Important Notes

ƶ6JGRQUVGTFGUETKDGUVJGWUGQH5-;&'%-YKVJFTQRJGCFCPF
SLT 225 for slab thicknesses up to d ≤ 43 cm. Information on
forming slabs up to d = 1.09 m is available in the SKYDECK assembly
instructions.
ƶ6JGRTQQHQHUVCDKNKV[CNNQYUVJGWUGQHVJGUNCDHQTOYQTMU[UVGO
within Design Class B1 according to DIN EN 12812.
ƶ 6JGJQTK\QPVCNǠZGFRQUKVKQPQHVJGUNCDHQTOYQTMOWUVDGIWCTCP
VGGF1VJGTYKUGVJGVTCPUHGTQHVJGJQTK\QPVCNNQCFUJCUVQDG
The SKYDECK drophead guaranteed by means of other measures supplied by the contractor,
with self-locking coupling
for quick assembly.
e.g. bracing.
ƶ 2TQRUCTGVQDGCNKIPGFXGTVKECNN[
ƶ +PVJGECUGQHWPHCXQWTCDNGYGCVJGTEQPFKVKQPURTGECWVKQPCT[

SKYDECK
measures must be implemented in accordance with the assembly
instructions.
ƶ 6JGHQNFCDNG5-;&'%-RNCVHQTOUGEWTGUQRGPDWKNFKPIGFIGUCPF
facilitates safe working conditions at the slab edge.
ƶ 9JGPOQXKPI5-;&'%-VCDNGUVJG5-;&'%-6TCPURQTVCVKQP(QTM
is to be used.
ƶ (QTCDGVVGTWPFGTUVCPFKPIFGVCKNGFKNNWUVTCVKQPUCTGRCTVN[KPEQO
plete. The safety installations which have possibly not been featured
The fast panelized slab formwork with drophead in these detailed drawings must nevertheless be available.

Tips for ensuring smooth construction progress


ƶ 5RTC[CNNUKFGUQHHQTOYQTMYKVJGI2'4+$KQ%NGCPDGHQTGGXGT[
use.
Shuttering 1 Start field 3 Longitudinal field Transport Beam ƶ 5RTC[YCUJHQTOYQTMDCEMYKVJYCVGTKOOGFKCVGN[CHVGTEQPETGVKPI
Based on the risk assessment, the con- This reduces the amount of cleaning work.
125

tractor must decide whether forming


takes place from above or below!
SKYDECK SD Beam
The simple solution for beams
ƶ 9KVJQWVGZEGRVKQPCNNEWTTGPVUCHGV[TGIWNCVKQPUCPFIWKFGNKPGUOWUV
using the SKYDECK system

Beams concreted together with the


be observed in those countries where our products are used.
Forming from above:
1500

slab - this is made possible with the


SKYDECK SD Beam.
1375

Thanks to the low weight, the Beam


Waler SD can be installed by hand and,
in the process, allows a high degree of

Ensure that appropriate safety precau- adaptability.

Q Easy and simple assembly


All components are installed by site

tions are taken, e.g. through well-


personnel from a safe position on the
ground. The Beam Waler SD is simply
mounted on the SKYDECK Main Beam
SLT 225 or 150 and is thus integrated in
the system. Adjust the size with the

trained and physically fit personnel! wedge, install beams and plywood


formlining - ready. Preliminary planning
is not required because work is carried
out using only one system component.

Weather conditions are to be taken into Q No additional anchors


Up to 60 cm high, the beam waler does
not need any additional anchors through
the concrete. The hydrostatic concrete

account! pressure is safely accommodated by


the system.

Q Beam dimensions Beams up to 30 cm wide and 60 cm high can


With only one system component - the be formed with the SKYDECK Beam Waler SD.
beam waler - beams up to 30 cm wide
and 60 cm high can be formed. Width
adjustments are carried out by means

Forming from below: of a wedge connection between the


side form waler and the beam truss.

Q Possible beam positions


Mounting the Beam Waler SD in the
SKYDECK Main Beam SLT 225, 150.

Striking by using a safe mobile scaffold! The PERI Beam Waler SD has been de-
signed for the SKYDECK grid dimension
of 1.50 m. Through the possibility of

250 2025 turning the panels on the short span of


75 cm, each beam position can continu-
ously be installed in the beam field. ƶ This poster presents only part of the intended use of the SKYDECK system.
2275 250 2025
More information is available in the assembly instructions.
1 3 7

pcs. Item Item no. Position the first prop with prophead at Install the first three panels. Check pcs. Item Item no. For the longitudinal field, first mount PERI pallets are equipped with crane Downstand beams with PERI Not permitted
a distance of 125 mm from the longitu- that they are correctly mounted. When the two main beams at one end and eyes which allow transportation ac- SKYDECK Beam Waler SD, 50
4 Slab Props dinal wall and 250 mm from the trans- mounting the following panels, they 2 Slab Props then swivel up together with the drop- cording to jobsite requirements. see separate brochure data sheet.
verse wall and secure with a tripod. are automatically centred on the main head props. The props must be se- Stacked components and pallets are to
2 Drophead SFK 061210 Position the second prop with drop- beams (see  starter field). The first 2 Drophead SFK 061210 cured, e.g. with tripods. be protected against the effects of the
head at a distance of 125 mm from SKYDECK fieldis now shuttered. weather, e.g. secure panels with ten-
the longitudinal wall and 2275 mm sion straps to prevent lifting!
from the transverse wall. Mount the
2 Prophead SSK 061200 first main beam and secure prop. 2 Main Beam SLT 225 061100 End Sup-
port SSL

2 Main Beam SLT 225 061100


3 Panel SDP 150 x 75 061000 Weight
[kg]
Item no.
Mounting the main beam The Prophead SSK is not a
substitute for the drophead
No End Support SSL without
any direct support through
with 50 mm spacings (cover prophead, drophead or
Bio Clean 20 L 0.91/L 031440 strip). combihead.
Bio Clean 208 L 0.91/L 031455 The Main Beam SLT must be mounted
3 Panel SDP 150 x 75 061000 in the middle of the main beam sup-
port of the SKYDECK Head. The main Use of the Use of the Use of the
SKYDECK Large Pallet beam connection encloses the main drophead prophead combihead
Item no. 061530 with beam support of the head.
2 Wall Holder SWH-2 061051 48 panels 150 x 75.
(in every 2nd field)
During shutter-
2 Wall Holder SWH-2 061051 1 Cover Strip SAL 150 061026 ing from above, SKYDECK Pallet
press down the SD 150 x 75 Main beam connection
panel with the Item no. 061500 with
foot when 14 Panels 150 x 75.
4 028000 0
Universal Tripod 15
0
Note: mounting.
2 4 Use the universal tripod from the 8 Main beam support
Pallets and Stacking Devices
starter field!
Position the third prop with drophead Mount SKYDECK Wall Holder SWH in Install panels: from above as in Fig. 8,
Original Instructions for Use

Height from top edge of prop to bottom edge of slab.


at a distance of 1500 mm from the
longitudinal wall and 250 mm from the
every second field. It is an erection aid
HQTJQTK\QPVCNOQWPVKPIDTCEMGVFWTKPI
from below as in Fig. 3 or 6. In every
second field along the wall, the
Assembly height system Important for prop extension or levelling from below.

transverse wall and secure. the installation process. With the wall SKYDECK Wall Holder SWH must be
For transportation and
Position the fourth prop with drophead holder, both the main beam as well as mounted. storage, see Instruc- Standard use: Main Beam SLT 225 Prophead at end of beam
at a distance of 1500 mm from the the panel can be mounted. tions for Use “Pallets Spray SKYDECK components before
longitudinal wall and 2275 mm from Remove tripod. and Stacking Devices”. every use, e.g. with PERI Bio Clean.
the transverse wall. Mount the second

33
41

41
main beam and secure prop.
SLT 225
2 Transverse Field Wall Holder SWH-2, End support SSL
Aluminium Item no. 061051 Prophead
or Combihead
Drophead
Inclined walls
25 Prophead or Combihead
recessed

1 3 Exception: Main Beam SLT 150 Panel on Prophead


St hut

17
s
ar te
t o rin

41
36
SLT 150 SLT 225 Prophead
Triangular Frame SDR or Combihead
f g

150 x 75, Aluminium


Wall Holder SWH-2, Aluminium

Item no. 061021


15 Drophead
5

For the transverse field (see  trans-


verse field), firstly position the slab 2 4 Prophead or Combihead
recessed
prop with the prophead, and then se-
cure. Position the second prop with
the drophead. Install the main beam.
Edge Beam SRT-2, turned
Wall Holder SWH On the main beam Section

pcs. Item Item no. Filler Timber, laid flat

2 Slab Props

approx.
27

38
1 Drophead SFK 061210 Panel
2 cm adjust-
ment range

Adjustment range
Main Beam

1.05 m
1 Prophead SSK 061200
Mounted sliding sleeve
with DW 15 thread.
Mount Wall Holder SWH-2 Alternative:
1 Main Beam SLT 225 061100 in every second field DW 15 Threaded Plate

Wall Holder SWH-2


3 Panel SDP 150 x 75 061000 6
On the panel Section
Secure the second prop with a tripod
to prevent it from falling over. Install
panel from below. Mount SKYDECK
Wall Holder SWH in every second Bracing
1 Wall Holder SWH-2 061051 field.
(in every 2nd field)

Note: Panel
Use the universal tripod from the start-
er field! Main beam
Mount Wall Holder SWH-2
on every second panel

Edge Beam SRT-2 Edge Beam SRT-2

4 Standard field Wall Holder SWH-2

Transverse infill
Infills 0 – 12 cm 12 – 24 cm 24 – 75 cm
0 – 12
12 – 24 24 – 75
The plywood thickness for infills <6
is 21 mm or 27 mm.
Important:
Attach filler plates with nails.
1 x SPKK per SLT 1 x SPKK per SLT
St hut

Formula for dropheads up to


s
ar te

d = 40 cm: Timbers are securely Timbers are securely


t o rin

nailed on before ele- nailed on before ele-


ments are assembled ments are assembled
Longitudinal infill =
f g

Length of room minus n x 2.30 m


Transverse infill =
9 Length of room minus n x 1.50 m

Due to the systematic assembly se- Longitudinal infills


quence, forming always is carried out
in the same way. One worker hangs 0 – 12 cm 12 – 24 cm 24 – 75 cm 24 – 75 cm
hooks in a main beam and pivots it up- 0 – 12 1. With Drophead 2. With Prophead
12 – 24 24 – 75 24 – 75
wards together with the drophead <6
prop. A second worker installs the
panel. SRT-2 SRT-2
SSL SSL

pcs. Item Item no. 10 Prophead Filler Timber


or Combihead
Edge Beam Drophead Prophead
1 Slab Prop A change in the direction of or Combihead
Timbers are securely End Support
shuttering takes place with nailed on before ele- Prophead
1 Drophead SFK 061210 SKYDECK system components. ments are assembled or Combihead
See Assembly Instructions!

1 Main Beam SLT 225 061100


Tables for infills
3 Panel SDP 150 x 75 061000 Perm. Width B [m] of the Filler Case 1 Perm. Span L [m] of the Edge Main Girders
B
All slab edges are to be secured! Girder used Slab Thickness
Case 1 Case 2
Fin Ply 21 mm Fin Ply 21 mm [m]
Slab Thickness Spruce 400 Spruce 400 0.20 0.30 0.40
Edge Beam SRT-2 d [m] parallel/across parallel/across Filler Timber
SPH or
1 Cover Strip SAL 150 061026 Finally, mount the SKYDECK Cover All slab edges are to be se- 0.20 0.58 0.65 Edge Beam GT 24 4.61 3.93 3.45
SRT-2
Strip. Level the formwork. cured! 0.30 0.52 0.59 VT 20 3.89 3.32 2.92
Case 2 B
0.40 0.47 0.56 max. 10 cm KH 10/16 3.79 3.23 2.84
B

0.43 0.46 0.54 Perm. Width B [m] of the Filler max. 0.40 m.
Combihead L L
SCK
Deflection Single-Field Beam B/300. Filler Timber
Striking Guardrails SKYDECK Platform
SPH or Edge
Beam SRT-2

Tips for striking SKYDECK Platform SDB on an open Longitudinal infills with Combihead Number of Filler Timber SPH / Edge Beam SRT:
building edge 0 – 5.0 cm: without standard parts; 5.1 – 12.4 cm: 1 x SPH / SRT; 12.5 – 24.9 cm: 1 x SRT+ 1 x SPH / SRT*
SCK up to 149.9 cm *Important: SPH perm. up to 50 cm slab thickness; SRT required for slab thicknesses from 50 cm.
After reaching the required concrete SLT 375
strength: 0 – 5 cm 12.5 – 20.0 cm 75 – 99.9 cm (+ 5 cm with SFK)
Tension Sleeve SAO Timbers are securely nailed
on before elements are as- 5 with SFK 75 – 99.9
– Always lower dropheads over large 0–5 12.5 – 20.0 Edge Beam
sembled. Filler Timber SPH SRT 
area. SKYDECK
Platforms SDB

Assembly Instructions for Standard Configuration

– The width compensation is to be


strucked first. SSL
≤ 50 cm SCK
SSK Mount End Support SSL before as- SSK / SCK
– The SKYDECK components are to be or SCK sembly of the beam and swivel up- SSK or SFK
stored in the transportation pallets For more information, wards together with the beam. or SCK
immediately after striking. see Assembly Instruc-
tions for the SKYDECK
1 2 3 Platform.
5.1 – 12.4 cm 20.1 – 74.9 cm (+ 5 cm with Drophead) 100 – 149.9 cm (+ 5 cm with SFK)
– Keep the transportation access free
100 – 149.9
and tidy. 5.1 – 12.4 20.1 – 74.9 / 79.9 with Drophead 5 with SFK
After striking, only the props Release the wedge of the drophead by Remove compensations. Remove Remove panels field-by field. Begin in Filler Timber SPH 25 – 74.9
Anchor Chain and M12
with dropheads and cover means of a hammer. This results in a props for the edge beam and stack in the corner where the two compensa- 60°– 90°
– With larger spans, begin in the mid- Anchor Coupler
strips remain in place. SRT
dle with lowering and removal of the striking clearance of approx. 60 mm pallets. Dismantle the SKYDECK filler tions meet. Lift the panel and push ap- Perm. tension force 3 kN SRT

props. between the panels and slab under- timber, edge beams, end supports and prox. 100 mm to the free side, and SSL SSL
side. infill areas. then pivot downwards. Stack the pan- Base Plate RS SCK
Attention: Wedge direction to be els directly in the pallets. + Anchor Bolt PERI 14/20 x 130 SSK SSK / SCK SSK / SCK or
taken into account! Note: Always dismantle the middle or SCK or SFK SFK
Striking guide values* [days] for the panel in the field first.
drophead system
The necessary concrete strength at the time SKYDECK Guardrail Holder and Number of Filler Timber SPH / Edge Beam SRT:
*Guide values for striking Transverse infill up to 149.9 cm 1 x SRT + 1 x SPH 225/150 or SRT*
Slab thickness

crete strength

of striking is decisive. This is to be calculated


Required con-

fck,cube [N/mm2]

time [days] for panels and Guardrail Post on one concreting


main beams at average
curing temperature [°C] of
by suitable methods.
section with Combihead SCK 0 – 5.0 cm: without standard parts; 5.1 – 12.4 cm: 1 x SPH 225/150 or SRT; 12.5 – 24.9 cm: 1 x SRT + 1 x SPH 225/150 or SRT*
Guidelines according to DIN 1045 must also be *Important: SPH perm. up to 50 cm slab thickness; SRT required for slab thicknesses from 50 cm.
taken into account, e.g. curing. A minimum of
d [m]

5° 10° 20° 1.88 cm²/m (Q 188) is necessary for the bottom


reinforcement layer. 0 – 5 cm 12.5 – 24.9 cm 75 – 99.9 cm
0.14 15 10 6 5 For systems without any middle support of the Ground plan View Timbers are securely
nailed on before ele-  75 – 99.9
0.16 13 8 5 4 main beams, a live load of 1 kN/m2 on the slab 0–5 12.5 – 24.9
which has struck early, is to be considered. ments are assembled SRT SPH  SPH
0.18 11 6 4 3 *Guide values according to Leonhard for cement
0.20 9 5 3 2 Z 35, CEM I 32.5 R.
0.22 8 4 3 2 SCK
1 x SPKK per SLT Place SCK laterally to the
0.25 7 4 2 2 SRT
main beam for the cover
0.30 6 3 2 2 strip
0.35 5 3 2 1
0.40-1.09 5 2 1 1 4 5 6 Guardrail Holder 5.1 – 12.4 cm 25 – 74.9 cm 100 – 149.9 cm
Guardrail Post SPH 225/150 5.1 – 12.4 25 – 74.9 100 – 149.9
or SRT
Remove main beams one field after The drophead props with cover strips Clean all SKYDECK components be-
the other and stack in pallets. Transpor- remain in position. Curing time: see fore the next use and spray once
tation to the next place of use is quick Striking Guide Values table. Remove re- again, e.g. with PERI Bio Clean.
Place SCK laterally to SPH 225/150
and safe. cessed columns on the walls and filler Guardrail Holder
the main beam for the SPH 225/150
areas on in-situ concreted columns. or SRT
cover strip or SRT
Guardrail Post

Edition 07 l 2013

EN_SKYDECK_P13.indd 1 05.08.13 09:40


SKYDECK
Slab Formwork

Poster

Edition 07 l 2013
The optimal System for every
Project and every Requirement

Wall Formwork Column Formwork

Slab Formwork Climbing Systems Tunnel Formwork Bridge Formwork

Shoring Systems Construction Scaffold Facade Scaffold Industrial Scaffold

DE en 08 | 2013 5ma 790488 © PERI GmbH

Access Protection Scaffold System-Independent Accessories Services

PERI GmbH
Formwork Scaffolding Engineering
P.O. Box 1264
89259 Weissenhorn
Germany
Tel. +49 (0)7309.950-0
Fax +49 (0)7309.951-0
[email protected]
www.peri.com