Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

3D IMAGE

DESCRIPTION RETAINER RING


MOC SS304L
SURFACE PROTECTION N.A.

ØID ØOD T FINISHED WGHT.


TUBE OD QTY. (Nos.)
(+0.07/0.00) (0.00/-0.20) (±0.10) (Grams)

Ø12.0 12.13 18.00 1.50 1.66 217,120


Ø18.0 18.13 24.00 1.50 2.33 161,000
Ø28.0 28.13 37.00 2.50 9.06 60,720
Ø44.5 44.63 53.26 2.50 13.07 88,320
RM TYPE RM RATE (Rs/Kg)
SOLID ROUND BAR
RM COST (A)
HOLLOW ROUND PIPE
OTHER - SHEET METAL
RM WEIGHT (Kg / Piece)

PROCESS COST (B) OPERATION-1 OPERATION-2 OPERATION-3 SCRAP COST TOTAL


(Rs/OPERATION/Piece)

MFG.COST (C=A+B)
(Rs/Piece)
REJECTION %C
INVENTORY CARRYING COST X% ON RM
OTHERS (D)
(Rs/Piece) OVERHEADS X%ON PROCESS COST
TOOL AMORTISATION COST 1 TIME
PROFIT X% ON (RM + PC)
TOTAL COST (A+B+C+D)
(Rs/Piece)
3D IMAGE

DESCRIPTION GROOVE SPLIT RING


MOC SS304L
SURFACE PROTECTION N.A.

ØID ØOD T FINISHED WGHT.


TUBE OD QTY. (Nos.)
(+0.07/0.00) (0.0/-0.20) (±0.10) (Grams)

Ø12.0 12.13 17.80 4.00 2.77 217,120


Ø18.0 18.13 24.00 4.50 4.67 161,000
Ø28.0 28.13 37.00 5.00 11.96 60,720
Ø44.5 44.63 53.25 8.00 28.40 88,320
RM TYPE RM RATE (Rs/Kg)
SOLID ROUND BAR
RM COST (A)
HOLLOW ROUND PIPE
OTHER
RM WEIGHT (Kg / Piece)
PROCESS COST (B) OPERATION-1 OPERATION-2 OPERATION-3 SCRAP COST TOTAL
(Rs/OPERATION/Piece)
MFG.COST (C=A+B)
(Rs/Piece)
REJECTION %C
INVENTORY CARRYING COST X% ON RM
OTHERS (D)
(Rs/Piece) OVERHEADS X%ON PROCESS COST
TOOL AMORTISATION COST 1 TIME
PROFIT X% ON (RM + PC)
TOTAL COST (A+B+C+D)
(Rs/Piece)

You might also like