AGGREGATE COMBINED

PROJECT : OVERLAYING OF ASPHALT HOT MIX TO THE HAUL ROAD 70 KM FROM TABANG COAL MINE TO SENYIUR PORT .

LOCATION : TABANG KUTAI KARTANEGARA .

DATE OF TEST : 18 April 2020


TYPE MIX DESIGN : AC-BASE
MAX. SCREEN : 38.1 MM MIX. DESIGN : MD-19

MATERIAL : HOT BIN

SEIVE SIZE COMPOSITION OF MATERIAL PROPORTION 0F MATERIAL (%)


TOTAL
HB - 1 HB - 2 HB - 3 HB - 4 SPECIFICATION
HOT BIN I HOT BIN II HOT BIN III HOT BIN IV COMMBINED
NO MM
(Fine Agg) (Medium Agg) (Medium Agg) (Coarse Agg) 34.00 22.00 26.00 18.00

11/2" 38.1 100 100 100 100 34.00 22.00 26.00 18.00 100.00 100.0 100.0

1" 25.400 100.00 100.00 99.47 67.17 34.00 22.00 27.00 12.09 95.09 90.0 100.0

3/4" 19.100 100.00 100.00 43.67 6.27 34.00 22.00 11.35 1.13 68.48 76.0 - 90.0
1/2" 12.700 100.00 100.00 9.75 1.37 34.00 22.00 2.53 0.25 58.78 60.0 - 78.0
3/8" 9.500 100.00 98.80 2.96 1.25 34.00 21.74 0.77 0.23 56.73 52.0 - 71.0
No.4 4.700 99.89 32.98 1.56 1.22 33.96 7.25 0.41 0.22 41.84 35.0 - 54.0
No.8 2.360 77.13 3.89 1.51 1.22 26.23 0.85 0.39 0.22 27.69 23.0 - 41.0
No.16 1.180 50.53 3.60 1.45 0.00 17.18 0.79 0.38 0.00 18.35 13.0 - 30.0
No.30 0.600 34.54 3.54 1.42 0.00 11.74 0.78 0.37 0.00 12.89 10.0 - 22.0
No.50 0.300 25.16 3.39 1.38 0.00 8.55 0.75 0.36 0.00 9.66 6.0 - 15.0
No.100 0.150 15.69 2.91 1.22 0.00 5.33 0.64 0.32 0.00 6.29 4.0 - 10.0
No.200 0.075 11.61 1.90 1.06 0.00 3.95 0.42 0.27 0.00 4.64 3.0 - 7.0

COMBINED AGGREGATE GRADATION CHART


0,08 0,150 0.300 0.600 1,180 2,36 4.700 9,50 12,7 19,1 25,4
100

90

PASSING (%)
80

70

60

50

40

30

20

10

0
0.01 0.10 1.00 10.00 100.00

SEIVE SIZE (MM)

PT. KALIRAYA SARI


DIUJI OLEH

SUYADI
LABORATORIUM

You might also like