Risk Assessment

Project: Bangladesh Greater Dhaka Sustainable Urban transport Project (BRT, Gazipur-Airport)
Risk assessment Conducted By : Date 11 April 2023.
Page
Name & Signature:Salauddin 2
Number
Activity: Risk Assement for Scaffolding Dismantling Works at chowrasta -cast in situ box girder.
Residual Risk (After taking
Hazards First Hazard
appropriate measures)
No Controls and Measures to be Taken
Activity Description Description of the Hazard Effects P S R P S R Result
• Ensure workers are medically fit for site works.
• Ensure all Workers are safety induction training upon site deployment.
• Work zone to be properly fenced, barricading, with Caution, and Safety Signs posted.
• Ensure operatives competency by in-house or 3rd party training
• Improper fencing/securing the work zone. • Hazard/Risk mitigation measures communication through daily toolbox talk on site by area safety officer and site engineer.
• Incompetent workers to carry out the task • Mobilization of work equipment fit for intended purpose with relevant certification/MOT and color-coded.
• Improper work methodology and • Deployment of competent staffs /workforce including hse staffs to ensure activities is carried out as per approved method statements , approved traffic management plan ,
hazard/risk and risk mitigations measures approved project hse management plan and working at height including scaffolding procedure and associated risk assessment , lifting procedure and associated risk assessment.
• Unsafe/damaged work equipment. Lack of Major injury, • Ensure emergency preparedness by having first aid box, first aider, and emergency contact number displayed on site including rescue arrangement for height.
1.Mobilization and LtI, Fatality, • Activity shall be carried out as per approved method statement and associated risk assessment all public protection measures shall be in place prior to work start.
Preparation for supervision to control & monitor Harm to Public,
• Non-availability of adequate task specific • Approved traffic management plan shall be established and maintained during the course of activity.
1 scaffolding PPE.
road users and 5 5 25 • Construction of box girders works shall be strictly in adherence to approved method statement and associated risk assessment. risk assessment must be reviewed prior to activity to 1 4 4 Acceptable
dismnatling at fatalities. Traffic identify any new hazard/hidden hazard and control measures appropriate to risk level must be established to proceed work.
chowrasta • Medically unfit workers related accident
• Inadequate public protection measures in • Toolbox talk shall be conducted on daily basic and topic shall be relevant to site conditions.
place. • Specific training such as working at height shall be done to ensure all operatives working at height know how to use safety harness and follow work at height safe work practices.
• Improper traffic management. • All relevant safety procedure such as working at height including scaffolding and associated risk assessment, lifting procedure and associated risk assessment shall be strictly
• Non-compliance to approved hse plan and complied.
procedure and risk assessment.

• No unauthorized road Crossing policy


• Daily toolbox talks to workforce.
• Follow road speed limits.
• Moving traffic. Major injury,
• Uncontrolled Pedestrian movement. LtI, Fatality, • No unauthorized parking
• Only licensed drivers will be allowed to operate vehicles.
Work adjacent to • Unauthorized entry into work zone. Harm to Public, 5 5 25 • Driver will pick and drop the people only at designated points
3 live road • Unauthorized removal of road users and 2 2 4 Acceptable
• Work zone will be properly secured by fencing/barricading and maintained at all times during the course of activity.
barricading/fencing. fatalities. Traffic • Traffic team to control traffic movement, pedestrian movement and movement of CGGC operatives
related accident • Authorized work zone entry/exit point shall be established and maintained and vehicle /equipment shall enter/exit from the authored entry/exit point.
• Flagman to deployed to moving equipment’s

Implementation of
approved Traffic
management Plan LTI, Road Traffic
for safe traffic • improper traffic management plan Accident, Injury • Traffic management arrangements shall be in accordance with approved traffic management plan taking in consideration of all stakeholders.
/pedestrian implementation to road • Traffic signage must be in accordance with traffic management plan.
movement and to • lack of barricading of work zone, users/public. • Deployment of competent traffic engineer/supervisors /traffic team on site.
ensure effective inadequate signage’s, CGGC 5 5 25 •safety
Flag and megaphone to control and alert traffic flow including pedestrian movement. Secure work zone by fencing/barricading using concrete barriers, jersey barriers, wire mess net,
4 work zone is • untrained traffic crew, employees hit cones based on site conditions. 2 2 4 Acceptable
established to • Deviation from approved traffic by public • Post-appropriate safety signage’s such as construction work zone, no unauthorized entry.
segregate work are management plan. vehicle resulting • Deployment of security persons to monitor and safeguard work zone especially during night
and traffic in multiple
/pedestrain fatality.
movement .

• Engaged competent scaffolders and scaffolding supervisors for scaffold activity.


• Install proper access/egress for working at height/scaffolding activity.
• Improper access and egress, • All precautionary measures based on site conditions shall be established and maintained to prevent material/object falling from height on traffic/pedestrain and Ensure the work area
• Unsafe working platform
• Falling of tools, objects and materials from Major injury, must be barricade and display scaffoldingwork ongoing sign.
Scaffolding height, • FULL BODY HARNESS must be worn and 100% tie to be followed by operatives at all times
dismantling works • Incompetency/Untrained personnel LtI, Fatality, • All operatives must be trained on working at height.
6 Harm to Public, 5 5 25 • Engage competent scaffolder for scaffolding dismantling works 2 2 4 Acceptable
deployed for scaffolds works. road users • Close supervision by scaffolding supervisor and area safety officer.
• Failure to follow working at height including • use rope to bring scaffoldig component down and do not throw scaffolding pipe from height..
scaffold procedure and risk assessmenet. • Work at height including scaffold procedure and associated risk assessment shall be strictly adhered by all operatives.
• Ensure that bracing, ties, brackets are installed as per the requirement and design.

Pre-stressing Pipe • Activity must be carried out as per approved method statements and associated risk assessment.
Installation • Slip, trip and fall. • Ensure operative wear mandatory and task specific PPE while carrying out task.
Steel Strand • Irritating to eyes, respiratory system skin • Ensure work equipment is inspected and fit for intended purpose and color-coded.
Installation irritation. • Operatives must use chemical permeable hang gloves while carrying out grouting works.
Grouting and Anchor • Injury due to contact with moving part of 4 4 16 •• Operative must ensure that drilling machine/grouting pump is fit for purpose.
Sealing the machine. Operatives must wear appropriate respiratory protective equipment (RPE). 2 2 4 Acceptable
Drilling activity. • Irritating to eyes, respiratory system skin • COSHH assessment for chemical used on site.
Use of grouting irritation, • Work at height procedure to be followed.
pumps. •Ensure electrically operated tool/work equipments is checked for insulation damage/ guard and safe electrical parcatices sucha as proper cable managmnet including routing,
funtional earth leakage circuit breaker and use of task spedcific ppe.

Made By: MDS - 1/2 -


Residual Risk (After taking
Hazards First Hazard
appropriate measures)
No Controls and Measures to be Taken
Activity Description Description of the Hazard Effects P S R P S R Result

Work related
Manual Handling of upper limb
disorders / • Avoid manual handling use mechnaical aid where practically possible.
10 construction Manual Handling Operations
cuts /
3 3 9
• Trained operatives on safe manaul handling techniques. 2 2 4 Acceptable
material abrasions / foot • use proper hand gloves to ensure proper grip.
& toe injuries

Residual
First Risk
25 Risk 3.6 Moderate
Average
Average

Made By: MDS - 2/2 -