Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Detail A Code

K1
Concrete In Situ Coloums
Size
300x300
Remarks

K2 300x300

Detail A

B02 = 2ND FLOOR OFFICE JIC BUILDING


B03 = ELECTRICAL, CHILLER, MAINTENANCE OFFICE, FRAGRANCE & TOBACCO LAB
B04 = WATER TANK, FIRE & CLEAN WATER PUMP BUILDING
B09 = WASTE STORAGE BUILDING
B10 = SECURITY BUILDING
B11 = PLN BUILDING

A B B B C

KEY PLAN

MBI AEP ISSUED FOR CONSTRUCTION


Nr. Date Issued by Issued to Description

Drawn By Checked By Approved By

Detail Pilecap Rahmat Hidayat F


Client
Azat

PT. ALEX ESTATE PRODUCTION


Alexander

Foundation 1 Project Name


HOTEL CONCENTRATE
Subject

Detail 1 HOTEL CONCENTRATE DETAIL FOUNDATION VILLA

PT. MITRA BALI INTERNASIONAL Role Structure


a company of :
Jalan Kelusu. Desa Pejeng Kelod. Stage Construction
Kecamatan Tampak Siring, Kab. Gianyar Bali
Indonesia Scale Status
T: +62 821 445 790 76 1 : 100 Final
E: [email protected]
Proj.Nr. MBI001 Suitability P.Size

Drw.Nr. MBI001-AEP-DF-001
Concrete In Situ Coloums
Code Size Remarks
K1 300x300
K2 300x300

B02 = 2ND FLOOR OFFICE JIC BUILDING


B03 = ELECTRICAL, CHILLER, MAINTENANCE OFFICE, FRAGRANCE & TOBACCO LAB
B04 = WATER TANK, FIRE & CLEAN WATER PUMP BUILDING
B09 = WASTE STORAGE BUILDING
B10 = SECURITY BUILDING
B11 = PLN BUILDING

A B B B C

KEY PLAN

MBI AEP ISSUED FOR CONSTRUCTION


Nr. Date Issued by Issued to Description

Drawn By Checked By Approved By


Rahmat Hidayat F Azat Alexander
Client

PT. ALEX ESTATE PRODUCTION


Project Name Subject
HOTEL CONCENTRATE
SCHEDULE COLOUMS
HOTEL CONCENTRATE

PT. MITRA BALI INTERNASIONAL Role Structure


a company of :
Jalan Kelusu. Desa Pejeng Kelod. Stage Construction
Kecamatan Tampak Siring, Kab. Gianyar Bali
Indonesia Scale Status
T: +62 821 445 790 76 1 : 100 Final
E: [email protected]
Proj.Nr. MBI001 Suitability P.Size

Drw.Nr. MBI001-AEP-DC-001
Concrete Slabs
Code Thickness RT1 RT2 RB1 RB2
S1 150 D10-150 D10-150 D10-150 D10-150
S2 200 D10-150 D10-150 D10-150 D10-150

Concrete In Situ Beams First Floor


Code Size Remarks
B1 300x500
B1a 200x300
B2 300x800
B3 200x350

B02 = 2ND FLOOR OFFICE JIC BUILDING


B03 = ELECTRICAL, CHILLER, MAINTENANCE OFFICE, FRAGRANCE & TOBACCO LAB
B04 = WATER TANK, FIRE & CLEAN WATER PUMP BUILDING
B09 = WASTE STORAGE BUILDING
B10 = SECURITY BUILDING
B11 = PLN BUILDING

A B B B C

KEY PLAN

MBI AEP ISSUED FOR CONSTRUCTION


Nr. Date Issued by Issued to Description

Drawn By Checked By Approved By


Rahmat Hidayat F Azat Alexander
Client

PT. ALEX ESTATE PRODUCTION


Project Name Subject
HOTEL CONCENTRATE
SCHEDULE BALOK TYPE A
HOTEL CONCENTRATE

PT. MITRA BALI INTERNASIONAL


a company of :
Role Structure
Jalan Kelusu. Desa Pejeng Kelod. Stage Construction
Kecamatan Tampak Siring, Kab. Gianyar Bali
Indonesia
T: +62 821 445 790 76
Scale 1 : 100 Status Final
E: [email protected]
Proj.Nr. MBI001 Suitability P.Size

Drw.Nr. MBI001-AEP-DB-001
Code Thickness RT1 RT2 RB1 RB2

B02 = 2ND FLOOR OFFICE JIC BUILDING


B03 = ELECTRICAL, CHILLER, MAINTENANCE OFFICE, FRAGRANCE & TOBACCO LAB
B04 = WATER TANK, FIRE & CLEAN WATER PUMP BUILDING
B09 = WASTE STORAGE BUILDING
B10 = SECURITY BUILDING
B11 = PLN BUILDING

A B B B C

KEY PLAN

MBI AEP ISSUED FOR CONSTRUCTION


Nr. Date Issued by Issued to Description

Drawn By Checked By Approved By


Rahmat Hidayat F Azat Alexander
Client

PT. ALEX ESTATE PRODUCTION


Project Name Subject

HOTEL CONCENTRATE SCHEDULE BALOK TYPE B

PT. MITRA BALI INTERNASIONAL


a company of :
Role Structure
Jalan Kelusu. Desa Pejeng Kelod. Stage Construction
Kecamatan Tampak Siring, Kab. Gianyar Bali
Indonesia
T: +62 821 445 790 76
Scale 1 : 100 Status Final
E: [email protected]
Proj.Nr. MBI001 Suitability P.Size

Drw.Nr. MBI001-AEP-DB-001
Code Thickness RT1 RT2 RB1 RB2

B02 = 2ND FLOOR OFFICE JIC BUILDING


B03 = ELECTRICAL, CHILLER, MAINTENANCE OFFICE, FRAGRANCE & TOBACCO LAB
B04 = WATER TANK, FIRE & CLEAN WATER PUMP BUILDING
B09 = WASTE STORAGE BUILDING
B10 = SECURITY BUILDING
B11 = PLN BUILDING

A B B B C

KEY PLAN

MBI AEP ISSUED FOR CONSTRUCTION


Nr. Date Issued by Issued to Description

Drawn By Checked By Approved By


Rahmat Hidayat F Azat Alexander
Client

PT. ALEX ESTATE PRODUCTION


Project Name Subject

HOTEL CONCENTRATE SCHEDULE BALOK TYPE C

PT. MITRA BALI INTERNASIONAL


a company of :
Role Structure
Jalan Kelusu. Desa Pejeng Kelod. Stage Construction
Kecamatan Tampak Siring, Kab. Gianyar Bali
Indonesia
T: +62 821 445 790 76
Scale 1 : 100 Status Final
E: [email protected]
Proj.Nr. MBI001 Suitability P.Size

Drw.Nr. MBI001-AEP-DB-001

You might also like