SAS Project Customer Training
SAS Project Customer Training
Course Schedule
Introduction, Pre-Training Evaluation, Project Scope
Engineering Deliverables
RTU Troubleshooting
Feedback Session
Mechanical Arrangement
Settable LED
Navigation keys
Local/Remote
Operating keys command
Open/Close command
Power supply
connector
2 RS232/485
links
3
O1
RS2 (232/485) 4 Watchdog
5
6
7 VIN VIN
+ DI1 + DI2
- -
8 - -
9
10
11
RS232/
12 RXD / T- RS485 Serial
13 GND
link 2
14 TXD / T+
15 #
GND
16 RS232/
CTS
17 RS422
RXD / T+ Serial
18 TXD / T- RS485
RTS / R+ link 1
19
R- (RS422)
20 #
DCD
21
22
Vaux Power
23 +
24 - supply
-
1 ms Time-tag 1
+
VIN
DI1 +
VIN
DI2
- -
2 - -
Opto Isolated 3
4 VIN VIN
+ DI3 + DI4
16 DI 5 -
-
-
-
7 VIN VIN
+ DI5 + DI6
- -
8 - -
9
10 VIN VIN
+ DI7 + DI8
- -
11 - -
12
The digital inputs can be configured as
13 VIN VIN
•SINGLE or DOUBLE BI +
-
DI9 +
-
DI10
14 - -
•SINGLE or DOUBLE Counters
15
•Digital Measurement
16 VIN VIN
+ DI11 + DI12
- -
17 - -
18
19 VIN VIN
+ DI13 + DI14
- -
20 - -
21
22 VIN VIN
+ DI15 + DI16
- -
23 - -
24
1
Making 70 VA/W 2 DO 1
3
4 DO 2
5
6 DO 3
7
8 DO 4
9
10 DO 5
11
12 DO 6
13
14 DO 7
15
16 DO 8
17
18
3
4 + U
5 - mA/V AI 1
#
6
7
8
9 + U
10 - mA/V AI 2
#
11
12
13
GND
14
15
16 + U
17 - mA/V AI 3
#
18
19
20 + U
21 - mA/V AI 4
#
22
23
24 Reserved
Cabinet
Mounting
BIU
CPU
DIU DOU AIU
22 SAS - MiCOM C264 - 22
BIU20x
CPU270
DIU20x
AIU20x
DOU20x
RTU applications
Data Concentrator
SOE Recorder
Measurement Centre
Quality metering
Bay Computer, integrated in DCS systems
Configuration(SCT) and
Maintenance (CMT)
Capacity
Printer
up to 4 Serial links for SCADAs
and IEDs
IEC 60870-5-103,101 up to 244 direct wired I/O
Modbus,
I/Os
up to 5012 internal binary points
up to 1024 internal analogue
points
Legacy
Bus up to 1024 internal digital
outputs
Configuration and
Maintenance
Capacity
Printer
up to 2 Serial links for SCADAs
up to 4 extension racks
Ethernet
up to 244 direct wired I/O on
each extension rack
up to 5012 internal binary points
Legacy up to 1024 internal analogue
Bus points
I/Os up to 1024 internal digital
outputs
29 SAS - MiCOM C264 - 29
Distributed Architecture
SCADA IEC870-5-101
Ethernet UCA2 or
IEC61850
IEC 870-5-103
Key Competitor Differentiation
1. Local Integration capability
2. IEC61850 technological gap
(wide possibilities of
scheme automation)
3. Relay Optimal Integration
MiCOM C264
4. Switchyard Field Distribution
MiCOM Pxxx
Third party protocols will implemented using external converter over legacy bus
protocols or station bus protocols
Using SCE
Helps in definition/edition of all system data with its equipment
Generates each equipment databases.
At first, the data definition is done by experts through templates or
models of data. These templates are then stored and delivered in
SCE libraries.
In a second time, the models can be loaded and instantiated as a
kind of duplication to create object data customised to the
application case.
In a third time users can make modification on its object database.
When all data of the concrete case are defined, the SCE generates
a coherent set of databases, named system databag, that can be
loaded into each system equipment by CMT, the maintenance tools.
• Electric process.
• System (device characteristics and communication).
• Graphic definition of Operator Interface with Archives,
Graphic .
How ?
Via ethernet (no hub, no front face)
Configuration and
Maintenance
Printer
Ethernet
Legacy
Bus
I/Os
List of connected
computers
Telnet (access to
shell)
Stop selected
computer tasks
Click OK
Click Next
Progress