PROJECT

MARVEL 2 MANAGE SUBCONTRACTOR :


MENT,
SITE PROJECT : HYDROGENATION PLANT

DAILY REPORT PT. PlateTECH Bajatama Indonesia


LOCATION : KAWASAN EKONOMI KHUSUS SEI MANGKEI-MEDAN
PEB & BRIDGE
PROJECT NO : TA2839

PROFESSION

INSTALLED
NO DESCRIPTION DATE GRID LINE ELEVATION TOTAL DOCUMENTATION
NAME MATERIAL CODE MATERIAL QTY Weight (kg)
El 6.000 BRACING BR38 1 34.82
El 6.000 BRACING BR39 1 34.82
El 6.000 BRACING BR31 1 71.48
El 6.000 BRACING BR310 2 82.00
1 Erection steel structure 4-Apr-23 El 6.000 PLAT PL4 1 10.65
El 6.000 PLAT PL5 1 11.11
El 3.500 - 5.100 BEAM TB18 3 249.56
El 3.500 - 5.100 BEAM TB121 3 203.56 932.92
El 3.500 - 5.100 CHANNEL CH14 6 234.91

Install & Uninstall Scaffolding A-C El 19.500 - 23.000


2 4-Apr-23
akses

A-C El 10.500
3 Bolt Tightening Torque & Impact 4-Apr-23
A-C El 6.000
A-C El 10.500
3 Repair & Fabrikasi Beam 4-Apr-23

DOCUMENTATION

Weather Condition : Clear Heavy Equipment :


07.00 - 08.00 : 13.00 - 14.00 : 1. Mobile Crane 55 T
08.00 - 09.00 : 14.00 - 15.00 : 2. Boomlift 41 M
09.00 - 10.00 : 15.00 - 16.00 : 3. Mobile Crane TMC
10.00 - 12.00 : 16.00 - 17.00 : 4. Boomlift 24 M
17.00 - 18.00 :