Technical Review Report

SR Ref: CEDSR-124328 Submission Count: 2 Report Date: 04-Sep-2023

Applicant Information
Client Name HAZEM MOHAMAD ALZEER
Trakhees ID P-0-221778

Consultant Name AL MAMZAR ENGINEERING CONSULTANCY


Trakhees ID C-X-172876

Contractor Name HERMANOS BUILDING CONTRACTING L.L.C


Trakhees ID C-0016-199665

Project Information
Project Location Al Furjan
Plot No. AFNCVIL048
Project ID (if any) CEDPR-05264
Project Description G+1 VILLA
Subject

Service Request Reference


Service Requested Building Permit - New
Service Request # CEDSR-124328 Requested on 21-Aug-2023

Review Comments
Reviewer nada.alhariri
TKS Structure Comments
Review Status RESUBMIT
1.
● As commented before: Full design report showing Design criteria, loads, ETABS and SAFE design
output shall be submitted.
● As commented before: Etabs model Ver.20.3. shall be submitted and all active spread sheets used in
design shall be provided.
● Thermal Loads shall be considered in the design.
● The factors in seismic load shall be rechecked.
● Wind load pattern shall be rechecked.
● Cantilever beams CB1 shall be rechecked.
● Clarified about STB.
● Independent not ETABS output Buckling calculations for columns/Walls 200&250 mm width shall be
submitted.
● More details in all submitted sections shall be provided.
● Boundary wall footing for F1&F2 calculations shall be submitted.
● No technical review for foundation until consideration the comments above.
    ... [To be responded]

Reviewer mohammed.abdulmalik
TKS Facility Permit Comments
Review Status APPROVED WITH COMMENTS

Page 1 of 2
Classification: Internal | Issued for service request from applicant
1. Reference to consultant’s undertaking letter Ref. No.dated 29-08-2023, the swimming pool is not included in the subject
reviewed as it’s in future plan to be done by specialist, separate approval shall be obtained for the same whenever the swimming
pool installation is scheduled in future.
 

Reviewer pauline.bernardo
TKS Sustainability Comments
Review Status APPROVED WITH COMMENTS
1. ADVISORY COMMENTS FOR EFFECTIVE ADMINISTRATION:
● Provide a comprehensive project specific “Green briefing / training” to the site team for proper site compliance.
● Please ensure adequate controls for proper implementation of green building requirements in all phases including
procurement, commissioning and -handing over.-
● Any green building issues / challenges that may potentially impact the original commitments made shall be brought to
Trakhees attention for necessary advice and clearance. Request for waivers at BCC stage will not be entertained.
● You are advised to look into Circulars and guidelines available in our portal for additional information.

Reviewer munira.alali
TKS Architecture Comments
Review Status APPROVED WITH COMMENTS
1. TRK individual NOC for Facilities outside plot limits including landscape ,Road access ,parking ,etc  to be obtained
prior any construction outside plot limits whereas all facilities shall be accessible  as per (DBC) Dubai Building
Code; The consultant shall bear full responsibility to comply with Master developer and  RTA Authority further
implications changes may be required upon issuing RTA final NOC    ... [To be responded]
Final Status

RESUBMIT

Note:
● This is a system generated Technical Report and doesn’t require signatures.
● Refer comments marked as [To be responded] and provide relevant response for Trakhees Review.
● Pending Re-submission requests will be cancelled if not responded in time.
● Applicants submitting/resubmitting documents or drawings without implementing previous comments
OR submitting/resubmitting drawings, data, calculations or information that are incomplete, without
sufficient details, unclear, incorrect, not in agreement with other area or disciplines
(Architectural/Structural/Services) OR submitting drawings for works already executed at site without
mentioning the status of such work etc., will be subject to imposing relevant penalties in compliance with
Trakhees CED violation procedures.

Page 2 of 2