2 meters height
B- Guardrail height
4- Maximum distance between two posts of a Tower scaffolding for medium duty is
A- 2 meters
B- 2.5 meters
C- 1.5 meters √
D-. 3 meters
5- First rung of the ladder with mobile scaffold should be....... from ground level.
A- within 3 feet
B- within 2 feet √
C- 2.5
D- 4
A- Step ladder
B- external
C- internal √
D- Extension
7- Mobile scaffolds are usually constructed for.......... duty. It means we're going to apply
maximum............kg of weight over one square meter of the paltfom
A- Medium, 120
B- Light, 240
C- Light, 120 √
D- Medium, 240
8- Which part of the scaffolding is not allowed to construct with mobile and tower according to
Aramco?
A- Guardrail
B- Lift
C- Bay
D- Cantilever √
9- Maximum distance between two posts of a Tower scaffolding for light duty is
A- 1.5 meters
C-. 2 meters √
D-. 3 meters
10- Minimum Diameter of a Caster for a light duty mobile scaffold should be
A- 4"
B- 7"
C- 6"
D- 5" √
A- Rigger 1
B- Rigger 2
C- Rigger 3
D- A and B √
2. Excavation plan is required for all types of soils if total depth of the Excavation is more than
A- 15 feet √
B- 18 feet
C- 20 feet ❌
D- 30 feet
A- 5"
B- 8"
C- 7"√
D- 10"
B- 40 Tons√
C- 41 Tons√
D-. 20 tons
A- 34°
B- 45°√
C- 54°
D- 90°
A- 20 meters
B- 15 meters √
C- 7.5 meters
D- 10 meters
A- 85%
B- 86%√
C- 75%
D- 70%
8- During Tandem, tailing turning lifts. Crane's load chart will be derated
A- 50%
B- 25% √
C- 75%
D- 85%
9- Maximum...........part of the screw jack can b adjusted ( threaded area of the jack outside the post)
A- 1/3
B- 1/4
C- 2/3 √
1- 38"
B- 40"
C- 45" √
D- 50"
A- 45°
B- 55°
C- 35°✔️
D- 65°
A- 45°
B- 55°✔️
C- 35°
D- 65°
4- We're going to install X bracing on the width of the Scaffold, how many maximum Open lifts can be
without bracing vertically?
A- 3
B- 2✔️
C- 1
D-. 4
B- 12"✔️
C- 14"
D- 15"
6- We're going to make a splice of two bracing tube. Minimum area of the tubes should be spliced is
A- 10"
B- 14"
C- 12"✔️
D- 15"
A- 6" maximum
B- 4" minimum✔️
C- 5" maximum
D- 4" maximum
A- 36"
B- 35"
C- 38"✔️
D- 45"
9- Ladder slope should be
A- 4:1✔️
B- 1:4
C- 3:1
D. 1:3
A- 36"
B- 35"
C- 38"
D- 45"✔️
D- 3.5 feet
3- A stand by man only understands English language while a worker in the group only understands
Arabic language. What must be done here.
B- An enclosed tank with no toxic gases and has good oxygen level √
5- A generator is being used outside an Excavation 5 feet deep. Workers are inside excavation. What
should be done?
C- Wind direction should be checked, it can carry carbon monoxide into the Excavation. Wind direction
should be opposite to the Excavation √
B- Carbon dioxide /
C- Water
D- wet chemical
7- A confined space found with NORMs . How many hours a continuous mechanical ventilation must be
performed prior to gas test and entry?
A- Maximum 4 hours
B- Minimum 3 hours √
C- Minimum 4 Hours ❌
D- minimum 2 hours
A- Safety officer
B- Stand by man
C- Entrants
D- All above √
A- A ladder
B- A fire extinguisher
C- A gas test √
D- A Light
10- If all workers are unconscious inside confined space because of H2S leakage. What should a stand by
man do? Select more than one
B- He can't enter confined space even in this situation, he's to call emergency rescue team.√
D. He Can only bring workers out without entering, if this confined space is none-entry confined space
and they are using Retrieval System for rescue√
1- Which activities need continue ventilation all the time from entry to exit.
A- Masonry work
B- Scaffold erection
D- Carpentry work
2- Which one is safe oxygen level to work in confined space according to Aramco?
A- 19% - 23.5%
B- 19.5%- 23%
C- 20%- 23%
D- 20% - 23.5%√
3- We can work on normal routine without using SCBA in confined space if carbon monoxide level is.
A- 100PPM
B- 35 PPM
C- Under 35 PPM√
D- 10PPM
4- We can work on normal routine without using SCBA in confined space if Hydrogen Sulphide level is.
A- 20 PPM
C- 10 PPM
D- Under 10 PPM √
D- All above
A- 20 minutes maximum
B- 15 minutes minimum
C- 15 minutes minimum √
D- 10 minutes minimum
A- 20%
B- 10%
C- 0 % √
D- 5%
B- swimming limit
C- Walking limit
A- 3 feet
B- 4 feet√
C- 5 feet ❌
D- 6 feet ❌
A- 19% - 23.5%
B- 19.5%- 23%
C- 20%- 23%
D- 20% - 23.5%√
B- 45°√
C- 34°
D- 35°
A- 20 feet √
B- 20 feet
C- 5 feet ❌
D- 8 feet
A- 80%
B- 85%
C- 86%√
D-. 70%
A- 39 tons
B- 40 tons√
C- 45 tons √
D- 20 tons
7- Excavation plan is required for B and C type soil if depth is ?
A- 6 feet
B- 7 feet √
C- 8 feet
D- 9 feet ❌
A- 3"
B- 4"√
C- 6"
D- 8"
A- 35"
B- 45"
C- 38"√
D- 49"
A- 32 Kph
B- 25 Kph √
C- 20 kph
D. 35 kph
11. Crane's load chart will be derated.......% of the capacity for tandem lifting.
A. 75%
B. 50%
C. 25%√
D. 80%
A. 15 PPM
B. 20 PPM
C. 8 PPM√
D. 12 PPM
13. Rigger level............can write Lift plan but only rigger..... Can approve it
A. (2 and 3) (2)
B. (1 and 3) ( 1)√
C. ( 1 and 2) (1)√❌
D. ( 3 and 2) (3)
A. Anemometre√
C. Load cell❌
D. Hook
15. A ladder should be extended from landing point minimum.
A. 0.9 meter√
B. 3 feet√
C. 2 feet
D. 1 feet
A. 7.5 meters
B. 50 meters
C. 15 meters√
D. 20 meters
17. Diameter of a Caster used for medium duty mobile scaffold should be, minimum?
A. 5"
B. 6"
C. 7"√
F. 10"
A. 30"
B. 20"
C. 27"√
D. 15"
19. We can work normally in atmosphere if carbon monoxide level is
A. 34 PPM√
B. 40 PPM
C. 36 PPM
D. 50 PPM
20. We should not use machine to excavate within........ Meters of live pipeline. We should excavate
manually.
A. 10 meters
B. 6 meters
C. 3 meters√
D. 23 meters
A- 3 feet
B- 4 feet☑️
C- 5 feet ☑️
D- 2 feet
A- 2 meters minimum
B- 2 feet maximum
C- 4 feet minimum
D- 2 feet minimum ☑️
3- Pedestrian barricade should be away from the Excavation edge. Minimum?
A- 1 meter ☑️
B- 2 meter
C- 4 meter
D- 4 feet
B- 2 meters
D- 5 feet
5- A loader is involved in backfilling activity. What's the safe distance from excavation for loader?
A- 2 meters
B- 3 meters
C- No limit ☑️
D-. 1 meter
A- 4 Feet ☑️
B- 5 feet ☑️
C- 3 feet
D- 3.9 feet
A- 45°
B- 53°
C- 34°☑️
D- 35°
9- Within how many meters we can't use machines for excavation (digging)from live oil pipeline?.
A- 6 meters
B- 5 meters
C- 3 meters ☑️
D- 2 meters
10- Select all precautions you think will be applied for excavation?
A- Barricades☑️
B- Signages ☑️
C- Blinking lights☑️
A. 2 meters
B. 3 meters
12. We have one 15 meters long trench. Apply minimum ladders for access?
A. 2 ☑️
B. 1❌
C. 3
D. 4
13. A pick up should stay away from excavation edge minimum? If excavation depth is 1 meter.
A. 1 meter
B. 2 meters☑️
C. 3 meters
D. 4 meters
14. A pick up should stay away from excavation edge minimum, if depth is 3 meters?
A. 6 meters
B. 2 meters
C. 3 meters☑️
D. 2 meters
A. 1 foot
B. 2 feet☑️
C. 1.9 feet☑️
D. 3 feet☑️
A- Asphalt
B- Level Ground
C- Level concrete✔️
D- over blocks
B- 38"
C- 45"✔️
D- 35"
A- 12"
B- 4"✔️
C- 6"
D- 5"
A- 1.5"
B- 1"✔️
C- 2 "
D- 3"
A- Within 10"
B- 15"
C- 8"
D-. Within 12"✔️
6- 230 kg weight over one square meter of the Scaffolding platform is.....?
A- light duty
B- medium duty ❌
C- special duty ✔️
D- heavy duty
A- 4"X4"
B- 5"X5"
C- 6"X6"✔️
D- 10"X10"
A- 1
B- 2✔️
C- 4
D- 3
A- 1/3
B- 2/3✔️
C- 1/4
D- 1/2
A- 8 meter ✔️
B- 9 meter
C- 5 meters
D- 10 meters
A. 2"
B. 1"✔️
C. 4"
D. 3"
A. 10" maximum
B. 12" maximum✔️
C. 12" minimum❌
D. 15" minimum
13. Diameter of the Caster for light duty mobile scaffold should be
A. 7" maximum
B. 5" minimum✔️
C. 5" maximum
D. 8" minimum
In this case we can provide a sole board under only one post but it's length should be....... minimum.
A. 20"
B. 15"
C. 30"✔️
D. 40"
15. A guardrail should be capable to bear minimum.........kg of force from all directions?
A. 23 kg
B. 200 kg
C. 90 kg✔️
D. 500 kg
16. We can make a raker splicing two or more tubes to support scaffold if this joint is made with 4
couplers.
A. True
B. False
A. 4:1✔️
B. 1:4
C. 3:1
D. 1:3
18. To reach over platform, step through opening in guardrail should be.......wide
B. 30" maximum❌
C. 27" maximum
D. 36"
19. Maximum gape between platform surface and toe board should be.......
A. 6 mm✔️
B. 8 mm
C. 10 mm
D. 12mm
A. All 10
B. 8
C. 5 maximum✔️
D. 2
Maximum distance between two posts of a Tower scaffolding for light duty is
A- 1.5 meters
C-. 2 meters ❌
D-. 3 meters
2- Which part of the scaffolding is not allowed to construct with mobile and tower according to
Aramco?
A- Guardrail
B- Lift
C- Bay
D- Cantilever √
3-First rung of the ladder with mobile scaffold should be....... from ground level.
A- within 3 feet
B- within 2 feet √
C- 2.5
D- 4
4- Height of mobile/tower scaffold should not exceed..........Times of the minimum Base dimension
A- 2
B- 3√
C- 4❌
D- 5
5-During Tandem, tailing turning lifts. Crane's load chart will be derated
A- 50%
B- 25% √
C- 75%
D- 85%
A- 85%
B- 86%√
C- 75%
D- 70%
A- 20 meters
B- 15 meters √
C- 7.5 meters
D- 10 meters
B- 45°√
C- 54°
D- 90°
A- 39 Tons
B- 40 Tons√
C- 41 Tons√
D-. 20 tons
10-An excavation plan is required for all types of soils if the total depth of the excavation is more than
A- 15 feet
B- 18 feet
C- 20 feet √
D- 30 feet
A- 4:1(75°)√
B- 4:1(70°)
C- 1:4(80°)
D. 1:3 (60°)
12:We're going to make a splice of two bracing tube. Minimum area of the tubes should be spliced is
A- 10"
B- 14"
C- 12"√
D- 15"
13: Maximum distance between bracing tube and node point should be
A- 10"
B- 12"√
C- 14"
D- 15"
A- 20-40°
B- 35-55°√
C- 35-59°
D- 40-70°
16-Which activities need continue ventilation all the time from entry to exit.
A- Masonry work
B- Scaffold erection
C- Welding and painting √
D- Carpentry work
17-Which one is safe oxygen level to work in confined space according to Aramco?
A- 19% - 23.5%
B- 19.5%- 23%
C- 20%- 23%
D- 20% - 23.5%√
18- We can work on normal routine without using SCBA in confined space if carbon monoxide level is.
A- 100PPM
B- 35 PPM
C- Under 35 PPM√
D- 10PPM
A- 20%
B- 10%
C- 0 %√
D- 5%
20- Which depth of excavation is a confined space? Select all correct options.
A- 3 feet
B- 4 feet√
C- 5 feet √
D- 6 feet√
1- Which activities need continue ventilation all the time from entry to exit.
A- Masonry work
B- Scaffold erection
D- Carpentry work
2- Which one is safe oxygen level to work in confined space according to Aramco?
A- 19% - 23.5%
B- 19.5%- 23%
C- 20%- 23%
D- 20% - 23.5%√
3- We can work on normal routine without using SCBA in confined space if carbon monoxide level is.
A- 100PPM
B- 35 PPM
C- Under 35 PPM√
D- 10PPM
4- We can work on normal routine without using SCBA in confined space if Hydrogen Sulphide level is.
A- 20 PPM
B- Under 100 PPM
C- 10 PPM
D- Under 10 PPM √
D- All above
A- 20 minutes maximum
B- 15 minutes minimum √
C- 15 minutes maximum
D- 10 minutes minimum
B- 10%
C- 0 %√
D- 5%
B- swimming limit
C- Walking limit
A. 100 kg
B. 200 kg
C. 90 kg√
D. 50 kg
B. 10 feet
D. 20 feet
13. A person falls from height wearing full body harness and connected with anchor point is an example
of.....
F. Falling object
A. 4 feet
B. 3 feet
C. 5 feet
D. 6 feet √
A. Workers
B. Material √
C. Top rail
D. Platform planks
1- We use toe board to protect………. From falling
A- Workers
B- Material ☑️
C- Guardrail
D- Platform
5- You are working at 4 feet high platform. Which Safety device with full body harness you need to
hold you after fall ?
A- Shock absorbing lanyard
B- Guardrail
C- Self Retracting Lifeline/Lanyard ✓
D- Toe board
A. 15 mm
B. 10 mm
C. 13 mm
D. 25 mm
A. 13 mm
B. 12 mm
C. 10 mm
D. 8 mm
A. 2 minimum
B. 3 maximum
C. 3 minimum
D. 4 minimum
A. 10”
B. 15”
C. 12”
D. 8”
A. 5000 pounds
B. 2300 kg
16. How many persons can anchor their lanyard to lifeline between 2 anchor points at a time?
A. 2 maximum
B. 3 minimum
C. 4 minimum
D. 3 maximum
17. Minimum Capacity of vertical lifeline?
A. 6000 lbs
B. 5000 lbs
C. 4000 lbs
D. 3000 lbs
A. 2
C. 3
D. 4
19. While attaching clamps to the lifeline,U -Bolt of the clamp should be at…….
A. 900 kg
C. 408 kg(900,lbs)
A. Panadol
B. Safety helmet
C. Gloves
24. For roof work, Using fall restrain system, Workers and material should be kept……… Feet away from
edge.
A. 5 feet minimum
B. 6 feet maximum
C. 6 feet minimum
D. 4 feet minimum
25. You are going to use fall arrest system with shock absorbing lanyard. At what height from ground
level will you anchor your lanyard ?
A. Maximum 15 feet
C. 10 feet