Regd. No.

4040/061/062

Universal Metal Works


Butwal-8,Sukhanagar, Shrawanpath

Ref No. Date: ……………………

S/N Particulars T B L kg/m Qty per set Qty total


1 Column 400 400 4800 67.6 1 5
2 Beam 500 8700 92.9 1 1
3 Beam 2 500 7367 92.9 1 1
4 Beam 350 7963 52.4 1 1
5 Beam 350 6050 52.4 1 1
6 Beam 350 4800 52.4 1 1
7 Beam 350 6875 52.4 1 1
8 Beam 350 5655 52.4 1 2
9 Beam 350 5075 52.4 1 1
10 Beam 350 4725 52.4 1 1
11 Beam 350 5150 52.4 1 1
12 beam 250 5855 52.4 1 17
13 Plate 20 670 400 42.076 1 4
14 Plate 20 520 400 32.656 1 10
15 Plate 20 400 500 31.4 1 4
16 Plate 20 670 400 42.076 1 4
17 Plate 20 670 400 42.076 1 4
18 Plate 20 200 150 4.71 1 32
19 Plate 10 100 100 0.785 1 108
20 Plate 6 100 457.2 9.2 1 8
21 Plate 6 100 300 9.2 1 20
22 Plate 6 100 200 9.2 34 8
23 Plate 6 100 175 9.2 1 18
24 Plate 6 50 125 3.66 1 34

Material estimate with 5% wastage


Cost amount @
Qty unit
25 20mm anchor bolt 32 pcs
26 16 anchor Bolt 64 pcs
27 Chemical expoxy 2 bag
28 Deck sheet 1520 sqft
Grand Amount
9847037407

Date: …………………………………..

Total Wt Total wt
324.48 1622.4
808.23 808.23
684.3943 684.3943
417.2612 417.2612
317.02 317.02
251.52 251.52
360.25 360.25
296.322 592.644
265.93 265.93
247.59 247.59
269.86 269.86
306.802 5215.634 4927.634
16.8304 67.3216
13.0624 130.624
15.7 62.8
16.8304 67.3216
16.8304 67.3216
0.7065 22.608
0.0785 8.478
4.20624 33.64992
2.76 55.2
62.56 500.48
1.61 28.98
0.4575 15.555
12113.07322
12,718.73
175 2,225,777.20
rate
200 6,400.00
150 9,600.00
2000 4,000.00
200 304,000.00
2,549,777.20
S/N Particulars T B L kg/m Qty per seQty total Total Wt
1 Column 200 [8inch] 20ft 200 6000 22.7 1 24 136.2
2 Column 150 [8inch] 10ft 150 3000 17.4 1 24 52.2
3 Beam 200 s centre 44ft 200 13412 24.5 1 6 328.594
4 Beam 200 n 40ft 200 12000 24.5 1 3 294
5 Beam 200 n to south 33.5ft 200 10210 24.5 1 12 250.145
6 Beam 150 150 10210 16 1 12 163.36
7 Beam 150 150 13412 16 1 3 214.592
8 Beam 150 150 12000 16 1 3 192
9 column 100 100 9000 9.56 1 2 86.04
10 Beam support 100 1200 9.56 1 9 11.472
11 plate10mm 10 1200 2400 240 4 0
12 plate12 mm 12 1200 2400 0 288 1 0
13 Plate 8mm 8 1200 2400 192 1 0
14 40*5 flat 5 100 4bandal 0

material estimate with 5% wastage

rate 170
Cost amount @
Qty unit 174
25 16mm anchor bolt thread cutting 90 pcs 120
26 not bolt 242 kg pcs 280
column 100 sq pipe 6pcs 288kg 170
28 ss railing 0 0 0
Grand Amount
Total wt
3268.8
1252.8
1971.564
882
3001.74
1960.32
643.776
576
172.08
103.248
960
288
192
400

15672.328
783
16455.328
2797350
2,797,350.00

10,800.00
67,760.00
48,960.00
-
2,924,870.00