Download as pdf or txt
Download as pdf or txt
You are on page 1of 29

Oracle

1Z0-1075-20
Oracle Manufacturing and Maintenance 2020
Implementation Essentials

QUESTION & ANSWERS

https://www.dumps4less.com/
Question #:1

Your customer is a light assembly manufacturing company that doesn’t require shop floor control. A
manufacturing engineer wants to generate a work definition automatically for some items, and wants to
eliminate the explicit maintenance of work definitions.

Which three steps must be completed and verified in the Work Definition area?

A. Ensure the predefined work definition name ORA_MAIN name is active.

B. Select a resource that is to be used in automatic work definition by enabling the attribute Default for
automatic work definition.

C. Select a standard operation that is to be used in automatic work definition by enabling the attribute
Default for automatic work definition.

D. Ensure the item is a standard item with a secondary item structure.

E. Ensure there is only one default standard operation at a given point in time.

Answer: A C D

Question #:2

Identify the three sources from which supply chain orchestration (SCO) can create the work orders.

A. Order Management

B. Quality

C. Inventory Min-Max Planning

D. Procurement

E. Planning

Answer: A D E

Question #:3

You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report
production exception and who gets notified after an exception is raised?

A. The Production Operator can report and exception and the application generates a notification that is
sent to all users who have access to the manufacturing plant.

B.

https://www.dumps4less.com/
B. The Production Operator can report an exception and the application generates a notification that is sent
to all users with the role of production supervisor who have access to the manufacturing plant.

C. The Production Operator or Manufacturing Engineer can report an exception and notifies the production
supervisor using Oracle Social Network since there is no system generated notification.

D. The Production Operator can report an exception and notifies the production supervisor using Oracle
Social Network since there is no system-generated notification.

Answer: B

Question #:4

Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM)
and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order,
for a nonstocked item.

A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).

B. Set the global sourcing rule in GOP to determine supply creation option as Make.

C. Set a local sourcing rule in GOP to determine supply creation option as Make.

D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.

E. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.

Answer: A B

Question #:5

A user wants to transfer the work order status updates and resource transaction data for costed resources to
Cost Management.

Which scheduled process should you run to achieve this requirement?

A. Transfer Cost to Cost Management

B. Transfer Transactions to Costing

C. Transfer Ledger Balances

D. Transfer General Ledger Balances to Balance Cubes

Answer: A

https://www.dumps4less.com/
Question #:6

You are setting up Fusion Manufacturing to support Back-to-Back Fulfillment.

Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-back item
components and resources.

A. Select the Used in Planning check box in the new Work Definition.

B. Select the Used in Planning check box in the Work Definition Names.

C. Select the Used in Planning check box in the Work Structure.

D. Select the Used in Planning check box in the item definition.

Answer: B

Question #:7

A Production Operator needs to load Work Order Transactions from an external system into Manufacturing
Cloud.

Identify the correct sequence of tasks to be performed.

A. Load Data to Fusion repository> Export File to UCM server > Process Import Operations Transactions>
Load file from UCM to Interface table.

B. Export File to UCM server> Load Data to Fusion repository> Process Import Operations Transactions>
Load file from UCM to Interface table.

C. Load Data to Fusion repository> Export File to UCM server > Load file from UCM to Interface table
>Process Import Operations Transactions.

D. Load Data to Fusion repository> Load File from UCM to Interface table> Export File to UCM server>
Process Import Operations Transactions.

Answer: B

Question #:8

While creating an item in Product Information Management (PIM), the following two item templates are
selected in sequence and applied.

1. Template: Finished Goods (WIP = No, Customer Ordered = Yes)

2. Template: Sub-assembly (WIP = Yes, Customer Ordered = No)

https://www.dumps4less.com/
Identify the Item Attribute values in the application.

A. WIP = Yes, Customer Ordered = Yes

B. WIP = Yes, Customer Ordered = No

C. WIP = No, Customer Ordered = Yes

D. WIP = No, Customer Ordered = No

Answer: C

Question #:9

In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an
assembly have been defined as required.

A cost accountant created different scenarios to represent different manufacturing and cost assumptions and
compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the
cost scenario to cost accounting.

Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting
in frozen type.

A. Publish cost planning scenario to Accounting.

B. Build cost planning scenario and perform cost roll up.

C. Create Accounting Distributions.

D. Transfer transactions from production to Costing.

E. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition.

F. Transfer Transactions from Inventory to Costing.

Answer: C E F

Question #:10

One of the key execution capabilities that Oracle Manufacturing Cloud offers is that you can generate and
manage work order exceptions.

Which option shows the production exception types that can be reported by the production operator?

A. Work Area, Work Center, and Resources

B.

https://www.dumps4less.com/
B. Work Center and Resources

C. Resources and Components

D. Work Area, Work Center, Resources, and Components

E. Work Area, Work Center, Resources, Components, and Miscellaneous

Answer: C

Question #:11

A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the
Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not
the Reservations tab.

Identify the two reasons that can cause the Reservations tab not to be displayed.

A. Work Order (WO-1025) is not a Configured item Work Order.

B. Work Order (WO-1025) is not a Back-to-Back Work Order.

C. Work Order (WO-1025) is not a Drop-Ship Work Order.

D. Work Order (WO-1025) is not a Pick-to-order Work Order.

E. Work Order (WO-1025) is not a Plan-to-produce Work Order.

Answer: A C

Question #:12

In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can
report the excess production completion?

A. Overcompletion Tolerance Type = Amount, value > 0

B. Overcompletion Tolerance Type = Amount, value = 0

C. Overcompletion Tolerance Type = Percentage, value = 100

D. Overcompletion Tolerance Type = Percentage, value > 0

E. Overcompletion Tolerance Type = Percentage, value = 0

Answer: B D E

https://www.dumps4less.com/
Question #:13

An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by
in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated
creation of a Supply Order rather than Work Order.

Identify two options that can cause this situation.

A. Sourcing rules for the product item are defined as Make as well as Transfer.

B. Sourcing rule for the product item is defined as Make, but Work Definition is not defined.

C. Sourcing rules for the product item are defined as Buy as well as Transfer.

D. Sourcing rule for the product item is defined as Buy.

Answer: A B

Question #:14

In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a
product. The cost of the assembly is calculated by using the standard costing method. The work definition and
resource rates of the assembly have been defined as required.

A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing
estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up
costs, the extended costs of purchase components are not included in a rolled-up scenario.

Identify the reason.

A. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.

B. Costs for purchase components P1 and P2 are not defined in cost accounting.

C. Create Accounting was not initiated.

D. Create Accounting Distributions was not initiated.

Answer: D

Question #:15

Identify three types of Item Quantities displayed in the Work Order History tab.

A. Scrapped Quantity

https://www.dumps4less.com/
B. In Process Quantity

C. Remaining Quantity

D. Total Quantity

E. Completed Quantity

Answer: A C E

Question #:16

A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs
executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to
prevent the Work Orders from being overwritten by plan runs.

Identify the two recommendations.

A. Update Supply Plan Options, Overwrite Firm Planned Orders = None.

B. Update Firm flag in the Details region of the Edit Work Definition page.

C. Update Firm flag in the Details region of the Edit Work Definition Names page.

D. Update Firm flag in the Details region of the Edit Work Order page.

Answer: A D

Question #:17

Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is
assigned to the work center W1. There are five units of LATHE available, of which three units are available
for the Morning Shift and the remaining units are available for the Evening Shits.

Which two actions must you perform to associate LATHE with W1?

A. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 3 against
the resource LATHE in the Morning Shift column.

B. Select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the
resource LATHE in the Morning Shift column.

C. Select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the
resource LATHE in the Evening Shift column.

D. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 2 against
the resource LATHE in the Evening Shift column.

https://www.dumps4less.com/
E. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 60%
against the resource LATHE in the Morning Shift column.

F. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 40%
against the resource LATHE in the Evening Shift column.

Answer: B E

Question #:18

The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled
the Process Item Structure Changes to Work Definitions program. However, after the execution of the program
the engineer did not receive a notification with the details of the Item Structure changes.

Which two reasons could cause this?

A. The engineer does not have Data access to Items Attributes.

B. The engineer does not have Data access to Items.

C. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was
performed.

D. The engineer does not have Data access to Item Structures.

E. The engineer does not have the Manage Work Definitions function privilege.

Answer: C E

Question #:19

A Production operator in your company is required to report production activities, such as completing or
scrapping production units, by referencing a work definition without creating work orders.

Identify the manufacturing transaction that a production operator can perform for reporting such activities.

A. Orderless Transactions

B. Operation Transactions

C. Resource Transactions

D. Movement request

E. Material Transactions

https://www.dumps4less.com/
Answer: A

Question #:20

The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to
configure these machines in such a way that those are costed to the work order for which operations are
performed on these machines.

Identify the correct setup that you will advise to the Plant Manager.

A. Set up the machines as cost element type of “Resource” by selecting Cost Element set ABC.

B. Set up the machines as cost element type of “Overhead” by selecting Cost Element set ABC.

C. Set up the machines as cost element type of “Overhead” by selecting Cost Element set Common.

D. Set up the machines as cost element type of “Resource” by selecting Cost Element set Common.

Answer: D

Question #:21

The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not
getting transferred to Costing.

Identify the reason for work order transactions not getting transferred to Costing.

A. The Manage Item Rules setup is not complete.

B. The Costing Interfaced Attribute is enabled in the resource definition.

C. The item was made inactive after the Work Order transaction.

D. The Costing Interfaced Attribute is not enabled in the resource definition.

Answer: D

Question #:22

Your customer has defined the work definitions. They have created and saved a new version for the work
definition and want to edit that work definition.

Which two attributes cannot be updated using the Edit Work Definition Details action?

A.

https://www.dumps4less.com/
A. State Date

B. Costing Priority

C. Version

D. Production Priority

Answer: A C

Question #:23

You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage
of the Standard Operation resource. Identify the setup required.

A. Deselect the Referenced check box while adding the standard operation to the work definition and
change the usage manually.

B. Select the Referenced check box while adding the standard operation to the work definition and change
the usage manually.

C. Use the Transfer and Edit Standard Operation functionality to edit the resource usage.

D. Use a Resource exception for the resource and alter its usage.

Answer: B

Question #:24

Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain
Management Cloud (Oracle SCM Cloud) to support integration requirements.

Identify four REST resources and the corresponding HTTP action available with Manufacturing Cloud.

A. Work Order Status GET method

B. Work Orders GET method

C. Work Order Status POST method

D. Work Orders PATCH method

E. Resource transaction POST method

F. Resource transaction GET method

Answer: A B D E

https://www.dumps4less.com/
Question #:25

A Production operator in your company is required to report production activities, such as completing or
scrapping production units, by referencing a work definition without creating work orders.

Identify the manufacturing transaction that a production operator can perform for reporting such activities.

A. Orderless Transactions

B. Operation Transactions

C. Resource Transactions

D. Movement request

E. Material Transactions

Answer: A
Question #:26

A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the
resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week,
due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two
hours during each of the assigned shifts.

Determine the available capacity of the resource R1 for that week.

A. 78 hours

B. 76 hours

C. 60 hours

D. 70 hours

Answer: A

Question #:27

Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items
with some overlap between them in terms of products manufactured. The distribution centers stock parts from
all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team
defines the items and sets the attributes for most parameters. The respective distribution centers and
manufacturing plants are allowed to change some attributes locally.

Identify two different ways of achieving this requirement.

https://www.dumps4less.com/
A. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate
Engineering organization as Inventory Organization.

B. Set up Plants as Inventory Organizations, Distribution Centers as Inventory Organizations, and


Corporate Engineering organizations as Item Organization.

C. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering
organization as Item Organization

D. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering
organization as Inventory Organization.

E. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate
Engineering organization as Item Organization.

Answer: B C

Question #:28

Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where
actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.

A plan is run and the Work Order WO-2045 is rescheduled.

Identify the duration of the rescheduled Work Order WO- 2045.

A. Rescheduled Work Order WO-2045 duration = 2 days

B. Rescheduled Work Order WO-2045 duration = 1.25 days

C. Rescheduled Work Order WO-2045 duration = 3.25days

D. Rescheduled Work Order WO-2045 duration = 0.75 days

Answer: D

Question #:29

Identify two reports that provide work order cost-related information to the costing user.

A. Work order Operational Analysis

B. WIP Balance by Plant

C. Purchase Variance Summary

D. Cost Accounting Dashboard

https://www.dumps4less.com/
Answer: A D

Question #:30

Work order costs are computed based on material and resource transactions reported and the cost method of
the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring
proper materials and resource transactions. The materials are costed and resources are defined with rates.

A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of
the work order WO-001, resources charged to the work order are missing.

Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.

A. Create accounting

B. Transfer Transactions from Production to Costing

C. Transfer Transactions from Inventory to Costing

D. Transfer Costs to Cost Management

Answer: B

Question #:31

A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is
assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours.
The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given
work order at noon.

What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?

A. 8:00 PM

B. 12:30 PM

C. 2:00 PM

D. 4:00 PM

E. 1:00 PM

Answer: D

https://www.dumps4less.com/
Question #:32

An employee is responsible for dealing with different manufacturing practices and processes, machines, tools
and equipment that turn raw material into a product.

Which seeded job role must this employee be provided with?

A. Manufacturing Engineer

B. Production Engineer

C. Production Operator

D. Manufacturing Supervisor

E. Production Supervisor

Answer: A

Question #:33

Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an
item that will be manufactured in-house.

A. Operation Items

B. Resources

C. Production Line

D. Operations

E. Manufacturing Lead Time

Answer: A B D

Question #:34

You are monitoring the production status on your shop floor. The production operator informs you that a
particular resource that was not functioning for the past week is now back in operation.

Which option shows the steps to quickly release the work orders affected by this operation, which were put on
hold using the mobile application?

A. Select the infotile On Hold> Select a work order you want to release> Select the work order operation
on hold > Swipe left on the work order name> Tap or click the Release action, and click OK

B.

https://www.dumps4less.com/
B. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order
name> Tap or click the Release action, and click OK

C. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order
name> Tap or click the Release action, and click OK

D. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the
work order name> Tap or click the Release action, and click OK

Answer: D

Question #:35

Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the
Manufacturing Cloud?

A. Use ibots to create the report.

B. Use Business Intelligence answers to create the report.

C. Use the Manufacturing subject area to select the report columns and create the report.

D. Use Business Intelligence publisher to create a template and use that template to create the report.

Answer: B D

Explanation
You can use Oracle Transactional Business Intelligence to create analysis and Oracle Business Intelligence
Publisher to create reports.

Question #:36

Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional
Operation.

A. There are no components attached to it.

B. The Automatically Transact check box is deselected.

C. The Automatically Transact check box is selected.

D. The Count Point check is selected.

E. The Count Point check box is deselected.

Answer: B E

https://www.dumps4less.com/
Question #:37

Your customer has the following business requirement. There are two work definitions created in the
application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished
Good. The Engine Finished Good item should have Pallet Finished Goods as one of its component.

Identify the way to establish the relationship between Pallet and Engine Work Definitions.

A. Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the
same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for
Engine.

B. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work
Definition for Pallet.

C. The two Work Definitions can be tied through Project or Seiban numbers.

D. The Work Definition versions can be used to tie the Work Orders.

Answer: D

Question #:38

During a Manufacturing Cloud implementation, the Production Supervisor wants to close the work orders for
last month and wants to make sure that the work orders include the correct cost.

Identify the approach to be taken by the Production Supervisor.

A. The Production Supervisor need not include cost variances while costing last month’s work orders
because those can be applied directly in subledger accounting.

B. The Production Supervisor needs to include all costs and variances in last month’s work orders and
close them; however, the work orders where updates are expected, should not be closed.

C. The Production Supervisor should make sure that all costs are included while closing last month’s work
orders; however, variances can be included after closing the work orders.

D. Work order costs can be updated anytime regardless of the status of the work order.

Answer: B

Question #:39

In a manufacturing cloud implementation, production operators want to perform work order updates using
Dispatch List.

https://www.dumps4less.com/
Identify two tasks that the Dispatch List allows the production users to perform.

A. Report Component Returns

B. Report Resource Transactions

C. Report Receipts

D. Report Material Transactions by Quantity and Serial Number

E. Report Cost Transactions

Answer: B D

Question #:40

In a manufacturing plant, a production operator in a given shift completes a car assembly and reports this using
orderless completion by referencing a Work Definition.

Identify the two purposes of the referenced Work Definition in Orderless reporting.

A. Material usage

B. Resource usage

C. Processing steps

D. Scrap material

E. Return material

Answer: A B

Question #:41

A manufacturing cloud user wants to print information available in the work order in PDF.

Identify the three reports that the user can print directly from the work order screen using the Print PDF action.

A. Work Order Traveler

B. Resource List

C. Print Labels

D. Print Component List

E.

https://www.dumps4less.com/
E. Bill of material

Answer: A C D

Question #:42

Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of
defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an
operation.

Identify the reason.

A. The user doesn’t have Override Item Structure Components in the Work Definition privileges.

B. An item cannot be assigned on an ad hoc basis.

C. The user doesn’t have access to the PIM module.

D. The user doesn’t have Data access to create item structure.

Answer: B

Question #:43

The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You
associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to
assign all units of resource R2 available for Day and Night Shift.

Identify the correct sequence of steps to achieve this requirement.

A. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource
Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.

B. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource
Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column

C. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource
Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.

D. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource
Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.

Answer: C

Question #:44

https://www.dumps4less.com/
Identify three requirements fulfilled by nonstandard work orders.

A. Rescheduling

B. Repair

C. Rework

D. Prototype

Answer: B C D

Question #:45

As a production supervisor, you require immediate access to critical shop floor execution systems to take
action while on the go.

Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?

A. Executing standard work order and updating item and resource usage

B. Creating a new standard or non standard work order

C. Searching for work orders and sending them through e-mail

D. Releasing work orders using quick swipe details

E. Reviewing operation, component, and resource detail

F. Reviewing customer information of work orders

Answer: C D E F

Question #:46

You are in the process of defining a Standard Operation for visual inspection. You want the completion of this
standard operation to be reported in all work orders that reference it.

Identify the setup that will fulfill this requirement.

A. Select the Automatically Transact check box while defining the Standard Operation.

B. Deselect the Count Point check box while defining the Standard Operation.

C. Select the Count Point check box while defining the Standard Operation.

D.

https://www.dumps4less.com/
D. Ensure that the Charge Type of the resource is Automatic.

Answer: C

Question #:47

As part of an implementation project, you have to perform setups related to a Manufacturing plant in
Functional Setup Manager.

What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

A. The Supply Chain Orchestration Functional Area

B. The Manufacturing Master Data Functional Area

C. The Manage Items Profile Options tasks

D. The Manage product and Child Value Sets task

Answer: B

Question #:48

The production user wants to report Work Order completion.

Identify two ways of reporting the progress of work order at work order operation level.

A. Change Move status to Ready.

B. Complete using quantity completion

C. Complete with Details

D. Quick Complete

E. Change status of Operation to completed

Answer: C D

Question #:49

A production operator needs to review the materials issued, resources charged, and operations performed for a
job that was executed in the previous shift.

Identify the task the operator has to select to review all the transactions in a single place for both Work Order

https://www.dumps4less.com/
and Orderless execution.

A. Manage Work Orders

B. Review Dispatch List

C. Report Resource, Material and Operation Transactions

D. Review Production Transaction History

Answer: A

Question #:50

Which entity should you use to configure the manufacturing plant in Functional Manager?

A. Legal Entity

B. Plant

C. Organization

D. Business Unit

Answer: B

Question #:51

You are reviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular
customer. The final assembly of the work order is serialized.

Which option shows the steps to complete the task using the mobile application?

A. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode
to open the work order details page > Click Actions and select the E-mail icon> Select required work
orders> Select the e-mail client, enter the recipient’s e-mail, and click Send.

B. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail
icon> Select required work orders>Select the e-mail client, enter the recipient’s e-mail, and click Send.

C. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode
to open the work order details page> Select required work orders> Click Social icon (OSN) > Select
recipient, and click Share.

D. Search the work order by customer name to open the work order details page> Click Actions and select
the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient’s e-mail, and

https://www.dumps4less.com/
click Send.

Answer: A

Question #:52

A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing
plant (MP). Sales orders are created and shipped from DW.

Identify the two Sourcing Rules that need to be set for order promising to schedule the order.

A. Define Local sourcing rule for organization MP: Source Type Make At, Source MP

B. Define Local sourcing rule for organization DW: Source Type Make From, Source MP

C. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW

D. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP

Answer: A D

Question #:53

Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without
creating a new version.

A. Delete an Operation

B. Costing Priority

C. Production Priority

D. Add an Operation

E. Completion Subinventory

Answer: C D E

Question #:54

During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional
Business Intelligence reports that are not available out-of- the box.

Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.

A.

https://www.dumps4less.com/
A. Oracle Business Intelligence Standard Edition

B. Oracle Business Intelligence Publisher

C. Oracle Business Intelligence Enterprise Edition

D. Oracle Business Intelligence Application

Answer: B

Question #:55

Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and
resources available in the spreadsheet.

Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop
Integration)?

A. Create Work Definitions

B. Update Work Definitions

C. Create and update ATO (Assemble To Order) model work definitions

D. Populate Descriptive flexfields

Answer: C D

Question #:56

A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center
resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.

Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar
page.

A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource
Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units
Availability column.

B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource
exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in
Default Availability column.

C. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource
Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units
Available.

https://www.dumps4less.com/
D. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource
exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4
units in Availability Override column.

Answer: D

Question #:57

A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its
existing Work Definitions. After copying from the existing Work Definition WD1 to the alternative Work
Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing
process WD2.

Identify the reason.

A. The Production Priority was not populated in the new Work Definition WD2 during creation.

B. The Item and Structure Name in the existing Work Definition WD1 were retained in the new Work
Definition WD2 as well during creation.

C. The Item and Structure Name were changed in the new Work Definition WD2 during creation.

D. The Start Data was not populated in the new Work Definition WD2 during creation.

Answer: D

Question #:58

To reduce the subassembly stock with no impact on material planning of child components of the
subassemblies stock, you need to modify the multilevel item structure of a product.

Identify the action that meets this requirement.

A. Change the Supply Type = Push in Item definition and Work Definition, for subassemblies having high
inventory stock.

B. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having
high inventory stock.

C. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies
having high inventory stock.

D. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies
having high inventory stock.

Answer: C

https://www.dumps4less.com/
Question #:59

Your customer has completed the required setup steps for automatic work definition. Identify the option that
shows the navigation steps needed to create an automatic work definition.

A. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic work
definition

B. Product Management> Product Information Management> Items> Edit Item > Actions> Create
automatic work definition

C. Manufacturing> Work Definition> Manage Standard Operations> Select default standard operation>
Actions> Create automatic work definition

D. Manufacturing > Work Definition> Manage Standard Operations> Create automatic definition

Answer: C

Question #:60

In your customer’s manufacturing facility, different types of Movement Requests are created. Key
manufacturing components are issued to the work orders form the manufacturing subinventory. The
manufacturing subinventory receives its supplies form the Warehouse subinventory through automatically
created Movement Requests.

Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse
subinventory?

A. Batch Wave Movement Requests

B. Pick Wave Movement Requests

C. Replenishment Requests

D. Requisition Movement Requests

Answer: D

Question #:61

You have been asked to set up cost estimates for 10 different purchased items. Which two steps could be used
to accomplish this task?

A. Use the Mass Edit functionality.

B.

https://www.dumps4less.com/
B. Run the ESS process “Update Item Cost Estimate”.

C. Enter cost estimates directly into UI.

D. Call web service.

E. Import spreadsheet.

Answer: C E

Question #:62

A Work Center created a month ago is no longer in use now. You want to remove the Work Center; however,
the system is no allowing you to delete it.

Identify three reasons for this.

A. There are resources associated with the Work Center.

B. The Work Center is being referenced in the Closed Work Order.

C. The Work Center is being referenced in the Open Work Order.

D. The work center is being references in the work definition operation.

E. The work center is being referenced in the Work Area.

Answer: A C E

Question #:63

Identify the two capabilities that the Application Development Framework Desktop Integration (ADFDI)
framework provides for Work Definitions in Manufacturing Cloud.

A. You can mass create and update work definitions and their operations, items, and resources.

B. You can mass create and update work definitions and their operations, items only and cannot add
resources in work definitions.

C. You can mass create and update work definitions and their operations only and cannot add items and
resources in work definitions.

D. You can copy work definitions form one organization to another organization.

Answer: A D

https://www.dumps4less.com/
Question #:64

A production Operator is executing work order in your plant. After completing move transactions, he notices
that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is
required to perform a reverse transaction to correct the errors. The operations are not count point enabled and
not auto charged.

Identify the four transactions to correct this situation.

A. Reverse from reject to ready.

B. Reverse from scrap to ready.

C. Reverse resources charged to a work order.

D. Reverse material issued to a work order.

E. Reverse at an operation.

F. Reverse the product at the last operation.

Answer: A B C D

Question #:65

In a Manufacturing Cloud post production support environment, a user wants to update some of the operations
in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the
orders.

Identify two reasons.

A. The work order operations do not have operations start or completion date.

B. The scheduled resources are not part of the organization selected by the user.

C. None of the operations include scheduled resources.

D. The operations are missing sequence.

Answer: C D

Question #:66

Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle
Manufacturing Cloud.

A.

https://www.dumps4less.com/
A. Resource calendars of the work centers involved

B. The primary work definition of the item

C. The lot size of the item

D. The shifts are defined in the plant calendar

E. Plant calendar exceptions

F. Resource calendar exceptions

Answer: B C D F

https://www.dumps4less.com/

You might also like