Daily Report Hydro 4 April
Daily Report Hydro 4 April
PROFESSION
INSTALLED
NO DESCRIPTION DATE GRID LINE ELEVATION TOTAL DOCUMENTATION
NAME MATERIAL CODE MATERIAL QTY Weight (kg)
El 6.000 BRACING BR38 1 34.82
El 6.000 BRACING BR39 1 34.82
El 6.000 BRACING BR31 1 71.48
El 6.000 BRACING BR310 2 82.00
1 Erection steel structure 4-Apr-23 El 6.000 PLAT PL4 1 10.65
El 6.000 PLAT PL5 1 11.11
El 3.500 - 5.100 BEAM TB18 3 249.56
El 3.500 - 5.100 BEAM TB121 3 203.56 932.92
El 3.500 - 5.100 CHANNEL CH14 6 234.91
A-C El 10.500
3 Bolt Tightening Torque & Impact 4-Apr-23
A-C El 6.000
A-C El 10.500
3 Repair & Fabrikasi Beam 4-Apr-23
DOCUMENTATION