Specification
Specification
LOCATION : Epifanio de los Santos Ave, Bago Bantay, Quezon City 1105 Metro
Manila
OWNER : KAREILLA MANAGEMENT CORPORATION
SUBJECT : SPECIFICATION
SCOPE OF WORK
The work under this heading consist of the furnishing of all materials, tools, and
equipment, and the performance of all necessary labor and services required to permit
the construction of the proposed renovation of showroom, in accordance with the
attached plans and specifications.
SITE CLEARING
The immediate site of the building shall be cleared of all destruction which shall impede
the construction operations.
USE OF MATERIALS
No other materials shall be used in the construction unless the same are subject to the
Architect/Engineer’s and or Owner’s approval.
FLOOR FINISHES
WALL FINISHES
DOORS
HARDWARES
Do not install surface-mounted items until finishes have been completed on the
substrate.
Set units level, plumb, and true to line and location. Adjust and reinforce the attachment
substrate as necessary for proper installation and operation.
Drill and countersink units which are not factory prepared for anchorage fasteners.
Space fasteners and anchors in accordance with industry standards.
Screw thresholds to substrate with No. 10 or larger stainless steel screws of the proper
type for permanent anchorage of threshold.
Clean operating items as necessary to restore proper function and finish of hardware.
Adjust door control devices to compensate for final operation of ventilating equipment
PAINTING
Provide labor, materials equipment and related items required to complete the exterior
and interior items and surfaces throughout the project including filling, sealing, priming,
and finishing.
Electrical work to be painted include the following (but not limited to):
Ensure surface temperature and the surrounding air temperature is above 50 degrees F.
before applying paint materials.
Acceptable manufacturer:
A. Boysen
Do not paint over dirt, dust, stains, rust, scale, oil grease, moisture, scuffed
surfaces, or other contamination or conditions detrimental to formation of a
durable paint film.
Apply paint in accordance with paint manufacturer’s instructions and as herein
specified.
Apply each coat of paint at no less than spreading rate indicated in the manufacturer’s
instructions.
MECHANICAL WORKS
ELECTRICAL WORKS
ELECTRICAL DEVICES
CONDUCTORS
BREAKERS/PANEL BOARD
The Plumbing Installation shall be done in accordance with the approved plans
and under direct supervision and control of a licensed Sanitary Professional
Engineer or Master Plumber.
All Plumbing works and materials shall conform to the provisions of the latest
edition of the National Plumbing Code.
Materials:
REYNALDO P. PECANA
ARCHITECT
REG.NO. 5129 TIN 178-081-509
PTR. 9557410 issued at Meycauyan
On Jan. 14, 2016