Professional Documents
Culture Documents
Loooooooooooooooui
Loooooooooooooooui
O
D1
Scale1:75
10
HD
O
~
D
PE
28
119
PN
0
X
10
D
PE
PN
10
15/1
LEV-UHY80 LEV-AIR05
4
LEV-NP030 19
Pk. Air Valve Chamber
3
. 19
2KT Pk
~
2KT TRA-AIR06
A TRA-NP033
~
2KT
~
od 100cm x
~
od 120cm
~
2KT
119
Pk. 191
17/7
2KT
20 2KT
11
OD280
15/3
1 Pk. 190
~
25
HDPE PN1
17/6
~
2
0
NODE A 17/5
Pk. 189
3a Pk. 188
20
17/4
642
17/1
Pk. 187
17/2
17/3
8/9
Pk. 186
12
17/8
Pk. 185
x
78/2
Bridge Crossing Type2
3
Pk.
BRC-DET002 184
17/9
~
x
PN10
122
Pk. 182
HDPE
6 OD63 ~
TRA-WAS05 Pk. 181 TRA-NP054
4 6 6 4
Pk. 180
170
24/1 22/1 9
. 17 20/4
8
OD280 HDPE PN10 Pk 21
17
~ ~
Pk.
~
25
20/3
20 ~ OD
~
23/22
24/2 O 28
D 0
ke 63 HD
OD280 HDPE PN10 ~ ~ ~ ep H
in DP
PE 20/1
5 5 10
7
era N
17
23/2
OD
tio 10
Pk.
~ n
63
24/3
~ 22/15
HD
23/21
22/2
PE
23/19
~
6
~
17
P
N10
Pk.
23/20
~ 23/3
~
22/3
~ ~
Bottom 48,5 m
24/4 5
~ ~ 17
4 4 ~ ~ 23/4
Pk.
7 5 80 5 7 24/5 22/14
22/4
~ max. WL 51,1 m
6 ~ 23/18
23/5
125
~ ~ ~ ~ 4
OD ep in
22/13
~ 17
OD
A
Pk.
ke
OD
23/17 124
63
63
24/6
~ ~
28
HD pera
HD
THE BRIDGE LEGS
0H
~ ~ ~
PE tio
o
6/115 23/6
PE
DP
THE BRIDGE LEGS
22/12
PN n
23/16 22/5
EP
P
10
PN10
N10
HDPE
OD90
N 10
24/7
~ ~ ~
22/6
OD
23/7 3 COC 07 - Concrete Chamber
~ ~ . 17 19
63
Pk for Flow Control Valve DN80
40
22/11
ion
HD
23/15
COC-LAY001
~ ~ erat pe
Frakull e Madhe ~ ~ in op er pi
P
TRA-AIR05 10
EP
keeping feed PN10 PN pe
6/117
23/14 23/8
~ ~ 22/7
TRA-EFM06 exist 0 HDPE
PE
HD pply pi n
N10
24/8
~~ ~
22/10
. 17
2 exis ep in
6/118
~
23/13
~ ~
Pk ke
Connection to existing feeder pipe
ion
24/9 erat pe 22/8 to reservoir Frakull e Madhe #1
~ of op er pi TRA-NP031 TRA-NP032
out g feed PN10
6/119
~ 23/9 in
exist 0 HDPE 10
OD90 HDPE PN10
24/10
~ 23/12 ~ 22/9 OD9 PE
PN pe
HD pply pi n 1
tion . 17
6/120
opera e
out of feeder pip10
~ ~ 90
OD ting su erat
op
io Pk
exis ep in
x 28/1
ng
existi HDPE PN
24/11
~
23/10
ke ~ ~
OD
126
OD90
OD
63
~ ~
OD ep in
23/11
280
600 300 685 200
24/12
HD
6/121
ke
~
63
10
~ ~
PE
HD
PE PN 28/14
HD erat
~ HD
PE
OD90
0
PN
. 17
~
PE ion
op
24/13 25/1 Pk
10
PN
28/2
PN
6/122 28/3
10
~ ~
10
20
OD
24/14
Pk. 169
25/13
~ ~ ~
63
~
HD
6/123
~
30
28/13
OD
~
PE
28/4
x
63
~
P
6/124
~
HD
N10
25/12
~ ~
SECTION A-A
Pk. 168
~ ~
50
PE
24/15 25/2 28/11 28/5
~
P
Pk. 167
N10
6/125
~ 28/6
25/11
28/12
~ Pk. 166
6/126
24/16
~ 25/3
~ ~ 28/10
BASEMENT REINFORCEMENT
~ Pk. 165
SCALE: 1/25
~
REFERENCE DRAWINGS:
SECTION B - B
CONCRETE PIPE SUPPORTER SCALE: 1/20
STRAP 2 SCALE: 1/25 DRAWING TITLE: DRAWING NO: SHEET:
20
15
15
M 20 (THROUGH BOLTS) 23
23
15
Ø12/20
1
2
26 34
Ø12/20
CONCRETE
20
15/20
164
164
80
170
B B
74
170
170
74
164
164
170
Ø10/20
CONCRETE
20/25 34
Ø10/20
Ø12/20 1 L=236cm
3
3
40
Ø12/20 Ø12/20
2 1
34
74 Ø12/20 Ø12/20
L=440cm
1 40 L=416cm
2
80
CONCRETE
80 15/20
80
40
STRAP 1
B Second Issue As Built Drawing 13-04-2017
1
STRAP 2 No.
A First Issue As Built Drawing
DESCRIPTION
23-03-2017
DATE
Rev
2
REVISIONS
36 30
20 10
Engineer:
STRAP 1 ELASTIC RING PIECE
24
Contractor:
100 310 100 10 10
3 Adresa: Zona industriale Patos, Fier
CHROME-HEX-BOLTS 6 4 Tel: ++355 385 40900
CONCRETE M 20 (THROUGH BOLTS) Fax: ++355 385 40062
e-mail: [email protected]
16 20 20 10
STOPPING PIECE STRAP 1 Client:
Financier:
301
20
70
400
L SECTION 100X100 mm 100 310 100 MATERIALS TABLE
Project:
MUNICIPAL INFRASTRUCTURE I
(BMZ 2009 66 523, 2020 59 988)
and MUNICIPAL INFRASTRUCTURE II
(BMZ 2010 65 705, 2020 60 408)
Rehabilitation of the Water Supply and Sewage Network in Fier
REINFORCEMENT TABLE Project No: ALB-ST-SW-1004-INT-STP-2013-FR
FIE-DRW-BRC-W-DET002