GENERAL KEYPLAN

BRIDGE CROSSING TYP 2 BRC-DET002 OVERVIEW:

O
D1
Scale1:75

10
HD
O

~
D

PE
28
119

PN
0
X

10
D
PE
PN
10
15/1
LEV-UHY80 LEV-AIR05
4
LEV-NP030 19
Pk. Air Valve Chamber
3
. 19
2KT Pk

~
2KT TRA-AIR06

A TRA-NP033

~
2KT

Cocnrete pipe Crossing 19 2 x


Pk.

~
od 100cm x

Cocnrete pipe Crossing 15/2

~
od 120cm

~
2KT

119

Pk. 191
17/7
2KT

100 190 600 600 70 190 600 100 x 1KT


120

20 2KT
11

OD280
15/3

1 Pk. 190
~

25
HDPE PN1
17/6

~
2

0
NODE A 17/5
Pk. 189

3a Pk. 188

20
17/4
642
17/1
Pk. 187

17/2
17/3

8/9
Pk. 186
12

17/8
Pk. 185
x
78/2
Bridge Crossing Type2

3
Pk.
BRC-DET002 184
17/9

Pk. 183 78/1

~
x

PN10
122
Pk. 182
HDPE
6 OD63 ~
TRA-WAS05 Pk. 181 TRA-NP054

OD63 HDPE PN10


23/1 HDPE OD110 121
22/23

4 6 6 4
Pk. 180

170
24/1 22/1 9
. 17 20/4

8
OD280 HDPE PN10 Pk 21

17
~ ~

Pk.
~

25
20/3

20 ~ OD

~
23/22
24/2 O 28
D 0
ke 63 HD
OD280 HDPE PN10 ~ ~ ~ ep H
in DP
PE 20/1

R Frakull E Madhe No.1


op E P PN 20/2

5 5 10

7
era N

17
23/2

OD
tio 10

Pk.
~ n

63
24/3

~ 22/15

HD
23/21
22/2

PE
23/19
~

6
~

17
P
N10

Pk.
23/20
~ 23/3

~
22/3

~ ~
Bottom 48,5 m
24/4 5
~ ~ 17

4 4 ~ ~ 23/4
Pk.

7 5 80 5 7 24/5 22/14
22/4
~ max. WL 51,1 m
6 ~ 23/18
23/5

125
~ ~ ~ ~ 4

OD ep in
22/13
~ 17

OD
A
Pk.

ke

OD
23/17 124

63
63
24/6
~ ~

28
HD pera
HD
THE BRIDGE LEGS

0H
~ ~ ~

PE tio
o
6/115 23/6

PE

DP
THE BRIDGE LEGS
22/12

PN n
23/16 22/5

EP
P

10

PN10
N10

HDPE
OD90
N 10
24/7
~ ~ ~
22/6

THE BRIDGE LEGS


6/116

OD
23/7 3 COC 07 - Concrete Chamber
~ ~ . 17 19

63
Pk for Flow Control Valve DN80

40
22/11
ion

HD
23/15
COC-LAY001
~ ~ erat pe

Frakull e Madhe ~ ~ in op er pi

P
TRA-AIR05 10

EP
keeping feed PN10 PN pe
6/117
23/14 23/8
~ ~ 22/7
TRA-EFM06 exist 0 HDPE
PE
HD pply pi n

N10
24/8
~~ ~
22/10

Air Valve Chamber DN80 OD9


90
OD ting su erat
op
io

. 17
2 exis ep in
6/118

~
23/13
~ ~
Pk ke
Connection to existing feeder pipe
ion
24/9 erat pe 22/8 to reservoir Frakull e Madhe #1
~ of op er pi TRA-NP031 TRA-NP032
out g feed PN10
6/119
~ 23/9 in
exist 0 HDPE 10
OD90 HDPE PN10

24/10
~ 23/12 ~ 22/9 OD9 PE
PN pe
HD pply pi n 1
tion . 17
6/120
opera e
out of feeder pip10
~ ~ 90
OD ting su erat
op
io Pk

exis ep in
x 28/1
ng
existi HDPE PN
24/11
~
23/10
ke ~ ~

OD
126
OD90

OD
63
~ ~

OD ep in
23/11

280
600 300 685 200
24/12

HD
6/121

ke
~

63
10
~ ~

PE

HD
PE PN 28/14

HD erat
~ HD

PE
OD90
0

PN
. 17
~

PE ion
op
24/13 25/1 Pk

10

PN
28/2

PN
6/122 28/3

10
~ ~

10
20

OD
24/14
Pk. 169
25/13
~ ~ ~

63
~

HD
6/123
~

30
28/13

OD

~
PE
28/4
x

63
~

P
6/124
~

HD

N10
25/12

~ ~

SECTION A-A
Pk. 168
~ ~

50
PE
24/15 25/2 28/11 28/5
~

P
Pk. 167

N10
6/125
~ 28/6

25/11
28/12
~ Pk. 166
6/126
24/16
~ 25/3

~ ~ 28/10

BASEMENT REINFORCEMENT
~ Pk. 165

SCALE: 1/25
~
REFERENCE DRAWINGS:
SECTION B - B
CONCRETE PIPE SUPPORTER SCALE: 1/20
STRAP 2 SCALE: 1/25 DRAWING TITLE: DRAWING NO: SHEET:

ELASTIC RING PIECE Ø10/20


3 Ø12/20
1 3 Ø10/20 Ø12/20
2 SECTION B-B LOT 2-TRANSMISSION MAIN Kafaraj well field - Komuna of Levan
Detail layout drawing - part #11 FIE-DRW-TRA-W-LAY12 1
Detail layout drawing in Kafaraj well field
FF PIECE, DCI, DN250, PN16
21 21 34 SCALE: 1/25
CHROME-HEX-BOLTS L E G E N D & NOTES:

20
15
15
M 20 (THROUGH BOLTS) 23
23
15

Ø12/20
1

2
26 34

Ø12/20
CONCRETE

20
15/20

164

164

80
170

B B

74
170
170

74
164

164
170

Ø10/20
CONCRETE
20/25 34
Ø10/20
Ø12/20 1 L=236cm
3

3
40
Ø12/20 Ø12/20
2 1
34
74 Ø12/20 Ø12/20
L=440cm
1 40 L=416cm
2
80
CONCRETE
80 15/20
80

40

STRAP 1
B Second Issue As Built Drawing 13-04-2017
1
STRAP 2 No.
A First Issue As Built Drawing

DESCRIPTION
23-03-2017

DATE
Rev
2
REVISIONS
36 30
20 10

Engineer:
STRAP 1 ELASTIC RING PIECE
24

SETEC Engineering GMBH & CO. KG


FF PIECE DCI DN300 410 3a
60

Contractor:
100 310 100 10 10
3 Adresa: Zona industriale Patos, Fier
CHROME-HEX-BOLTS 6 4 Tel: ++355 385 40900
CONCRETE M 20 (THROUGH BOLTS) Fax: ++355 385 40062
e-mail: [email protected]

16 20 20 10
STOPPING PIECE STRAP 1 Client:

L SECTION 100X100 mm Sh.A Ujesjelles Kanalizime Fier


60

Financier:
301
20

ELASTIC RING PIECE t = 8cm Kreditanstalt für Wiederaufbau and European Union


BRACKET 10 OD315 HDPE
10

70
400
L SECTION 100X100 mm 100 310 100 MATERIALS TABLE
Project:
MUNICIPAL INFRASTRUCTURE I
(BMZ 2009 66 523, 2020 59 988)
and MUNICIPAL INFRASTRUCTURE II
(BMZ 2010 65 705, 2020 60 408)
Rehabilitation of the Water Supply and Sewage Network in Fier
REINFORCEMENT TABLE Project No: ALB-ST-SW-1004-INT-STP-2013-FR

Designed by: Drawing title: Date:

J.Ndrio LOT 2-TRANSMISSION MAIN April 2017


Checked by: Kafaraj well field - Komuna of Levan
L.Peti BRIDGE CROSSING TYP 2 BRC-DET002 Approval date:
Approved by:
Detail Construction Drawing
Project area: Engineer's Approval: Scale: Format:
1 :20/25/75 A2
Sheet:

FIER DRAWING No:


1 of 1

FIE-DRW-BRC-W-DET002