Fertilizer Manufacturing
ISSUE 1
May 2004
Confidentiality *
2 Distribution List
3 Revision Issue
4 Table of Contents
S/ Description
No.
1. Authorization 1
2. Distribution List 2
3. Revision Issue 2
4. Table of Contents 2
5. Introduction 3
6. Purpose 3
7. Scope 3
8. Responsibility 3
9. References 3
10. Abbreviations 3
11. Definition 4
12. Action 5
12.1 Maintain Audit Schedules 5
12.2 Audit Preparation 6
12.3 Audit Performance 7
12.4 Audit Reporting 9
12.5 Audit Follow-up 10
13. Record 12
Revision No.01 Issue Date: 31/5/2004
Document No.: FM-PR-PSM-AU-01 Page: 2 of 13
)ك.م.شركة صناعة الكيماويات البترولية (ش
PETROCHEMICAL INDUSTRIES CO. (K.S.C.)
Process Safety Management System
14. Flowchart 12
5 Introduction
6 Purpose
7 Scope
8 Responsibilities
9 References
10 Abbreviations
11 Definitions
12 ACTION
PSM Coordinator:
12.1.2 Ensure that the schedule allows for every element of the
PSM system to be audited at least twice a year or at such
greater frequency as the PSM committee may determine,
having considered the status and importance of every
element at each area and the nature and quantities of
hazardous substances. External audit is to be carried out at
least every three years.
12.2.1.2 Brief the Lead Auditor on type and scope of the audit.
The Lead Auditor shall agree on the exact audit date, scope and
program with the auditee and confirm this in writing before the
audit date by one week at least. A copy shall be sent to the PSM
Coordinator.
The Lead Auditor shall enter the known details of the audit in the
Audit Plan & Report Form, which will update the Audit Report
Status Log.
The Lead Auditor shall obtain and review all copies and documents
relevant to the audit, e.g. procedures, work instructions,
specifications, standards and previous Audit Reports.
When an Audit Team has been established, the Lead Auditor shall
brief the team on the audit plan and assign responsibilities to team
members.
Every auditor shall review the existing checklists and update the
checklist if needed according to the requirements for their part of
the audit, using the Audit Checklist, the upgrades to the checklists
should be communicated to PSM coordinator for capturing these
improvements.
12.3.2.4 Verify what was discussed, the audit team will check
field items such as equipment files, inspection and
test records, training records, etc. In addition, the
team would like to interview operating and
maintenance personnel and tour the operation.
The Lead Auditor shall meet with the audit Team (if any);
The Lead Auditor shall convene a closing meeting with auditee and
shall;
The Lead Auditor shall complete the report on the "Audit Plan &
Report Form" and the associated CARs, both on the PSM
database.
The audit report shall mention the standard for each PSM element
under "the cross reference to standard". Under "Detailed Audit
Report", the report should include:-
The findings: List major findings. Findings are facts and are
not opinion.
When the Auditor signs the report, then the system will
automatically update the Audit Report Status Log and the CAR
status log.
The PSM Coordinator shall file the original Audit Checklist(s) and
the extra new items captured during the audit. The checklists will
be updated accordingly. The copies of CARs also to be filled for
follow up.
The PSM Coordinator shall enter the follow-up date on the CAR
and advise the Lead Auditor.
13 Records:
14 Flowchart
(Coordinator)
(Coordinator)
Document Reasons
Accepted by Auditor No
(Auditor)
Yes
Yes
Document Reasons
Audit Report
Acceptable by No
Auditee
(Auditee)
Yes
Is Coordinator
Review Required? No Audit Complete