Report & Investigation Pencurian
Report & Investigation Pencurian
04-HES-IPW-XII-2013
PT. INDRA PRATAMA WASUPONDA
INCIDENT REPORT
1. PROJECT DETAILS
2. ACCIDENT DETAILS
Days/Date/Time of Incident : Between Wednesday (27 March 19) - Thuesday (28 March 19)
Days/Date/Time Reported : Thuesday, 28 March 2019
Locations : Innalahi 02
Weather Conditions : Cloudy
Personal Damage Class I Personal Damage Class II Personal Damage Class III
QUESTION RELATED TO DETAILS OF INCIDENT DESCRIPTION (Please use and attach additional paper if this space is
INCIDENT/ACCIDENT
Where & when did the incident happen? insufficient)
What was the task? LAMPIRAN 1
What kind of PPE, equipment, tools, and
materials were being used?
(Attach witness statement, sketches, comments, photographs and other details where appropriate)
Abuse/misuse of equipment Low level job skill Operating at improper speed Inadequate warning system
Safety inspection failure Tried to avoid discomfort Removing safety devices Poor Housekeeping
Housekeeping failure Tried to gain or safe time Use defective equipment Radiation exposure
Inadequate
Tried to avoid extra effort Use equipment unsafely Fire & explosion hazard
design/construction/engineering
Inadequate leadership/supervision Influence of emotions Use PPE improperly Inadequate ventilation
Preventive maintenance failure Fatigue/stress (physics/mental) Improper lifting, loading Temperatures extremes
Services equipment in
Purchasing failure Lack of knowledge Chemical hazard
operation
Miscommunication/misunderstand Improper motivation Improper placement Inadequate illumination
Inadequate work procedures/no Inexperiences in task being
Improper position for task Congested/restricted work area
documented procedures performed
Act or omission of another
Inadequate training provided Horseplay Excessive noise
person
Under influence of Environment condition (wind,
Production pressure Possible personal problem
alcohol/drugs dust, rain, etc)
a Others
a Others
a Others
aOthers
6. CORRECTIVE ACTION
2. Mengamankan unit menunggu instruksi lebih lanjut. Contractor (IPW) & Saat Itu juga
Construction Dept.