NARRATIVE REPORT

DAY 1

MAM’AM GINA GAVE AN ORIENTATION AND TOURED US TO EACH OFFICE WITHIN PANELCO 1 THEN
INTRODUCED US TO THE GOOD WORKERS.

DAY 2

WE OBSERVED THE REWINDING AND ASKED WHAR ARE THE DIFFERENT TYPES OF TRANSFORMER STEP UP, STEP
DOWN VOLTAGE THEN CURRENT TRANSFORMER OIL.

DAY 3

WE WERE GIVEN THE OPPORTUNITY TO LEARN HOW TO STOP SECONDARY IN REWINDING.

DAY 4

WE WENT TO THE PANEL SUBSTATION TO ASK THENM TO PAINT THE FENCE SO THAT IT DOESN’T GET DAMAGED
QUICKLY AND WE ALSO ASKED QUESTIONS ABOUT WHAT THINGS ARE TOP LIKE SUSPENTION INSULATOR,
POTENTIAL TRANSFORMER, CURRENT TRANSFORMER AND LIGHTNING RAP ARRESTLER.

DAY 5

WE DISASSEMBLED THE TRANSFORMER AND REMOVED THE OIL.

DAY 6

WE OBSERBED THE TEAM GLEN CLEARING OPERATION TEAM TO SEE IF THEY COULD HELP US BUILD THE POST AT
PATAR MABINI.

DAY 7

WE JOINED THE TEAM GLEN CLEARING OPERATION TEAM AGAIN. WE CUT DOWN TREES AGAIN AND HELPED WE
LIFTED TREES.

DAY 8

WE JOINED TEAM JOSEPH IN THE CLEARING, WE CUT DOWN THE TREES AGAIN AND CLEAN THE BROKEN
BRANCHES IN THE MABINI PANGASINAN.

DAY 9

WE JOINED TEAM HAROLD WIRING OPERATION. WE WENT TO BARANGAY BUED ALAMINOS CITY, PANG. TO
PULL WIRES AND FIXED THE PULLED WIRES.

DAY 10

WE JOINED TEAM HAROLD WIRING OPERATION. WE JOINED AGNO PANGASINAN TO HELP DIG FOR SWINGING
POLES.

RANIER B. MENDEZ