MD1-0-T-030-05-00070 - 3 ITP For Field Erected Tank
MD1-0-T-030-05-00070 - 3 ITP For Field Erected Tank
TWO(2) X 500MW
MONG DUONG 1 THERMAL POWER PLANT
APPROVED A
Approved without exception
Engineer: Sudin De
Discipline: Senior Mec Engineer
01-Oct-12
Date:
FOR CONSTRUCTION
PROJECT :
CONSULTANT :
CONTRACTOR :
TABLE OF CONTENTS
11 HYDROSTATIC TEST
12 CLEANING/PAINTING
13 FINAL INSPECTION
14 ATTACHMENT
DISCIPLINE : Mechanical
ITP No. ITP-M-103
INSPECTION & TEST PLAN DESCRIPTION OF WORK :
Rev. No. 0
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT PAGE 1 OF 2
Field Erection Tank
DATE Sep. 18. 2012
DISCIPLINE : Mechanical
ITP No. ITP-M-103
INSPECTION & TEST PLAN DESCRIPTION OF WORK :
Rev. No. 0
WO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT PAGE 2 OF 2
Field Erection Tank
DATE Sep. 18. 2012
9 Nozzle, Manhole and Other Opening Connection API 650 / ERQ 4.14
1) Welding Inspection ITP-M-103-03 W W S
2) Dimensional Inspection ITP-M-103-02 W W S
3) Air Soap Bubble Test for Reinforcement ITP-M-103-06 W W S
4) NDE, If required NDE REPORT W R R
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
MATERIAL VERIFICATION :
DIMENSIONAL CHECK
0 180
ROUNDNESS
90 270
0 180
PLUMBNESS
90 270
NOZZLE
ITEM ELEVATION AZIMUTH NOZZLE NO. ELEVATION AZIMUTH
NO.
MANHOLE
NOZZLE
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
SIGN
DATE
(SAMPLING)
TWO(2) X 500MW MONG DUONG 1 THERMAL POWER PLANT
TEST PRESSURE :
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
TEST PRESSURE :
NOZZLE
SIZE RESULT NOZZLE SIZE RESULT
NO.
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-103-06
HYUNDAI ENG. & CONST. CO., LTD.
# Settlement Check
25%
50%
75%
100%
Holding(24 Hours)
After discharge
# The sketch of Bench Mark
1 Shell Plate
North
EL.+1000
4 Bottom Plate
2
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
FORM NO. ITP-M-103-07
HYUNDAI ENG. & CONST. CO., LTD.
RESULT
NO. CHECK ITEM REMARK
ACC N/A REJ
Verification of Material
1 -Manufacturer: ________________________________
-Batch Code No.: _______________________________
Weather Condition
-Relative Humidity :
2
-Temperature(°C): Air : Steel:
-Dew Point:
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
SKETCH :
REMARK :
SIGNATURE DATE
SUBCONTRACTOR :
CONTRACTOR :
EMPLOYER :
Description Remarks
No By Date A/B No./Location By Date HDEC Employer
PUNCH LIST