Form.

04-HES-IPW-XII-2013
PT. INDRA PRATAMA WASUPONDA

INCIDENT REPORT

1. PROJECT DETAILS

Project : Penataan Lahan Reklamasi 2018-2020


Contract no. : 4600043278
Location : Innalahi
Report no. : 05/INV/IPW/HES/III/2019

INVESTIGATION TEAM MEMBERS POSITION


1. Ichsan Yusran Safety Koord.
2. Angga Eko P. Supervisior
3.
4.
5.
6.

2. ACCIDENT DETAILS

Days/Date/Time of Incident : Between Wednesday (27 March 19) - Thuesday (28 March 19)
Days/Date/Time Reported : Thuesday, 28 March 2019
Locations : Innalahi 02
Weather Conditions : Cloudy

Work hours : from 07:00 WITA to 17:00 WITA


Overtime : from - to -

Journey/work travel related : Yes No a


Environmental damaged Property damaged a Near miss

Personal Damage Class I Personal Damage Class II Personal Damage Class III

3. DETAILS OF THE DAMAGE

PERSON/ ENVIRONMENT/ DAYS LOST (IF PERSON) ESTIMATED COST REMARKS


EQUIPMENT/ TOOLS
Excavator CAT320 D (Exc-07) -
CT 2719

WITNESS NAME ID NUMBER OCCUPATION EMPLOYER


OGHAN SARJONO C - 11612 SUPERVISIOR
PURDIANTO C - 18650 OPERATOR
4. DESCRIPTION OF ACCIDENT/INCIDENT

(Include detail of injuries/damage and assessment of apparent cause)

QUESTION RELATED TO DETAILS OF INCIDENT DESCRIPTION (Please use and attach additional paper if this space is
INCIDENT/ACCIDENT
Where & when did the incident happen? insufficient)
What was the task? LAMPIRAN 1
What kind of PPE, equipment, tools, and
materials were being used?
(Attach witness statement, sketches, comments, photographs and other details where appropriate)

5. ROOT CAUSE ANALYSIS OF ACCIDENT/ HAZARD/ NEAR MISS

BASIC CAUSES IMMEDIATE CAUSES


JOB FACTORS PERSONAL FACTORS SUBSTANDARD PRACTICES/ACTS SUBSTANDARD CONDITION
Operating equipment without
Caused by employee Physical incapability Inadequate guard/sign
authority/permit
Defective tools,equipment or
Caused by another employee Inattention to hazard Failure to make secure
material
Defective from normal use Unaware of safe method Failure to warn Inadequate/improper PPE

Abuse/misuse of equipment Low level job skill Operating at improper speed Inadequate warning system

Safety inspection failure Tried to avoid discomfort Removing safety devices Poor Housekeeping
Housekeeping failure Tried to gain or safe time Use defective equipment Radiation exposure
Inadequate
Tried to avoid extra effort Use equipment unsafely Fire & explosion hazard
design/construction/engineering
Inadequate leadership/supervision Influence of emotions Use PPE improperly Inadequate ventilation

Preventive maintenance failure Fatigue/stress (physics/mental) Improper lifting, loading Temperatures extremes

Services equipment in
Purchasing failure Lack of knowledge Chemical hazard
operation
Miscommunication/misunderstand Improper motivation Improper placement Inadequate illumination
Inadequate work procedures/no Inexperiences in task being
Improper position for task Congested/restricted work area
documented procedures performed
Act or omission of another
Inadequate training provided Horseplay Excessive noise
person
Under influence of Environment condition (wind,
Production pressure Possible personal problem
alcohol/drugs dust, rain, etc)

a Others
a Others
a Others
aOthers

6. CORRECTIVE ACTION

6.1 Short Term Action


Corrective Action By whom By when
1. Melaporkan kejadian tersebut ke Project Manager (Contr.)
dan User PT. Vale (DONE) SPV Saat itu juga
2. Melakukan komunikasi dengan pihak Mine Rehabilitation
dan Dept. DSS Untuk membuat laporan pencurian. (DONE) PM Saat itu juga
6.2 Long Term Action
Corrective Action By whom By when
1. Membuat laporan di Security Gate Gunung Batu, Dept. DSS
PTVI dan ke Polsek Nuha untuk investigasi dan penyelidikan Contractor (IPW) & Saat Itu juga
lebih lanjut. DSS Dept.

2. Mengamankan unit menunggu instruksi lebih lanjut. Contractor (IPW) & Saat Itu juga
Construction Dept.