SOP For Reactor
SOP For Reactor
SOP For Reactor
I. PURPOSE
To define the Standard Operating Procedure for Manufacturing of Reactor.
II. SCOPE
This procedure is applicable for Manufacturing of all Reactor at Chemsept
Engineering Pvt. Ltd.
III. PROCEDURE
1
STANDARD OPERATING PROCEDURE
Doc No. : QA/SOP/MOF
SOP FOR MANUFACTURING OF REACTOR REV No. : 00 DATE : 03.06.2022
14 After Rolling Of Shell ‘L’ Seam Set-Up Prepared. Quality Shell Drawing,
Then QC Officer Check it By Edge Preparation, Angle WPS
of Edge, Root Gap & Root Face.
15 Then Welder Welding the Shell At ‘L’ Seam. Production Shell Drawing,
WPS
16 ‘L’ Seam Visual inspection. ‘L’ Seam Back chip DP Quality Shell Drawing,
Inspection. LPT Procedure
17 After DP Inspection ok , QC person give clearance for Production Shell Drawing,
backside welding WPS
Production Shell & Dish
For Shell to Shell & Dish to Shell Set-Up. ‘C’ Seam Drawing, WPS
18 Set-Up Prepared
2
STANDARD OPERATING PROCEDURE
Doc No. : QA/SOP/MOF
SOP FOR MANUFACTURING OF REACTOR REV No. : 00 DATE : 03.06.2022
3
STANDARD OPERATING PROCEDURE
Doc No. : QA/SOP/MOF
SOP FOR MANUFACTURING OF REACTOR REV No. : 00 DATE : 03.06.2022
37 QC Officer Checks the Internal Coil Hydro Testing (To Quality GA Drawing
Check Leakages or Pressure Drop) Hydro Testing
Procedure
38 Pneumatic Testing At Pad Plates & Flanges (To Quality GA Drawing,
Check Porosity, Pin Holes or Cracks) Pneumatic
testing
Procedure
39 QC Officer Checks the Vessel Pneumatic Testing (To Quality GA Drawing,
Check Leakages or Pressure Drop) Pneumatic
testing
Procedure
40 After Hydro The Equipment Giving to Finishing/Acid Production GA Drawing
Cleaning/Painting As Per Requirements Given In Passivation &
Drawings. Polishing
Procedure,
Painting
Procedure
41 Final Packaging (Taking Photos during Packing) & Quality Packing
Preparation of Packing list. Procedure
42 Dispatch. Production Invoice
Packing list