Sr No ITEM DESCRIPTION

A ANTI-TERMITE TREATMENT

Preconstruction antitermite treatment to the building under construction by providing,Supplying & Diluting.
Stage 1: Treating the bottom and the sides (upto 30 cm height of the excavated trench @ 5 liters per sqm of the
surface area.
Stage 2: After masonry/RCC work, the backfill in the immediate contact with the foundation structure treatment @ 7.5
liters per sqm. Of the vertical surface of the substructure for each side
1 Stage 3: surface treatment by spreading emulsion over the plinth area before laying the base concrete under floors @
5.0 litres/Sqm.
Stage 4: Pumping the emulsion in plinth masonry on filling side at floor junction @ 7.5 litres/Sqm.
Stage 5: Pumping the emulsion from outer side of the plinth below ground around the masonry @ 5.0 litres/Sqm as per
I.S. 8944 Emulsion. (1Chlorpyrifos: 19 water) with five years service guarantee (Measurements to be taken for plinth
area)
Note – Treatment should start when foundation trenches and pits are ready to take bed concrete or leveling course in
foundations. Lying of bed concrete should start when the chemical emulsion has been absorbed by the soil and the
surface is reasonably dry. Treatment should not be carried out when it is raining or when soil is wet with rain or subsoil
water. This also applies to fill up soil within the plinth area before laying the subgrade for flooring

2 Diluting and injecting chemical emulsion for POST CONSTRUCTIONAL anti-termite treatment (including the cost of
chemical emulsion) :
Along external wall where the apron is not provided using chemical emulsion @ 7.5 liters / sqm of the vertical surface
a of the substructure to a depth of 300 mm including excavation channel along the wall and rodding etc. complete, with
Chlorpyriphos/ Lindane E.C. 20% with 1% concentration.

b Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre
including drilling and plugging holes etc. With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration.
Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12
c mm diametre holes and plugging with cement mortar 1 :2 (1 cement : 2 sand) to match the existing floor, With
Chlorpyriphos/ Lindane E.C. 20% with 1% concentration.
Treatment of existing masonry using chemical emulsion @ one litre per hole at 300 mm interval including drilling 10mm
d dia and 200mm deep holes at 45 degree and plugging them with cement mortar 1:2 (1 cement : 2 sand) to the full
depth of the hole, with Chlorpyriphos/ Lindane E.C. 20% with 1% concentration.
Treatment at points of contact of wood work by chemical emulsion Chlorpyriphos/ Lindane (in oil or kerosene based
e solution) @ 0.5 litres per hole by drilling 6 mm dia holes at downward angle of 45 degree at 150 mm centre to centre
and sealing the same.
B MASONARY WORKS

1 Providing and laying masonry of I.S. Standard C.C. hollow block 100 x 200 x 400 mm with 100 mm thick in cement
mortar 1:6 proportion for super structure including curing, scaffolding etc. complete.

2 Providing and laying masonry of I.S. Standard C.C. hollow block 200 x 200 x 400 with 200mm thick mm in cement
mortar 1:6 proportion for superstructure including curing, scaffolding etc. complete

Providing and constructing masonry in precast solid Concrete Block (Grade D-50 As per I.S. 2185, Part-I, 1974,
3 Reframed 1987) having compressive strength 5-00 N/mm2) of size (300 mm x 200 mm x 150mm) in cement mortar 1:6
for superstructure including striking joints on unexposed faces, racking out joints on exposed faces, watering, curing
and scaffolding etc. complete
Providing and constructing masonry in Autoclaved Areaclaved ( Celluar) Concrete Block of aproved manufacturer
4 confirming to IS 2185 Part III 1984 of size ( 625x240x225)mm in extra fine jointing mortar of fixoblock of in
superstucture including,striking joints,racking out joints watering and scaffolding etc.complete
Providing and constructing masonry in Autoclaved Areaclaved ( Celluar) Concrete Block of aproved manufacturer
5 confirming to IS 2185 Part III 1984 of size ( 625x240x200)mm in extra fine jointing mortar of fixoblock of in
superstucture including,striking joints,racking out joints watering and scaffolding etc.complete
Providing and constructing masonry in Autoclaved Areaclaved ( Celluar) Concrete Block of aproved manufacturer
6 confirming to IS 2185 Part III 1984 of size ( 625x240x150)mm in extra fine jointing mortar of fixoblock of in
superstucture including,striking joints,racking out joints watering and scaffolding etc.complete

Providing and constructing masonry in Autoclaved Areaclaved (Celluar) Concrete Block of aproved manufacturer
7 confirming to IS 2185 Part III 1984 of size (625x 240x100)mm in extra fine jointing mortar of fixoblock of in half brick
thick wall including 2 hoop iron strips 25mm x 1.6mm at every third course,properly bend and bonded at ends
scaffolding racking out joints and watering compete
Random rubble masonry with hard stone in structure, including leveling up with cement concrete 1:6:12 (1 cement : 6
8 coarse sand : 12 graded stone aggregate 20mm nominal size) at window sills, ceiling level and the like.Cement mortar
1:6 (1 cement : 6 coarse sand)
LGFS WALL SYSTEM

Designing, providing, installing and fixing factory finished custom designed cold form Light Gauge Steel Framed super
structure comprising of steel wall panel, trusses, purlins etc manufactured out of minimum 0.75 mm thick steel sheet as
per design requirements. The steel sheet shall be galvanized (AZ-150gms Aluminium Zinc Alloy coated steel having
minimum yield strength 300-550 Mpa) conforming to AISI specifications and IBC 2009 for cold formed steel framing
and construction and also as per IS: 875-1987, ISO 800-1984 and IS:801- 1975. The wind load shall be as per
provisions of IS 875 (part -III). LGSFS frame shall be designed as per IS: 801 using commercially available software
such as Frame CAD Pro-11.7/ STAAD PRO-V8i/ ArchitekV2.5.16/ Revit architecture-2011 or equivalent. Proper usage
3 of Connection Accessories like Heavy Duty Tension Ties, Light Duty Hold-ons, Twist Straps (to connect truss with wall
frames), Strong Tie, Tie Rod, H-Brackets, Boxing Sections, L-Shaped Angles for better structural stability. The framing
section shall be cold form C-type having minimum web depth 89 mm x 39mm flange x 11mm lip in required length as
per structural design requirement duly punched with dimple/ slot at required locations as per approved drawings. The
slots will be along centre line of webs and shall be spaced minimum 250mm away from both ends of the member. The
frame can be supplied in panelized or knock down condition in specific dimensions and fastened with screws
extending through the steel beyond by minimum of three exposed threads. All self drilling tapping screws for joining the
members shall have a Type II coating in accordance with ASTM B633(13) or equivalent corrosion protection of gauge
10 & 12, TPI 16 & 8 of length 20mm. The frames shall be fixed to RCC slab or Tie beam over Neoprene rubber using
self expanding carbon steel anchor bolt of dia as per approved drawings. design subject to minimum 12mm diameter
and 121mm length conforming to AISI 304 and 316 at 500mm c/c with minimum embedment of 100mm in RCC (RCC
to be paid separately) and located not more than 300mm from corners or termination of bottom tracks complete in all
respects. The item also includes the submission of stability reports duly examined and issued by any NIT/IIT. The rate
includes the concept design, detailed design, fabrication of sections, transportation, installation and all required fixing
arrangement at site as described above

Providing and fixing of external wall system on Light gauge steel frame work with outer face cement boards as per
standard sizes fixed with self- drilling / taping screws / fasteners @ 60cm c/c of approved make. A groove of 2 mm to
3mm shall be maintained and grooves shall be sealed with silicon based sealant. The board shall be fixed in a
4 staggered pattern. Screws shall be of counter sunk rib head of 1.60mm to 4 mm thick or 8 to 10 gauge of length
varying from 25 to 45 mm and. Internal face 12.5 mm thick gypsum plaster board fixed on cement board as per
standard sizes fixed with self_x0002_drilling / taping screws / fasteners @ 60cm c/c of approved make, proper taping
and jointing to be done using fiber mesh tape and epoxy and acrylic based jointing compound for seamless finish.(cost
of frame work to be paid for separately)

a Outer face having 6mm thick fiber cement board fixed on 9mm thick fiber cement board, Type A, as per IS:14862:2000
(high pressure steam cured) Inner Face :- 12.5 mm thick gypsum plaster board conforming to IS 2095:2011 fixed on 8
mm thick fibre cement board confirming to IS:14862:2000 of type B (High pressure steam cured)

Providing and fixing internal wall panels on Light gauge steel frame work with 12.5mm thick gypsum plaster board
conforming IS 2095:2011 fixed on Cement Fiber Board 8 mm thick as per IS 14862:2000 of type B (High pressure
5 Steam Cured) as per standard sizes fixed with self-drilling / taping screws / fasteners @ 60cm c/c of approved make,
Screws shall be of counter sunk rib head of 1.60mm to 4 mm thick or 8 to 10 gauge of length varying from 25 to 45
mm. Proper taping and jointing to be done using fiber mesh tape and epoxy and acrylic based jointing compound for
seamless finish.(cost of frame work to be paid for separately

6 Providing and fixing in all exterior face panels breathable vapour barrier underneath the cement fiber board as per
National Building Code 2009 complete as per direction of Engineer-in-charge.

7 Supplying and installation of moisture resistant/fire resistant Cement Fiber Board 6 mm thick as per IS 14862:2000
oftype B (High pressure Steam Cured) as per standard sizes fixed with self-drilling / taping screws. Screws shall be of
counter sunk rib head of 1.60mm to 4 mm thick or 8 to 10 gauge of length varying from 25 to 45 mm
Providing and fixing thermal insulation with Resin Bonded Fibre glass wool conforming to IS: 8183 having density 24
8 kg/m3, 50 mm thick, wrapped in 200G Virgin Polythene Bags fixed to wall with screw, rawel plug & washers and held
in position by criss crossing GI wire etc. complete as per directions of Engineer-in-Charge.
DRY WALL PARTITION
Providing and laying Gypsum panel partitions 100mm thick with water proof Gypsum panels of size 666x500x100mm,
9 made of calcite phosphor Gypsum fixed with tongue and groove, jointed with bonding plaster as per manufacturers
specifications in superstructure above plinth level up to floor II level. Gypsum blocks will have a minimum compressive
strength of 9.3 kg/cm2.

Providing and fixing, in position concealed G.I. section for wall paneling using board of required thickness fixed on the
'W' profile (0.55mm thick ) having a knurled web of 51.55mm and two flanges of 26mm each with lips of 10.55 mm,
placed @ 610mm C/C in perimeter channel having one flange of 20mm and another flange of 30mm with thickness of
10 0.55mm and web of length 27mm. Perimeter channel is fixed on the floor and the ceiling with the nylon sleeves @
610mm C/C with fully threaded self_x0002_tapping dry wall screws. Board is fixed to the 'W' profile with 25 mm
countersunk ribbed head screws @ 200mm C/C., all complete as per the drawing and directions of engineer-in-charge
the joints of the boards are finished with specially formulated jointing compound and 48mm wide jointing tape to
provide seamless finish.
10 mm thick tapered edge calcium silicate board made with calcareous and siliceous materials reinforced with
a cellulose fibre manufactured through autoclaving process to give stable crystalline structure, with compressive strength
225 kg/sq.cm, Bending strength 100 kg/sq.cm.
b 12 mm thick Gypsum board conforming to IS: 2095 Part-I.

c 8 mm thick non-asbestost multipurpose termite, fire & moisure resistance cement bonded particle board as per IS:
14276 with suitable cement bonded board screw.

d 9mm thick non asbestos,heavy duty fibre cement board reinforced with cellulose fibre manufactured through
autoclaving process(High pressure steam cured) Type A,Category 4, conforming to IS 14862.
C PLASTER WORK

Providing waterproof sand faced plaster above ground level on concrete or block masonry surfaces in two coats, base
coat of 13 mm thick in cement mortar 1:4 (1 cement: 4 M Sand(Artificical)), clearing the surface by combing it and
1 finishing coat of 8 mm. thick in cement mortar 1:3 (1 cement: 3 4 M Sand(Artificical)) and taking out surface grains by
mechanical arrangement or applying second coat by mechanical means and mixing water proofing material in cement
plaster work in proportion recommended by the manufacturers including cost of all material, labour, and T and P
including all lead, lift and scaffolding etc. complete.

Providing and applying 12 mm thick (average) premixed formulated one coat gypsum light weight plaster having
2 additives and light weight aggregates as vermiculite/ perlite respectively conforming to IS: 2547 (Part -1 and II) 1976,
applied on hacked/ uneven background such as bare brick/ block/ RCC work on walls and ceiling at all floors and
locations,excluding in wall which may come in contact with dampness finished in smooth line and level etc. complete.

Supply and laying of vermiculite cementitious concrete coating as fire proofing material around structural steel
members (viz beams, coloumns, bracings and including carrying out the design for the coating thickness and getting
the same reviewed by the owner/EIL complete with supply and welding of ms nuts clearing the steel surfaces, applying
primer paint compatible with the already applied paint to the nuts and effected surfaces of the members die to welding.
3 Supplying, placing and fixing in position welded wire fabric reinforcement 3 mm dia 50x50 mesh conforming to IS:1566
and tying the reinforcement to the nuts with 16SWG tying wire, including straightening, cleaning, curing, bending,
applying the self primer paint after cleaning of steel members, vibrating, tamping, curing or providing a layer of
approved membrane of curing compound, rendering wherever required to achive a smooth and even surface,
providing chamfering at corners, supplying and laying of 10mm thick bituminous mastic flashing cionforming to IS:3037
for protection of top edges; painting the surfaces with 2 coats of micrporous exterior top coat including the cost of all
labour, materials, shuttering, staging, scaffolding for all shapes and positions at all heights above pavement etc, all
complete as per specifications and directions of Engineer-in-Charge.( ALL MATERIALS SDHALL BE SUPPLIED BY
THE CONTRACTOR)

Providing & Applying Gypsum plaster directly on bare block-wall/RCC surfaces with Trowel Finish. Rate to include for
4 filling of cracks/gaps, surface cleaning (if required) and then applying average 12 mm thick Gypsum plaster and
trowelling in line and level with neat and smooth surfaces free of undulations, cracks, levelling marks etc or any other
deformities arising out of poor workmanship. Rate to include for finishing of niches and chases for Electrical Switch
Boxes, Conduiting etc. The cost of providing & erecting scaffolding as required is included in the cost.

5 Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and
smooth complete
D FLOORING WORK

1 Providing and laying in situ cement concrete M30 with tremix treatment for 200mm thickness for flooring with groove
cutting of 4mm wide and 20mm deep with necessary refilling with bitumen etc. complete.
Providing and laying cement concrete floor of mix M-25 with ready mixed concrete from RMC. The ready mixed
2 concrete shall be laid and vibrated with a poker vibrator and finished with screed board vibrator , vacuum dewatering
process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of
Engineer-in-charge. The channel shuttering spaced 4m apart shall be included in this item.)

Providing and laying cement concrete. floor of mix M-20 with ready mixed concrete from RMC. The ready mixed
3 concrete shall be laid and vibrated with a poker vibrator and finished with screed board vibrator , vacuum dewatering
process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of
Engineer-in-charge. The channel shuttering spaced 4m apart shall be included in this item.)

Providing and laying polished natural stone 25 to 30 mm thk. Kota stone of size 0.430m x0.56m(17"x22") (Machine
cut) of an approved qualityand size for paving /flooring in plain and/or diamond/approved pattern including cement
4 mortar bedding of25 mm thick in 1:4 proportion, cement float, machinecutting, dressing, leveling, jointing, filling the
jointswith neat cement slurry or with required pigment,machine polishing at site, curing, finishing, etccomplete as
directed by Engineer In Charge.

Providing and laying machine cut, mirror polished, Marble stone flooring laid in required pattern in linear portion of the
5 building all complete as per architectural drawings, with 18 mm thick stone slab laid over 20 mm (average) thick base
of cement mortar 1:4 (1 cement : 4 M Sand(Artificical)) laid and jointed with white cement slurry @ 4.4 kg/sqm
including pointing with white cement slurry admixed with pigment to match the marble shade including rubbing, curing
and polishing etc. all complete as specified and as directed by the Engineer-in-Charge.

Providing and laying Vitrified tiles Matt/Antiskid finish in floor in Size of Tile 600 x 600 mm (thickness to be specified by
6 the manufacturer) with water absorption less than 0.08% and conforming to IS:15622, of approved brand &
manufacturer, in all colours and shade, laid on 20 mm thick cement mortar 1:4 (1 cement: 4 M Sand(Artificical)) jointing
with grey cement slurry @3.3 kg/sqm including grouting the joints with white cement and matching pigments etc. The
tiles must be cut with the zero chipping diamond cutter only . Laying of tiles will be done with the notch trowel, plier,
wedge, clips of required thickness, leveling system and rubber mallet for placing the tiles gently and easily.

Providing and applying antifungal self leveling 3mm EPU system including coving at floor wall junction, necessary
surface preparation by cleaning and de-dusting. The System shall be executed in three stages, firstly by applying a
7 solvent free epoxy primer which has a volumetric ratio of mixing @ 200 microns dft, then laying 1.8mm self leveling
epoxy based screed and finally applying a solvent free EPU ( epoxy-polyurethane), self leveling coating to yield a dft of
1000 microns. The EPU coating shall be a two component with volumetric ratio of mixing. No fillers shall be added at
the site while laying the self leveling EPU including Aisle or zone marking in different colours etc. complete as per
manufacturers specifications and as directed & approved by Engineer In-Charge.
Providing & fixing 20+2 mm thick machine cut mirror polish 1st quality Granite riser 150mm ht. for staircase (black
8 galaxy or approved) polished,including backing coat of 1:4 cement plaster/mortar/cement paste , cleaning etc.
complete as per Architects details drawingand design
Providing & fixing 20 +mm thick machine cut mirror polish 1st qualityGranite treads 300mm wide for staircase (black
9 galaxy or approved) including grooves and edge moulding & polishing with backing coat of 1:4 cement
plaster/mortar/cement paste,cleaning etc.complete as perArchitects details drawing and design

Providing and laying 16-20 mm thick and 75mm wide strips of rough jet black Granite stone (or equivalent) of approved
10 colour, on ramp to get anti-skid effect including cement mortar bedding of 25 mm thick in 1:4 proportion, cement float,
machine cutting, dressing, leveling, jointing, filling the joints with neat cement slurry or with required pigment, curing,
finishing etc. complete as directed by Engineer-in_x0002_charge
Providing & fixing 20 +mm thick machine cut mirror polish 1st quality kota treads 300mm wide for staircase (approved)
11 including grooves and edge moulding & polishing with backing coat of 1:4 cement plaster/mortar/cement
paste,cleaning etc.complete as perArchitects details drawing and design
E CLADDING WORK

Providing&fixing in position 20 +/-2mm thick machine cut, mirrorpolished, 1st quality granite cladding approved
equivalent in lift lobby / passage installed in approved pattern and design of size 600 x 1200mm and as directed
1 including backingcoat of 1:4 cement plaster of required thickness with stainless steelfasteners cleats etc. The joint
between the granite slabs to be filled white cement mixed with with matching pigments. The rate toinclude all curing,
polishing at all lift and levels.
Providing and fixing polished natural stone tiles /slab 15 to 20mm thk. Kota stone of approved quality, pattern and
colour for flush/projected skirting and risers including preparing the surface and levelling in the desired line,backing of
2 20 thk. cement mortar in porportion 1:3,square cut top edge or chamfered top edge in cementmortar 1:3, cement float,
machine cutting, leveling,jointing, filling the joints with neat cement or pigmentmixed with cement, polishing, finishing,
curing etccomplete as directed by Engineer In Charge.

Providing and fixing polished natural stone tiles /slab 15 to 20mm thk.marble of approved quality, pattern and colour for
flush/projected skirting and risers includingpreparing the surface and levelling in the desired line,backing of 20 thk.
3 cement mortar in porportion 1:3,square cut top edge or chamfered top edge in cementmortar 1:3, cement float,
machine cutting, leveling,jointing, filling the joints with neat cement or pigmentmixed with cement, polishing, finishing,
curing etccomplete as directed by Engineer In Charge.

Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption
4 less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps,
over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm
including grouting the joint with white cement & matching pigments etc. complete.

Providing and fixing 8mm thk. vitrified tiles as specified below conforming to I.S. 15622-2006 with water absorbtion less
than 0.08% and of approved quality, pattern and colour for dado in the wet area including preparing the surface and
5 levelling in the desired line, backing of 20 thk. cement mortar in porportion 1:3 with approved waterproofing compound,
square cut top edge or chamfered top edge in cement mortar 1:3, cement float, machine cutting, leveling, jointing,
filling the joints with neat cement slurry or approved colour grout, finishing, curing etc complete as directed by Engineer
In Charge. Light coloured glazed vitrified tiles/ Dark coloured glazed vitrified tiles/ Light coloured antiskid / matt vitrified
tiles/ Dark coloured antiskid / matt vitrified tiles
Aluminium Skirting:
6 Supply of 2.6 mm thick Aluminium Profile for skirting, width of Aluminium profile 126 mm and 6feet long with counter
hole and Anodising etc. complete in all respect as directed by the Engineer-in-Charge
F FABRICATION WORK

Providing & fixing S.S. pipe hand rail along the wall in staircase or ramps or passages consisting of 50 mm dia. 18
1 gauge 304 grade stainless steel pipe. Supported with 25 mm 18 gauge S.S. pipe (304grade) brackets & 5mm thick
tapered edge coller base plate fixed to wall with SS screws at approx. 600 mm center to center fixed horizontally or in
inclined position at required height including grinding the welded joints, buffing,protecting the railing members by
means of wrappers during construction etc. complete as per detailed drawing as directed by the Engineer in charge.

Providing, fabricating & fixing in position MS Staircase Railing with Top hand rail of 50mm dia Hollow MS pipe of 16
2 gauge to be welded as railing to the verticals made of 40mm dia MS tubes with 25mm dia MS Rod Mid Rails 3 Nos.
welded to 40mm dia MS Tube Vertical Pipe. Verticals should be fixed to the concrete slabs with 200mm x 150mm, 10
gauge MS plate anchored with 4 Nos. of 10mm dia 75mm long Expansion bolts. All MS sections to be hot-dipped
galvanised finish to all steel members as per manufacturers specifications etc., complete. all as per Architectural
drawings and instructions. etc. complete as directed by the Engineer in charge.

Providing, detailing, and fabricating as per specifications, transporting to site and erecting Openable Entrance Gates
fabricated using B Class GI Hollow pipes including track and wheel, locking arrangement, fixing bolts, nuts, washers,
3 cleats, stiffeners, gussets and all necessary operations like straightening, bending, cutting, drilling, grinding, machining
if specified, welding etc. complete weighing 18 to 20kg/Sqm, including cleaning, Grinding and removing the welding
burr and preparing surface and applying one coat of red oxide zinc chromate primer and one coat of Synthetic Enamel
paint after fabrication and second coat of Synthetic Enamel paint after erection, with approved colour, shade and
brand etc. including touching up with primer etc. complete as directed by Engineer In Charge.

Providing, fabricating and fixing M.S. grill work as per approved design and as per weight specified below to fencing /
4 compound mades out of square / round bars, M.S. flats, angles, with necessary holdfast including painting with one
coat of red oxide zinc chromate primer and two coats of approved synthetic enamel paint etc. complete as directed by
Engineer In Charge.
Designing, providing, installing and fixing factory finished custom designed cold form Light Gauge Steel Framed super
structure comprising of steel wall panel, trusses, purlins etc manufactured out of minimum 0.75 mm thick steel sheet as
per design requirements. The steel sheet shall be galvanized (AZ-150gms Aluminium Zinc Alloy coated steel having
minimum yield strength 300-550 Mpa) conforming to AISI specifications and IBC 2009 for cold formed steel framing
and construction and also as per IS: 875-1987, ISO 800-1984 and IS:801- 1975. The wind load shall be as per
provisions of IS 875 (part -III). LGSFS frame shall be designed as per IS: 801 using commercially available software
such as Frame CAD Pro-11.7/ STAAD PRO-V8i/ ArchitekV2.5.16/ Revit architecture-2011 or equivalent. Proper usage
5 of Connection Accessories like Heavy Duty Tension Ties, Light Duty Hold-ons, Twist Straps (to connect truss with wall
frames), Strong Tie, Tie Rod, H-Brackets, Boxing Sections, L-Shaped Angles for better structural stability. The framing
section shall be cold form C-type having minimum web depth 89 mm x 39mm flange x 11mm lip in required length as
per structural design requirement duly punched with dimple/ slot at required locations as per approved drawings. The
slots will be along centre line of webs and shall be spaced minimum 250mm away from both ends of the member. The
frame can be supplied in panelized or knock down condition in specific dimensions and fastened with screws
extending through the steel beyond by minimum of three exposed threads. All self drilling tapping screws for joining the
members shall have a Type II coating in accordance with ASTM B633(13) or equivalent corrosion protection of gauge
10 & 12, TPI 16 & 8 of length 20mm. The frames shall be fixed to RCC slab or Tie beam over Neoprene rubber using
self expanding carbon steel anchor bolt of dia as per approved drawings. design subject to minimum 12mm diameter
and 121mm length conforming to AISI 304 and 316 at 500mm c/c with minimum embedment of 100mm in RCC (RCC
to be paid separately) and located not more than 300mm from corners or termination of bottom tracks complete in all
respects. The item also includes the submission of stability reports duly examined and issued by any NIT/IIT. The rate
includes the concept design, detailed design, fabrication of sections, transportation, installation and all required fixing
arrangement at site as described above
G DOOR WORK

Providing and fixing of Metal Fire door from ISO 9001:2015 certified Manufacturer . The door must have been
manufactured with galvanised - GI sheet of GPSP Grade as per IS 277. All Fire doors must satisfy the requirement of
latest NBC 2016 Part 4 for Fire & Life Safety guidelines for 120 minutes Fire Rating with minimum 20 minutes
Insulation properties along with its Stability & Integrity for 120 minutes. The Prototype sample of the door must carry a
1 prior test evidence as per IS 3614 part-2 / BS 476 Part 20 & 22 . The manufacturer must submit the copy of test
evidence prior to start of production .The offered test certificate should either carries it's Validity or certificate must not
be older than 5 years from CBRI / NABL Accreditated Lab i.e Spectro / International Lab i.e Exova / TBW etc .
Recommended fire door must also be certified by a third party evaluation program from approved International agency
like IFC/ Intertek/ Certifire and must carry a lable on all doors . All doors should be finished with Powder coating in
desired regular RAL Shades.

Door frame shall be Single rebate profile of section 100 x 57 mm made out of 1.20mm thick galvanised steel sheet with
a factory pre-punched groove so as to accomodate Fire & smoke seal size 10x4mm . Frames should be butt jointed
1a and field assembled with bolting system for proper strength .Frames should be provided with back plate for anchor
fasteners (payable extra ) for installation on a finished plastered wall opening. The Air gap between Wall and frame
can be filled with fire retardant sealant (payable in extra item).

Door leaf should be minimum 46mm thick fully flush double skin door. Door leaf must be manufactured from 0.8mm
(22 guage) thick galvanised steel sheet. The door should be provided with reinforcement pads to receiving
1b appropriate Hardwares of Becker Fire Solutions or Equivalent make. The Shutter shall be filled with proprietary infill
material . For Double leaf doors; astragal has to be provided on meeting stile for both active and inactive leaf. Vision
panels wherever required should be of 120 minutes fire rating and should be of non-wired type. All hardwares ,
Fasteners and FR Glass shall be payable in Extra item.
2 VISION PANEL

Supply and fixing of Interlayered FR Glass of Saint-gobain, Pyrobeck ,Glaverbel or equivqlent make minimum 11 mm
thick interlayred , 120 minutes fire Rated (EW120, EI 20 minutes ) Non Wired, Toughened Interlayered Glass of
a approved make and is to be fixed in between the glass beading by using ceramic fiber of size 300 mm x 600mm
(Clear vision ) and the manufacturer should have tested the similar glass of similar size or bigger size . The Location of
the Fr Glass will be as per the directions of Engineer-in-charge ( Actual supplied Glass size will be meaured for
payment).
3 FIXTURES FOR DOORS

a
Supply & fixing of SS Ball Bearing Hinges of size 100 x 75 x 3mm complet with SS Screws of BB1953 Becker F.S Make
b Supply & fixing of anchor fastners of HILTI/ FISHER/ Equvalent of maximum 80mm length.
c Supply & fixing of door closers of BLC-0408 Becker F.S Make.
d Supply & fixing of PEL 246/346 Becker F.S. double leaf panic exit devices.Single Leaf Panic Bar Set

e
Supply & fixing of PEL905 Becker F.S. Make Panic Trim For Operation From The Other Side Of The Panic Bar.

f Supply & fixing of Stainless Steel 304 grade 300mm Long Concealed Flush Bolt of BFBS1930 Becker FS Make with
necessary screws as required.

Supplying and fixing rolling shutters of approved make, made of required size M.S. laths interlocked together through
their entire length and jointed together at the end by end locks mounted on specially designed pipe shaft with brackets,
3 side guides and arrangements for inside and outside locking with push and pull operation complete including the cost
of providing and fixing necessary 27.5cm long wire springs manufacturedfrom high tensile steel wire of adequate
strength conforming to I.S. 4454- part-1 with fixing ball bearing and M.S. top cover of required thickness for rolling
shutters.
4 Extra for providing suitable mechanical device chain and crank operation for operating rolling shutters.

5 Extra for providing grilled rolling shutters manufactured out of 8 mm dia. M.S. bar instead of laths as per design
approved by Engineer-in-Charge. (Area of grill to be measured)
H PAINTING WORKS
Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content
1 less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to
achieve even shade and Colour. Two Coats

2 Providing and applying two coats of fire retardant paint on cleaned wood / ply surface @ 3.5 sqm per litre per coat
including preparationof base surface as per recommendations of manufacturer to make the surface fire retardant.

3 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's
specifications including appropriate priming coat, preparation of surface, etc. complete.
a On steel work
b On concrete work

Finishing walls by any mechanical or manual means with Premium Acrylic Smooth exterior paint (Premium exterior) of
4 required shade including all scaffolding. New work (Two or more coat applied @1.67ltr/10sqm over and including one
coat undiluted exterior waterproofing coating @ 2.39 litre/10 sqm with crack bridging ability of upto 0.5mm on
horizontal surfaces with an elongation of 150% and water proofing of upto 3 bars on vertical surface)

5 Floor painting with floor enamel paint of approved brand and manufacture of required colour to give an even shade:
Two or more coats on new work

6 Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:
One or more coats on New Work
I CEILING WORKS

Providing and fixing With 16 mm thick beveled tegular mineral fibre Anti microbial false ceiling tile confirming to ISO 5
(class 100) specifications at all heights of size 595X595mm of approved texture, design and pattern. The tiles should
have Humidity Resistance (RH) of 99%, Light Reflectance ? 85%, Thermal Conductivity k = 0.052 - 0.057 w/m K, Fire
Performance as per (BS 476 pt - 6 &7)in true horizontal level suspended on interlocking T-Grid of hot dipped all round
galvanized iron section of 0.33 mm thick (galvanized @120 gsm) comprising of main T runners of 15x32 mm of length
1 3000 mm, cross T of size 15x32mm of length 1200 mm and secondary intermediate cross T of size 15x32 mm of
length 600 mm to form grid module of size 600x600 mm suspended from ceiling using galvanized mild steel item
(galvanised@80gsm) 50 mm long 8mm outer diameter M-6 dash fasteners, 6 mm diameter fully threaded hanger rod
up to 1000 mm length and L-shape level adjuster of size 85x25x2 mm, spaced at 1200 mm centre to centre along
main ‘T’. The system should rest on periphery walls /partitions with the help of GI perimeter wall angle of
size24x24X3000 mm made of 0.40 mm thick sheet, to be fixed to the wall with help of plastic rawl plug at 450 mm
centre to centre & 40 mm long dry wall S.S. screws. The exposed bottom portion of all T-sections used in false ceiling
support system shall be pre-painted with polyester baked paint, for all heights. The work shall be carried out as per
specifications, drawings and as per directions of the engineer-in-charge.
Providing and fixing 12.5 mm thick tapered edge gypsum moisture resistant board at all height including providing and
fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120
gms/sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with
flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm
dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required
length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9
2 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80
mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a
direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I.
wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30
mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long
dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the
help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered
and square edges of the board with recommended jointing compound , jointing tapes , finishing with jointing compound
in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per
manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts
made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the
Engineer in Charge

Providing and fixing GI Metal Ceiling Lay in perforated Tegular edge global white color tiles of size 595x595 mm and
0.5 mm thick with 8 mm drop; made of GI sheet having galvanizing of 100 gms/sqm (both sides inclusive) and 20%
perforation area with 1.8 mm dia holes and having NRC (Noise Reduction Coefficient ) of 0.5, electro statically
polyester powder coated of thickness 60 microns (minimum), including factory painted after bending and perforation,
and backed with a black Glass fiber acoustical fleece. of specified materials of size 595x595 mm in true horizontal
3 level, suspended on inter locking metal grid of hot dipped galvanized steel sections ( galvanized @ 120 grams/ sqm,
both side inclusive) consisting of main "T" runner with suitably spaced joints to get required length and of size 24x38
mm made from 0.30 mm thick (minimum) sheet, spaced at 1200 mm center to center and cross "T" of size 24x25 mm
made of 0.30 mm thick (minimum) sheet, 1200 mm long spaced between main "T" at 600 mm center to center to form
a grid of 1200x600 mm and secondary cross "T" of length 600 mm and size 24x25 mm made of 0.30 mm thick
(minimum) sheet to be interlocked at middle of the 1200x600 mm panel to form grids of 600x600 mm and wall angle of
size 24x24x0.3 mm and laying false ceiling tiles of approved texture in the grid including, required cutting/making,
opening for services like diffusers, grills, light fittings, fixtures, smoke detectors etc. Main "T" runners to be suspended
from ceiling using GI slotted cleats of size 27 x 37 x 25 x1.6 mm fixed to ceiling with 12.5 mm dia and 50 mm long
dash fasteners, 4 mm GI adjustable rods with galvanised butterfly level clips of size 85 x 30 x 0.8 mm spaced at 1200
mm center to center along main T, bottom exposed width of 24 mm of all T-sections shall be pre-painted with polyester
paint, all complete for all heights as per specifications, drawings and as directed by Engineer-in-charge.

Open cell metal Ceiling : P/F of chequered metal ceiling (Silver Color) in Reception as per design. (Make : Armstrong/
Equivalent) of Cell size 100x100mm mounted on Skelet suspended ceiling system which includes G.I. Main at every
4 1200c/c and cross are fixed to main T at 600mm c/c. Wall angle is then fixed along the perimeter of wall with nail /
screw. The suspension is done with all acessories like soffit cleat, levelling clips & wire rods as per the drawings.
Please refer image

Metal Ceiling:-TRAC TILE (600mm X 600mm)FALSE CEILING SYSTEM – STEEL (WITH CLIP-IN SUSPENSION)
Supply & Ffixing of Trac Clip-in Tile Steel Coated False Ceiling System (600mm x 600mm) manufactured out of
0.50mm thick Regular Modified Polyester Coated Galvanised Steel (Z-180gms Zinc coating mass total of both sides,
5 275Mpa yield strength) on the exposed side and a primer coating on the back coil coated on both the sides in
manufacturer's standard colour shades, with square or bevelled edges. Two sides of each tile to be raised and pipped
and stopped to ensure positive engagement into the spring clip in profile, yet allow for demounting of individual tiles.
Suspension with rows of 0.5mm galvanised steel clip in profiles 40mm x 20mm, installed at 600mm c/c spacing to
support the tiles. Suspension profiles suspended from roof structure by GI suspension angles, ceiling brackets and
hold-on clamps. Wall angle to be 23x23x0.5mm thick coil coated steel matching the colour of tiles.
Providing and Fixing 12'-6" X 2' wooden ceiling of 4mm thk bird eye maple dyed 517 veneer of archid/ century/
truwood make pasted over 4mm thk. flexiply screwed to 1/2"X1/2" chrome plated MS pipe frame of 18 gauge thickness
6 in required curvature using stainless steel studs of 1" dia as per detailed drg. & fixed to the rcc roof using rawl plugs
and heght adjustable G.I suspension wires. including finishing in matt melamine polish (ICI/MRF poly coats only)
complete in all respects as per detail drawing . Rate should include cost of dismantling existing gypboard ceiling where
required & making new again, cutting of holes for lights etc. for concealing conduits/wiring, nothing extra will be paid
for this.
J Landscaping

Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the
1 required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 sand), including making joints with or
without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage
opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be
measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in_x0002_Charge).

Supply and installation of approved make Rolled Matrix Soil Filter cum surface drainage System as per approved
manufacturers specifications. consist of dimple raised, moulded polypropylene sheet bonded to a high strength
2 polypropylene geotextile fabric This geotextile fabric composite allows passage of moisture through fabric while
preventing fine soil from entering to drainage channel. all complete as specified and as directed by the Engineer-in-
Charge :

3 Supplying, Dumping, mixing and filling of earth and sludge or manure in the desired proportion in trenches, flooding
with water and levelling
Preparation of mounds of various size and shape by available excavated /supplied earth in layers not exceeding 20 cm
4 in depth, breaking clods, watering of Each layer, dressing etc. leadupto 50 metre and lift upto 1.5 m complete as per
direction of Engineer-in-Charge
Providing and laying Needle Punched and mechanically bonded non woven Geotextile of Type II indigenously
5 manufactured from high quality Propylene staple fibers (continuous filament will not be accepted) on the prepared
Surface for Seperation.

Supply of light weight Podium Lawn or Green Podium system which consists of a HDPE root barrier sheet, 10 mm Geo
Mat (Dry size), 25mm Roof Mat (Dry Size) consisting of 15mm Super Absorbent Polymer Substrate & 10 mm Geo Mat
6 in a tile form consolidated with Scrim expanding to 50 mm with the addition of 4.25 ltrs of water/SFT, covered with
Mexican Sod Lawn of 50 mm Thickness or Selected Ground Covers. Entire system to weigh 8 kgs/ SFT ±10% in the
wet form and have a height of 120 mm ± 10%

Providing and planting different variety of plants of approved quality and sizes as mentioned including making pits of
7 requiredsize at site, refilled with B.C. Soil mixture manuring and pesticide etc. complete (to be paid separately)
including watering and 90 days maintenance from the date of final bill as per direction of Engineer-in-Charge complete
in all respect (B.C. Mixture paid separately).

Shrubs (75-90 cm height)


Bahunia Tomentosa, Beloperone Species, Caselpinnia Pulcherima, Bird of Paradise, Callandra Emarginata, Callandra
Hybrida, Cassia Bi flora, Cassia Laevigata, Cestrum Nocturnum, Dombeya Mastersii, Euphorbia Caracasana,
a Euphorbia Pulcherima, Excorea bi color, Excorea tri color, Ficuas Blackii, Ficus Reginold, Ficus Panda, Gardenia,
Gulphinia, Jasminoides, Hamelia Pattens, Heliconia, Hibiscus Rosasinensis, Hibiscus Verigated, Hibiscus Viceroy,
Jatropha Multifida, Largestomia Indica, Malpighia Coccigera, Murraya Exotica, Murraya Koeniggi, Murraya Sambucum,
Mussaenda Erythrophylla, Nerium Oleander, Nyctanthus Arbortristis, Plumbego Capensis, Putranjeeva Roxburghii,
Tabernaemontana Coronaria, Tabernaemontana Divaricata, Tecoma Gaudi Chaudi, Tecoma Stans, Thevetia Nerifolia,
Thuja Compacta and equivalent plants.

Creeper plants (height :30cm to 45 cm)


b Allamanda Cathartica, Allamanda Grandiflora, Allamanda Violacea, Begnonia Venustha, Boughan Villas (Variety :
Butiana, Lady Mary Bearing, Mahaara, Mohan, Scarlet Queen Variagata, Glabra Formosa, Peruviana Odissi, Partha,
Shubhra, Thimma, Spectabillis, L.N. Birla, Refulgens), Clerodendrum Splendens, Clerodendrum Thompsonae, Ipomea
Purpurea, Jasminum Grandiflorum, Jasminum Humile (Yellow), Passiflora Caerulea (Rakhi Bel), Petrea Volubilis, Quis
Qualis Indica, Tecoma Grandiflora, Veronia Elaegnifolia (Curtain Creeper), Mandvellia, Garlic Creeper, Callimitis
Ground cover plants height:30cm-45cm
Alpinia Verigated, Alternanthera species, Aspyragus Myerri, Aspyragus Springenii, Aspidistra, Canna (regular, Dwarf),
Chlorodendron Inermii, Chlorophytum (Green), Chlorophytum verigated, Coffea Chinensis, Dianella Verigated,
c Durranta (Goldiana, Green, Verigated), Euphorbia Milli hybrid, Ipomea (Golden leaves), Iresine herbstii, Juniper
Prostata, Juniper Africana, Ophiopogon plant, Ophiopogon jaburan, Portulacaria Afra (jade Plant), Schefflera Green,
Schefflera verigated, Setcreasea Purpurea, Syngonium (Butterfly) species, Syngonium miniature, Syngonium Dwarf,
Syngonium variegated, Tradescantia, Wadelia Trilobata, Zebrina Tradescantia, Pendanas, Spider Lily Black, Spider
Lily verigated, Aclypha (Red, Green,Mini), Lantana (Red, Yellow, Purple, White, verigated), Haemalia Mini and similar
plants.

Winter seasonal height: 20- 30 cm


Any of one from Alyssum, Anemone, Antirrhinium Hybrid, Aster Hybrid, Begonia and its different varieties, Calendula,
d Carnation,Coleus, Daisy, Dianthus, Fressia, Gazania, Impatiens, Kalanchoe, Marigold Inca, Missam branthemum,
Nemasia, Nasturitium, Ornamental Kale, Pansy Hybrid Sakata,Petunia Hybrids such as Bravo, Star andPicotee,
Salvia, Stock, Stock, Verbena

e Summer and rainy seasonalplants


Any of one from Celosia, Caladium Hybrid, Cockscomb, Cosmos, Gaillardia, Gomphorena, Kochchea, Portulacca,
Sunflower Hybrid, Sunflower Single, Tapiocca Variegated (Manihot Esculenta), Vinca, Zinnia Hybrids.
Providing and making rumble strips 15-20mm high at centre, 250mm wide placed at 1m centre to centre over drive
6 way floor by using close graded premix surfacing material type B and thermoplastic road marking paint shall conform
to technical specification.
K WATERPROOFING WORK

Providing and laying roof insulation with 40 mm thick impervious sprayed, closed cell free Rigid Polyurethane foam
1 over deck insulation conforming to IS - 12432 Pt. III (density of foam being 40-45 kg/ cum), over a coat of polyurethane
primer applied @ 6-8 sqm per litre, laying 400 G polythene sheet over PUF spray and providing a
wearing course of 40 mm thick cement screed 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal
size) in chequered rough finish, in panels of 2.5 m x 2.5 m and embedding with 24 G wire netting and sealing the joints
with polymerized mastic, all complete as per direction of Engineer-in-Charge.

Providing and filling AAC bats (of size 40-60 mm) with cement mortar mixed in the ratio 1:3:6 (1 cement : 3 coarse
sand : 6 block bats) including mixing of approved water proofing compound inrecommended proportion for balcony.
The laid brick bat mix shall be well rammed and compacted as required. Further surfaces shall be screeded with
cement concrete mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 stone grit of size 6 mm and below by volume) admixed
2 with approved integral water proofing compound in recommended proportion, laid to an average thickness of 25mm
and finished smooth or ready to receive finish material as specified. Care shall be taken prior to filling all drain outlets
pipes are well grouted and sealed. This shall be tested by ponding water for required depth and maintaining for 7 days.
(Rate includes cost of AAC bats, cement mortar, top screed, labour charges for working at all levels, leads and
heights). For payment the area of sunken slab and the depth of filling including the thickness of screed shall be
measured.
Providing & applying membrane waterproofing treatment to podium / landscape area consisting of following
operations:
a) Cementious based chemical waterproofing coating (two or more coats) of approved make, including preparation of
surfaces to receive chemicals, treatment and curing.
b) Light weight concrete of density 450 kg/cum (for non traffic area) and of minimum 75 mm thickness at draining point
and rest area sloped to drain water as detailed in drawing.
3 c) Slope shall be developed with required density mix to suite the type of traffic expected
d) 3.0 mm thick APP Polymer modified polyester black finished reinforced with glass fibre matt sheet, laid over a coat
of bitumen primer having density 0.87-0.89 kg/litre and Viscosity 70- 160cps at 25 degrees C, @ 0.4 litre / sqm. Over
the primer coat the layer of membrane shall be laid using Butane Torch and sealing all joints etc., and preparing the
surface to receive top protective coat, complete
e) Top protective layer comprising of 30 mm thick water proof screed in 1:4 cement mortar mix (1 Cement :4 Coarse
sand) admixed with approved water proofing compound as specified by the manufacturer or as directed by E-I-C,
spread over entire terrace area and finished to receive Architectural finish.
f) The vertical vertical surfaces shall be plastered with 12 mm thick cement mortar 1:4 (1 Cement :4 Fine sand).
g) Work shall include adding Polypropylene mesh fibers with Microban to mortar in proportion recommended by the
manufacturer with use of approved products and work carried out as per manufacturer's specifications and directions
of Engineer-in charge. The rate shall include cost of all materials specified above, preparation of the surface, its
application, testing by ponding of water for 72 hours etc. and labour charges for working at all leads and
heights. The rate includes giving guarantee for 10 years on Rs.100/- Stamp paper in approved proforma .
L MISCELLINIOUS WORKS

Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-
1 25, reinforced with 8 mm dia four no longitudinal and 9 nos cross sectional T.M.T. Hoop bars, including providing50
mmdia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mmx1.6 mm
complete, all as per direction of Engineer-in_x0002_Charge.
2 Providing and fixing in position precast R.C.C. manhole cover and frame of required shape and approved quality
UNIT QTY

Sqm 9352.32249

Rmt

Rmt

Sqm

Rmt

Rmt

Cum

Cum

Cum

Cum

Cum 3096.677

Cum

Sqm
Cum 126.23

Kg

Sqm

Sqm

Sqm

Sqm

Sqm
Sqm

Sqm

Sqm

Sqm

Sqm

Sqm 13894.05945

Sqm 32632.04865

Sqm 9808.428

Sqm

Sqm 32632.04865

Sqm 32778.473
Cum 215.91

Cum

Sqm 837.399

Sqm 460.068

Sqm

Sqm

Rmt

Rmt

Sqm 52.54

Sqm 846.45

Sqm 663.9705
Sqm 547.9599

Sqm 2153.5473

Sqm

Sqm

Rmt

Rmt 694.266

Sqm 612.1437

Sqm 72.24

Sqm
Kg

Sqm 273.85625

Sqm 27.385625

Each 306

Each 351
Set 102
Each 83

Each 83

Each 83

Sqm 384

Sqm 384

Sqm

Sqm 26021.1851

Sqm

Sqm
Sqm

Sqm 13894.05945

Sqm

Sqm 6610.86355

Sqm
Sqm

Sqm

Sqm

Sqm 460.068
Sqm

Cum 16.95

Sqm 932.18

Cum 279.65

Cum

Sqm

Sqm

Sqm

Each
Each

Each

Each

Rmt

Sqm 15742.84

Cum 1390.98
Sqm 1829.03

Sqm

Sqm
A ANTITERMITE
BASEMENT 2
FLOOR 1 2142.123 2142.123
Wall 1 270.278 4.98 1345.984
1 75.42 3.48 262.4616
BASEMENT 1
FLOOR 1 3623.697 3623.697
Wall 1 270.278 4.275 1155.438
GROUND FLOOR 1 822.618 822.618

Masonary work
Ground floor
DC building
1 40.674 0.2 6.45 52.47
1 9.891 0.2 6.45 12.76
1 53.2 0.2 6.45 68.63
1 39.245 0.2 6.45 50.63
1 9.634 0.2 6.45 12.43
1 44.9 0.2 6.45 57.92
2 0.3 0.2 6.45 0.77
Core 1 3.723 0.2 6.6 4.91
1 2.875 0.2 6.6 3.80
Deduct
FD1 -2 1.2 0.2 2.15 -1.03
Main entrance opening -1 9.2 0.2 6.6 -12.14
-1 4.4 0.2 6.6 -5.81
D2 -1 1.8 0.2 2.15 -0.77
Opening -2 2.96 0.2 2.15 -2.55
DG Build. 1 22.926 0.2 6.6 30.26
1 8.005 0.2 6.6 10.57
GIS Room 1 87.525 0.2 6.6 115.53
1s Floor
1 40.674 0.2 7.05 57.35
1 9.891 0.2 7.05 13.95
1 53.2 0.2 7.05 75.01
1 39.245 0.2 7.05 55.34
1 9.634 0.2 7.05 13.58
1 44.9 0.2 7.05 63.31
2 0.3 0.2 7.05 0.85
Core 1 3.723 0.2 7.2 5.36
1 2.875 0.2 7.2 4.14
Deduct
D1 -1 1.2 0.2 2.25 -0.54
RS -4 4 0.2 4 -12.80
DG Build. 1 22.926 0.2 7.05 32.33
1 8.005 0.2 7.05 11.29
GIS Room 1 87.525 0.2 7.05 123.41
2nd Floor
1 40.674 0.2 7.05 57.35
1 9.891 0.2 7.05 13.95
1 53.2 0.2 7.05 75.01
1 39.245 0.2 7.05 55.34
1 9.634 0.2 7.05 13.58
1 44.9 0.2 7.05 63.31
2 0.3 0.2 7.05 0.85
Core 1 3.723 0.2 7.2 5.36
1 2.875 0.2 7.2 4.14
Deduct
D1 -1 1.2 0.2 2.25 -0.54
RS -4 4 0.2 4 -12.80
DG Build. 1 22.926 0.2 7.05 32.33
1 8.005 0.2 7.05 11.29
GIS Room 1 87.525 0.2 7.05 123.41
3rd Floor
1 40.674 0.2 7.05 57.35
1 9.891 0.2 7.05 13.95
1 53.2 0.2 7.05 75.01
1 39.245 0.2 7.05 55.34
1 9.634 0.2 7.05 13.58
1 44.9 0.2 7.05 63.31
2 0.3 0.2 7.05 0.85
Core 1 3.723 0.2 7.2 5.36
1 2.875 0.2 7.2 4.14
Deduct
FD -2 1.9 0.2 2.25 -1.71
D1 -1 1.2 0.2 2.25 -0.54
RS -4 4 0.2 4 -12.80
DG Build. 1 22.926 0.2 7.05 32.33
1 8.005 0.2 7.05 11.29
GIS Room 1 87.525 0.2 7.05 123.41
4th Floor
1 40.674 0.2 7.05 57.35
1 9.891 0.2 7.05 13.95
1 53.2 0.2 7.05 75.01
1 39.245 0.2 7.05 55.34
1 9.634 0.2 7.05 13.58
1 44.9 0.2 7.05 63.31
2 0.3 0.2 7.05 0.85
Core 1 3.723 0.2 7.2 5.36
1 2.875 0.2 7.2 4.14
Deduct
D1 -1 1.2 0.2 2.25 -0.54
RS -4 4 0.2 4 -12.80
DG Build. 1 22.926 0.2 7.05 32.33
1 8.005 0.2 7.05 11.29
GIS Room 1 87.525 0.2 7.05 123.41
5th Floor
1 40.674 0.2 7.05 57.35
1 9.891 0.2 7.05 13.95
1 53.2 0.2 7.05 75.01
1 39.245 0.2 7.05 55.34
1 9.634 0.2 7.05 13.58
1 44.9 0.2 7.05 63.31
2 0.3 0.2 7.05 0.85
Core 1 3.723 0.2 7.2 5.36
1 2.875 0.2 7.2 4.14
Deduct
FD -2 1.9 0.2 2.25 -1.71
D1 -1 1.2 0.2 2.25 -0.54
RS -4 4 0.2 4 -12.80
DG Build. 1 22.926 0.2 7.05 32.33
1 8.005 0.2 7.05 11.29
GIS Room 1 87.525 0.2 7.05 123.41
6th Floor
1 40.674 0.2 7.05 57.35
1 9.891 0.2 7.05 13.95
1 53.2 0.2 7.05 75.01
1 39.245 0.2 7.05 55.34
1 9.634 0.2 7.05 13.58
1 44.9 0.2 7.05 63.31
2 0.3 0.2 7.05 0.85
Core 1 3.723 0.2 7.2 5.36
1 2.875 0.2 7.2 4.14
Deduct
D1 -1 1.2 0.2 2.25 -0.54
RS -4 4 0.2 4 -12.80
DG Build.
PARAPET 1 89.32 0.2 1.2 21.44
GIS Room 1 87.525 0.2 7.05 123.41
TERRACE FLOOR
PARAPET 1 40.674 0.2 1.2 9.76
1 9.891 0.2 1.2 2.37
1 53.2 0.2 1.2 12.77
1 39.245 0.2 1.2 9.42
1 9.634 0.2 1.2 2.31
1 44.9 0.2 1.2 10.78
2 0.3 0.2 1.2 0.14
GIS Room 1 87.26 0.2 1.2 20.94

Stone Masonary
Compound wall 1 70.13 0.6 1.2 50.49
1 70.13 0.45 2.4 75.74

External plaster
Basement 1 1 70.418 1.5 105.63
Deduct ventilator
V1 -13 5 0.45 -29.25
Basement 2 1 70.418 4.5 316.88
V1 -13 5 1.5 -97.50
DC build.
Ground Floor 1 199.432 6.6 1316.25
FD2 -2 1.2 2.25 -5.40
D2 -0.5 0.9 2.15 -0.97
Main Entrance opening -1 9.2 6.6 -60.72
-1 4.5 2.25 -10.13
D3 -1 1.8 2.15 -3.87
Openinng -2 2.96 2.5 -14.80
DG build 1 78.591 6.6 518.70
Deduct -1 49.945 6.6 -329.64
GIS Build 1 51.614 6.6 340.65
1st floor 1 176.456 7.2 1270.48
Deduct opening
RS -4 4 4 -64.00
DG build 1 78.591 7.05 554.07
Deduct -1 49.945 7.05 -352.11
GIS Build 1 51.614 7.05 363.88
2nd Floor 1 176.456 7.2 1270.48
Deduct opening
RS -4 4 4 -64.00
DG build 1 78.591 7.05 554.07
Deduct -1 49.945 7.05 -352.11
GIS Build 1 51.614 7.05 363.88
3rd Floor 1 176.456 7.2 1270.48
Refuge Balcony parapet 1 56.535 2.5 141.34
Deduct opening
RS -4 4 4 -64.00
FD -1 1.2 2.25 -2.70
DG build 1 78.591 7.05 554.07
Deduct -1 49.945 7.05 -352.11
GIS Build 1 51.614 7.05 363.88
4th Floor 1 176.456 7.2 1270.48
Deduct opening
RS -4 4 4 -64.00
DG build 1 78.591 7.05 554.07
Deduct -1 49.945 7.05 -352.11
GIS Build 1 51.614 7.05 363.88
5th Floor 1 176.456 7.2 1270.48
Refuge Balcony parapet 1 56.535 2.5 141.34
Deduct opening
RS -4 4 4 -64.00
FD -1 1.2 2.25 -2.70
DG build 1 78.591 7.05 554.07
Deduct -1 49.945 7.05 -352.11
GIS Build 1 51.614 7.05 363.88
6th Floor 1 176.456 7.2 1270.48
Deduct opening
RS -4 4 4 -64.00
DG build 1 78.591 2.6 204.34
1 28.05 2.85 79.94
GIS Build 1 51.614 2.85 147.10
Terrace Floor
DC build.
Parapet wall 1 40.83 2.6 106.16
1 103.67 2.6 269.54
1 9.63 2.6 25.04
1 54 1.4 75.60
Core wall ST1 1 39.028 2.85 111.23
Deduct opening
FD1 -1 1.2 2.25 -2.70
Core wall ST2 1 42.151 2.85 120.13
Deduct opening
FD1 -1 3 2.25 -6.75
OHT 1 24.426 2.25 54.96
GIS Build 1 87.126 2.6 226.53
1 32.198 2.85 91.76
Internal Plaster
1 Basement 1 1 316.371 3.3 1044.02
V1 -6.5 5 0.45 -14.63
Core st 01 1 21.498 3.6 77.39
Lobby 1 22.506 3.6 81.02
FD1 -2 1.2 2.15 -5.16
Lift Door -1 1 2.15 -2.15
2 Basement 2 1 490.335 3.9 1912.31
Deduct
V1 -13 5 1.5 -97.50
Add jambs 13 13 0.23 38.87
Core st 01 1 21.498 4.2 90.29
Lobby 1 22.506 4.2 94.53
FD1 -2 1.2 2.15 -5.16
Lift Door -1 1 2.15 -2.15
Core st 02 1 18.8 4.2 78.96
Lobby 1 22.851 4.2 95.97
FD1 -2 1.2 2.15 -5.16
Lift Door -2 2.9 2.15 -12.47
3 Ground Floor
DC build. 1 226.756 6.45 1462.58
Deduct
FD2 -2 1.2 2.25 -5.40
D2 -0.5 0.9 2.15 -0.97
Main Entrance opening -1 9.2 0 0.00
-1 4.5 2.25 -10.13
D3 -1 1.8 2.15 -3.87
Openinng -2 2.96 2.5 -14.80
Core st 01 1 21.498 6.6 141.89
Lobby 1 22.506 6.45 145.16
FD1 -2 1.2 2.15 -5.16
Lift Door -1 1 2.15 -2.15
Core st 02 1 18.8 6.6 124.08
Lobby 1 22.851 6.45 147.39
FD1 -1 1.2 2.15 -2.58
FD2 -0.5 1.2 2.15 -1.29
Lift Door -2 2.9 2.15 -12.47
DG build 1 59.044 6.45 380.83
FD1 -2 1.2 2.15 -5.16
St 01 1 29.1 6.45 187.70
FD1 -1 1.2 2.15 -2.58
St 02 1 18.83 6.45 121.45
Lobby 1 12.69 6.45 81.85
FD1 -3 1.2 2.15 -7.74
GIS Build 1 106.195 6.45 684.96
FD2 -1 1.8 2.15 -3.87
St-01 1 16.8 6.45 108.36
Lobby 1 20.13 6.45 129.84
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
4 FIRST FLOOR
DC build. 1 264.418 7.05 1864.15
D1 -1 1.2 2.15 -2.58
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
RS -4 4 4 -64.00
Add jambs 4 8 0.2 6.40
Core st 01 1 21.498 7.2 154.79
Lobby 1 22.506 7.05 158.67
FD1 -2 1.2 2.15 -5.16
Lift Door -1 1 2.15 -2.15
Core st 02 1 18.8 7.2 135.36
Lobby 1 22.851 7.05 161.10
FD1 -1 1.2 2.15 -2.58
FD2 -0.5 1.2 2.15 -1.29
Lift Door -2 2.9 2.15 -12.47
DG build 1 59.044 7.05 416.26
FD1 -2 1.2 2.15 -5.16
St 01 1 29.1 7.05 205.16
FD1 -1 1.2 2.15 -2.58
St 02 1 18.83 7.05 132.75
Lobby 1 12.69 7.05 89.46
FD1 -3 1.2 2.15 -7.74
GIS Build 1 106.195 7.05 748.67
FD2 -1 1.8 2.15 -3.87
St-01 1 16.8 7.05 118.44
Lobby 1 20.13 7.05 141.92
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
5 2ndFLOOR 1 264.418 7.05 1864.15
D1 -1 1.2 2.15 -2.58
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
RS -4 4 4 -64.00
Add jambs 4 8 0.2 6.40
Core st 01 1 21.498 7.2 154.79
Lobby 1 22.506 7.05 158.67
FD1 -2 1.2 2.15 -5.16
Lift Door -1 1 2.15 -2.15
Core st 02 1 18.8 7.2 135.36
Lobby 1 22.851 7.05 161.10
FD1 -1 1.2 2.15 -2.58
FD2 -0.5 1.2 2.15 -1.29
Lift Door -2 2.9 2.15 -12.47
DG build 1 59.044 7.05 416.26
FD1 -2 1.2 2.15 -5.16
St 01 1 29.1 7.05 205.16
FD1 -1 1.2 2.15 -2.58
St 02 1 18.83 7.05 132.75
Lobby 1 12.69 7.05 89.46
FD1 -3 1.2 2.15 -7.74
GIS Build 1 106.195 7.05 748.67
FD2 -1 1.8 2.15 -3.87
St-01 1 16.8 7.05 118.44
Lobby 1 20.13 7.05 141.92
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
6 3rdFLOOR 1 264.418 7.05 1864.15
D1 -1 1.2 2.15 -2.58
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
FD3 -2 1.9 2.15 -8.17
Add jambs 2 3.8 0.2 1.52
RS -4 4 4 -64.00
Add jambs 4 8 0.2 6.40
Core st 01 1 21.498 7.2 154.79
Lobby 1 22.506 7.05 158.67
FD1 -2 1.2 2.15 -5.16
Lift Door -1 1 2.15 -2.15
Core st 02 1 18.8 7.2 135.36
Lobby 1 22.851 7.05 161.10
FD1 -1 1.2 2.15 -2.58
FD2 -0.5 1.2 2.15 -1.29
Lift Door -2 2.9 2.15 -12.47
DG build 1 59.044 7.05 416.26
FD1 -2 1.2 2.15 -5.16
St 01 1 29.1 7.05 205.16
FD1 -1 1.2 2.15 -2.58
St 02 1 18.83 7.05 132.75
Lobby 1 12.69 7.05 89.46
FD1 -3 1.2 2.15 -7.74
GIS Build 1 106.195 7.05 748.67
FD2 -1 1.8 2.15 -3.87
St-01 1 16.8 7.05 118.44
Lobby 1 20.13 7.05 141.92
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
6 4thFLOOR 1 264.418 7.05 1864.15
D1 -1 1.2 2.15 -2.58
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
RS -4 4 4 -64.00
Add jambs 4 8 0.2 6.40
Core st 01 1 21.498 7.2 154.79
Lobby 1 22.506 7.05 158.67
FD1 -2 1.2 2.15 -5.16
Lift Door -1 1 2.15 -2.15
Core st 02 1 18.8 7.2 135.36
Lobby 1 22.851 7.05 161.10
FD1 -1 1.2 2.15 -2.58
FD2 -0.5 1.2 2.15 -1.29
Lift Door -2 2.9 2.15 -12.47
DG build 1 59.044 7.05 416.26
FD1 -2 1.2 2.15 -5.16
St 01 1 29.1 7.05 205.16
FD1 -1 1.2 2.15 -2.58
St 02 1 18.83 7.05 132.75
Lobby 1 12.69 7.05 89.46
FD1 -3 1.2 2.15 -7.74
GIS Build 1 106.195 7.05 748.67
FD2 -1 1.8 2.15 -3.87
St-01 1 16.8 7.05 118.44
Lobby 1 20.13 7.05 141.92
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
7 5thFLOOR 1 264.418 7.05 1864.15
D1 -1 1.2 2.15 -2.58
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
FD3 -2 1.9 2.15 -8.17
Add jambs 2 3.8 0.2 1.52
RS -4 4 4 -64.00
Add jambs 4 8 0.2 6.40
Core st 01 1 21.498 7.2 154.79
Lobby 1 22.506 7.05 158.67
FD1 -2 1.2 2.15 -5.16
Lift Door -1 1 2.15 -2.15
Core st 02 1 18.8 7.2 135.36
Lobby 1 22.851 7.05 161.10
FD1 -1 1.2 2.15 -2.58
FD2 -0.5 1.2 2.15 -1.29
Lift Door -2 2.9 2.15 -12.47
DG build 1 59.044 2.15 126.94
FD1 -2 1.2 2.15 -5.16
St 01 1 29.1 2.15 62.57
FD1 -1 1.2 2.15 -2.58
St 02 1 18.83 2.15 40.48
Lobby 1 12.69 2.15 27.28
FD1 -3 1.2 2.15 -7.74
GIS Build 1 106.195 2.15 228.32
FD2 -1 1.8 2.15 -3.87
St-01 1 16.8 2.15 36.12
Lobby 1 20.13 2.15 43.28
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
8 6thFLOOR 1 264.418 7.05 1864.15
D1 -1 1.2 2.15 -2.58
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
RS -4 4 4 -64.00
Add jambs 4 8 0.2 6.40
Core st 01 1 21.498 7.2 154.79
Lobby 1 22.506 7.05 158.67
FD1 -2 1.2 2.15 -5.16
Lift Door -1 1 2.15 -2.15
Core st 02 1 18.8 7.2 135.36
Lobby 1 22.851 7.05 161.10
FD1 -1 1.2 2.15 -2.58
FD2 -0.5 1.2 2.15 -1.29
Lift Door -2 2.9 2.15 -12.47
DG build
St 01 1 29.1 2.7 78.57
FD1 -1 1.2 2.15 -2.58
St 02 1 18.83 2.7 50.84
Lobby 1 12.69 2.7 34.26
FD1 -3 1.2 2.15 -7.74

GIS Build 1 106.195 7.05 748.67


FD2 -1 1.8 2.15 -3.87
St-01 1 16.8 7.05 118.44
Lobby 1 20.13 7.05 141.92
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
7 Terrace
Core st 01 1 21.498 2.7 58.04
Lobby 1 22.506 2.7 60.77
FD1 -1.5 1.2 2.15 -3.87
Lift Door -1 1 2.15 -2.15
Ceiling 1 31.515 31.52
1 27.578 27.58
Core st 02 1 18.8 2.7 50.76
Lobby 1 22.851 2.7 61.70
FD1 -1 1.2 2.15 -2.58
FD2 -0.5 1.2 2.15 -1.29
Lift Door -2 2.9 2.15 -12.47
Ceiling 1 19.53 19.53
1 28.11 28.11
GIS Build
St-01 1 16.8 2.7 45.36
Lobby 1 20.13 2.7 54.35
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
8 Staircase flight bottom
DC build.
ST01
Flight1 5 3.69 1.85 34.13
Flight2 27 4.025 1.85 201.05
Flight3 1 1.8 1.85 3.33
Landing 33 4 1.85 244.20
ST02
Flight1 3 3.69 1.5 16.61
Flight2 27 4.025 1.5 163.01
Flight3 1 1.8 1.5 2.70
Landing 31 3.1 1.42 136.46
DG build
ST01
Flight1 5 3.69 1.7 31.37
Flight2 21 4.025 1.7 143.69
Flight3 1 1.8 1.7 3.06
Landing 31 4 1.7 210.80
ST02
Flight1 3 3.69 1.5 16.61
Flight2 21 4.025 1.5 126.79
Flight3 1 1.8 1.5 2.70
Landing 31 3.1 1.42 136.46
GIS build
ST01
Flight1 5 3.69 1.7 31.37
Flight2 27 4.025 1.7 184.75
Flight3 1 1.8 1.7 3.06
Landing 33 4 1.7 224.40

Vermiculate Coating
DC Build
ISHB 49 2.574 6.6 832.43
294 2.574 7.2 5448.64
DG build
ISHB 17 2.574 6.6 288.80
102 2.574 7.2 1890.35
GIS Build
ISHB 8 3.956 6.6 208.88
40 3.956 7.2 1139.33
TREMIX FLOORING
Basement 1 1 1741.69 1741.69
1 79.405 79.41
Basement 2 1 4745.849 4745.85
Ground floor 1 2882.165 2882.17
1st to 6th 6 3055.544 18333.26
DG Build
1st to 5th 5 502.49 2512.45
GIS Build
Ground floor
2nd to 6th 5 496.73 2483.65

Concret Floor
DG Build
Ground floor 1 582.807 0.2 116.56
GIS Build
Ground floor 1 496.73 0.2 99.35

Kota Stone Flooring


Basement 1
Core ST01 1 26.99 26.99
Lobby 1 31.56 31.56
Staircase Landing 1 3.995 1.8 7.19
Basement 2
Core ST01 1 9.99 9.99
Staircase Landing 2 3.995 1.8 14.38
Core ST02 1 19.53 19.53
Staircase Landing 1 3.1 1.5 4.65
Ground Floor
DC build
Core ST01 1 11.711 11.71
Staircase Landing 4 1.84 1.8 13.25
Core ST 02 1 8.25 8.25
Staircase Landing 4 3.1 1.5 18.60
1st to terrace floor 24 4 1.8 172.80
Terrace floor
Core ST01 1 4 1.5 6.00
Core ST02 1 8.49 8.49
DG Build
ST-01 2 40.14 80.28
Landing 2 3.366 1.5 10.10
1st to terrace floor 20 4 1.8 144.00
GIS Build
ST-01 1 40.14 40.14
Landing 1 3.366 1.5 5.05
1st to terrace floor 24 4 1.8 172.80
Terrace floor
Core ST01 1 4 1.5 6.00
Core ST02 1 8.49 8.49
GIS Buil
ST-01 1 17.15 17.15

Kota Skirting/Riser
DC Build
basement 1
Core ST01 1 21.5 0.1 2.15
FD1 -1 1.2 0.1 -0.12
Lobby 1 22.51 0.1 2.25
FD1 -2 1.2 0.1 -0.24
Staircase Landing 1 7.595 0.1 0.76
Basement 2
Core ST01 1 8.72 0.1 0.87
FD1 -1 1.2 0.1 -0.12
Staircase Landing 1 7.595 0.1 0.76
Core ST02 1 18.8 0.1 1.88
FD1 -1 1.2 0.1 -0.12
Staircase Landing 1 6.1 0.1 0.61
Ground Floor 1 16.5 0.1 1.65
FD1 -2 1.2 0.1 -0.24
Landing 1 7.595 0.1 0.76
FD1 -1 1.2 0.1 -0.12
Terrace floor
Core ST01 1 7 0.1 0.70
FD1 -1 1.2 0.1 -0.12
Core ST02 1 12.654 0.1 1.27
FD1 -1 1.2 0.1 -0.12
DG build
Basement 1
Core ST01 1 29.1 0.1 2.91
FD1 -1 1.2 0.1 -0.12
Staircase Landing 1 6.7 0.1 0.67
Basement 2
Core ST01 1 29.1 0.1 2.91
FD1 -1 1.2 0.1 -0.12
Staircase Landing 1 6.7 0.1 0.67
Ground Floor
Core ST01 1 29.1 0.1 2.91
FD1 -1 1.2 0.1 -0.12
Staircase Landing 1 6.7 0.1 0.67
Core ST02 1 18.83 0.1 1.88
FD1 -2 1.2 0.1 -0.24
Staircase Landing 3 6.7 0.1 2.01
1st to 5th Floor
Core ST01 20 6.7 0.1 13.40
FD1 -5 1.2 0.1 -0.60
Staircase Landing 20 6.7 0.1 13.40
Core ST02 20 6.7 0.1 13.40
FD1 -5 1.2 0.1 -0.60
Staircase Landing 20 6.7 0.1 13.40
Terrace floor
Core ST01 1 6.7 0.1 0.67
FD1 -1 1.2 0.1 -0.12
Core ST02 1 6.7 0.1 0.67
FD1 -1 1.2 0.1 -0.12

Staircase
DC Build
Stair 01 riser 382 1.8 0.15 103.14
Skirting 382 0.1 0.15 5.73
Stair 02 riser 358 1.8 0.15 96.66
Skirting 358 0.1 0.15 5.37
DG build
Stair 01 riser 287 1.8 0.15 77.49
Skirting 287 0.1 0.15 4.31
Stair 02 riser 287 1.8 0.15 77.49
Skirting 287 0.1 0.15 4.31
GIS build
Stair 01 riser 328 1.8 0.15 88.56
Skirting 328 0.1 0.15 4.92

Kota Steps
Staircase
DC Build
Stair 01 Tread 349 1.8 0.3 188.46
Skirting 349 0.3 0.1 10.47
Stair 02 Tread 325 1.8 0.3 175.50
Skirting 325 0.3 0.1 9.75
DG build
Stair 01 riser 258 1.8 0.3 139.32
Skirting 258 0.3 0.1 7.74
Stair 02 riser 258 1.8 0.3 139.32
Skirting 258 0.3 0.1 7.74
GIS build
Stair 01 riser 295 1.8 0.3 159.30
Skirting 295 0.3 0.1 8.85

Marble Flooring
DC build
CORE L1
Ground Floor to 6th
Passenger Lobby 7 32.862 230.03
Terrace floor
Passenger Lobby 7 32.862 230.03

MARBLE CLADDING
CORE L1
Ground Floor to 6th
Passenger Lobby 7 25.417 3.6 640.51
FD1 -2 1.2 2.15 -5.16
Lift Door -2 1.4 2.1 -5.88
Terrace floor
Passenger Lobby 7 32.862 230.03
FD1 -2 1.2 2.15 -5.16
Lift Door -2 1.4 2.1 -5.88
CORE L2 2
Ground Floor to 6th
Freight Lift Lobby 7 22.848 4.2 671.73
FD1 -2 1.2 2.15 -5.16
Lift Door -2 1.4 2.1 -5.88
Terrace floor
Freight Lift Lobby 7 22.848 4.2 671.73
FD1 -1 1.2 2.15 -2.58
FD2 -2 2.925 2.15 -12.58
Lift Door -2 2.9 2.1 -12.18

Hand Rail
DC build
Base 1 to Base 2
St 01 2 3.69 7.38
Base 2 to GF
St 01 3 3.242 9.73
St 02 3 3.242 9.73
GF to 1st
St 01 1 1.35 1.35
4 4.025 16.10
St 02 1 1.35 1.35
4 4.025 16.10
1st to terrace
St 01 24 4.025 96.60
St 02 24 4.025 96.60

Refuge Floor 2 55.636 111.27


DG build
Base 1 to Base 2
St 01 2 3.69 7.38
Base 2 to GF
St 01 3 3.242 9.73
GF to 1st
St 01 1 1.35 1.35
4 4.025 16.10
St 02 1 1.35 1.35
4 4.025 16.10
1st to terrace
St 01 20 4.025 80.50
St 02 20 4.025 80.50
GIS build
Base 1 to Base 2
St 01 2 3.69 7.38
Base 2 to GF
St 01 3 3.242 9.73
GF to 1st
St 01 1 1.35 1.35
4 4.025 16.10
1st to terrace
St 01 20 4.025 80.50

MS RAILING
Base 1 to Base 2
St 01 2 3.69 1.05 7.75
Base 2 to GF
St 01 3 3.242 1.05 10.21
St 02 3 3.242 1.05 10.21
GF to 1st
St 01 1 1.35 1.05 1.42
4 4.025 1.05 16.91
St 02 1 1.35 1.05 1.42
4 4.025 1.05 16.91
1st to terrace
St 01 24 4.025 1.05 101.43
St 02 24 4.025 1.05 101.43
DG build
Base 1 to Base 2
St 01 2 3.69 1.05 7.75
Base 2 to GF
St 01 3 3.242 1.05 10.21
GF to 1st
St 01 1 1.35 1.05 1.42
4 4.025 1.05 16.91
St 02 1 1.35 1.05 1.42
4 4.025 1.05 16.91
1st to terrace
St 01 20 4.025 1.05 84.53
St 02 20 4.025 1.05 84.53
GIS build
Base 1 to Base 2
St 01 2 3.69 1.05 7.75
Base 2 to GF
St 01 3 3.242 1.05 10.21
GF to 1st
St 01 1 1.35 1.05 1.42
4 4.025 1.05 16.91
1st to terrace
St 01 20 4.025 1.05 84.53
DOOR
DC build
BASEMENT 1
FD1 2 1.2 2.15 5.16
BASEMENT 2
FD1 4 1.2 2.15 10.32
GROUND FLOOR
FD1 7 1.2 2.15 18.06
FD2 7 2.925 2.15 44.02
1ST TO TERRACE
FD1 21 1.2 2.15 54.18
FD2 7 2.925 2.15 44.02
DG build
BASEMENT 1
FD1 1 1.2 2.15 2.58
BASEMENT 2
FD1 2 1.2 2.15 5.16
GROUND FLOOR
FD1 6 1.2 2.15 15.48
1ST TO TERRACE
FD1 21 1.2 2.15 54.18
GIS build
GROUND FLOOR
FSD1 1 1.925 2.15 4.14
1ST TO TERRACE
FSD1 4 1.925 2.15 16.56

Vision panel
BASEMENT 1
FD1 2 1.2 0.1 2.15 0.52
BASEMENT 2
FD1 4 1.2 0.1 2.15 1.03
GROUND FLOOR
FD1 7 1.2 0.1 2.15 1.81
FD2 7 2.925 0.1 2.15 4.40
1ST TO TERRACE
FD1 21 1.2 0.1 2.15 5.42
FD2 7 2.925 0.1 2.15 4.40
DG build
BASEMENT 1
FD1 1 1.2 0.1 2.15 0.26
BASEMENT 2
FD1 2 1.2 0.1 2.15 0.52
GROUND FLOOR
FD1 6 1.2 0.1 2.15 1.55
1ST TO TERRACE
FD1 21 1.2 0.1 2.15 5.42
GIS build
GROUND FLOOR
FSD1 1 1.925 0.1 2.15 0.41
1ST TO TERRACE
FSD1 4 1.925 0.1 2.15 1.66

Hinges
BASEMENT 1
FD1 2 3 6.00
BASEMENT 2
FD1 4 3 12.00
GROUND FLOOR
FD1 7 3 21.00
FD2 7 6 42.00
1ST TO TERRACE
FD1 21 3 63.00
FD2 7 6 42.00
DG build
BASEMENT 1
FD1 1 3 3.00
BASEMENT 2
FD1 2 3 6.00
GROUND FLOOR
FD1 6 3 18.00
1ST TO TERRACE
FD1 21 3 63.00
GIS build
GROUND FLOOR
FSD1 1 6 6.00
1ST TO TERRACE
FSD1 4 6 24.00

Anchor Fastener
BASEMENT 1
FD1 2 4 8.00
BASEMENT 2
FD1 4 4 16.00
GROUND FLOOR
FD1 7 4 28.00
FD2 7 5 35.00
1ST TO TERRACE
FD1 21 4 84.00
FD2 7 5 35.00
DG build
BASEMENT 1
FD1 1 4 4.00
BASEMENT 2
FD1 2 4 8.00
GROUND FLOOR
FD1 6 4 24.00
1ST TO TERRACE
FD1 21 4 84.00
GIS build
GROUND FLOOR
FSD1 1 5 5.00
1ST TO TERRACE
FSD1 4 5 20.00

Door Clooser
BASEMENT 1
FD1 2 2.00
BASEMENT 2
FD1 4 4.00
GROUND FLOOR
FD1 7 7.00
FD2 7 2 14.00
1ST TO TERRACE
FD1 21 21.00
FD2 7 2 14.00
DG build
BASEMENT 1
FD1 1 1.00
BASEMENT 2
FD1 2 2.00
GROUND FLOOR
FD1 6 6.00
1ST TO TERRACE
FD1 21 21.00
GIS build
GROUND FLOOR
FSD1 1 2 2.00
1ST TO TERRACE
FSD1 4 2 8.00

Panic bar set


BASEMENT 1
FD1 2 2.00
BASEMENT 2
FD1 4 4.00
GROUND FLOOR
FD1 7 7.00
FD2 7 7.00
1ST TO TERRACE
FD1 21 21.00
FD2 7 7.00
DG build
BASEMENT 1
FD1 1 1.00
BASEMENT 2
FD1 2 2.00
GROUND FLOOR
FD1 6 6.00
1ST TO TERRACE
FD1 21 21.00
GIS build
GROUND FLOOR
FSD1 1 1.00
1ST TO TERRACE
FSD1 4 4.00

Panic Trim
concealed flush bolt lock

Rolling Shutter
24 4 4 384.00

Granite Cladding
Compound wall 1 70.13 5.25 368.18
Basement retaining outside 1 70.423 6 422.54
Deduct
Ventilator -13 5 0.45 -29.25
-13 5 1.5 -97.50

Granite Floor
Ramp 1 16.79 16.79
1 25.11 25.11
1 10.64 10.64

Synthetic paint
DC build
1 Basement 1
Core st 01 1 21.498 3.6 77.39
FD1 -1 1.2 2.15 -2.58
2 Basement 2
Core st 01 1 21.498 4.2 90.29
FD1 -1 1.2 2.15 -2.58
Core st 02 1 18.8 4.2 78.96
FD1 -1 1.2 2.15 -2.58
3 Ground Floor
Core st 01 1 21.498 6.6 141.89
FD1 -1 1.2 2.15 -2.58
Core st 02 1 18.8 6.6 124.08
FD1 -1 1.2 2.15 -2.58
4 FIRST FLOOR terrace
c Core st 01 6 21.498 7.2 928.71
FD1 -6 1.2 2.15 -15.48
Core st 02 6 18.8 6.6 744.48
FD1 -6 1.2 2.15 -15.48
8 Staircase flight bottom
ST01
Flight1 5 3.69 1.85 34.13
Flight2 27 4.025 1.85 201.05
Flight3 1 1.8 1.85 3.33
Landing 33 4 1.85 244.20
ST02
Flight1 3 3.69 1.5 16.61
Flight2 27 4.025 1.5 163.01
Flight3 1 1.8 1.5 2.70
Landing 31 3.1 1.42 136.46

3 Ground Floor
St 01 1 29.1 6.45 187.70
FD1 -1 1.2 2.15 -2.58
St 02 1 18.83 6.45 121.45
Lobby 1 12.69 6.45 81.85
FD1 -3 1.2 2.15 -7.74

Staircase 1 16.8 6.45 108.36


Lobby 1 20.13 6.45 129.84
FD1 -0.5 1.2 2.15 -1.29
FD2 -1 1.8 2.15 -3.87
4 FIRST to 6th
St 01 4 29.1 7.05 820.62
FD1 -1 1.2 2.15 -2.58
St 02 4 18.83 7.05 531.01
FD1 -1 1.2 2.15 -2.58

Staircase 5 16.8 7.05 592.20

DG build
ST01
Flight1 5 3.69 1.7 31.37
Flight2 21 4.025 1.7 143.69
Flight3 1 1.8 1.7 3.06
Landing 31 4 1.7 210.80
ST02
Flight1 3 3.69 1.5 16.61
Flight2 21 4.025 1.5 126.79
Flight3 1 1.8 1.5 2.70
Landing 31 3.1 1.42 136.46
GIS build
ST01
Flight1 5 3.69 1.7 31.37
Flight2 27 4.025 1.7 184.75
Flight3 1 1.8 1.7 3.06
Landing 33 4 1.7 224.40

Kerb 1 251.16 0.15 0.45 16.95

earth filling 1 932.18 0.3 279.65


Waterproofing
DC build
Podium & Landscape 1 1829.029 1829.03
Refuge balcony 2 927.322 0.75 1390.98
Terrace waterproof 1 3306.45 3306.45
DG build
Terrace waterproof 1 6844.763 6844.76
GIS Build
Terrace waterproof 1 5591.63 5591.63

Entrace gate
Main Gate 2 17.2 2.1 72.24
Sub Total Total

9352.322 9352.322

3096.677
398.37

442.57

442.57
440.86

442.57

440.86
420.39

68.50

126.23

13894.06
32632.05
9808.428
32778.47

215.91

837.399
547.9599
846.45

460.068

460.068

2153.547
2153.547

694.266
612.1437
273.8563

27.38563
306

351
102

83
384

663.9705

52.54

6610.864
15742.84

You might also like